E-mail from T Alexion to Benne at ANO-2 Regarding Steam Generator (SG) Tube Inspection Frequency
ML030370253
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/22/2003
From: Alexion T
NRC/NRR/DLPM/LPD4
To: Benne S
Entergy Nuclear Operations
Alexion T W,NRR/DLPM,415-1326
Shared Package
ML030420086 List:
References
Download: ML030370253 (3)


Text

-

-



.--.----

--

- -

'-.-*---.------.

J rage i I Thnmc Akvinn - RAI AN fl TI JRF INPFCTION FREOUENGY From:

To:

Date:

Subject:

Thomas Alexion SBENNE2@entergy.com 1/22/03 2:23PM RAI ON SG TUBE INSPECTION FREQUENCY

Steve, See the attached.

Tom evir- - PAI C)M Ar, TUBE INSPECTION FREQUENr'v rage ] !

REQUEST FOR ADDITIONAL INFORMATION REQUEST TO MODIFY STEAM GENERATOR (SG) TUBE INSPECTION FREQUENCY ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2)

1.

The licensee located and removed a loose part approximately 12 inches above the cold leg tubesheet in the "B" SG. Were any loose parts left in service? If so, summarize the basis, including any analysis performed, for the conclusion that these loose parts will not cause unacceptable wear before the next scheduled inspection (2R1 7)?

2.

Table I of the November 22, 2002, letter indicates that 271 special interest inspections were conducted. Please describe the results of these inspections. (The staff assumes that some of the results in Table 2 arose from the special interest inspections; however, a one-to-one comparison cannot be made.)

3.

The licensee indicates that SGs such as those at DC Cook, Farley, and South Texas have not experienced large amounts of wear. The licensee also indicates that these SGs are similar in design to the ANO-2 SGs.

a.

Provide details explaining the similarities and differences between the ANO-2 SGs and the SGs at the referenced plants.

b.

What process is in place to gain relevant industry operating experience that may affect the operational assessment of ANO-2 during the proposed extended inspection interval?

I C'\\WlNDOWS\\TEMP\\GW1OOOO1.TMP



-*-*--

Mail Envelope Properties (3E2EEFA5.3EE: 0: 20628)

Subject:

Creation Date:

From:

Created By:

RAI ON SG TUBE INSPECTION FREQUENCY 1/22/03 2:23PM Thomas Alexion TWA@nrc.gov Recipients entergy.com SBENNE2 (SBENNE2 @entergy.com)

Post Office Action Transferred Delivered Date & Time 01/22/03 02:23PM Route entergy.com Files MB6808RAI.wpd MESSAGE Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

Size 5891 657 Date & Time 01/22/03 02:18PM 01/22/03 02:23PM No None Yes Standard No None No Standard Immediate Delivered & Opened Page 1 1 Ir.-AW ND W

S E M P\\GoW M

?

-L2L.**7*

7***7.~*2

  • o*

f.....

f

......