MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] |
Text
k Progress Energy 10 CFR 54 Serial: RNP-RA/03-0007 JAN 2'0 2003 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 RESPONSE TO NRC REQUEST 9 OF REQUEST FOR ADDITIONAL INFORMATION REGARDING SEVERE ACCIDENT MITIGATION ALTERNATIVES Ladies and Gentlemen:
By letter dated June 14, 2002, Carolina Power & Light (CP&L) Company submitted an application for the renewal of the Operating License for the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, also referred to as RNP.
By letter dated October 23, 2002, the NRC provided a request for additional information to CP&L regarding the Severe Accident Mitigation Alternatives analysis contained in the Environmental Report. The response to the request for additional information was provided by letter dated January 2, 2003. However, the response to NRC Request 9 was delayed as discussed in a telephone call between CP&L and NRC on December 23, 2002, and as documented in CP&L letter dated January 15, 2003. The purpose of this letter is to provide the response to NRC Request 9.
Attachment I provides an Affirmation pursuant to 10 CFR 50.30(b).
Attachment II provides the response to NRC Request 9 of the request for additional information regarding Severe Accident Mitigation Alternatives.
If you have any questions concerning this matter, please contact Mr. C. T. Baucom.
Sincerely,
- u,)2&u' 4N Yý2 B. L. Fletcher III Manager - Support Services - Nuclear Attachments:
I. Affirmation II. Response to NRC Request 9 of Request for Additional Information Regarding \
Severe Accident Mitigation Alternatives Progress Energy Carolinas. Inc.
3581 West Entrance Road Hartsville, SC 29550
United States Nuclear Regulatory Commission Serial: RNP-RA/03-0007 Page 2 of 2 JSK/jsk c: Mr. T. P. O'Kelley, Director, Bureau of Radiological Health (SC) (w/o Attachments)
Mr. L. A. Reyes, NRC, Region II (w/Attachments)
Mr. C. Patel, NRC, NRR (w/o Attachments)
NRC Resident Inspectors, HBRSEP (w/o Attachments)
Attorney General (SC) (w/o Attachments)
Mr. S. K. Mitra, NRC, NRR (w/Attachments)
Mr. R. L. Emch, NRC, NRR (w/Attachments)
Mr. R. M. Gandy, Division of Radioactive Waste Management (SC) (w/o Attachments)
United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RAI03-0007 Page 1 of 1 AFFIRMATION The information contained in letter RNP-RA/03-0007 is true and correct to the best of my information, knowledge, and belief, and the sources of my information are officers, employees, contractors, and agents of Carolina Power and Light Company. I declare under penalty of perjury that the foregoing is true and correct.
Executed On: zýOAAo T. P.eeary Plant Ge eral Man er, HBRSEP, Unit No. 2
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/03-0007 Page 1 of 2 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 RESPONSE TO NRC REQUEST 9 OF REQUEST FOR ADDITIONAL INFORMATION REGARDING SEVERE ACCIDENT MITIGATION ALTERNATIVES NRC Request 9 "The RNP PRA does not utilize the Rhodes reactor coolant pump (RCP) seal LOCA model endorsed by the NRC. The use of this model could impact the risk from RCP seal LOCA events and the estimated benefits of associated SAMAs. Please discuss the RCP seal LOCA model used in the PSA and why this is judged to provide an appropriate representation of RCP seal LOCA events. Provide an assessment of the potential impact that use of the Rhodes model could have on the cost-benefit results for those SAMAs associated with RCP seal LOCAs. Also, provide an estimate of when RCP seals constructed of improved materials will be installed on pump "A" (see Phase 1 SAMA 14)."
CP&L Response Based on information contained within WCAP-15603, "WOG2000 Reactor Coolant Pump Seal Leakage Model for Westinghouse PWRs," Revision 1, Carolina Power &
Light (CP&L) Company understands that the Rhodes model differs from the RNP Current Licensing Basis (CLB) and the current RNP Probabilistic Safety Assessment (PSA) RCP seal model. The Rhodes model uses a less conservative spectrum of seal failure modes, resulting leakage rates, and core uncovery times for high temperature 0-rings when compared to the NUREG/CR-4550 model for the case involving older type 0-rings. Additionally, the Rhodes model conservatively assumes no time delay from the initial loss of RCP seal cooling to the onset of RCP seal failure. For example, the Rhodes model includes a high leakage failure mode (i.e., "popping") that occurs at the onset of the loss of RCP seal cooling with a high probability of occurrence (e.g., 20%).
The current RNP RCP seal model, based on the original interpretation of NUREG/CR 4550 for older type 0-rings, is representative of the current licensing basis in that it reflects the plant-specific actions that RNP has committed to and that are approved by the NRC, especially in regard to Station Blackout and 10 CFR 50, Appendix R. Specifically, the PSA model assumes that restoration of seal cooling within 90 minutes of the loss of AC power, in accordance with plant procedures, will prevent excess seal leakage. The PSA model also credits the dedicated shutdown diesel generator, the use of which is prescribed within plant procedures. Therefore, application of the Rhodes model assumptions to the RNP PSA model without corresponding modifications to RNP, and
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/03-0007 Page 2 of 2 without corresponding modifications to RNP CLB commitments, would not be appropriate and would not provide valid risk insights.
When compared to the current RNP PSA model, adopting the Rhodes model assumptions for RCP seal leakage rates and probabilities would be expected to lower the safety benefit of RCP seal-related SAMAs, since increased time would be available for restoration of offsite power to mitigate an RCP seal Loss of Coolant Accident (LOCA).
It is not clear whether the Rhodes model assumption that binding and popping failures start at the beginning of the scenario is used to simplify the calculations, or whether it represents expected seal behavior. If it represents expected RCP seal behavior, then the time available to prevent or mitigate the event by restoration of offsite power would be reduced, which would effectively eliminate the capability to credit restoration of seal cooling using the dedicated shutdown diesel generator. This failure mode (i.e., immediate, large) could not be prevented or mitigated by the RNP dedicated shutdown diesel generator due to the timing and high leak rates. The overall impact would be to increase the safety benefit of RCP seal-related Severe Accident Mitigation Alternatives (SAMAs), because of the reduction in credit taken for mitigating actions.
The evaluation of SAMAs in conjunction with the use of the Rhodes model would include the costs of modifications to RNP and to RNP's CLB commitments to match the assumptions of the model.
One of the findings of the Peer Certification Review of the RNP PSA recommends the evaluation of use of an upgraded RCP seal model. This recommendation has been entered into the CP&L Corrective Action Program and will be evaluated and dispositioned in accordance with Company procedures. As part of this action, CP&L will determine if any insights obtained from the Rhodes model are appropriate for inclusion in the long-term maintenance of the RNP PSA model.
RNP recognizes the importance of the risk posed by postulated RCP seal LOCAs. In this regard, RNP has installed high temperature O-rings in two of the three RCPs. Installation of the high temperature O-ring in the third RCP is planned for Refueling Outage 22, which currently scheduled for spring 2004.