January 24, 2003 Mr. John L. Skolds President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3, AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2
Dear Mr. Skolds:
On January 3, 2003, the staff of the U.S. Nuclear Regulatory Commission (NRC) received the Exelon Generation Companys combined application for renewal of Operating Licenses DPR-19 and DPR-25 for the Dresden Nuclear Power Station, Units 2 and 3, respectively, and for renewal of Operating Licenses DPR-29 and DPR-30 for the Quad Cities Nuclear Power Station, Units 1 and 2, respectively. We are currently performing an acceptance review for docketing in accordance with the requirements of 10 CFR 2.101, and will notify you of the results of our review. A schedule for the review will be provided at the time the application is determined acceptable for docketing.
We have enclosed, for your information, a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication.
I am the project manager for the review of your license renewal application. I can be reached at 301-415-1392. Please send me a copy of all license renewal correspondence.
Mr. Louis Wheeler is the project manager responsible for the review of the environmental report section of your application, and he can be reached at 301-415-1444. Mr. Lawrence Rossbach continues to remain responsible for NRC project management of all issues other than license renewal for Dresden Nuclear Power Station, Units 2 and 3. Likewise, Mr. Carl Lyon continues to remain responsible for NRC project management of all issues other than license renewal for Quad Cities Nuclear Power Station, Units 2 and 3.
Sincerely,
/RA/
Tae Kim, Senior Project Manager License Renewal Section License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-238, 50-249, 50-254, and 50-265
Enclosure:
As stated cc w/enclosure: See next page
January 24, 2003 Mr. John L. Skolds President and Chief Nuclear Officier Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3, AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2
Dear Mr. Skolds:
On January 3, 2003, the staff of the U.S. Nuclear Regulatory Commission (NRC) received the Exelon Generation Companys combined application for renewal of Operating Licenses DPR-19 and DPR-25 for the Dresden Nuclear Power Station, Units 2 and 3, respectively, and for renewal of Operating Licenses DPR-29 and DPR-30 for the Quad Cities Nuclear Power Station, Units 1 and 2, respectively. We are currently performing an acceptance review for docketing in accordance with the requirements of 10 CFR 2.101, and will notify you of the results of our review. A schedule for the review will be provided at the time the application is determined acceptable for docketing.
We have enclosed, for your information, a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication.
I am the project manager for the review of your license renewal application. I can be reached at 301-415-1392. Please send me a copy of all license renewal correspondence.
Mr. Louis Wheeler is the project manager responsible for the review of the environmental report section of your application, and he can be reached at 301-415-1444. Mr. Lawrence Rossbach continues to remain responsible for NRC project management of all issues other than license renewal for Dresden Nuclear Power Station, Units 2 and 3. Likewise, Mr. Carl Lyon continues to remain responsible for NRC project management of all issues other than license renewal for Quad Cities Nuclear Power Station, Units 2 and 3.
Sincerely,
/RA/
Tae Kim, Senior Project Manager License Renewal Section License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-238, 50-249, 50-254, and 50-265
Enclosure:
As stated cc w/enclosure: See next page DISTRIBUTION:
See next page Accession no.: ML030240603 DOCUMENT NAME:C:\\ORPCheckout\\FileNET\\ML030240603.wpd *See previous concurrence OFFICE LA:RLEP PM:RLEP SC:RLEP OGC (NLO w/comment)
PD:RLEP NAME HBerilla*
TJKim*
SLee*
RWeisman*
PTKuo*
DATE 1/16/03 1/16/03 1/24/03 1/24/03 1/24/03 OFFICIAL RECORD COPY
DISTRIBUTION: Letter to John L. Skolds w/FRN, Dated: January 24, 2003 Accession no.: ML030240603 HARD COPY RLEP RF T. Kim E-MAIL:
PUBLIC W. Borchardt D. Matthews F. Gillespie RidsNrrDe R. Barrett E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo C. Holden H. Nieh G. Holahan H. Walker S. Black B. Boger D. Thatcher G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Smith (srs3)
T. Kobetz R. Assa C. Munson RLEP Staff L. Rossbach C. Lyon L. Lund S. Coffin T. Chan D. Terao M. Ring, RIII
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION EXELON GENERATION COMPANY, LLC DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NOTICE OF RECEIPT OF APPLICATION FOR RENEWAL OF FACILITY OPERATING LICENSE NOS. DPR-19, DPR-25, DPR-29, AND DPR-30 FOR AN ADDITIONAL 20-YEAR PERIOD DOCKET NOS. 50-238, 50-249, 50-254, AND 50-265 The U.S. Nuclear Regulatory Commission (NRC or Commission) has received an application, dated January 3, 2003, from the Exelon Generation Company, LLC, filed pursuant to Section 104b of the Atomic Energy Act of 1954, as amended, and 10 CFR Part 54, to renew Operating License Nos. DPR-19, DPR-25, DPR-29, and DPR-30 for the Dresden Nuclear Power Station, Units 2 and 3, and the Quad Cities Nuclear Power Station, Units 1 and 2, respectively. Renewal of the licenses would authorize the applicant to operate each of the facilities for an additional 20-year period. The current operating licenses for the Dresden Nuclear Power Station, Units 2 and 3, expire on December 22, 2009, and January 12, 2011, respectively. Both of the current operating licenses for the Quad Cities Nuclear Power Station, Units 1 and 2, expire on December 14, 2012. The Dresden Nuclear Power Station, Units 2 and 3, are boiling-water reactors designed by General Electric Company and are located in Grundy County, Illinois. The Quad Cities Nuclear Power Station, Units 1 and 2, are also boiling-water reactors designed by General Electric Company, and are located in Rock Island County, Illinois.
The acceptability of the tendered application for docketing and other matters, including an opportunity to request for a hearing, will be the subject of a subsequent Federal Register notice.
Copies of the application are available for public inspection at the Commissions Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor),
Rockville, Maryland, or electronically from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS) under accession number ML030090359. The ADAMS Public Electronic Reading Room is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html. In addition, the application is available on the NRC web page at http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html, while the application is under review. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR Reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr@nrc.gov.
The license renewal application is also available to local residents near the Dresden Nuclear Power Station at the Morris Public Library in Morris, Illinois, and at the Coal City Public Library in Coal City, Illinois. For local residents near the Quad Cities Nuclear Power Station, the license renewal application is available at the River Valley District Library in Port Byron, Illinois.
Dated at Rockville, Maryland, this 24th day of January 2003.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation
Dresden and Quad Cities Nuclear Power Stations cc:
Site Vice President - Quad Cities Nuclear Power Station Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Quad Cities Nuclear Power Station Plant Manager Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Regulatory Assurance Manager - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Quad Cities Resident Inspectors Office U.S. Nuclear Regulatory Commission 22712 206th Avenue N.
Cordova, IL 61242 William D. Leech Manager - Nuclear MidAmerican Energy Company P.O. Box 657 Des Moines, IA 50303 Vice President - Law and Regulatory Affairs MidAmerican Energy Company One River Center Place 106 E. Second Street P.O. Box 4350 Davenport, IA 52808 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.
Rock Island, IL 61201 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, IL 60532-4351 Document Control Desk-Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President Mid-West Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Counsel, Nuclear Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Dresden and Quad Cities Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Jose Dubon Licensing Engineer Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Alan P. Nelson Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Dresden Nuclear Power Station Plant Manager Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Dresden Resident Inspectors Office U.S. Nuclear Regulatory Commission 6500 N. Dresden Road Morris, IL 60450-9766 Chairman Grundy County Board Administration Building 1320 Union Street Morris, IL 60450 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager - License Renewal Program Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-3 Kennett Square, PA 19348 Sr. Engineer - License Renewal Prog.
Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555