Rod Position Indication 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Rod Position Indication LCO 3.1.7 The Analog Rod Position Indication (ARPI) System and the Demand Position Indication System shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS

..................................... NOTE .....................................

Separate Condition entry is allowed for each inoperable rod position indicator per group and each demand position indicator per bank.

CONDITION REQUIRED ACTION COMPLETION TIME A. One ARK per group A.1 Verify the position Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the rods with inoperable for one or operabe oiti more groups. inoperable position indicators by using movable incore detectors*. I OR A.2 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to - 50% RTP.

B. One or more rods with B.1 Verify the position 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable position of the rods with indicators have been inoperable position moved in excess of indicators by using 24 steps in one movable incore direction since the detectors.

last determination of the rod's position. OR (continued)

  • During Cycle 22, the position of Control Rod H-10, Shutdown Bank B, can be determined by verifying gripper coil parameters of the Control Rod Drive Mechanism have not changed state, until the repair of the indication system for this rod is completed.

Amendment No. 197 I

HBRSEP Unit No. 2 3.1-15