Letter to Lew Myers, Firstenergy Nuclear Operating Co. Davis-Besse Nuclear Power Station - Inspection Schedule Update
ML030900753
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/31/2003
From: Grobe J
NRC/RGN-III
To: Myers L
FirstEnergy Nuclear Operating Co
References
Download: ML030900753 (6)


Text

March 31, 2003 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - INSPECTION SCHEDULE UPDATE

Dear Mr. Myers:

The purpose of this letter is to provide you with an updated schedule of U. S. Nuclear Regulatory Commission (NRC) inspections at the Davis-Besse Nuclear Power Station so you will have an opportunity to prepare for the inspections or inform us of any conflicts between planned inspections and significant plant activities. This letter is an update to our previous inspection schedule letter dated November 27, 2002.

On April 29, 2002, we informed you of the formation of the NRCs Davis-Besse Oversight Panel under NRC Inspection Manual Chapter 0350, Oversight of Operating Reactor Facilities in a Shutdown Condition with Performance Problems. The Davis-Besse Oversight Panel assesses facility performance and utilizes the plant's performance indicators to determine the inspections necessary to be completed at the Davis-Besse facility. Where they are valid, it is expected that you will continue to submit performance indicators during the current extended shutdown.

Throughout the past months the NRC has conducted special inspections to review the effectiveness of your efforts to identify and correct the deficiencies that led to the extended shutdown of the Davis-Besse facility. The special inspections have confirmed progress in resolving the issues contained in our Restart Checklist. The NRC will continue special inspections to assess the status of Restart Checklist issue resolution as you complete your problem discovery and corrective actions in each area. The planned and ongoing special inspections are listed in Enclosure 1. Note that the Safety System Design and Performance Capability (IP 71111.21), Permanent Plant Modifications (IP 71111.17), and Identification and Resolution of Problems(IP 71152) inspections previously scheduled between July and December 2003 are incorporated into the special inspections scheduled to be completed prior to facility restart. lists NRC baseline inspection activities that are planned through March 2004.

Routine inspections performed by the resident inspectors are not listed due to their ongoing and continuous nature.

L. Myers The inspection schedule is less firm later in 2003 and 2004 and may be adjusted due to changes in your schedule or emerging performance issues at Davis-Besse or other Region III facilities. In addition, since the terrorist attacks on September 11, 2001, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness. We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2003, we plan to continue these inspections, conduct portions of the security baseline inspection program, and perform additional inspections to evaluate your compliance with any new requirements that may be ordered.

The inspection plan will be adjusted by the Davis-Besse Oversight Panel based on the NRCs assessment of facility performance and progress in addressing the items on the Restart Checklist. You will be notified of any changes in the inspection plan or schedule.

If you have any questions regarding the enclosed inspection plans, please contact Christine Lipa at (630) 829-9619.

Sincerely,

/RA/

John A. Grobe, Chairman Davis-Besse Oversight Panel Docket No. 50-346 License No. NPF-3

Enclosures:

As stated cc w/encl: B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists

L. Myers The inspection schedule is less firm later in 2003 and 2004 and may be adjusted due to changes in your schedule or emerging performance issues at Davis-Besse or other Region III facilities. In addition, since the terrorist attacks on September 11, 2001, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness. We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2003, we plan to continue these inspections, conduct portions of the security baseline inspection program, and perform additional inspections to evaluate your compliance with any new requirements that may be ordered.

The inspection plan will be adjusted by the Davis-Besse Oversight Panel based on the NRCs assessment of facility performance and progress in addressing the items on the Restart Checklist. You will be notified of any changes in the inspection plan or schedule.

If you have any questions regarding the enclosed inspection plans, please contact Christine Lipa at (630) 829-9619.

Sincerely, John A. Grobe, Chairman Davis-Besse Oversight Panel Docket No. 50-346 License No. NPF-3

Enclosures:

As stated cc w/encl: B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists DOCUMENT NAME: C:\ORPCheckout\FileNET\ML030900753.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME DPassehl/klg CLipa WDean per email JGrobe DATE 03/27/03 03/27/03 03/28/03 03/31/03 OFFICIAL RECORD COPY

L. Myers ADAMS Distribution:

AJM DFT SPS1 RidsNrrDipmIipb GEG HBC CST1 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1 DB0350

Enclosure 1 Davis-Besse Special Inspections Integrated Leak Rate Test Inspection Normal Operating Pressure Test Inspection Programmatic Effectiveness Inspection Sump Modification Inspection Design Issues-Path A-System Health Readiness and Latent Issue Reviews Inspection Design Issues-Path B-Safety Function Validation of 10 Systems Inspection Design Issues-Path C-High Energy Line Break, Environmental Qualification and Seismic Qualification Topical Issue Inspection Post-Fire Safe Shutdown Topical Issue Inspection*

Management and Human Performance Corrective Action Inspection (Phase 2)

Management and Human Performance Corrective Action Effectiveness Inspection (Phase 3)

Radiation Protection Program Special Inspection and Supplemental Inspection (95002)

Backlog Assessment Inspection Corrective Action Team Inspection Restart Readiness Assessment Team Inspection

  • Depending on the outcome of the post-fire safe shutdown topical issue inspection, the baseline fire protection triennial inspection (IP 71111.05) will be conducted either from May 5-23, 2003, or during CY 2004.

Enclosure 2 Davis-Besse Baseline Inspections Planned Dates Inspection Title Start End Procedure 71111.06 Flood Protection April 2003 71122 RAM Process & Transportation 05/12/2003 05/16/2003 71114 Emergency Preparedness Inspection 06/09/2003 06/13/2003 71121 ALARA Review and Instrumentation 07/14/2003 07/18/2003 71111.01 Hot Adverse Weather August 2003 71111.12 Maintenance Effectiveness (Biennial) 09/15/2003 09/19/2003 TI 2515/148 Interim Compensatory Measures at 09/08/2003 09/12/2003 Nuclear Plants 71121 Occupational Rad Safety Inspection 10/20/2003 10/24/2003 71111.01 Cold Adverse Weather November 2003 71114 Baseline EP Inspection & PI Verification 02/09/04 02/13/04 71121.01 Access Control and ALARA 02/09/04 02/13/04