April 8, 2003
Joseph E. Venable
Vice President Operations
Waterford 3
Entergy Operations, Inc.
17265 River Road
Killona, Louisiana 70066-0751
SUBJECT: :
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF
NRC INITIAL OPERATOR LICENSING EXAMINATION (EXAMINATION
REPORT 50-382/03-301)
Dear Mr. Venable:
In a telephone conversation on April 3, 2003, between Messrs. T. O. McKernon and A. Vest,
Operations Training, arrangements were made for the administration of an initial licensing
examination at the Waterford 3 facility during the weeks of August 22 and 25, 2003.
As agreed during the telephone conversation, your staff will prepare the examination based on
the guidelines in DRAFT Revision 9 of NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors." The NRC regional office will discuss with your staff any
changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by May 5, 2003. The written and operating examinations and the supporting reference
materials identified in Attachment 2 of ES-201 will be due by June 30, 2003. Pursuant to
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. Any delay in receiving the required
examination and reference materials, or the submittal of inadequate or incomplete materials,
may cause the examinations to be rescheduled.
In order to conduct the requested written examination, it will be necessary for your staff to
provide adequate space and accommodations in accordance with ES-402. Appendix E of
NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the
written examination is being administered. Further, the NRC will conduct an examination
validation during the week of August 4, 2003.
To permit timely NRC review and evaluation, your staff should submit the preliminary license
application (Office of Management and Budget (OMB) approval number 3150-0090), medical
certification (OMB approval number 3150-0024), and waiver request (OMB approval
Entergy Operations, Inc.
-2-
number 3150-0090) at least 30 days before the first examination date (July 23, 2003). If the
applications are not received at least 30 days before the examination date, a postponement
may be necessary. Signed applications certifying that all training has been completed should
be submitted no later than August 11, 2003.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0101, which expires on April 30, 2003.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />
per response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. A. Vest has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Tom McKernon at (817) 860-8153, or me at
(817) 860-8159.
Sincerely,
/RA/
Anthony T. Gody, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-382
License: NPF-38
cc:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Entergy Operations, Inc.
-3-
Jackson, Mississippi 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, Louisiana 70066-0751
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, Louisiana 70066-0751
Chairman
Louisiana Public Service Commission
P.O. Box 91154
Baton Rouge, Louisiana 70821-9154
Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, Louisiana 70066-0751
Michael E. Henry, Administrator
and State Liaison Officer
Department of Environmental Quality
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
Parish President
St. Charles Parish
P.O. Box 302
Hahnville, Louisiana 70057
Winston & Strawn
1400 L Street, N.W.
Entergy Operations, Inc.
-4-
Washington, D.C. 20005-3502
Entergy Operations, Inc.
-5-
Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (TRF)
Branch Chief, DRP/E (WBJ)
Senior Project Engineer, DRP/E (VGG)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
ADAMS: Yes
No Initials: ______
Publicly Available Non-Publicly Available
Sensitive
Non-Sensitive
SOE:OB
C:OB
TOMcKernon
ATGody
/RA/
/RA/
4/7/03
4/8/03
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax