February 5, 2003 Dr. Ronald L. Simard Nuclear Energy Institute (NEI) 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
RESOLUTION OF EARLY SITE PERMIT TOPIC 11 (ESP-11), CRITERIA FOR DETERMINING ESP DURATION (10-20 YEARS)
Dear Dr. Simard:
This letter confirms our understandings and expectations regarding the duration of early site permits (ESP) issued under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Subpart A. This topic, which is identified as ESP-11 on the list of Nuclear Energy Institute (NEI) generic ESP issues, was discussed during a public meeting on December 5, 2002 (Meeting Summary - ADAMS Accession No. ML023540387). Subsequently, NEI documented its position on this topic in a letter dated December 20, 2002. The staff agrees with NEIs position regarding the requested duration subject to the observations and clarifications stated below.
- 1. The lead ESP applicants will request a 20-year ESP and will provide the necessary information to support the NRCs staff evaluation of that requested duration.
- 2. Factors included in the approval of the requested duration include the uncertainties of the application information and data provided (e.g., parameters such as population distributions, man-made hazards) and the uncertainties of the methodologies used to make future projections. The NRC review with respect to time dependent site characteristics will be based on values representative of the end-of-life (i.e., ESP expiration) conditions at the site.
- 3. The NRC staff will review the subject ESP application information and determine whether the information provided therein supports the acceptability of the requested ESP duration.
Pursuant to 10 CFR 52.24, the Commission will issue an ESP in the form, and containing the conditions and limitations, that the Commission deems appropriate and necessary.
- 4. Should the NRC staff determine that the analysis does not support the requested 20-year time period, the staff will notify the ESP applicant of any concerns in this area in order to provide the applicant with an opportunity to supplement its application. The applicant can either provide additional information to support the full time period requested or amend its application to revise the duration requested. For example, if any of the application information regarding site characteristics (e.g., meteorology, geology) can only be demonstrated to be reliable for an interval less than the requested 20-year time period, the NRC staff will pursue through the request for additional information process reasonable assurance that their determination on those characteristics will be acceptable for the requested ESP duration.
R. Simard Please contact Ronaldo Jenkins, the ESP Senior Project Manager, at 301-415-2985 if you have any questions on this matter.
Sincerely,
/RA/
James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation Project No. 689 cc: See next page
R. Simard Please contact Ronaldo Jenkins, the ESP Senior Project Manager, at 301-415-2985 if you have any questions on this matter.
Sincerely,
/RA/
James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation Project No. 689 cc: See next page Distribution:
Hard Copy NRLPO Rdg.
RJenkins MGamberoni JLyons E-mail PUBLIC ACRS/ACNW RidsNrrAdip (RBorchardt)
RidsNrrAdpt (BSheron)
RidsOgcRp NRLPO Group RidsNrrOD (SCollins)
ACCESSION NO. ML030160592 OFC PM:NRLPO SPA:NRLPO DD:NRLPO D:NRLPO SPSB:BC NAME RJenkins JWilson MGamberoni JLyons MJohnson DATE 1/16/03 1/16/03 1/16/03 2/4/03 1/17/03 OFC RLEP:SC SPLB:SC OGC NAME JTappert SWeerakkody JMoore DATE 1/21/03 1/16/03 1/31/03 OFFICIAL RECORD COPY
ESP-Generic cc:
Mr. David Lochbaum Union of Concerned Scientists 1707 H Street, NW Suite 600 Washington, DC 20006-3919 Mr. Paul Gunter Director of the Reactor Watchdog Project Nuclear Information & Resource Service 1424 16th Street, NW, Suite 404 Washington, DC 20036 Mr. Russell Bell Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. Thomas P. Miller U.S. Department of Energy Headquarters - Germantown 19901 Germantown Road Germantown, MD 20874-1290 Mr. James Riccio Greenpeace 702 H Street, NW, Suite 300 Washington, DC 20001 Rod Krich Vice President, Licensing Projects Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Patricia Campbell Winston & Strawn 1400 L Street, NW Washington, DC 20005 Mr. Eddie Grant Exelon Generation 200 Exelon Way, KSA3-E Kennett Square, PA 19348 Mr. James F. Mallay, Director Regulatory Affairs FRAMATOME, ANP 3315 Old Forest Road Lynchburg, VA 24501 Mr. Ernie H. Kennedy Vice President New Plants Nuclear Plant Projects Westinghouse Electric Company 2000 Day Hill Road Windsor, CT 06095-0500 Dr. Regis A. Matzie Senior Vice President and Chief Technology Officer Westinghouse Electric Company 2000 Day Hill Road Windsor, CT 06095-0500 Mr. Gary Wright, Manager Office of Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive Springfield, IL 62704 Mr. Vince Langman Licensing Manager Atomic Energy of Canada Limited 2251 Speakman Drive Mississauga, Ontario Canada L5K 1B2 Mr. David Ritter Research Associate on Nuclear Energy Public Citizens Critical Mass Energy and Environmental Program 215 Pennsylvania Avenue, SE Washington, DC 20003 Mr. Tom Clements 6703 Guide Avenue Takoma Park, MD 20912 Mr. Edwin Lyman Nuclear Control Institute 1000 Connecticut Avenue, NW Suite 410 Washington, DC 20036
Mr. Jack W. Roe SCIENTECH, INC.
910 Clopper Road Gaithersburg, MD 20878 Dr. Gail H. Marcus U.S. Department of Energy Room 5A-143 1000 Independence Ave., SW Washington, DC 20585 Ms. Marilyn Kray Vice President, Special Projects Exelon Generation 200 Exelon Way, KSA3-E Kennett Square, PA 19348 Mr. Joseph D. Hegner Lead Engineer - Licensing Dominion Generation Early Site Permitting Project 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. George Alan Zinke Project Manager Nuclear Business Development Entergy Nuclear M-ECH-683 1340 Echelon Parkway Jackson, MS 39213 Mr. Charles Brinkman Westinghouse Electric Co.
Washington Operations 12300 Twinbrook Pkwy., Suite 330 Rockville, MD 20852 Mr. Ralph Beedle Senior Vice President and Chief Nuclear Officer Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Dr. Glenn R. George PA Consulting Group 130 Potter Street Haddonfield, NJ 08033 Arthur R. Woods Enercon Services, Inc.
500 TownPark Lane Kennesaw, GA 30144