Technical Specifications, Reduce Minimum Reactor Coolant System Flow
ML031120008
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/18/2003
From:
NRC/NRR/DLPM/LPD2
To:
Moroney B, NRR/DLPM, 415-3974
References
TAC MB6526
Download: ML031120008 (2)


Text

TABLE 2.2-1 (Continued)

REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS FUNCTIONAL UNIT

9.

Local Power Density - High(5)

Operating 10 Loss of Component Cooling Water to Reactor Coolant Pumps - Low

11. Reactor Protection System Logic
12. Reactor Trip Breakers 13 Rate of Change of Power-High(4)
14. Reactor Coolant Flow - Low(1) 15 Loss of Load (Turbine)

Hydraulic Fluid Pressure - Low(5)

TRIP SETPOINT Trip setpoint adjusted to not exceed the limit lines of Figures 2 2-1 and 2.2-2

> 636 gpm**

Not Applicable Not Applicable

< 2.49 decades per minute

> 95 4% of design Reactor Coolant flow with four pumps operating*

> 800 psig ALLOWABLE VALUES Tnp setpoint adjusted to not exceed the limit lines of Figures 2.2-1 and 2 2-2.

> 636 gpm Not Applicable Not Applicable

< 2.49 decades per minute

> 94.9% of design Reactor Coolant flow with four pumps operating'

> 800 psig

10-minute time delay after relay actuation.

Amendment No 8, 60, 13i ST LUCIE - UNIT 2 2-5

TABLE 3.2-2 DNB MARGIN LIMITS PARAMETER Cold Leg Temperature (Narrow Range)

Pressurizer Pressure Reactor Coolant Flow Rate AXIAL SHAPE INDEX FOUR REACTOR COOLANT PUMPS OPERATING 5350F* < T < 5490F 2225 psia** < PPZR < 2350 psia*

> 355,000 gpm COLR Figure 3.2-4 I

Applicable only if power level > 70% RATED THERMAL POWER.

    • Limit not applicable during either a THERMAL POWER ramp increase in excess of 5% of RATED THERMAL POWER or a THERMAL POWER step increase of greater than 10% of RATED THERMAL POWER.

ST. LUCIE - UNIT 2 3/4 2-15 Amendment No. 8, 82, 131