January 27, 2003 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing and Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
WITHDRAWAL OF EXEMPTION REQUEST (TAC NO. MB6747)
Dear Mr. Young:
By letter dated November 18, 2002, you requested an exemption to Title 10 of the Code of Federal Regulations (10 CFR) Section 55.59(c)(1). This exemption would have allowed the licensed operator requalification examinations for Crystal River Unit 3 to be rescheduled due to a possible labor action. Subsequently, by letter dated December 19, 2002, you withdrew the exemption request.
While considering issuance of the requested exemption, the NRC staff published in the Federal Register (67 FR 76198, December 11, 2002) an environmental assessment and finding of no significant impact as required by 10 CFR 51.21. Since the exemption request has been withdrawn, the environmental assessment and finding of no significant impact is no longer applicable and is being withdrawn. Therefore, the Commission has filed the enclosed Notice of Withdrawal of Environmental Assessment with the Office of the Federal Register for publication.
Sincerely,
/RA by MMcConnell for/
Brenda L. Mozafari, Sr. Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
Notice of Withdrawal cc w/encl: See next page
ML030270175 OFFICE PM:PDII/S2 LA:PDII/S2 SC:PDII/S2 OGC NAME BMozafari EDunnington AHowe Uttal NLO, conditioned on change being made in FRN DATE 1/13/03 1/13/03 1/24/03 1/23/03 COPY Yes/No Yes/No Yes/No
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION FLORIDA POWER CORPORATION DOCKET NO. 50-302 NOTICE OF WITHDRAWAL OF ENVIRONMENTAL ASSESSMENT The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Florida Power Corporation (the licensee) to withdraw its November 18, 2002, application for exemption for the Crystal River Nuclear Plant, Unit 3, located in Citrus County, Florida.
The proposed exemption would have allowed the licensed operator requalification examinations for Crystal River Unit 3 to be rescheduled due to a possible labor action.
The Commission had previously issued an Environmental Assessment and Finding of No Significant Impact published in the FEDERAL REGISTER on December 11, 2002 (67 FR 76198) for the proposed exemption as required by 10 CFR 51.21. However, by letter dated December 19, 2002, the licensee withdrew the proposed change. Therefore, the Commission is withdrawing its previously issued Environmental Assessment and Finding of No Significant Impact.
For further details with respect to this action, see the request for exemption dated November 18, 2002, and the licensees letter dated December 19, 2002, which withdrew the request for exemption. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams/html. Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 27th day of January 2003.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Matthew McConnell, Acting Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Mr. Dale E. Young Crystal River Nuclear Plant, Unit 3 Florida Power Corporation cc:
Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042 Mr. Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Ms. Sherry L. Bernhoft Manager Regulatory Affairs Crystal River Nuclear Plant (NA2H) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. Richard L. Warden Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Heinz Mueller (5 copies)
Environmental Review Coordinator US EPA Region 4 61 Forsyth Street, SW Atlanta, GA 30303-3104