ML030370764

From kanterella
Jump to navigation Jump to search
Letter, Foreign Ownership, Control, or Influence Information
ML030370764
Person / Time
Site: Beaver Valley
Issue date: 01/31/2003
From: Springer M
Office of Administration
To: Bezilla M
FirstEnergy Nuclear Operating Co
Moroney B, NRR/DLPM, 415-3974
References
Download: ML030370764 (4)


Text

January 31, 2003 Mr. Mark Bezilla, Vice President Beaver Valley Power Station, Units 1 & 2 FirstEnergy Nuclear Operating Company P.O. Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - FOREIGN OWNERSHIP, CONTROL, OR INFLUENCE INFORMATION

Dear Mr. Bezilla:

We are writing to advise you that your company has not yet submitted its Foreign Ownership, Control, or Influence (FOCI) information that was outlined in our letter of March 22, 2002. As you may recall, the Nuclear Regulatory Commission (NRC) is taking steps to enhance its licensees ability to respond to the continuing heightened security environment by processing personnel security clearances for licensees. In order for the NRC to grant the personnel security clearances that your company requested subsequent to our March 22, 2002, letter, we must first make a Facility Security Clearance determination based on the FOCI information you submit. Currently, the NRC is authorized to disseminate classified information to uncleared persons only under special circumstances when timeliness is critical to mitigating an emergency situation. Under our new clearance program, licensees may have access to classified information under more routine circumstances once personnel security clearances are granted.

However, before we can grant personnel security clearances, the NRC needs to make a successful FOCI determination, which may require several months to complete. Therefore, it is imperative that you provide your FOCI information to us as soon as possible. If you need to review the regulations on FOCI and Facility Security Clearance requirements, an overview can be found in Part 95 of Title 10 of the Code of Federal Regulations.

Questions regarding FOCI packages should be referred to J. Keith Everly of the Office of Nuclear Security and Incident Response at 301-415-7048 or jke@nrc.gov.

Sincerely,

/RA/

Michael L. Springer, Director Office of Administration Docket Nos: 50-334 and 50-412 cc: See next page

ML030370764 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosures "E" = Copy with attachments/enclosures "N =

No copy OFFICE INFOSEC INFOSEC ADM/SB OGC**

OGC**

NAME JKEverly ALSilvious*

CMStone*

DFHassell*

JRGoldberg*

DATE 01/30/03 01/ 02 /03 01/ 02 /03 12/16/02 12/16/02 OFFICE DLPM/PM DLPM/LA D/DLPM D/DFS D/NSIR D/ADM NAME BMoroney MOBrien Tmarsh for JAZwolinski*

TOMartin*

RPZimmerman*

MLSpringer DATE 01/29/03 01/30/03 01/ 13 /03 01/ 13 /03 01/ 14 /03 01/31/03

DISTRIBUTION (Letter to licensees regarding submittal of FOCI information)

PUBLIC DCF: LRD 3.00.09 LRD 7.00.09 P.G. Norry, EDO S. A. Morris, EDO S.J. Collins, NRR B.W. Sheron, NRR J.A. Zwolinski/ Tad Marsh, NRR B.A. Boger, NRR R. P. Zimmerman, NSIR M. F. Weber, NSIR G. M. Tracy, D/DNS M.L. Springer, D/ADM T.O. Martin, D/DFS J. K. Everly, NSIR ADM R/F DFS R/F INFOSEC R/F PDI-1 R/F S. Richards R. Laufer M. OBrien B. Platchek, R-I ACRS OGC

Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Deparment of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: M. P. Pearson, Director Services and Projects (BV-IPAB)

Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077 Robert F. Saunders, President FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308