ML030420039
| ML030420039 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/28/2003 |
| From: | Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030420039 (133) | |
Text
To: 00935 US NRC DOCUMENT CNTRL DESK DETROIT EDISON -
FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 01/28/03 PAGE 1
WASHINGTON, DC 20555 Media:
8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 60 11 IR 01/27/03 AFC Please.destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166.
(734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: e52186 Ao01
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Remove Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev31 10/99 Page TRM 3.8-3 Rev 31 10/99 Insert Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM I File: 1754
=DSN: TRM VOL I
[ Rev: 60 Date: 1/27/03 Recipient q 5
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM-3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 LEP-I TRM Vol.
I
FERMI 2 -
TECHNICAL REQUIREMENTS-MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revi'sion 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3-12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TEM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 LEP-2 TRM Vol. I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 5.0-6 5.0-7 5.0-8 5.0-9 BI. 0-1 B2. 0-1 B3. 0-1 B3. 0-2 B3. 0-3 B3. 0-4 B3. 0-5 B3. 0-6 B3. 0-7 B3. 1-1 B3. 2-1 B3. 3. 1-1 B3. 3. 1-2 B3. 3.2-1 B3. 3.2-2 B3. 3. 3-1 B3. 3. 4-1 B3. 3. 4-2 B3. 3. 5-1 B3. 3. 5-2 B3. 3. 6-1 B3. 3.6-2 B3. 3. 6-3 B3. 3. 6-4 B3. 3. 6-5 B3. 3.7-1 B3. 3.7-2 B3. 38-1 B3. 3. 9-1 B3. 3. 10-1 B3. 3. 11-1 B3. 3. 12-1 B3. 3. 13-1 B3. 3. 14-1 B3. 4. 1-1 B3. 4.1-2 B3. 4.1-3 B3. 4.1-4 B3. 4.1-5 B3. 4.2-1 B3. 4.3-1 B3. 4.4-1 B3. 4.5-1 B3. 4.6-1 B3. 4.7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision Page Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision REV 60 1/27/03 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM B3.6.3-1 B3.6.4-1 B3.6.5-1 B3. 6. 6-1 B3.6.7-1 B3.6.8-1 B3.7. 1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.7.9-2 B3. 8. 1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3.8. 6-1 B3. 9. 1-1 B3.9.2-1 B3.9.3-1 B3.9.4-1 B3. 10-1 B3. 11. 1-1 B3.12. 1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol. I LEP-3
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 Revision 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REV 59 1/27/03 TRM Vol. I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.1-l.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-NOTE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.l-1.
REV 60 01/03 TRM Vol. I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TINE A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspectio~n of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 I
Primary Containment Hydrogen Recombiners TR 3.6.2 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment'hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogen" recombiners.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 TR 3.6 I
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM 3.6-32 TRM Vol. I
Ultimate Heat Sink Minimum Temperature TR 3.7.1 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41*F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0 F.
REV 60 01/03 I
TRM Vol.
I TRM 3.7-1
AC Sources TR 3.8.3 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC-Sources TRLCO 3.8.3 APPLICABILITY:
Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2,
3, 4, and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 TR 3.8 TRM Vol. I TRM 3.8-3
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location Remove Insert In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM I File: 1754 DSN: TRMVOLI I Rev: 60 Date: 1/27/03 Recipient 93
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 LEP-I TRM Vol.
I
FERMI 2 -
TECHNICAL REQUIREMENTS-MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST. OF EFFECTIVE PAGES TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM!
TRM TRM TRM TRM Page Page 5.0-6 5.0-7 5.0-8 5.0-9 BI.0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3.1-1 B3.2-1 B3.3. 1-1 B3. 3. 1-2 B3. 3. 2-1 B3. 3. 2-2 B3.3.3-1 B3. 3. 4-1 B3. 3. 4-2 B3. 3. 5-1 B3. 3.5-2 B3. 3. 6-1 B3. 3. 6-2 B3. 3.6-3 B3. 3.6-4 B3. 3. 6-5 B3. 3.7-1 B3. 3.7-2 B3. 3 8-1 B3. 3.9-1 B3. 3. 10-1 B3. 3. 11-1 B3. 3.12-1 B3. 3. 13-1 B3. 3. 14-1 B3. 4.1-1 B3. 4
.1-2 B3. 4.1-3 B3. 4
.1-4 B3.4.1-5 B3.4.2-1 B3. 4.3-1 B3.4.4-1 B3.4.5-I B3.4. 6-1 B3.4.7-1 B3.5-1 B3. 6. 1-1 B3.6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM T REV 60 1/27/03 B3. 6.3-1 B3. 6.4-1 B3. 6.5-1 B3. 6.6-1 B3. 6.7-1 B3. 6. 8-1 B3.7.1-I B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-I B3.7. 6-1 B3.7.7-1 B3.7.8-1 B3.7.9-I B3.7.9-2 B3.8. 1-I B3.8.2-1 B3.8.3-I B3. 8. 4-1 B3.8.5-1 B3.8.6-1 B3.9.1-I B3.9.2-1 B3.9.3-1 B3.9.4-1 B3.10-1 B3. 11. 1-I B3.12. 1-1 B3. 12.2-1 B3.12.3-1 B3.12.4-1 B3. 12.5-1 B3. 12. 6-1 B3.12.7-1 B3. 12.8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 LEP-3 TRM Vol. I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 REV 59 1/27/03 TRM Vol.
I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.1-1.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-NOTENOTE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-l.
REV 60 01/03 TRM Vol. I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 TRM Vol.
I TRM 3. 6-1
Primary Containment Hydrogen Recombiners TR 3.6.2 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogen" recombiners.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 TRM Vol. I TRM 3. 6-2
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM 3.6-32 TRM Vol. I
Ultimate Heat Sink Minimum Temperature TR 3.7.1 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS)
Mi3nimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41 0F."
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 TRM Vol. I TRM 3.7-1
AC Sources TR 3.8.3 TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 APPLICABILITY:
Emergency Diesel Generator (EDG) surveillance requ.Lrements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2,
3, 4,
and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TINE A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 TRM Vol. I TRM 3.8-3
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Remove Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Insert Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMA TON DTC: TMTRM I File: 1754 IDSN: TRM VOL I Rev: 60 Date: 1/27/03 Recipient q *-"
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRE 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12 Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision-31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol. I LEP-2
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM Page Page 5.0-6 5.0-7 5.0-8 5.0-9 BI. 0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3. 1-1 B3.2-1 B3. 3. 1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3. 3. 3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3. 3.5-2 B3. 3.6-1 B3. 3. 6-2 B3. 3. 6-3 B3. 3. 6-4 B3.3.6-5 B3. 3.7-1 B3.3.7-2 B3.3.8-1 B3. 3. 9-1 B3. 3. 10-1 B3.3.11-1 B3. 3. 12-1 B3. 3. 13-1 B3. 3. 14-1 B3.4. 1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4. 3-1 B3.4. 4-1 B3.4. 5-1 B3.4.6-1 B3.4. 7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31
- 31.
31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 REV 60 1/27/03 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM Revision B3.6.3-1 B3.6.4-1 B3.6.5-1 B3. 6.6-1 B3.6.7-1 B3. 6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3. 7. 6-1 B3.7.7-1 B3. 7.8-1 B3.7.9-1 B3. 7.9-2 B3. 8. 1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3.8.6-1 B3. 9. 1-1 B3. 9.2-1 B3. 9.3-1 B3. 9. 4-1 B3.10-1 B3. 11. 1-1 B3.12. 1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12. 6-1 B3.12.7-1 B3. 12. 8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 LEP-3 TRM Vol. I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REV 59 1/27/03 TRM Vol.
I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.1-1.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-NOTENOTE Separite Condition entry xs allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-l.
REV 60 01/03 TRM Vol.
I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 I
Primary Containment Hydrogen Recombiners TR 3.6.2 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TINE A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogern recombiners.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 TR 3.6 TRM Vol. I TRM 3. 6-2
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM 3.6-32 TRM Vol. I
Ultimate Heat Sink Minimum Temperature TR 3.7.1 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS)
Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41 0F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0 F.
REV 60 01/03 TR 3.7 I
AC Sources TR 3.8.3 "TR 3.8 EL TR 3.8.3 AC TRLCO 3.8.3 APPLICABILITY:
ACTIONS ECTRICAL POWER SYSTEMS Sources Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2,
3, 4, and 5, During movement of irradiated fuel assemblies in the secondary containment.
CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 I
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Remove Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev31 10/99 Page TRM 3.8-3 Rev 31 10/99 Insert Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS -INFORMATION DTC: TMTRM T File: 1754
[DSN: TRM VOL I
[Rev: 60 Date: 1/27/03 Recipient
ý5
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31
.TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-I
FERMI 2 - TECHNICAL REQUIREMENTS-MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Page TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 5.0-6 5.0-7 5.0-8 5.0-9 B1. 0-1 B2. 0-1 B3. 0-1 B3. 0-2 B3. 0-3 B3. 0-4 B3.0-5 B3.0-6 B3.0-7 B3. 1-1 B3.2-1 B3. 3. 1-1 B3.3.1-2 B3. 3.2-1 B3. 3.2-2 B3. 3. 3-1 B3. 3. 4-1 B3.3.4-2 B3. 3. 5-1 B3. 3. 5-2 B3. 3. 6-1 B3.3.6-2 B3.3.6-3 B3. 3. 6-4 B3. 3. 6-5 B3. 3. 7-1 B3. 3.7-2 B3. 3. 8-1 B3. 3. 9-1 B3. 3. 10-1 B3. 3. 11-1 B3. 3. 12-1 B3. 3. 13-1 B3. 3. 14-1 B3.4. 1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3. 4.1-5 B3.4.2-1 B3.4.3-1 B3. 4.4-1 B3.4.5-1 B3.4.6-1 B3.4.7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 T REV 60 1/27/03 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM Revision B3.6. 3-1 B3. 6. 4-1 B3. 6.5-1 B3.6. 6-1 B3. 6. 7-1 B3.6 8-1 B3.7. 1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7. 4-2 B3.7. 5-1 B3.7. 6-1 B3.7.7-1 B3.7.8-1 B3.7. 9-1 B3.7. 9-2 B3. 8. 1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3. 8. 6-1 B3. 9. 1-1 B3. 9.2-1 B3. 9.3-1 B3. 9.4-1 B3.10-1 B3. 11. 1-1 B3.12. 1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12. 6-1 B3.12.7-1 B3.12. 8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol.
I LEP-3
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
0 2
0 3
0 4
0 5
0 6
0 7
0 8
0 9
0 10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
REV 59 1/27/03 TRM Vol.
I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.1-1.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-NOTE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-I.
REV 60 01/03 TRM Vol. I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION T2IE A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 TRM Vol.
I TRM 3. 6-1
Primary Containment Hydrogen Recombiners TR 3.6.2 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance "requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogern recombiners.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 TRM 3. 6-2 TRM Vol. I
MSIV Leakage Control System TR 3.6.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immed2iately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentatxon.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TR 3.6 TRM 3.6-32 TRM Vol-. I
Ultimate Heat Sink Minimum Temperature TR 3.7.1 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS)
Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41 0F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 I
AC Sources TR 3.8.3 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 APPLICABILITY:
Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2, 3,
4, and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 "TR 3.8 I
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location Remove Insert In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Title Page Rev 60 1/27/03 List of Effective Pages LEP-l through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS-INFORMATION DTC: TMTRM I File: 1754 I DSN: TRM VOL1 I Rev: 60 Date: 1/27/03 Recipient 43S
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision -31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31 TRM 3. 6 -a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-I
FERMI 2 -
TECHNICAL REQUIREMENTS-MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM.
TRM TRM TRM TRM Page Page 5.0-6 5.0-7 5.0-8 5.0-9 B1.0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3.1-1 B3.2-1 B3.3. 1-1 B3. 3. 1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3. 6-1 B3.3. 6-2 B3.3. 6-3 B3.3. 6-4 B3.3. 6-5 B3.3.7-1 B3.3.7-2 B3.3, 8-1 B3.3. 9-1 B3.3.10-1 B3. 3. 11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4. 1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4. 6-1 B3.4.7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM REV 60 1/27/03 B3.6.3-1 B3. 6.4-1 B3. 6.5-1 B3. 6.6-1 B3. 6. 7-1 B3. 6.8-1 B3.7. 1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7. 9-1 B3.7.9-2 B3. 8.1-1 B3.8.2-1 B3.8.3-1 B3. 8. 4-1 B3.8.5-1 B3.8.6-1 B3. 9. 1-1 B3.9.2-1 B3. 9.3-1 B3.9.4-1 B3.10-1 B3. 11. 1-1 B3.12. 1-1 B3. 12.2-1 B3.12.3-1 B3. 12. 4-1 B3.12.5-1 B3.12. 6-1 B3.12.7-1 B3. 12.8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31
'31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol.
I LEP-3
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 REV 59 1/27/03 TRM Vol.
I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.1-1.
When the associated 4.16 kV LOP instrumentation is requxred to be OPERABLE.
ACTIONS
-NOTE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoxnt associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-1.
REV 60 01/03 TRM Vol. I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber survexllance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 TRM Vol. I TRM 3. 6-1
Primary Containment Hydrogen Recombiners TR 3.6.2 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogen" recombiners.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 I
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) Instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM Vol. I TRM 3.6-32
Ultimate Heat Sink Minimum Temperature TR 3.7.1 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2,
and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41°F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 TR 3.7 TRM Vol. I TRM 3.7-1
AC Sources TR 3.8.3 TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
APPLICABILITY:
MODES 1, 2, 3,
4, and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immedcately assessment on the OR affected EDG (s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 I
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Remove Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31-10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Insert Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TtRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM File: 1754
[ DSN: TRM VOLI I Rev: 60 Date: 1/27/03 Recipient 4S5
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision-31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRN 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol. I LEP-I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM
- TRM, TRM TRM TRM TRM Page 5.0-6 5.0-7 5.0-8 5.0-9 B1.0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3. 1-1 B3.2-1 B3.3. 1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3.6-1 B3.3.6-2 B3.3.6-3 B3.3.6-4 B3.3.6-5 B3.3.7-1 B3.3.7-2 B3.3,8-1 B3.3.9-1 B3.3.10-1 B3. 3. 11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3. 4.4-1 B3.4.5-1 B3. 4.6-1 B3.4.7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 54 Revision 54 Revision 54 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 56 Revision 45 Revision 31 Revision 31 Revision 31 Revision 31 Revision 34 Revision 34 Revision 34 Revision 34 Revision 31 Revision, 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM REV 60 1/27/03 Page B3. 6.3-1 B3. 6. 4-1 B3. 6. 5-1 B3. 6. 6-1 B3. 6.7-1 B3. 6. 8-1 B3.7. 1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7. 6-1 B3.7.7-1 B3 7. 8-1 B3.7.9-1 B3. 7. 9-2 B3. 8. 1-1 B3.8.2-1 B3.8.3-1 B3.8. 4-1 B3.8.5-1 B3.8.6-1 B3.9.1-1 B3. 9.2-1 B3. 9.3-1 B3.9.4-1 B3. 10-1 B3. 11. 1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12. 6-1 B3.12.7-1 B3.12.8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol.
I LEP-3
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REV 59 1/27/03 TRM Vol. I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.l-l.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-- NOTEO Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-1.
REV 60 01/03 TRM Vol.
I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months interLor and exterior of the suppression chamber.
REV 60 01/03 TRM Vol.
I TRM 3.6-1
Primary Containment Hydrogen Recombiners TR 3.6.2 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance rxequirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombxner hydrogen' recombiners.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 TRM Vol. I TRM 3. 6-2
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM Vol. I TRM 3.6-32
Ultimate Heat Sink Minimum Temperature TR 3.7.1 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS)
Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2,
and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41 0 F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVE ILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 TRM 3.7-1 TRM Vol.
I
AC Sources TR 3.8.3 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 APPLICABILITY:
Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2, 3,
4, and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
I TRM 3.8-3
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location Remove Insert In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM
[File: 1754 I DSN: TRM VOL I I Rev: 60 Date: 1/27/03 Recipient
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRM" 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TR!M TRM TRM TRM TRM Page Page 5.0-6 5.0-7 5.0-8 5.0-9 BI. 0-1 B2.0-1 B3.0-I B3.0-2 B3. 0-3 B3. 0-4 B3.0-5 B3.0-6 B3.0-7 B3. 1-1 B3.2-1 B3.3.1-I B3.3.1-2 B3.3.2-I B3.3.2-2 B3.3.3-I B3.3.4-1 B3.3.4-2 B3.3.5-I B3.3.5-2 B3.3.6-I B3.3.6-2 B3.3. 6-3 B3.3.6-4 B3.3.6-5 B3.3.7-I B3.3.7-2 B3.3.. 8-i B3.3. 9-1 B3.3. 10-1 B3. 3. 11-I B3.3. 12-1 B3.3. 13-1 B3.3. 14-1 B3.4.1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-I B3. 4.5-1 B3. 4.6-1 B3. 4.7-1 B3. 5-1 B3. 6. 1-1 B3. 6. 2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM T REV 60 1/27/03 B3. 6.3-1 B3.6.4-1 B3. 6.5-1 B3. 6.6-1 B3.6.7-1 B3.6.8-1 B3. 7. 1-i B3.7.2-1 B3.7.3-1 B3.7.4-1 B3. 7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.7.9-2 B3.8. 1-I B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3.8.6-1 B3. 9. 1-1 B3.9.2-1 B3.9.3-1 B3. 9. 4-1 B3.10-I B3. 11. 1-1 B3.12. 1-1 B3.12.2-I B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 "31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol. I LEP-3
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 REV 59 1/27/03 TRM Vol.
I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.i-I.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-NT NOTEE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-l.
REV 60 01/03 TRM Vol.
I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 TRM Vol. I TRM 3. 6-1
Primary Containment Hydrogen Recombiners TR 3.6.2 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogen' recombiners.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 TR 3.6 TRM Vol. I TRM 3. 6-2
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM 3.6-32 TRM Vol.
I
Ultimate Heat Sink Minimum Temperature TR 3.7.1 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS)
Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41 0 F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 I
AC Sources TR 3.8.3 TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 APPLICABILITY:
Emergency DLesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2,
3, 4, and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 TRM Vol. I TRM 3.8-3
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Remove Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Insert Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - 1NFORMA TION DTC: TMTRM
[File: 1754 IDSN: TRM VOL I Rev: 60 Date: 1/27/03 Recipient q35
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-1b Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8.
Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12 Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol. I LEP-I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 ReVision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3-12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM
- TRM, TRM TRM TRM TRM Page Page 5.0-6 5.0-7 5.0-8 5.0-9 B1. 0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3. 1-1 B3.2-1 B3.3. 1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3. 3. 4-2 B3.3.5-1 B3.3.5-2 B3. 3. 6-1 B3.3.6-2 B3.3.6-3 B3. 3. 6-4 B3.3.6-5 B3.3.7-1 B3.3.7-2 B3.3.8-1 B3.3.9-1 B3. 3. 10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4.6-1 B3.4.7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM T REV 60 1/27/03 B3.6.3-1 B3.6.4-1 B3.6.5-1 B3.6. 6-1 B3. 6. 7-1 B3.6. 8-1 B3.7. 1-1 B3.7.2-1 B3.7. 3-1 B3.7.4-1 B3.7. 4-2 B3.7.5-1 B3.7. 6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.7.9-2 B3.8. 1-1 B3.8.2-1 B3. 8.3-1 B3.8.4-1 B3.8.5-1 B3. 8. 6-1 B3. 9.1-1 B3. 9.2-1 B3. 9.3-1 B3. 9.4-1 B3. 10-1 B3. 11. 1-1 B3.12. 1-1 B3.12.2-1 B3.12.3-1 B3. 12.4-1 B3.12.5-1 B3. 12. 6-1 B3. 12. 7-1 B3. 12. 8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 LEP-3 TRM Vol.
I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REV 59 1/27/03 TRM Vol.
I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be wathin the allowable values listed in Table TR3.3.8.1-l.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-N O
TENOTE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP anstrumentation.
allowable value listed in Table TR3.3.8.1-1.
REV 60 01/03 TRM Vol. I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 TRM Vol.
I TRM 3.6-1
Primary Containment Hydrogen Recombiners TR 3.6.2 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogen" recombiners.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 I
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM Vol.- I TRM 3.6-32
Ultimate Heat Sink Minimum Temperature TR 3.7.1 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41*F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 I
AC Sources TR 3.8.3 TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 APPLICABILITY:
Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2,
3, 4,
and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG (s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 TRM Vol. I TRM 3.8-3
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Remove Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Insert Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM I File: 1754
[DSN: TRM VOL I I Rev: 60 Date: 1/27/03 Recipient q3ff
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31
)TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3,6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-I
FERMI 2 -
TECHNICAL REQUIREMENTS-MANUAL VOL I
-LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision Page TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRI4 TRM TRM TRM TRM 5.0-6 5.0-7 5.0-8 5.0-9 BI. 0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3. 1-1 B3.2-1 B3. 3. 1-1 B3.3.1-2 B3.3.2-1 B3. 3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3. 6-1 B3.3.6-2 B3.3.6-3 B3.3.6-4 B3.3.6-5 B3.3.7-1 B3.3.7-2 B3.3,8-1 B3.3. 9-1 B3. 3. 10-1 B3. 3. 11-1 B3. 3.12-1 B3.3.13-1 B3.3.14-1 B3. 4. 1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4.6-1 B3.4.7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision-31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 54 Revision 54 Revision 54 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 56 Revision 45 Revision 31 Revision 31 Revision 31 Revision 31 Revision 34 Revision 34 Revision 34 Revision 34 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM REV 60 1/27/03 Page B3. 6.3-1 B3.6.4-1 B3.6.5-1 B3.6.6-1 B3.6.7-1 B3.6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.7.9-2 B3. 8.1-1 B3. 8.2-1 B3. 8.3-1 B3. 8.4-1 B3. 8.5-1 B3. 8. 6-1 B3. 9. 1-1 B3. 9.2-1 B3. 9.3-1 B3. 9.4-1 B3.10-1 B3. 11. 1-1 B3.12. 1-1 B3.12. 2-1 B3.12. 3-1 B3. 12. 4-1 B3.12.5-1 B3.12. 6-1 B3. 12. 7-1 B3. 12. 8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol. I LEP-3
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REV 59 1/27/03 TRM Vol.
I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.1-l.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-NOTE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-1.
REV 60 01/03 TRM Vol. I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual Inspection of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 TRM 3.6-1 TRM Vol. I
Primary Containment Hydrogen Recombiners TR 3.6.2 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogern recombiners.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 TRM Vol. I TRM 3. 6-2
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM 3.6-32 TRM Vol. I
Ultimate Heat Sink Minimum Temperature TR 3.7.1 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS)
Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41*F.-
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 TR 3.7 TRM Vol. I TRM 3. 7-1
-TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
APPLICABILITY:
MODES 1, 2,
3, 4,
and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG (s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 TRM Vol. I TRM 3.8-3
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANAUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location Remove Insert In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS-INFORMATION DTC: TMTRM T File: 1754 1 DSN: TRM VOL I
[ Rev: 60 Date: 1/27/03 Recipient 9.35"
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a -
Revision 31 TRM 3.3-41 Revision 56 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol. I LEP-I
FERMI 2 -
TECHNICAL REQUIREMENTS-MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31
,TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRi.
TRM TRM TRM TRM Page Page 5.0-6 5.0-7 5.0-8 5.0-9 BI.0-1 B2.0-1 B3.0-1 B3.0-2 B3. 0-3 B3. 0-4 B3.0-5 B3. 0-6 B3.0-7 B3. 1-1 B3.2-1 B3. 3. 1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3. 3. 5-2 B3. 3. 6-1 B3. 3. 6-2 B3.3.6-3 B3.3.6-4 B3. 3. 6-5 B3.3.7-1 B3.3.7-2 B3.38-1 B3.3.9-1 B3. 3. 10-1 B3. 3. 11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4. 1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4. 6-1 B3.4.7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM REV 60 1/27/03 B3.6.3-1 B3.6.4-1 B3.6.5-1 B3. 6. 6-1 B3. 6.7-1 B3. 6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7. 6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3. 7. 9-2 B3. 8. 1-1 B3.8.2-1 B3.8.3-1 B3. 8.4-1 B3.8.5-1 B3. 8.6-1 B3. 9. 1-1 B3.9.2-1 B3. 9.3-1 B3. 9. 4-1 B3. 10-1 B3. 11. 1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12. 6-1 B3.12.7-1 B3.12.8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision "Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 LEP-3 TRM Vol. I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REV 59 1/27/03 TRM Vol. I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.1-1.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-NOTE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-1.
REV 60 01/03 TRM Vol.
I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immecdiately chamber inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months anterior and exterior of the suppression chamber.
REV 60 01/03 I
I
Primary Containment Hydrogen Recombiners TR 3.6.2 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogen recombiners.
SURVEILLANCE REQUIREMENTS SURVE IJLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 TR 3.6 I
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) Instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM 3.6-32 TRM Vol. I
Ultimate Heat Sink Minimum Temperature TR 3.7.1 TR 3.7 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.1 Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41'F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 I
AC Sources TR 3.8.3 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 APPLICABILITY:
Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2, 3,
4, and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 TR 3.8 TRM Vol. I TRM 3.8-3
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 60 dated 1/27/03 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 59 dated 11/27/02 has been inserted prior to inserting these pages.
Location In Front of TRMI Manual Immediately following Title Page 3.3 Instrumentation 3.6 Containment Systems 3.7 Plant Systems 3.8 Electrical Power Systems Remove Title Page Rev 59 11/27/02 List of Effective Pages LEP-1 through LEP-4 Rev 59 11/27/02 Page TRM 3.3-35 Rev 31 10/99 Page TRM 3.6-1 Rev 31 10/99 Page TRM 3.6-2 Rev 31 10/99 Page TRM 3.6-32 Rev 31 10/99 Page TRM 3.7-1 Rev 31 10/99 Page TRM 3.8-3 Rev 31 10/99 Insert Title Page Rev 60 1/27/03 List of Effective Pages LEP-1 through LEP-4 Rev 60 1/27/03 Page TRM 3.3-35 Rev 60 01/03 Page TRM 3.6-1 Rev 60 01/03 Page TRM 3.6-2 Rev 60 01/03 Page TRM 3.6-32 Rev 60 01/03 Page TRM 3.7-1 Rev 60 01/03 Page TRM 3.8-3 Rev 60 01/03 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMA lHON DTC: TMTRM I File: 1754 l DSN: TRM VOL I
] Rev: 60 Date: 1/27/03 Recipient C,3e-
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 60 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 56 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 59 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12.
Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision-31 TRM 3.6-19 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-I
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 ReVision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 60 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 REV 60 1/27/03 TRM Vol.
I LEP-2
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM
- TRM, TRM TRM TRM TRM Page Page 5.0-6 5.0-7 5.0-8 5.0-9 B1.0-1 B2.0-1 B3.0-1 B3. 0-2 B3.0-3 B3.0-4 B3.0-5 B3. 0-6 B3.0-7 B3. 1-1 B3.2-1 B3. 3. 1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3.6-1 B3.3.6-2 B3.3. 6-3 B3.3.6-4 B3.3. 6-5 B3.3.7-1 B3.3.7-2 B3.3ý 8-1 B3.3.9-1 B3.3.10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3. 3. 14-1 B3. 4. 1-1 B3.4. 1-2 B3.4. 1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4.6-1 B3.4.7-1 B3.5-1 B3. 6. 1-1 B3. 6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 54 54 54 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 56 45 31 31 31 31 34 34 34 34 31 31 31 31 31 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM
-TRM TRM TRM REV 60 1/27/03 B3.6.3-1 B3. 6.4-1 B3.6.5-1 B3. 6.6-1 B3.6.7-1 B3. 6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7. 8-1 B3.7.9-1 B3.7. 9-2 B3.8. 1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3.8.6-1 B3. 9. 1-1 B3. 9.2-1 B3. 9. 3-1 B3. 9. 4-1 B3.10-1 B3. 11. 1-1 B3. 12. 1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12. 6-1 B3.12.7-1 B3.12. 8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 43 31 31 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol.
I LEP-3
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REV 59 1/27/03 TRM Vol. I LEP-4
LOP Instrumentation TR 3.3.8.1 TR 3.3 INSTRUMENTATION TR 3.3.8.1 Loss of Power (LOP) Instrumentation TRLCO 3.3.8.1 APPLICABILITY:
The 120 volt basis instrumentation trip setpoints associated with the LOP instrumentation shall be within the allowable values listed in Table TR3.3.8.1-1.
When the associated 4.16 kV LOP instrumentation is required to be OPERABLE.
ACTIONS
-NOTE Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more 120 volt A.1 Assess the Immediately basis instruments with OPERABILITY of the a trip setpoint
-associated 4.16 kV exceeding the LOP instrumentation.
allowable value listed in Table TR3.3.8.1-I.
REV 60 01/03 TRM Vol.
I TRM 3.3-35
Suppression Chamber TR 3.6.1 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber TRLCO 3.6.1 APPLICABILITY:
Suppression chamber surveillance requirement TRSR 3.6.1.1 shall be met.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TINE A.
TRSR 3.6.1.1 not met.
A.1 Declare suppression Immediately chamber inoperable.
SURVE ILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 18 months interior and exterior of the suppression chamber.
REV 60 01/03 I
Primary Containment Hydrogen Recombiners TR 3.6.2 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners TRLCO 3.6.2 APPLICABILITY:
Primary containment hydrogen recombiners surveillance requirement TRSR 3.6.2.1 shall be met.
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.2.1 not met, A.1 Declare associated Immediately for either or both primary containment primary containment hydrogen recombiner hydrogen recombiners.
SURVE ILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY TRSR 3.6.2.1 Perform CHANNEL CALIBRATION of all 18 months recombiner operating instrumentation and control circuits.
REV 60 01/03 I
MSIV Leakage Control System TR 3.6.6 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.6 Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)
TRLCO 3.6.6 APPLICABILITY:
MSIV LCS subsystem surveillance requirements TRSR 3.6.6.1, 3.6.6.2, and 3.6.6.3 shall be met for both MSIV LCS subsystems.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.6.6.1 not met.
A.1 Declare the Immediately associated MSIV LCS OR subsystem inoperable.
TRSR 3.6.6.2 not met.
OR TRSR 3.6.6.3 not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.6.6.1 Perform CHANNEL CHECK of the pressure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days pressure control (pressure and differential pressure) instrumentation.
TRSR 3.6.6.3 Perform CHANNEL CALIBRATION of the-pressure 18 months control (pressure and differential pressure) instrumentation.
REV 60 01/03 TRM 3. 6-32 TRM Vol.
I
Ultimate Heat Sink Minimum Temperature TR 3.7.1 PLANT SYSTEMS TR 3.7.1 Ultimate Heat Sink (UHS) Minimum Temperature TRLCO 3.7.1 APPLICABILITY:
The following requirements shall be met for both reservoirs of the Ultimate Heat Sink.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or both reservoirs A.l Visually inspect Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with an average water reservoir(s) to temperature < 41'F.
verify that no ice has formed.
B.
One or both reservoirs B.1 Demonstrate Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> with ice formed.
OPERABILITY of each safety related pump in the reservoir(s) by running each pump.
SURVE ILLANCE REQUIREMENTS SURVE ILIANCE FREQUENCY TRSR 3.7.1.1 Verify the average water temperature of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each reservoir, and combined average water temperature of the two reservoirs, are
> 41 0F.
REV 60 01/03 TR 3.7 TRM Vol. I TRM 3. 7-1
AC Sources TR 3.8.3 "TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 APPLICABILITY:
Emergency Diesel Generator (EDG) surveillance requirements TRSR 3.8.3.1, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.
MODES 1, 2, 3,
4, and 5, During movement of irradiated fuel assemblies in the secondary containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
TRSR 3.8.3.1 not met.
A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).
TRSR 3.8.3.2 not met.
OR TRSR 3.8.3.3 not met.
OR TRSR 3.8.3.4 not met.
REV 60 01/03 I