ML030450527

From kanterella
Jump to navigation Jump to search
Technical Spec Pages 3,4-10, 3,4-11,3,5-5 and 3,6-24
ML030450527
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/13/2003
From:
NRC/NRR/DLPM
To:
References
Download: ML030450527 (4)


Text

SIRVs 3.4.4 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 Safety/Relief Valves (S/RVs)

LCO 3 4.4 The safety function of five S/RVs shall be OPERABLE, AND The relief function of four additional S/RVs shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> S/RVs inoperable.

AND A.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify the safety function lift setpoints of the required In accordance with S/RVs are as follows:

the Inservice Testing Program Number of Setpoint S/RVs (psiq) 7 1195 +36,-60 5

1205 +36, -60 4

1210 +36, -60 (continued)

Amendment No 8.-409,444, 130 RIVER BEND 3.4-10

S/RVs 3.4.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.4.4.2

-NOTE--

Valve actuation may be excluded.

Verify each required relief function S/RV actuates on 18 months an actual or simulated automatic initiation signal.

SR 3.4.4.3 NOTE Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify each required S/RV relief mode actuator In accordance with strokes when manually actuated.

the Inservice Testing Program on a STAGGERED TEST BASIS for each valve solenoid Amendment No. 84-, 130 RIVER BEND 3.4-11

ECCS--Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.5 NOTE Vessel injection/spray may be excluded.

Verify each ECCS injection/spray subsystem 18 months actuates on an actual or simulated automatic initiation signal.

SR 3.5.1.6 NOTE Valve actuation may be excluded.

Verify the ADS actuates on an actual or simulated 18 months automatic initiation signal.

SR 3.5.1.7 NOTE Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify each ADS valve relief mode actuator strokes In accordance with when manually actuated.

the Inservice Testing Program on a STAGGERED TEST BASIS for each valve solenoid SR 3.5.1.8 NOTE-ECCS actuation instrumentation is excluded.

Verify the ECCS RESPONSE TIME for each ECCS 18 months injection/spray subsystem is within limits.

Amendment No. 84, 130 RIVER BEND 3.5-5

LLS Valves 3.6.1.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1 NOTE-Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify each LLS valve relief mode actuator strokes In accordance with when manually actuated.

the Inservice Testing Program on a STAGGERED, TEST BASIS for each valve solenoid SR 3.6.1.6.2

-NOTE Valve actuation may be excluded.

Verify the LLS System actuates on an actual or 18 months simulated automatic initiation signal.

Amendment No. 8"-, 130 RIVER BEND 3.6-24