ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Millstone Unit 2 Date of Examination: 12/16/02 Exam Level (circle one):

O / SRO(_j / SRO(U)

Operating Test No.:

1 B.1 Control Room Systems System / JPM Title Type Safety Code*

Function

a.

Reactor Protection System/Respond to Failed Tc Instrument N,S 7

b.

Containment Cooling System/Shifting Containment Air M,A,S 5

Recirculation and Cooling Units

c.

Emergency Diesel Generators/"A" DG Operability Test M,A,S 6

d.

Main Feedwater System/Start a Second Main Feedwater Pump N,S,L 4(S)

e.

Emergency Core Cooling System/HPSI Pump Operability Test D,A,S 3

f.

Reactor Coolant Pump System/Respond to RCP Seal Problems D,A,S 4(P)

g.

Chemical and Volume Control System/Manual Makeup to the D,A,S 1

VCT

h.

(SPARE)Circulating Water System/Respond to Circulating N,A,S 8

Water Malfunction

i.

(SPARE)A.C. Electrical Distribution/Cross-Tying 480 Volt Buses D, S 6

B.2 Facility Walk-Through

a.

Rod Control Drive System/Startup and Parallel CEDM MG Sets D

1

b.

Instrument Air System/Supplying Emergency Backup Air to 2-D,L,R 8

CH-192

c.

Containment System/Establish Manual Control of Hydrogen D,R 5

Purge Valve

d.

(SPARE) Waste Gas Disposal System/Shift from "A" to "B" N,R 9

Waste Gas Decay Tank

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA NUREG-1021, Revision 8

JOB PERFORMANCE MEASURE APPROVAL SHEET I

JPM

Title:

Respond toFailed Tc Instrument ID Number:

JPM-220 II.

Initiated:

R. J. Ashey Developer Revision:

0 II1. Reviewed:

IV. Approved:

Ter na Reviewer User Department Supervisor Nu-r Training Supervisor

/2

I/I

(.WL,

8/13/02 Date Date Date

JOB PERFORMANCE MEASURE WORKSHEET Facility:

MP-2 Examinee:

JPM Number:

JPM-220 Rev.

0 Task

Title:

-Respond to Failed Tc Instrumfent System:

RPS Time Critical Task:

Yes

.Validated Time (minutes):

No X

15 Task No.(s):

NUTIMS #012-01-006 Applicable To:

K/A No.

SRO X

012 A4.03 RO X

PEO K/A Rating 3.6/3.6 Method of Testingi:

Simulated Performance:

Location:

Classroom:

Actual Performance:

X Simulator:

X In-Plant:

Task Standards:

Required Materials (procedures, equipment):

General

References:

At the completion of this JPM, the examinee has responded to the failure of the Tc instrument, to include bypassing the appropriate RPS channel and recommending entry into the appropriate Technical Specification Action Statement.

0 0

0 0

0 ARP 2590C, DA-3, Rev. 004-10 Unit 2 Technical Specifications RPS bypass keys for TM/LP, High Power, and Local Power Density trip bistables.

ARP 2590C, DA-3, Rev 004-08 Unit 2 Technical Specifications 2

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

JPM-220 Initiating Cues:

Initial Conditions:

Simulator Reauirements:

You are the PPO.

Respond to changing parameters and alarms by reporting your observations and conclusions.

The examiner will act as the Unit Supervisor, participate in the communication process, and give direction for any required action.

Make recommendations and perform actions as directed by the US.

All operating conditions are normal.

Initialize in any at power IC with NOP/NOT. Ensure all bypass keys are removed from RPS, Channel "C" When examinee is in position, enter malfunction RP12C at a severity of 67%.

3 Rev.

0

  • * *
  • NOTES TO EXAMINER * * * *
1. Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

This JPM may be done concurrently with JPM-221 and JPM-223.

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-220 TITLE: Respond to Failed Tc Instrument X

Performance Steps:

Observe the following annunciators:

"* TM-LP TRIP CH C (DA_3 on C-04)

"* RPS PRE TRIP (AA-7 on C-04)

"* RX POWER T CH DEVIATION (AA-8 on C-04)

GRADE X

Standards:

Examinee observes and reports to the US/SM the following annunciators:

"* TM-LP TRIP CH C (DA-3 on C-04)

"* RPS PRE TRIP (AA-7 on C-04)

"* RX POWER AT CH DEVIATION (AA-8 on C-04)

Cue:

The US/SM acknowledges the report.

Comments:

The examinee may respond to the annunciators in any order; however, this JPM assumes that DA-3 on C-04 will be the first priority based on the red annunciator.

X Performance S X

Standards:

teps:

Observe Channel "C" pressurizer pressure indication and TM-LP setpoint and compare to other safety channel indications.

  • Examinee observe Channel "C" pressurizer pressure indication and TM-LP setpoint and compares to other safety channel indications on C-03.
  • Examinee determines that Channel "C" pressurizer pressure indications are equivalent to all other indications.

Cue:

If necessary, ask what the examinee is observing and his conclusions Comments:

Examinee may also compare Channel "C" indications on the PPC and ESAS.

4 START TIME:

STEP I STEP 2 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-220 TITLE: Respond to Failed Tc Instrument Performance S Standards:

teps:

Observe Channel "C" Th and Tc are indicatio noperly for present conditions.

Examinee compares all Th and Tc instruments and determines that T-1 12CC is reading significantly higher than all other cold leg temperatures, which are normal.

Comments:

Cue:

If necessar' ask what theexaminee is observing.

T-1 12CC is reading approximately 565°F. All other channels are reading approximately 550'F.

X Performance Steps:

X Standards:

Obtain necessary keys and requests permission to bypass the following Channel "C" RPS trip units:

"* TM-LP

"* High Power

"* Local Power Density Examinee obtains the appropriate keys and requests permission/recommends bypassing the following Channel "C" RPS trip units:

"* TM-LP

"* High Power

"* Local Power Density Cue:

USISM dire..s the examinee to bypass the requested channels.

Comments:

5 STEP 3 STEP 4 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-220 TITLE: Respond to Failed Tc Instrument X

Performance Steps:

X Standards:

Exarr RPS LCO refen ST, CSLu Cue:

LI/Macknowied; Inform the US/SM that the following Channel "C" RPS trip units are bypassed and that Technical Specification LCO 3.3.1.1, Table 3.3-1, and 3.3.2.1, Table 3.3-3 should be referenced:

"* TM-LP

"* High Power

"* Local Power Density inee informs the US/SM that the following Channel "C" trip units are bypassed and that Technical Specification 3.3.1.1, Table 3.3-1, and 3.3.2.1, Table 3.3-3 need to be enced:

M-LP tigh Power ocal Power Density Comments:

Technical Specification LCO 3.3.2.1 is NOT applicable for this event.

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

6 STEP 5 GRADE

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

Date Performed:

Operator:

Evaluator(s):

JPM-220 Rev.

0 For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes Validated Time (minutes):

No X

15 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

7

EXAMINEE HANDOUT JPM ID Number:

JPM-220 Initiatingq Cues:

Initial Conditions:

You are the PPO.

Respond to changing parameters and alarms by reporting your observations and conclusions.

The examiner will act as the Unit Supervisor, participate in the communication process, and give direction for any required action.

Make recommendations and perform actions as directed by the US.

All operating conditions are normal.

8

JOB PERFORMANCE MEASURE APPROVAL SHEET I.

JPM

Title:

ID Number:

"6A" DG Operability Test JPM-223 Revision:

0 II.

Initiated:

R. J. Ashey Developer III.

Reviewed:

TL 4ical Reviewer Date IV. Approved:

User Department Supervisor Date cldear Training Supervisor 8/13/02 Date 9 P =*-.,

JOB PERFORMANCE MEASURE WORKSHEET Examinee:

JPM Number:

JPM-223 Rev.

0 Task

Title:

"A" DG Operability Test System:

Electrical Time Critical Task:

Yes No X

Validated Time (minutes):

20 min Task No.(s):

NUTIMS # 064-01-120 Applicable To:

K/A No.:

SRO X

064 A4.06 RO X

K/A Rating:

3.9/3.9 Method of Testing:

Simulated Performance:

Actual Performance:

X Location:

Classroom:

Simulator:

X Task Standards:

Required Materials (Drocedures. eauioment):

General

References:

Examinee performs the Facility 1 Diesel Generator Operability Test on the 'A' D/G to the point of starting the D/G per SP 2613A, recognizes the failure to start, and notifies the US/SM of the diesel failure to start.

Stop watch Authorized OPS Form 2613A-001, Rev. 019-04 SP 2613A, Diesel Generator Operability Tests, Facility 1, Rev. 020 04 SP 2613A, Diesel Generator Operability Tests, Facility 1, Rev. 020 04 2

Facility:

MP-2 PEO In-Plant:

  • * *
  • READ TO THE EXAMINEE * * * *

/ will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

JPM-223 Rev.

0 Initiatinq Cues:

Initial Conditions:

Simulator Requirements:

0 You are the SPO.

0 The US has directed you to perform the Periodic 'A' D/G Operability Test (Fast Start, Loaded Run) per SP 2613A I will act as the US, PEO, etc.

0 All plant conditions are normal.

NO other surveillances are being performed.

SP 2613A-001 has been authorized for release.

Valve Alignment Check, OPS Form 2613A-002 was performed two weeks ago NO maintenance has been performed on the "A" DG in the last two weeks.

The 'A' D/G pre-start check list, 2346A-002, has been completed.

0 A PEO has been briefed and is standing by at the 'A' D/G gage board. He will complete the D/G Data Sheet, 2346A 004.

The applicable portions of SP 2619G, AC Electrical Sources Inoperability, were completed 5 minutes ago.

There are NO Ozone alerts in affect.

"B" D/G is OPERABLE.

Initialize at a normal 100% power IC and enter malfunction EG13A to prevent the "A" DG from starting.

3 NOTES TO EXAMINER. -.

1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

This JPM may be performed bin conjunction with JPM-220 and JPM 221.

I I

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-223 TITLE:

"A" DG Operability Test Performance Steps: Observe "A Service Water header flow and ensure minimum flow of at least 3,000 gpm is maintained after engine start.

Standards:

Examinee observes "A" Service Water header flow indication on C-06 or the PPC and states that flow will be maintained at least 3, 000 gpm.

Cue:

Comments:

STEP 2 GRADE When the D/G is started, the service water valves will change position resulting in approximately 700 gpm less header flow.

Performance Steps: Check Diesel Day Tank level by the following:

"* Observe "A" diesel day tank level gage, LG-7003 and record.

"* Check level greater than 134 inches and initial form.

"* Check Diesel Gen 12U Supply Tank Hi/Lo alarm NOT lit and initial form.

Standards:

e Examinee dispatches a PEO to observe "A" diesel day tank level gage, LG7003, in "A" diesel day tank room and records results on OPS Form 2613A-001.

", Examinee checks level is greater than 134 inches and initials OPS Form 2613A-001.

"* Examinee checks DIESEL GEN SUPPLY TANK HIlL 0 alarm window on C-08 is NOT lit and initials OPS Form 2613A-001.

Cue:

When asked, report "A" diesel day, tank le'vel greater than 134 inches.

Comments:

4 START TIME:

STEP 1 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-223 TITLE:

"A" DG Operability Test STEP 3 Performance Steps: Check "B" DIG is OPERABLE and DG B FDR BKR, 15G-13U-2 is open.

GRADE Standards:

Examinee ensures the "B" DIG is aligned for automatic operation and the "B" DIG feeder breaker, 15G-13U-2 is open.

Cue:

~

Comments:

Initial conditions state that the "B" D/G is OPERABLE.

STEP 4 Performance Steps: Ensure DIESEL GEN 12U TROUBLE annunciator is not lit.

GRADE Standards:

Examinee ensures DIESEL GEN 12U TROUBLE annunciator, A-36 on C-08 is NOT lit.

Cue:

Comments:

STEP 5 Performance Steps: Obtain stop watches for the operator at C-08 (and the operator at "A" DIG gage board for local operation).

GRADE Standards:

Examinee ensures a stop watch is available at C-08.

Cue:

Comments:

The time for prelubing will be monitored by the operator at C-08; therefore only the operator at C-08 is required to have a stop watch.

5

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-223 TITLE:

"A" DG Operability Test Performance Steps: Station an operator at the "A" DIG gage board and establish communications.

GRADE Standards:

Examinee will verify a PEO is stations at the "A" DIG gage board and that communications are established.

Cue:

Comments:

Performance Steps: Prior to engine start, ensure fuel rack position is at MINIMUM position.

GRADE Standards:

Examinee will determine from the PEO whether the fuel rack position is at MINIMUM.

Cue:

Report that fuel rack position is at minimum.

Comments:

6 STEP 6 STEP 7

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-223 STEP 8 TITLE:

"A" DG Operability Test Performance Steps: Record or initial on OPS Form 2613A-001 the following:

"* Engine hour reading prior to the run.

"* Fuel rack position at MINIMUM.

GRADE Standards:

Examinee will direct the PEO to record or initial on OPS Form 2346A-004 the following:

"* Engine hour reading prior to the run (Local)

"* Fuel rack position at MINIMUM (Local)

Cue:

Inform examinee that the appropriate information has been recorded on OPS Form 2346A-004.

Comments:

STEP 9 Performance Steps: Refer to Technical Specification LCO 3.8.1.1 and SP 2619G, AC Electrical Sources Inoperability, and determine applicability.

GRADE Standards:

Examinee informs the US/SM of the need to log into TSAS 3.8.1.1b and the need to perform SP 2619G.

Cue:

Inform the examinee that you have entered TSAS 3.8.*.lb and that SP 2619G has been performed.

Comments:

Initial conditions state that SP 2619G has been performed.

7

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-223 TITLE:

"A" DG Operability Test Performance Steps: Install chart recorder.

Standards:

Examinee directs the installation of the chart recorder:

"* Connect the voltage signal cables to the generator voltage terminals.

"* Connect the governor shaft position and speed/frequency cable to the Diagnostic Enclosure, T4037.

Cue: ' When requested, report that the chart recorder is installed.

Comments:

Performance Steps: Ensure the following parameters upon starting:

"* Fuel oil pressure at minimum of 5 psig at filter

"* Nominal starting air pressure of greater than 150 psig.

"* Fuel rack is at 1/8 to 1/4 position with engine at rated speed.

"* Service Water flow to "A" DIG is greater than 559 gpm.

When the D/G starts, initial OPS Form 2346A-004 for the above listed items.

Standards:

Examinee will direct the PEO to observe the following information during the DIG start:

"* Fuel oil pressure is at a minimum of 5 psig at the filter

"* Nominal starting air pressure is greater than 150 psig.

"* Fuel rack is at 1/8 to 1/4 position with engine at rated speed.

"* Service Water flow to "A" DIG is greater than 559 gpm.

Examinee will direct the PEO to initial QPS Form 2346A 004 for the above listed items.

Cue:

Acknowledge the requirement to initial for the above listed parameters on the OPS Form.

Comments:

8 STEP 10 GRADE STEP 11 GRADE

--- - ----------- ~ ----------- ~-~ ----

--~~ ------------

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-223 STEP 12 TITLE:

"A" DG Operability Test Performance Steps: If D/G prelube time exceeds 12 minutes and D/G is not started, then perform applicable steps to rotate the D/G with air.

GRADE Standards:

Examinee states that the prelube time should NOT exceed 12 minutes.

Cue:

Comments:

X Performance Steps: Place Prelube Pump switch in START and start prelube timing.

GRADE X

Standards:

"* Examinee places Prelube Pump switch in the START position and starts the stop watch.

"* Examinee stops the stop watch when 9.5 to 12 minutes has elapsed.

Cue:

At *th e discretinon ofii th exmier infor*m theex'am*ine~e tht 9

minutes has elapsed Comments:

The 9 minute mark allows the examinee time to review the next set of steps.

9 STEP 13


~-~~ --------- ~

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-223 TITLE:

"A" DG Operability Test STEP 14 X

Performance Ste GRADE X

Standards:

ps: When 9/ to 12 minutes has elapsed, perform the following:

"* Start the chart recorder

"* Simultaneously place the "A" DG Manual Start Stop switch in START and start the stop watch.

"* When 9Y2 to 12 minutes has elapsed, examinee informs the PEO to start the chart recorder

"* Examinee simultaneously places the "A" DG Manual Start-Stop switch in START and starts the stop watch.

Cue:

Inform examinee that the chart recorder is running.

Comments:

X Performance Steps: When diesel Ready To Load alarm is lit, stop the stop watch.

GRADE X

Standards:

After approximately 12 seconds, the examinee observes the DIESEL GEN 12U DISABLED and DIESEL GEN 12U TROUBLE annunciators are lit.

Cue:

Comments:

"* The diesel has failed to start. The DIESEL GEN 12U READY TO LOAD annunciator will NOT be lit as expected. The examinee may or may NOT stop the stop watch.

"* The examinee may or may NOT place the Prelube Pump switch in the OFF position at this time.

"* The examinee may or may NOT refer to the Alarm Response Procedure for the given annunciators.

10 STEP 15

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-223 TITLE:

"A" DG Operability Test STEP 16 X

Performance Steps: Notify the US/SM of the "A" diesel failure to start.

GRADE X

Standards:

Examinee informs the US/SM of the "A" DIG failure to start and/or the "A" diesel in inoperable.

Cue:

S LIS/SM acknowledges the report.

X Performance Steps: Stop the prelube pump.

GRADE X

Standards:

Examinee places the Prelube Pump switch in STOP.

Cue:

Direct the examinee to stop the prelube pump.

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

11 STEP 17

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM-223 Rev.

0 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes Validated Time (minutes):

No X

20 minutes Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

12 I

EXAMINEE HANDOUT JPM ID Number:

JPM-223 Initiatinq Cues:

Initial Conditions:

You are the SPO.

The US has directed you to perform the Periodic 'A' DIG Operability Test (Fast Start, Loaded Run) per SP 2613A I will act as the US, PEO, etc.

All plant conditions are normal.

NO other surveillances are being performed.

SP 2613A-001 has been authorized for release.

Valve Alignment Check, OPS Form 2613A-002 was performed two weeks ago NO maintenance has been performed on the "A" DG in the last two weeks.

The 'A' D/G pre-start check list, 2346A-002, has been completed.

A PEO has been briefed and is standing by at the 'A' D/G gage board. He will complete the D/G Data Sheet, 2346A 004.

The applicable portions of SP 2619G, AC Electrical Sources Inoperability, were completed 5 minutes ago.

There are NO Ozone alerts in affect.

"B" D/G is OPERABLE.

13

JOB PERFORMANCE MEASURE APPROVAL SHEET I.

JPM

Title:

ID Number:

Start a Second Main Feedwater Pump JPM-222 Revision:

0 II.

Initiated:

R. J. Ashey Developer 14 4/5/02 Date III.

Reviewed:

Date IV. Approved:

User De'partment Supervisor N c ear Training Supervisor Date

JOB PERFORMANCE MEASURE WORKSHEET Facility:

MP-2 Examinee:

JPM Number:

JPM-222 Rev.

0 Task

Title:

Start a Second Main Feedwater Pump System:

Main Feedwater System Time Critical Task:

Yes No X

Validated Time (minutes):

4 6 Task No.(s):

NUTIMS # 059-01-069 Applicable To:

K/A No.:

SRO X

059 A4.03 RO X

K/A Rating:

2.9*/2.9 Method of Testing:

Simulated Performance:

Location:

Classroom:

Actual Performance:

X Simulator:

X In-Plant:

Task Standards:

Required Materials (procedures, equipment):

General

References:

At the completion of this JPM, the examinee will have placed a second main feed pump in operation.

OP 2321, Main Feedwater System, Rev. 017-00 OP 2321, Main Feedwater System, Rev. 017-00 2

PEO

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

Initiating Cues:

JPM-222 S

0 Initial Conditions:

0 0

S S

S Simulator Reauirements:

Rev.

0 You are the SPO.

The US has directed you to place the "B" Main Feed Pump in automatic operation in preparation for raising power to 100%.

Power is at approximately 55%

"B" SGFP Overspeed Test keyswitch if "OFF".

"B" SGFP Valve Limiter Override Permissive keyswitch in "NORMAL".

Five Condensate Demineralizers are in service.

"B" SGFP lube oil temperature is 1000F.

Set to any IC at 55-60% power with only the "A" SGFP running.

3 NOTES TO EXAMINER * * * *

1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

Under NO circumstances must the examinee be allowed to manipulate any devices during the performance of this JPM (in-plant only).

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump START TIME:

STEP 1 Performance Steps: Ensure Condensate header pressure is greater than 400 psig and that at least 5 condensate demins are in service.

GRADE Standards:

Examinee observes P-5224 to ensure condensate header pressure is greater than 400 psig.

Cue:

If necessary, question what the examinee is observing.

Comments:

Initial Conditions state that 5 condensate demineralizers are in service.

STEP 2 GRADE Comments:

__ Performance Steps: Set "B" SGFP lube oil temperature controller, TIC 6339, to 110°F.

Standards:

Examinee dispatches a PEO to adjust the "B" SGFP lube oil temperature controller, TIC-6339, to I I OF.

Cue:

As the PEO, report that the "B" SGFP lube oil controller temperaturehas been set to IoIoeF.

NJo action is required to set the lube oil temperature controller.

4


~ -------------

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE: Start a Second Main Feedwater Pump STEP 3 X

Performance Steps:

GRADE X

Standards:

Open the following SGFP STM DRNS:

"* HP SPLY, MS 100E/238

"* EXT SPLY, MS 100A/B

"* TB 1st STAGE, MS 184B

"* HP BELOW SEAT, MS 186A

"* HP ABOVE SEAT, MS 186B

"* EXT BELOW SEAT, MS 185A

"* EXT ABOVE SEAT, MS 185B Examinee presses the 'open' push button for the following valves and ensures the green 'open' light is lit.:

"* HP SPL Y, MS 100E/238

"* EXT SPL Y, MS IOOA/B

"* TB Ist STAGE, MS 184B

"* HPBELOWSEAT, MS 186A

"* HP ABOVE SEAT, MS 186B EXTBELOWSEAT, MS 185A EXT ABOVE SEAT, MS 185B Cue:

Comments:

STEP 4 GRADE

__ Performance Steps: Station an operator at "B" SGFP start.

Standards:

to locally monitor Examinee dispatches a PEO to the "B" SGFP to look for abnormal conditions; e.g., high vibration, leaks, etc.

Cue:

Report that aPEO is stationed at the "B" SGFP.

Comments:

5

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump X

Performance Steps: Open "B" SGFP DIS VLV, FW-38B.

X Standards:

Examinee momentarily places the "B" SGFP DIS VL V, FW-38B, to the open position and observes only the red

'open' light is lit.

Cue:

Comments:

X Performance Steps: Press 'SEL' on the "B" SGFP MIN FLOW RECIRC, FIC-5240, controller until the cursor appears above the controller output.

X Standards:

The examinee presses the 'SEL' button on the "B" SGFP MIN FLOW RECIRC, FIC-5240, controller until the cursor appears above the controller output (right hand bar graph).

Cue:

Comments:

6 STEP 5 GRADE STEP 6 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump X

Performance Steps: Set "B" SGFP MIN FLOW RECIRC, FIC-5240, controller to 65-70% open signal in manual control.

X Standards:

Examinee presses the 'up arrow' on "B" SGFP MIN FLOW RECIRC, FIC-5240, controller to obtain a 65-70%

output signal.

Comments:

STEP 8 GRADE Cue:

If necessary, ask the examinee what helshe is observing.

As the minimum flow recirc valve is opened, the feed pump turbine will roll off the turning gear.

__ Performance Steps:

When "B" SGFP turning gear disengages, place "B" SGFP TURN GEAR CNTL to STOP.

Standards:

Examinee observes feed pump turbine roll off the turning gear and places the "B" SGFP TURN GEAR CNTL switch in the STOP position..

Cue:

Comments:

"* If this step is NOT performed within 5 seconds, then the examinee will be required to reset the TGX relay on the rear of C-05 by pressing the PB TGX/SGFPT B RESET TURNING GEAR LOCKOUT.

"* Failure to perform this step within 5 seconds does NOT constitute a failure of this JPM.

7 STEP 7 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 STEP 9 TITLE:

Start a Second Main Feedwater Pump Performance Steps: Press "B" SGFP alarm ACK and RESET buttons and ensure the "B" SGFP TRIP alarm is reset.

GRADE Standards:

The examinee presses the "B" SGFP alarm ACK and RESET buttons on the SGFP insert and ensures the "B" SGFP TRIP alarm is reset.

Cue:

Comments:

STEP 10 X

Performance Steps GRADE X

Standards:

Comments:

Press the "B" SGFP RESET button on C-05 and ensure the following:

"* HP STM STOP, MS-67B and EXT STM STOP, MS 66B are open

"* SGFP B TURBINE TRIP alarm is NOT lit.

Examinee presses the "B" SGFP RESET button on C-05 and observes the following:

"* HP STM STOP, MS-67B and EXT STM STOP, MS 66B are open

"* SGFP B TURBINE TRIP alarm is NOT lit.

Cue:

If necessary, ask the examinee what he/she is observing.

The examinee may press "B" SGFP alarm ACK and RESET buttons to clear the SGFP Trouble alarm and the trip alarm on the insert at any time during this JPM.

8


- ----- ~ ------ ~~~

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump X

Performance Steps: Place the "A" SGFP in MANUAL.

GRADE Comments:

STEP 12 X

Standards:

Cue:

Examinee presses the MANUAL push button for the "A" SGFP and ensures the 'manual' button light is lit.

If left in automatic, the "A" SGFP speed will lower when "B" SGFP speed is raised above 3,000 rpm.

X Performance Steps: Press "B" SGFP control START push button GRADE X

Standards:

Examinee presses the "B" SGFP control START push button and observes a rise in speed.

Cue:

Comments:

When this step is performed:

"* The controller will open the valve limiter to 20% at the 'Valve Limiter Rate of 5%/sec.

"* The speed setpoint will ramp from zero to the minimum controlling speed setting (1,000 rpm) at 20 rpm/min.

9 STEP 11


~~ ----------------- ~~ ------ ~

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump STEP 13 Performance Steps: Locally check the "B" SGFP.

GRADE Standards:

Examinee will instruct the PEO at the "B" SGFP to check for:

"* SGFP seal leakage and proper operation of TCVs

"* Bearing lube oil supply temperature being maintained between 100 and 130°F.

"* Rubs, squeaks, or unusual noises.

Cue:

As the PEO, report that all conditions are normal.

Comments:

STEP 14 X

Performance Steps: Check SGFP at 1,000 RPM X

Standards:

Examinee will observe "B" SGFP speed between 970 and 1030 rpm.

Cue:

If necessary, ask examinee what he/she is observing.

Comments:

10 GRADE


~~~~

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump STEP 15 X

Performance Steps GRADE X

Standards:

Press the "B" SGFP TRIP button and check the following:

"* HP STM STOP, MS-67B and EXT STM STOP, MS 66B indicate closed

"* "B" SGFP speed lowers.

"* SGFP B TURBINE TRIP alarm is lit.

Examinee presses the "B" SGFP TRIP button on C-05 and observes the following:

"* HP STM STOP, MS-67B and EXT STM STOP, MS 66B green closed lights are lit.

"* "B" SGFP speed is lowering.

"* SGFP B TURBINE TRIP alarm is lit.

Cue:

If necessary, ask examinee what he/she is observing.

Comments:

STEP 16 GRADE Performance Steps: Press "B" SGFP alarm ACK and RESET buttons and ensure the "B" SGFP TRIP alarm is reset.

Standards:

The examinee presses the "B" SGFP alarm ACK and RESET buttons on the SGFP insert and ensures the "B" SGFP TRIP alarm light is NOT lit.

Cue:

Comments:

11

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump X

Performance Steps:

Press the "B" SGFP RESET button on C-05 and ensure the following:

"* HP STM STOP, MS-67B and EXT STM STOP, MS 66B are open

"* SGFP B TURBINE TRIP alarm is NOT lit.

X Standards:

Examinee presses the "B" SGFP RESET button on C-05 and observes the following:

"* HP STM STOP, MS-67B and EXT STM STOP, MS 66B are open

"* SGFP B TURBINE TRIP alarm is NOT lit.

Comments:

STEP 18 Cue:

If necessary, ask the examinee what helshe is observing.

The examinee may press "B" SGFP alarm ACK and RESET buttons to clear the SGFP Trouble alarm and the Trip alarm on the insert at any time during this JPM.

X Performance Steps: Press "B" SGFP control START push button X

Standards:

Examinee presses the "B" SGFP control START push button and observes SGFP speed rising.

Cue:

Comments:

When this step is performed:

The controller will open the valve limiter to 20% at the 'Valve Limiter Rate of 5%/sec.

The speed setpoint will ramp from zero to the minimum controlling speed setting (1,000 rpm) at 20 rpm/min.

12 STEP 17 GRADE GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump X

Performance Steps: Check SGFP at 1,000 RPM X

Standards:

Examinee will observe "B" SGFP speed between 970 and 1030 rpm.

Cue:

If necessary, ask examinee what he/she is observing.

Comments:

Performance GRADE Standards:

Steps: If the standby SGFP lube oil pump starts while resetting the "B" SGFP then align it for automatic operation by placing the standby lube oil pump switch, P171B or P172B, to STOP and returning it to AUTO.

Examinee determines whether the "B" SGFP standby lube oil pump started.

If so, examinee places the standby lube oil pump switch on C-08 for P171 B or P172B, to STOP and returns it to AUTO.

Cue:

Comments:

13 STEP 19 GRADE STEP 20

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 STEP 21 TITLE:

Start a Second Main Feedwater Pump X

Performance Steps: Close the following drain valves:

"* HP SPLY, MS-1 00E/238

"* HP ABOVE SEAT, MS-186B GRADE X

Standards:

Examinee presses the closed push button for HP SPL Y, MS-100E/238, and HP ABOVE SEAT, MS-186B and observes the green closed light.

Cue:

Comments:

X Performance Steps X

Standards:

When "B" SGFP bearing oil supply temperature (PPC point T7123) is between 100 and 110°F, simultaneously perform the following:

"* Raise "B" SGFP speed and lower "A" SGFP speed to obtain FRV D/P greater than 20 psid and SGFP speed difference within 100 to 200 rpm of each other.

"* Using "B" SGFP MIN FLOW RECIRC controller, maintain minimum flow between 4,200 and 4,500 gpm.

When "B" SGFP bearing oil temperature, as read on PPC point T7123, is between 100 and 1 10°F, then the examinee adjusts "A" and "B" SGFP speed to establish FRV DIP greater than 20 psid and SGFP speed between 100 and 200 rpm of each other.

The examinee adjusts "B" minimum flow recirc valve to maintain minimum flow between 4,200 and 4,500 gpm.

Comments:

Cue:

If lube oil temperature is NOT at 100 to 110, then tell the examinee that the oil temperature is at the correct temperature.

SGFP differential speeds, FRV D/P, and SGFP minimum flow may be outside the given limits momentarily while adjusting feed pump speeds and the minimum flow valve, provided the given limits are established when the examinee has completed making adjustments.

14 STEP 22 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump STEP 23 X

Performance Steps:

GRADE X

Standards:

Place the "B" SGFP MIN FLOE RECIRC, FIC-5249, controller in AUTO by the following:

"* Press SEL button until cursor appears above actual flow bar graph.

"* Ensure actual flow is greater than 4,200 gpm.

"* Press SEL button until cursor appears above the setpoint bar graph.

"* Using the 'up' and' down' arrow buttons, adjust the setpoint to 4,200 gpm.

"* Press A/M button and check the 'A' light is lit.

Examinee places the "B" SGFP MIN FLOE RECIRC, FIC-5249, controller in AUTO by the following:

"* Press SEL button until cursor appears above actual flow bar graph.

"* Ensure actual flow is greater than 4,200 gpm.

"* Press SEL button until cursor appears above the setpoint bar graph.

"* Using the 'up' and' down' arrow buttons, adjust the setpoint to 4,200 gpm.

"* Press AIM button and check the A' light is lit Cue:

Comments:

15

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump STEP 24 X

Performance Steps:

GRADE X

Standards:

Close the following valves:

"* EXT SPLY, MS 100A/B

"* TB I STAGE, MS 184B

"* HP BELOW SEAT, MS 186A

"* EXT BELOW SEAT, MS 185A

"* EXT ABOVE SEAT, MS 185B Examinee presses the 'close' button for the following valves and ensures the respective green' closed' light for each valve is lit:

" EXT SPLY, MS IOOA/B TB Ist STAGE, MS 184B

" HPBELOWSEAT, MS 186A

" EXTBELOWSEAT, MS 185A

" EXT ABOVE SEAT, MS 185B Cue:

Comments:

STEP 25 X

Performance Steps GRADE X

Standards:

To place the "A" SGFP in automatic speed control, perform the following:

"* Using "A" SGFP speed RAISE and LOWER buttons, adjust speed to achieve a difference between 'actual' speed and 'auto' speed setpoint of less than or equal to 100 rpm.

"* Press and hold "A" SGFP AUTO control for 3 seconds.

"* Ensure transfer to auto speed control was successful.

Examinee adjusts the speed difference between

'actual' and 'auto' setpoint to less than or equal to 100 rpm.

  • Examinee presses and holds the "A" SGFP AUTO control for 3 seconds.

Examinee observes AUTO speed light is lit.

Cue:

Comments:

16

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-222 TITLE:

Start a Second Main Feedwater Pump X

Performance Steps:

To place the "B" SGFP in automatic speed control, perform the following:

"* Using "B" SGFP speed RAISE and LOWER buttons, adjust speed to achieve a difference between 'actual' speed and 'auto' speed setpoint of less than or equal to 100 rpm.

"* Press and hold "B" SGFP AUTO control for 3 seconds.

"* Ensure transfer to auto speed control was successful.

GRADE X

Standards:

"* Examinee adjusts the speed difference between

'actual' and 'auto' setpoint to less than or equal to 100 rpm.

"* Examinee presses and holds the "B" SGFP AUTO control for 3 seconds.

Examinee observes AUTO speed light is lit.

Cue:

Comments:

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

17 STEP 26

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM-222 Rev.

0 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

I Time Critical Task?

Yes Validated Time (minutes):

No X

20 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

18

EXAMINEE HANDOUT JPM ID Number:

JPM-222 Initiating Cues:

S S

Initial Conditions:

S S

S S

S You are the SPO.

The US has directed you to place the "B" Main Feed Pump in automatic operation in preparation for raising power to 100%.

Power is at approximately 55%.

"B" SGFP Overspeed Test keyswitch if "OFF".

"B" SGFP Valve Limiter Override Permissive keyswitch in "NORMAL".

Five Condensate Demineralizers are in service.

"B" SGFP lube oil temperature is 100'F.

19

JOB PERFORMANCE MEASURE APPROVAL SHEET I

JPM

Title:

HPSI Pump Operability Test ID Number:

JPM-100 Revision:

5 II.

Initiated:

R. J. Ashey Developer IlI.

Reviewed:

IV. Approved:

User Department Supervisor N u ar Training Supervisor 8/13/02 Date Date Date A1111-

JOB PERFORMANCE MEASURE WORKSHEET Examinee:

JPM Number:

JPM-100 Rev.

5 Task

Title:

HPSI Pump Operability Test System:

Emergency Core Cooling System Time Critical Task:

Yes No X

Validated Time (minutes):

15 Task No.(s):

NUTIMS #006-02-017 Applicable To:

K/A No.

SRO X

006 A3.02 RO X

PEO K/A Rating 4.1/4.1 Method of Testing:

Simulated Performance:

Actual Performance:

X Location:

Classroom:

Simulator:

X Task Standards:

Required Materials (procedures, equipment):

General

References:

At the completion of this JPM, the examinee has initiated Facility I HPSI pump surveillance on "A" HPSI pump and recognized the failure of the pump to meet the acceptance criteria for differential pressure, and states that the pump has failed its surveillance and/or that it is NOT OPERABLE.

"* SP 2604A, HPSI Pump Operability and Inservice Testing, Facility 1

"* Calculator

"* OPS Form 2604A-1; authorized and dated SP 2604A, Section 4.1 (Rev. 12, Ch. 6) 2 Facility:

MP-2 In-Plant:

        • READ TO THE EXAMINEE****

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

Initiating Cues:

Initial Conditions:

JPM-100 Rev.

5 You are the PPO.

The Unit Supervisor has directed you to perform surveillance SP 2604A on the "A" HPSI Pump.

An IST is NOT required.

The examiner will act as the Unit Supervisor and/or PEO.

The plant is at 100% power, NOT/NOP.

No equipment is out of service.

OPS Form 2604A-1 has been authorized for release.

Simulator Requirements:

Initialize to any stable IC with the turbine on line and enter Malfunction SI05A @ 9% to degrade "A" HPSI pump performance.

3

  • * * *.NOTES TO EXAMINER * * * *
1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

This JPM may be performed in conjunction with JPM-222 and JPM-012.

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-100 TITLE: HPSI Pump Operability Test START TIME:

STEP I

GRADE Performance Steps:

Standards:

Ensure the following are open:

"PP MINFLOW STOP, SI-659"

"* "PP MINFLOW STOP, SI-660"

"* HPSI pump min. flow recirc. stop, 2-SI-423

"* HPSI pump suction stop, 2-SI-470 Examinee performs the following:

Observes SI-659 & SI-660 are open by their red lights only lit on C-01.

  • Directs/requests PEO, to locally check open 2-SI-423 and 2 S1-470.

Cue:

Report that 2-SI-423 and 2-SI-470 are locked open.

Comments:

STEP 2

GRADE Performance Steps:

Standards:

Refer to TS LCO and log entry into Action Statement LCO, 3.5.2a (closed injection valves).

Examinee informs the US to log into TSAS 3.5.2a due to closing the injection valves.

Cue:

Report that the applicable entry has been made.

Comments:

Performance Steps:

Standards:

Ensure an operator stationed in the "A" Safeguards Room to monitor initial pump start.

Examinee directs/requests a PEO to go to "A" Safeguards Room and prepare for "A" HPSI pump start.

Cue:

I am in the "A" Safeguards Room. Oil levels are good and I am standing by for pump start.

Comments:

This may have already been directed when sending PEO to check valve alignment.

4 STEP 3

GRADE

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-100 TITLE: HPSI Pump Operability Test STEP 4 GRADE X

Performance Steps:

X Standards:

If the "A" HPSI pump is allowed to be capable of injecting into the RCS by T/S LCO 3.4.9.3, "Overpressure Protection Systems," and TRM 8.0, "Shutdown Cooling System," PERFORM the following:

1. PERFORM one of the following (C-01):

"* CLOSE 2-S1-656, "HPSI HDR A STOP"

"* CLOSE all 4 HPSI header "A" injection valves:

"LOOP 1A, SI-617" "LOOP 1B, SI-627" "LOOP 2A, SI-637" "LOOP 2B, SI-647"

2. If "B" HPSI Pump is aligned to Facility 1, Ensure "B" HPSI control switch is in the PULL-TO-LOCK position.
3. ENSURE "HPSI PP A" control switch is in the normal after trip position (C-01).
  • Examinee either obtains key and closes 2-SI 656 OR closes 2-SI-617, 627, 637, and 647 on C-01 and observes the respective valve closes by checking green only light is lit.

Examinee ensures the "B" HPSI Pump control switch is in the PULL-TO-LOCK position.

Examinee also observes "A" HPSI pumps switch to ensure a green flag is present and the green light only is lit.

Cue:

Comments:

The note prior to this step states that it is preferable to close the HPSI header injection valves.

Performance Steps:

Standards:

Record time "A" HPSI header flow path secured in SM Log.

Examinee states they would inform the US to log time.

Cue:

Inform the examinee that the applicable entry has been made.

Comments:

5 STEP 5

GRADE

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-100 TITLE: HPSI Pump Operability Test STEP 6

GRADE X

Performance Stel X

Standards:

At the ESAS panel, start the "A" HPSI pump.

Examinee performs the following:

"* (In MODE 1) Observes no "1/5" lights or bistable "TRIP" lights lit for SIAS, CIAS, EBFAS, or MSI on Facility I and Facility 2 ESF Actuation Cabinets 5 and 6 and all Sensor Cabinets.

"* Places TEST PERMISSIVE SWITCH, S-501 in "TEST SIAS" on Actuation Cabinet 5.

"* Places TEST GROUP SWITCH, S-502 in "GROUP 2" on Actuation Cabinet 5.

"* Places TRIP TEST, S-102 (S-302) switch in "CONT PRESS SIAS/CIAS/EBFAS/MSI" on Sensor Cabinet "A"

("C").

"* Presses and holds "TRIP TEST" button on bistable BA 101 (BA301) on Sensor Cabinet "A" ("C").

"* Checks actuation module, AM514 "1/5" light is lit on Actuation Cabinet 5.

"* Presses "1/5" "TEST" button on actuation module AM514.

"* Releases "TRIP TEST" button on bistable BA 101 (BA301) on Sensor Cabinet "A" ("C").

Cue:

Comments:

  • Sensor cabinet "A" or "C" may be used. If cabinet "C" is used, two operators are required. Cabinet "C" components are in parentheses.
  • Examinee is allowed more than one attempt to start the "A" HPSI pump.

STEP 7

X Performance Step GRADE X

Standards:

Compare start data and initial form if satisfactory.

Examinee observes the following and initials form:

"* Red "TRIP" light is lit on actuation module AM514.

"* HPSI pump has started by its red light only lit and/or amperage indication on C-01.

Cue:

Comments:

6 pS:

)S:

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-100 TITLE: HPSI Pump Operability Test STEP 8

Performance Steps:

GRADE Comments:

Standards:

During pump operation, observe the following:

Normal motor amperage (C-01)

Visible oil levels (local)

Normal differential pressure (typically > 1231 psid)

NO abnormal noise or vibration (local)

Examinee directs/requests the PEO to observe the listed local parameters Examinee observes motor amperage less than the red line on C-01.

Examinee observes discharge pressure (C-01) and compares to suction pressure (C-01 or local)

Cue:

If asked, there s no abntormal noise or vibration and the oil levels are still good.

If requested, suction pressure is 41 psig.

Examinee may use off line HPSI Pump discharge pressure as an estimation of running HPSI suction pressure.

Examinee may determine that HPSI Pump DIP is NOT acceptable.

STEP 9

GRADE Performance Steps:

Standards:

Restore ESF panels.

Examinee performs the following:

Presses SIAS RESET button on Actuation Cabinet 5.

Presses red "TRIP"light on bistable BA101 (BA301).

Places TRIP TEST, S-102 (S-302) switch in "OPERATE".

Places TEST PERMISSIVE SWITCH, S-501 in "OPERA TE".

Places TEST GROUP SWITCH, S-502 in "GROUP I ".

Resets "A TI FAULT" alarm by pressing ATI reset button on Actuation Cabinet 5.

Cue:

Comments:

7

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-100 TITLE: HPSI Pump Operability Test STEP 10 X

Performance Steps:

GRADE X

Standards:

Ex C

pr When at least 2 minutes of pump operation has elapsed, obtain and record "A" HPSI Pump suction and discharge pressure.

aminee obtains pump discharge pressure from PPC or 01 and pump suction pressure (from PEO), at local essure indication and records on OPS Form.

Cue:

Report that local suction pressure is 41 psig.

Comments:

STEP 11 X

Performance Stej GRADE X

Standards:

Calculate "A" HPSI pump D/P.

Examinee subtracts pump suction pressure from discharge pressure, records value on OPS Form, and compares to acceptance criteria.

Cue:

Comments:

Examinee should obtain a D/P of approximately 1193 psid.

STEP 12 X

Performance Steps:

Reports that the D/P is < 1201.8 psid and/or the acceptance criteria for D/P is not being met.

X Standards:

Examinee states that the value is less than the acceptance criteria of 1201.8 psid and marks data section 1 as 'unsat'.

Cue:

Acknowledge report and ask: "What impact does this have on the "A" HPSI pump status?"

Comments:

8 GRADE pS:

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-100 TITLE: HPSI Pump Operability Test STEP 13 X

Performance Steps:

Informs the US/SM and IST Coordinator of the status of the "A" HPSI pump.

GRADE X

Standards:

Examinee notifies the US/SM and the IST Coordinator that the "A" HPSI pump has failed its surveillance and that it is NOT OPERABLE.

Cue:

Acknowledge. report.

Comments:

Examinee may state the need to stop the "A" HPSI Pump and replace the "A" HPSI pump with the "B" HPSI pump.

After this step is completed, the JPM is considered complete.

STOP TIME:

9

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM-1 00 Rev.

5 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes Validated Time (minutes):

No X

15 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

10

EXAMINEE HANDOUT JPM ID Number:

JPM-100 Initiatinq Cues:

Initial Conditions:

You are the PPO.

The Unit Supervisor has directed you to perform surveillance SP 2604A on the "A" HPSI Pump.

An IST is NOT required.

The examiner will act as the Unit Supervisor and/or PEO.

The plant is at 100% power, NOT/NOP.

No equipment is out of service.

OPS Form 2604A-1 has been authorized for release.

11

JOB PERFORMANCE MEASURE APPROVAL SHEET JPM

Title:

ID Number:

,Respond to RCP Seat ProblemsT JPM-012 Revision:

6 II.

Initiated:

R. J. Ashey Developer Ill.

Reviewed IV. Approved User Ilepartment Supervisor N

e /

n N~ikar Training Supervisor 4/10/02 Date Date Date J.

JOB PERFORMANCE MEASURE WORKSHEET Facility:

MP-2 JPM Number:

Task

Title:

JPM-012 Respond to RCP Seal Problems System:

Reactor Coolant Pump System Time Critical Task:

Yes No X

Validated Time (minutes):

15 Task No.(s):

NUTIMS # 003-01-033 Applicable To:

K/A No.:

SRO X

003 A4.04 RO X

K/A Rating:

3.1/3.0 Method of Testinq:

Simulated Performance:

Location:

Classroom:

Actual Performance:

X Simulator:

X In-Plant:

Task Standards:

Required Materials (procedures,equipment):

General

References:

Examinee responds to annunciators, evaluates RCP indications and makes recommendations on continued plant operation based on his findings. A manual plant trip, followed by tripping of the 'C' RCP should be recommended.

ARP 2590B, Annunciator Response for C-02/3 OP 2301C, Reactor Coolant Pump Calculator ARP 2590B, Annunciator Response for C-02/3 OP 2301C, Reactor Coolant Pump 2

Examinee:

Rev.

6 PEO

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

Initiating Cues:

Initial Conditions:

Simulator Requirements:

JPM-012 Rev.

6 You are the PP.

Respond to any changing conditions related to th14 eetfr Coelant-Pumfw by reporting your observations and conclusions. Make recommendations; however, NO action is to be taken unless directed by the US.

The examiner will act as the US, participate in the communication process, and give directions for any required action.

The plant is at 55-60% power with normal operating parameters.

The simulator will be reset to any IC with the turbine on line and stable conditions.

When the examinee is ready as the PPO, enter malfunction CC06C @ 30% on a 60 second ramp to cause a reduction in RBCCW flow to the 'C' RCP.

3

  • * *
  • NOTES TO EXAMINER * * * *
1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

This JPM may be performed in conjunction with JPM-222 and JPM-100.

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-012 TITLE:

Respond to RCP Seal Problems START TIME:

Performance Steps:

Respond to DA-25 on C-03 (RCP C CLG WTR FLOW LO).

GRADE Standards:

Examinee refers to ARP 2590B and performs the following:

Comments:

  • Checks 'C' RCP RBCCW inlet temperature on C 04R at approximately 80°F.
  • Checks 'C' RCP RBCCW outlet temperature on C 04R at approximately 90°F.
  • Checks RBCCW temperature rise across 'C' RCP seal cooler is approximately 10 to 12OF
  • Checks RBCCW inlet pressure is approximately equal to 'A' header pressure

If necessary, aslk wfiat the examinee is observing.

As a result of this malfunction, various other alarms will be annunciated. The examinee may respond to the annunciators in a different order than listed in this JPM.

4 STEP I

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-012 TITLE:

Respond to RCP Seal Problems X

Performance Steps: Respond to AA-27 on C-03 (RCP C ANTIREV BRG TEMP HI).

Standards:

X X

X STEP 2 GRADE Cue:

Itf necessary, asakwhat the examineis observing.

Comments:

Only the steps with an 'X' are considered critical.

If the determination is made that the Reactor and RCP must be tripped at the appropriate limit, then starting the lift pump, contacting the Duty Officer, and recommending a plant shut down may NOT be performed and; therefore, are NOT considered critical steps.

5 Examinee refers to ARP 2590B and performs the following;

  • Checks "C" RCP Anti Reverse Bearing temperature on C-04 is between 155 and 1650F.
  • If necessary, adjusts 'A' RBCCW Heat Exchanger TCV to maintain outlet temperature between 75 and 85°F
  • Starts the 'C' RCP lift pump by taking the Start-Stop switch to 'Start' on C-03.

"* States that "C" RCP temperatures must continue to be monitored.

"* If anti-reverse bearing temperature reaches 1940F, recommends notifying the Duty Officer.

"* If anti-reverse bearing temperature reaches 2210, recommends initiating a controlled plant shutdown.

"* if the temperature reaches 2500F, recommends tripping.

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-012 TITLE:

Respond to RCP Seal Problems X

Performance Steps: Respond to BB-28 on C-03 (RCP C UPPER GUIDE TEMP HI).

Standards:

"* Examinee refers to ARP 2590B.

"* If temperature rises above 194°F, examinee recommends tripping the reactor and then the 'C' RCP.

Comments:

Cue:

Ifiecessary, as whatthe Vamine is obserinj

"* If NOT already performed by the examinee, refer to step 2 for additional actions.

"* This step is critical only if the temperature responds in a way that requires a shut down or a trip. This step is N/A if the recommendation to shut down or trip is made based on another annunciator.

X Performance Steps: Respond to CB-28 on C-03 (RCP C UPPER THRUST TEMP HI).

GRADE Standards:

  • Examinee refers to ARP 2590B.

X

  • If temperature rises above 194°F, examinee recommends tripping the reactor and then the 'C' RCPu Cue: 'if necessary, ask what the~xamineeis observing.

Comments:

"* If NOT already performed by the examinee, refer to step 2 for additional actions.

"* This step is critical only if the temperature responds in a way that requires a shut down or a trip. This step is N/A if the recommendation to shut down or trip is made based on another annunciator.

6 STEP 3 GRADE STEP 4

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-012 TITLE:

Respond to RCP Seal Problems X

Performance Steps: Respond to DA-28 on C-03 (RCP C LOWER THRUST TEMP HI).

Standards:

"* Examinee refers to ARP 2590B.

"* If temperature rises above 194°F, examinee recommends tripping the reactor and then the 'C' RCP.

Cue:

If necssary, ask what the examie is observing.

Comments:

"* If NOT already performed by the examinee, refer to step 2 for additional actions.

"* This step is critical only if the temperature responds in a way that requires a shut down or a trip. This step is N/A if the recommendation to shut down or trip is made based on another annunciator.

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

7 STEP 5 GRADE

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

Date Performed:

Operator:

Evaluator(s):

JPM-012 Rev.

6 For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes No X

Validated Time (minutes):

15 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

8 1

EXAMINEE HANDOUT JPM ID Number:

JPM-012 Initiatinq Cues:

Initial Conditions:

You are the PPO. Respond to any changing conditions related to the Reactor Coolant Pumps by reporting your observations and conclusions. Make recommendations; however, NO action is to be taken unless directed by the US.

"* The examiner will act as the US, participate in the communication process, and give directions for any required action.

The plant is at 55-60% power with normal operating parameters.

9

I JPM

Title:

JOB PERFORMANCE MEASURE APPROVAL SHEET Shifting Contnm,mtint Air Re~c irculation andI Cooling-~Unitfs ID Number:

JPM-221 Revision:

0 I1. Initiated:

R. J. Ashey Developer 1-7 O-8/13/02 Date I1l.

Reviewed:

Date IV. Approved:

User Department Supervisor N

ar Training Supervisor Date PJai- /

JOB PERFORMANCE MEASURE WORKSHEET Examinee:

JPM Number:

JPM-221 Rev.

0 Task

Title:

-Shifting Cont hent Air Recirculation and C ICo Units System:

Containment Cooling System Time Critical Task:

Yes Validated Time (minutes):

No X

15 Task No.(s):

NUTIMS #022-01-117 (022-004-01-01)

Applicable To:

SRO X

022 A4.01 RO X

PEO K/A Rating 3.6/3.6 Method of Testinq:

Simulated Performance:

Actual Performance:

X Location:

Classroom:

Simulator:

X Task Standards:

Required Materials (procedures, equipment):

General

References:

At the completion of this JPM, the examinee has successfully stopped and restarted an OPERABLE CAR Fan.

0 S

OP 2313A, Containment Air Recirculation and Cooling System ARP 2590A, for annunciator D-3.

OP 2313A, Containment Air Recirculation and Cooling System, Sections 4.1, 4.2 (Rev. 008-05)

ARP 2590A, D-3 (Rev 004-01)

OP 2330A, Reactor Building Closed Cooling Water, Rev 20 MP-14-OPS-GDLO2, Operations Standards, Rev, 004 2

Facility:

MP-2 K/A No.

In-Plant:

  • * *
  • READ TO THE EXAMINEE * * *
  • will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

JPM-221 Initiatinq Cues:

Initial Conditions:

The Unit Supervisor has directed you to align CAR fans such that "A", "C", and "D" are operating in fast speed and "B" CAR fan is secured.

"A", "B", and "C" CAR fans are operating.

The plant is at 100% power.

Electrical PMs are scheduled on the breaker for the "B" CAR fan.

Simulator Requirements:

Initialize at any 100% power IC with "A", "B", and "C" CAR fans operating.

RBCCW may or may not be aligned to "D" CAR fan.

Ensure RBCCW header flows within normal range (- 6,000 gpm)

Insert malfunction CH01D on BT39 to cause the "D" CAR Fan to trip when started.

3 Rev.

0 S

S 0

  • * *
  • NOTES TO EXAMINER * * * *
1. Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-221 TITLE: Shiftina Containment Air Recirculation and Coolina Units START TIME:

STEP I

X Performance Steps:

GRADE X

Standards:

Ex "S

an Place "B" CAR fan switch to "STOP" and hold for approximately 2 seconds, then release switch.

'aminee places and holds switch for "B" CAR fan on C-01 to TOP" and observes respective green light only lit and nperage decay. After 2 seconds, examinee releases switch.

Comments:

Cue:

The examinee must realize that 4 CAR fans may not be operated in fast speed simultaneously and must first stop "B" CAR fan. Starting a fourth CAR fan in fast constitutes failure of this JPM.

STEP 2

Performance Steps:

GRADE Standards:

Comments:

If desired, isolate cooling water outlet flow from "B" CAR Cooler by closing:

"* "NORM OUTLET, RB-28-2B"

"* "EMERG OUTLET, RB-28-3B" Monitor RBCCW System flow an pressure Examinee may NOT opt to close the above listed valves.

However, if examinee closes the outlet valves, in order to pass this step, he/she should realize that RBCCW flows need to be adjusted and that he/she must monitor RBCCW header flow and pressure.

Based on the reason for shifting CAR fans and the NOTE associated with this step, closing these valves is NOT necessary.

If these valves are closed, flow should be adjusted to other components such as SFPC or other CAR fan if possible, to prevent exceeding a maximum pump discharge pressure of 140 psig or a low flow rate of 4000 gpm [prevent lifting relief valves].

4

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-221 TITLE: Shifting Containment Air Recirculation and Coolinq Units Performance Steps:

GRADE Standards:

"* If desired to isolate cooling water inlet to the applicable CAR Cooler, obtain key and close "CLR D INLET, RB-28.1B".

"* Monitor RBCW System flow and pressure.

Examinee observes red only light lit for RB-28. ID on C-01.

Cue:

Comments:

Based on the reason for shifting CAR fans and the NOTE associated with the previous step, closing this valve is NOT necessary.

If the valve is closed, flow should be adjusted to other components such as SFPC or other CAR fan if possible, to prevent exceeding a maximum pump discharge pressure of 140 psig or a low flow rate of 4000 gpm [prevent lifting relief valves].

STEP 4

GRADE Performance Steps:

Standards:

Ex Verify CLR D INLET, RB-28.1D, is locked open.

'aminee observes only red light lit for RB-28. ID on C-01.

C ue:...**

Comments: The CAR Cooler Inlet Valves are normally open during operations.

5 STEP 3

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-221 TITLE: Shifting Containment Air Recirculation and Cooling Units STEP 5

Performance Steps:

Ensure cooling water outlets from "D" CAR fan are open:

"* "NORM OUTLET, RB-28-2D"

"* "EMERG OUTLET, RB-28-3D" GRADE Standards:

Examinee observes red only lights lit for RB-28.2D and 28.3D and flow indication on C-01.

Cue:mtra Comments: Both normal and emergency outlet valves are normally open during operations.

STEP GRADE 6

Performance Steps:

Check Facility 2 RBCCW header flow less than 8,000 gpm.

E Standards:

Examinee observes Facility 2 RBCCW header flow on C-06 or PPC < 8, 000 gpm.

Cue:

e Comments: If required, question examinee what they are observing.

6 A

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-221 TITLE: Shiftinq Containment Air Recirculation and Cooling Units STEP 7

X Performance Step GRADE X

Standards:

Place "D" CAR fan switch to "START HIGH" and observe "FAST SPEED" indicating light lit.

Examinee momentarily places the handswitch for the 'D' CAR fan to "START HIGH" and observes the associated 'fast speed' red light is only momentarily lit. Additionally, the examinee should observe the CTMT AIR RECIRC FAN D TRIP and the CTMT AIR RECIRC FAN D VIBRATION HI annunciators on C-01.

Cue:

Comments:

Attempting to start the fan in 'slow' will not constitute failure of this JPM.

The examinee may or may NOT reset the CTMT AIR RECIRC FAN D VIBRATION HI annunciator MP-14-OPS-GDLO2, Attachment 2, states, "To protect the plant or prevent a plant transient, the SM is authorized to reset any tripped device without knowing the cause." The loss of the "D" CAR Fan is NOT an immediate concern.

Performance Steps:

Standards:

Obtain the Annunciator Response Procedure for annunciator D-3 on C-01 and asks the US/SM to restart the "B" CAR Fan Examinee obtains ARP 2590A for annunciator D-3, CTMT AIR RECIRC FAN D and asks the US/SM to restart the "B" CAR Fan.

Cue:

Comments:

The examinee may or may NOT reset the CTMTAIR RECIRC FAN D VIBRATION HI annunciator.

Failure to ask the US or SM for permission to restart the "B" CAR Fans does NOT constitute a failure of this JPM.

7 STEP 8

GRADE

)S:

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-221 TITLE: Shifting Containment Air Recirculation and Cooling Units STEP 9

Performance Steps:

Verify CLR B INLET, RB-28.1B, is locked open.

GRADE Standards:

Examinee observes only red light lit for RB-28. 1B on C-01.

Cue:

Comments: The CAR Cooler Inlet Valves are normally open during operations.

STEP GRADE 10 Performance Steps:

Ensure cooling water outlets from "B" CAR fan are open:

"* "NORM OUTLET, RB-28-2B"

"* "EMERG OUTLET, RB-28-3B" E

Standards:

Examinee observes red only lights lit for RB-28.2B and 28.3B and flow indication on C-01.

Cue:

Comments: Both normal and emergency outlet valves are normally open during operations.

STEP 11 Performance Steps:

Check Facility 2 RBCCW header flow less than 8,000 gpm.

GRADE Standards:

Examinee observes Facility 2 RBCCW header flow on C-06 or PPC < 8, 000 gpm.

Comments: If required, question examinee what they are observing.

8

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-221 TITLE: Shifting Containment Air Recirculation and Cooling Units STEP 12 X

Performance SteF GRADE X

Standards:

)S:

Place "B" CAR fan switch to "START HIGH" and observe "FAST SPEED" indicating light lit.

Examinee momentarily places the handswitch for the 'B' CAR fan to "START HIGH" and observes the associated 'fast speed' red light is lit. Additionally, the examinee should observe the starting and running current on the ammeter for the "B" CAR Fan Cue:

Comments:

Attempting to start the fan in 'slow' will not constitute failure of this JPM provided the fan is placed in 'fast' prior to completion of the JPM.

Failure to observe the ammeter does NOT constitute failure of this JPM.

Performance Steps:

Standards:

Reset the "CTMT AIR RECIRC FAN B VIBRATION HI" annunciator on C-01.

Examinee depresses the "CAR FAN VIB RESET B & D" pushbutton on C-01 and observes annunciator clearing on C 01.

Cue:~

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

9 STEP 13 GRADE

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM-221 Rev.

0 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes Validated Time (minutes):

No X

15 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

10

EXAMINEE HANDOUT JPM ID Number:

221 Initiating Cues:

Initial Conditions:

The Unit Supervisor has directed you to align CAR fans such that "A", "C", and "D" are operating in fast speed and "B" CAR fan is secured.

"A", "B", and "C" CAR fans are operating.

The plant is at 100% power.

Electrical PMs are scheduled on the breaker for the "B" CAR fan.

11

JOB PERFORMANCE MEASURE APPROVAL SHEET Mianual Makeup to the VCT ID Number:

JPM-022 Revision:

6 II.

Initiated:

R. J. Ashey Developer III.

Reviewed:

Tqh al Reviewer IV. Approved:

User Department Supervisor

" lear Training-u-pervisor I

JPM

Title:

4 8/14/02 Date Date Date pat

.W I -

JOB PERFORMANCE MEASURE WORKSHEET Examinee:

JPM Number:

JPM-022 Rev.

6 Task

Title:

-Manual Makeup to tbe VCT~

System:

CVCS Time Critical Task:

Yes Validated Time (minutes):

No X

15 Task No.(s):

NUTIMS #004-01 -1 94 Applicable To:

K/A No.

SRO X

004 A4.14 RO X

PEO K/A Rating 3.9/4.2 Method of Testing:

Simulated Performance:

Location:

Classroom:

Actual Performance:

X Simulator:

X In-Plant:

Task Standards:

Required Materials (procedures, eguipment):

General

References:

At the completion of this JPM, the examinee has recognized a malfunction with boric acid injection during attempted makeup to the VCT.

"* OP 2304C, Make Up (Boration and Dilution) Portion of CVCS

"* OP 2208, Reactivity Calculations

"* Calculator OP 2304C, Section 4.9, Rev. 021-05 OP 2208, Reactivity Calculations, Rev 013 2

Facility:

MP-2

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

JPM-022 Rev.

6 Initiatingq Cues:

The Unit Supervisor has directed you to perform a manual blended makeup to the VCT and raise VCT level by 2% while maintaining the PMW and Boric Acid flow controllers in the "AUTO" mode of operation.

When makeup is completed, return the system lineup to normal.

The examiner will act as the US.

Initial Conditions:

"* RCS boron concentration is 820 ppm Simulator Requirements:

"* Initialize at any MOL IC with charging, letdown, and makeup to the VCT available.

"* Ensure VCT level is 84% or less and pressure is 25 psig or less.

"* Enter remote function CVR14 (CLOSE) to close 2-CH-1 72.

  • * *
  • NOTES TO EXAMINER * * * *
1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

This JPM may be performed in conjunction with JPM-1 10 and JPM-222 3

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-022 TITLE: Manual Makeup to the VCT START TIME:

STEP I

GRADE

__Performance Steps:

Standards:

Ensure PMW is available and at least one charging pump operating.

Examinee observes at least one red indicating light lit on C-02 for PMW pump and charging pump.

Cue:

k Comments:

Performance Steps:

Standards:

Determine the required ratio of boric acid flow to PMW flow.

Examinee uses either OP 2208 or PPC to determine that the ratio of boric acid to PMW flow is 1 gallon to 6.25 gallons, respectively.

Comments:

A PMW value of 6.0 to 6.4 gallons is acceptable for use.

Performance Steps:

GRADE Standards:

Ensure the following are closed:

"* Makeup valve stop, CH-512 (C-04)

"* VCT makeup bypass, CH-196 (C-02)

"* RWST isolation, CH-192 (C-02)

Examinee observes indicating lights for CH-512 on C-04 and CH 196/192 on C-02 by their green lights only lit.

Cue:

Comments:

4 STEP 2

GRADE STEP 3

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-022 TITLE: Manual Makeup to the VCT Performance Steps:

Standards:

Cue:

Determine the desired VCT level change in % level and total gallons required.

Examinee states that a 2% level rise is required and using 34 gal/% that a total of 68 gallons is required.

Comments:

Performance Steps:

Standards:

Reset PMW and boric acid controllers (FC-21 OX / FC 210Y), to zero.

For each controller, examinee performs the following:

"* Checks "L" indicated

"* Presses and holds "SEL" button until "TOTAL RST" is displayed.

"* Presses "RIL" button to shift controller to "R" (resets totalizer), then back to "L".

"* Presses "SEL" until controller number is displayed.

Cue:

Comments:

Manual leak rate determination is NOT in progress.

STEP 6

Performance Steps:

GRADE Standards:

Start PPC trend of VCT level (L226).

Examinee starts PPC trend and displays it on PPC monitor.

Cue:

Comments:

5 STEP 4

GRADE STEP 5

GRADE

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-022 TITLE: Manual Makeup to the VCT STEP 7

X Performance SteF GRADE X

Standards:

Adjust automatic setpoints of PMW and boric acid controllers (FC-210X / FC-210Y), and ensure controllers are in automatic.

For each controller, examinee performs the following:

"* Ensures "AM" is lit.

"* Adjusts controller setpoint as necessary to obtain a ratio of I gal. BA to 6.25 gals. PMW.

Comments:

Cue:

"* Any ratio of approximately 1 gal. BA to 6.25 gal. PMW is acceptable (i.e. 8 gals. BA to 48-52 gals. PMW; 10 gals BA to 60-65 gals PMW; 12 gals. BA to 72-78 gals. PMW, etc.).

"* Controllers are normally in "AM" mode.

STEP 8

X Performance Steps:

GRADE X

Standards:

Ex "D

Place makeup mode selector switch in "MANUAL".

  • aminee places the makeup mode selector switch from the

'ILUTE" position to the "MANUAL" position on C-04.

Cue:

Comments:

STEP 9

X Performance Step GRADE X

Standards:

Start one boric acid pump.

Examinee starts the selected (by indicated switch position)

B.A. pump by:

"* placing its hand switch to the "START" position

"* checking red light lit

"* checking indicated discharge pressure is at least 98 psig.

Cue:

Comments:

The selected BA pump must be supplied by the BAST used to determine the VCT blend.

6

)S:

)S:

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-022 TITLE: Manual Makeup to the VCT STEP 10 X

Performance Steps:

Open makeup stop valve, CH-512.

GRADE X

Standards:

Examinee places CH-512 switch to "OPEN" on C-04 and ensures red light only is lit.

Cue:.

Comments:

Examinee may check that the "M" (of "AM"), extinguishes on makeup controllers.

STEP 11 X

Performance Steps:

Ensure flows have stabilized at setpoints of the flow controllers.

GRADE X

Standards:

  • Examinee watches flow controllers on C-04 to ensure flow begins and then stabilizes at setpoints.

Examinee observes that there is NO B.A. flow indicated.

Examinee observes BAMAKEUP FLOW HIlL0 annunciator is alarming ands acknowledges the alarm.

Examinee notifies US/SM of the low BA flow.

Cue:.

Comments:

7

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-022 TITLE: Manual Makeup to the VCT STEP 12 X

Performance Steps:

X Standards:

Terminate the on-going dilution to the VCT or recommend termination to the Unit Supervisor.

Examinee terminates the make up to the VCT by the following:

"* Closes CH-512 on C-04 by placing its control switch in the "CLOSE" position until the green light only is lit

"* Secures the B.A. pump on C-02 by placing its hand switch in the "STOP" position and verifying the green light is lit.

"* Ensures PMW flow has stopped as indicated on controller FC-21OX.

OR

"* Examinee places the Makeup Mode Selector switch on C-04 in the "DILUTE" or "BORATE" position.

"* Examinee ensures PMW flow has stopped as indicated on controller FC-21 OX.

Cue:

Comments:

STEP 13 X

Performance Steps:

Notify US that the inadvertent dilution has been terminated.

GRADE X

Standards:

"* Examinee notifies US that the dilution has been terminated as indicated by no flow on FC-21OX.

"* Examinee states that he/she would monitor reactor power to determine the effects of the dilution.

Cue:

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

8 GRADE

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM-022 Rev.

6 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes Validated Time (minutes):

No X

15 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

9

EXAMINEE HANDOUT JPM ID Number:

JPM-022 Initiatinq Cues:

"* The Unit Supervisor has directed you to perform a manual blended makeup to the VCT and raise VCT level by 2% while maintaining the PMW and Boric Acid flow controllers in the "AUTO" mode of operation.

"* When makeup is completed, return the system lineup to normal.

"* The examiner will act as the US.

Initial Conditions:

RCS boron concentration is 820 ppm 10

JOB PERFORMANCE MEASURE APPROVAL SHEET I.

JPM

Title:

gC oss-iTyii 4,80Volt iBses ID Number:

JPM-053 Revision:

6 I1. Initiated:

R. J. Ashey Developer II1. Reviewed:

IV. Approved:

Ter al Reviewer User Department Supervisor 4

Training Supervisor 4/4/02 Date Date Date

JOB PERFORMANCE MEASURE WORKSHEET Facility:

MP-2 JPM Number:

Examinee:

JPM-053 Task

Title:

Cross-Tying 480 Volt Buses System:

AC Electrical Distribution System Time Critical Task:

Yes No X

Validated Time (minutes):

10 Task No.(s):

Applicable To:

K/A No.:

NUTIMS # 062-01-394 SRO X

062 A4.01 RO X

K/A Rating:

3.3/3.1 Method of Testing:

Simulated Performance:

Location:

Classroom:

Actual Performance:

X Simulator:

X In-Plant:

Task Standards:

Required Materials (procedures,equipment):

General

References:

At the completion of this JPM, the examinee has successfully cross-tied Bus 22A with Bus 22B, and has isolated transformer 24A1 -1X per OP-2344A.

OP 2344A, 480 Volt Load Centers OP 2344A, 480 Volt Load Centers, Rev. 020-04 2

Rev.

6 PEO

  • * *
  • READ TO THE EXAMINEE * **
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

JPM-053 Rev.

6 Initiating Cues:

Initial Conditions:

Simulator Requirements:

You are the SPO.

Electrical maintenance has given work control an AWO to replace 480 volt transformer, 24A1-1 X.

"* The US has directed you to cross tie Bus 22A with Bus 22B in accordance with OP 2344A, 480 Volt Load Centers, to allow tagging of the transformer.

"* The plant is @ 100% power and NOT/NOP.

"* Group 1 and Group 2 backup heaters are in PULL-TO-LOCK and caution tagged.

"* "C" TBCCW Pump is in service and "A" TBCCW Pump has been secured.

"* Initialize to any IC with 100% power, NOT/NOP.

"* Place Group 1 and Group 2 backup heaters in PULL-TO LOCK and caution tag their hand switches on C-03.

"* Place "C" TBCCW Pump in service and secure "A" TBCCW Pump 3

NOTES TO EXAMINER * * * *

1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. 'What are you looking at?" or "What are you observing?").

4.

Under NO circumstances must the examinee be allowed to manipulate any devices during the performance of this JPM (in-plant only).

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-053 TITLE:

Cross-Tying 480 Volt Buses Performance Steps: Verify combined load of Bus 22A and Bus 22B is

< 1800 amps.

GRADE Standards:

Cue:

Ifnec Comments:

Examinee observes ammeters on C-08 for Bus 22A and Bus 22B and determines that adding both together will NOT exceed 1800 amps or states that placing the two groups of backup heaters in PULL-TO-LOCK will prevent exceeding 1800 amps.

This is a note prior to first step. Placing the two groups of backup heaters in PULL-TO-LOCK will prevent exceeding 1800 amps.

X Performance Steps: Place SYN SEL SW 22A/22B in the CL TIE/TRIP A position X

Standards:

"* Examinee obtains sync switch handle and places it in the 22A/22B sync switch slot.

"* Examinee rotates switch to the CL TIE TRIP A position.

Cue:

Comments:

4 START TIME:

STEP 1 STEP 2 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-053 TITLE:

Cross-Tying 480 Volt Buses STEP 3 GRADE Performance Steps: Ensure bus voltages are matched.

Standards:

Examinee observes the volt meters on C-08 for Bus 22A and Bus 22B and determines they are matched.

Cue: Ifrjic4 p

nee w Comments:

STEP 4 X

Performance Steps: Using 22A/22B TIE BKR, 22A-1T-2 (B10111), breaker control switch, close 22A/22B TIE BKR, 22A-1T-2 (80111).

GRADE X

Standards:

Examinee momentarily places the 22A/22B TIE BKR, 22A-1 T-2 (B01 11), breaker control switch in the CLOSE position.

Cue:

Comments:

Performance Steps: Ensure 22A/22B TIE BKR, 22A-1T-2 (B0111), has closed and 22A SPLY BKR, 24A1-1X3-2 (B0102) has opened.

GRADE Standards:

Examinee observes that the 22A/22B TIE BKR, 22A-1 T-2 (B0111), has a red 'closed' light and 22A SPLY BKR, 24A1-1X3-2 (BO102) has a green 'open' light.

Cue:

Comments:

5 STEP 5

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-053 TITLE:

Cross-Tying 480 Volt Buses STEP 6 X

Performance Steps: To de-energize 480 volt transformer, 24A1-lX, open 24A/22A FDR BKR, 24A1-2 (A103).

GRADE X

Standards:

Examinee opens 24A/22A FDR BKR, 24A1-2 (A103).

Cue:*I "s inform examinee ttther required to be cleopergized at this time.

~

Comments:

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

6

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM-053 Rev.

6 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes No X

Validated Time (minutes):

10 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

7 I

EXAMINEE HANDOUT JPM ID Number:

JPM-053 Initiating Cues:

Initial Conditions:

You are the SPO.

Electrical maintenance has given work control an AWO to replace 480 volt transformer, 24A1 -1X.

The US has directed you to cross tie Bus 22A with Bus 22B in accordance with OP 2344A, 480 Volt Load Centers, to allow tagging of the transformer.

"* The plant is @ 100% power and NOT/NOP.

"* Group 1 and Group 2 backup heaters are in PULL-TO-LOCK and caution tagged.

"* "C" TBCCW Pump is in service and "A" TBCCW Pump has been secured.

8

JOB PERFORMANCE MEASURE APPROVAL SHEET I.

JPM

Title:

Respiclo Circulating1 Water Miffiiiclon ID Number:

JPM-224 Revision:

0 II.

Initiated:

R. J. Ashey Developer II1. Reviewed:

"l*bjat Reviewer IV. Approved:

User Department Supervisor N

ar Training Supervisor 8/30/02 Date Date Date l I

  • .. I/

JOB PERFORMANCE MEASURE WORKSHEET Examinee:

JPM Number:

JPM-224 Rev.

0 Task

Title:

Respon~d to Circulating Water Malfunction.

System:

Plant Service Systems Time Critical Task:

Yes No X

Validated Time (minutes):

15 Task No. (s):

NUTIMS # 000-04-250 Applicable To:

K/A No.:

SRO X

075 A2.02 RO X

PEO K/A Rating:

2.5/2.7*

Method of Testing:

Simulated Performance:

Location:

Classroom:

Actual Performance:

X Simulator:

X In-Plant:

Task Standards:

Required Materials (procedures,equipment):

At the completion of this JPM the examinee has started the "B" Circulating Water Pump, observed the trip of the "B" Circulating Water Pump, and properly cross tied "A" and "B" water boxes with "A" Circulating Water Pump supplying.

0 0

0 OP 2325A AOP 2517 ARP 2590E General

References:

OP 2325A, Circulating Water System, Rev. 026-03 AOP 2517, Circulating Water Malfunctions, Rev. 000-02 ARP 2590E, Rev. 008-06 2

Facility:

MP-2

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

Initiating Cues:

Initial Conditions:

Simulator Requirements:

JPM-224 Rev.

0 You are the SPO.

"* The US has directed you to start the "B" Circulating Water Pump.

"* The examiner will act as the US.

"* "A" and "B" water boxes area cross tied with "A" Circulating Water Pump supplying.

"* "B" Circulating Water Pump was tagged for PMs. All tags are cleared.

"* Water Box Priming is in service on all water boxes.

"* The "B" Circulating Water Bay has been educted. Water is visible in the suction line sight glass.

"* "B" Circulating Water Pump lube water flow is 11 gpm.

"* There are NO diving operations in progress.

"* The screen wash system is in 'manual' with screens in 'slow'.

"* Reset to any stable 100% power IC.

"* Cross tie "A" and "B" water boxes with the "A" Circulating Water Pump supplying.

"* Insert malfunction CW01 B on BT40 to trip the "B" Circulating Water Pump when the associated Condenser Inlet valve, CW 11 G is full open.

3

  • * *
  • NOTES TO EXAMINER * * * *
1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

Under NO circumstances must the examinee be allowed to manipulate any devices during the performance of this JPM (in-plant only).

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-224 TITLE:

Respond to Circulating Water Malfunction START TIME:

STEP 1 X

Performance Steps: Ensure condenser inlet X-TIE, CW-12D is closed.

X Standards:

Examinee places the condenser inlet X-TIE, CW-12D, switch in the CLOSE position.

Cue:

Comments:

STEP 2 GRADE

"* This action will stop circ water flow to the "B" water box and may result in a slight degradation of vacuum.

"* The HI COND D/T and the HI COND DIS TEMP alarms will be annunciated.

These are expected alarms for the condition.

Performance Steps: Ensure "B" water box OUTLET, CW-1 1 B, is open.

Standards:

Examinee observes the green open light only is lit for "B" water box OUTLET, CW-11B Cue:

Comments:

4 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-224 STEP 3 TITLE:

Respond to Circulating Water Malfunction X

Performance Steps: When al least 5 seconds has elapsed, position "B" water box INLET, CW-11G to between 20 and 25%

open.

X Standards:

Cue:

"* Examinee waits 5 seconds then places "B" water box INLET, CW-11 G to the OPEN position.

"* When the red and green lights are lit (indicating 20 to 25% open), the examinee places the hand switch for CW-IIG in the N position.



A Comments:

The examinee is allowed more than one attempt to position the inlet valve to 20-25% open.

STEP 4 Performance Steps: Locally check that the "C" Circulating Water Pump is NOT rotating backwards.

GRADE Standards:

Examinee dispatches a PEO to the Intake Structure to ensure the OB" Circulating Water Pump is NOT rotating backwards.

Cue:

Comments:

5 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-224 TITLE: Respond to Circulating Water Malfunction Performance Steps: Position "B" water box INLET, CW-11G to between 20 and 25% open.

Standards:

Examinee states that the "B" water box INLET, CW-11G is 20 to 25% open.

Cue:

Comments:

STEP 6 This step was performed previously.

X Performance Steps: Start the "B" Circulating Water Pump and monitor the pump starting current.

X Standards:

Examinee momentarily places the "B" Circulating Water Pump hand switch in the START position and observes starting current.

Cue:

Comments:

STEP 7 GRADE X

Performance Steps: When the pump starting current has decayed, open "B" water box INLET, CW-11G.

X Standards:

Examinee places the "B" water box INLET, CW-11 G, to the OPEN position Cue:

Comments:

6 STEP 5 GRADE GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-224 TITLE:

Respond to Circulating Water Malfunction X

Performance Steps:

  • Observe the CIRC WATER PUMP B OVERLOAD/TRIP annunciator and "B" Circulating Water Pump amps are at zero.

0 Obtain the annunciator response procedure.

GRADE X

Standards:

"* Examinee observes the CIRC WATER PUMP B OVERLOAD/TRIP annunciator, B-9, alarm and "B" Circulating Water Pump amps at zero.

"* Examinee obtains ARP 2590E for B-9.

Cue:

Comments:

STEP 9 Performance Steps: Go to AOP 2517, Circulating Water Malfunctions.

GRADE Standards:

Examinee performs the required steps of the Annunciator Response Procedure and obtains AOP 2517, Circulating Water Malfunctions.

Cue:

Comments:

7 STEP 8

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-224 TITLE:

Respond to Circulating Water Malfunction Performance Steps: Ensure "A" or "B" Circulating Water Pump is operating and ensure "C" or "D" Circulating Water Pump is operating.

GRADE Standards:

Examinee states that "A", "C" and "D" Circulating Water Pumps are operating.

Cue:

Comments:

STEP 11 Performance Steps: Go to Section 5.0, Trip of One Circulating Water Pump.

GRADE Standards:

Examinee proceeds to Section 5.0 of AOP 2517.

Cue:

Comments:

Performance Steps: Stop any process liquid waste discharges.

Standards:

Cue:

Iforn Examinee informs the US/SM that process liquid waste discharges must be secured.

Comments:

8 STEP 10 STEP 12 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-224 TITLE:

Respond to Circulating Water Malfunction STEP 13 Performance Steps: Ensure Sodium Hypochlorite shocking of bays is NOT in progress.

GRADE Standards:

Examinee informs the US/SM that Sodium Hypochlorite shocking of bays must be secured, if in progress.

Cue:

Comments:

STEP 14 GRADE X

Performance Steps: Close "B" water box INLET, CW-11G X

Standards:

Examinee places the hand switch for the "B" water box INLET, CW-1 IG, in the CLOSE position and observes the green only light is lit.

Cue:

Comments:

9

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-224 TITLE:

Respond to Circulating Water Malfunction STEP 15 X

Performance Steps: Perform the following:

"* Place "B" Circulating Water Pump in PULL-TO LOCK.

"* Ensure "B" water box OUTLET, CW-1 1 B is open.

"* Open Condenser inlet XTIE, CW-12D.

GRADE X

Standards:

Examinee performs the following:

"* Places "B" Circulating Water Pump in PULL-TO LOCK.

"* Observes the red only light is lit for "B" water box OUTLET, CW-11B.

"* Places the hand switch for Condenser inlet XTIE, CW 12D, in the OPEN position and observes the red only light is lit.

Cue:

Comments:

X Performance Steps: Check condenser back pressure is less than or equal to 4.5 inches Hg.

GRADE X

Standards:

Examinee observes condenser back pressure on P-5124 or recorder 5265 has stabilized at less than 4.5 inches Hg.

Cue:

Comments:

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

10 STEP 16

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM-224 Rev.

0 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

I Time Critical Task?

Yes No X

Validated Time (minutes):

15 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

11

EXAMINEE HANDOUT JPM ID Number:

JPM-224 Initiating Cues:

Initial Conditions:

0 You are the SPO.

"* The US has directed you to start the "B" Circulating Water Pump.

"* The examiner will act as the US.

"* "A" and "B" water boxes area cross tied with "A" Circulating Water Pump supplying.

"* "B" Circulating Water Pump was tagged for PMs. All tags are cleared.

"* Water Box Priming is in service on all water boxes.

"* The "B" Circulating Water Bay has been educted. Water is visible in the suction line sight glass.

"* "B" Circulating Water Pump lube water flow is 11 gpm.

"* There are NO diving operations in progress.

"* The screen wash system is in 'manual' with screens in 'slow'.

12

JOB PERFORMANCE MEASURE APPROVAL SHEET I.

JPM

Title:

Startup and-Parallel CEDM-MG Sets ID Number:

JPM-013 Revision:

6 I1. Initiated:

R. J. Ashey Developer 424 III.

Reviewed:

Technical ev6er 8/28/02 Date Date IV. Approved:

User Department Supervisor uclear Training Supervisor Date C//, ý XIIIIXZ4ý-

JOB PERFORMANCE MEASURE WORKSHEET Examinee:

JPM Number:

JPM-013 Rev.

6 Task

Title:

Startup and Parallel CEDM M°G Sets System:

CEDM Time Critical Task:

Yes Validated Time (minutes):

No X

20 Task No.(s):

NUTIMS # 001-01-019 Applicable To:

SRO X

001 A.408 RO X

K/A Rating:

3.7/3.4 Method of Testing:

Simulated Performance:

X Location:

Classroom:

Actual Performance:

Simulator:

Task Standards:

Required Materials (procedures,equipment):

General

References:

In-Plant:

X At the completion of this JPM, the examinee has successfully started and paralleled the "A" CEDM MG set with the "B" CEDM MG set.

OP 2302A OP 2302A, Section 4.7 (Rev. 016-05) 2 Facility:

MP-2 K/A No.:

PEO

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

JPM-013 Rev.

5 Initiatinq Cues:

Initial Conditions:

Simulator Requirements:

The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set.

"* The plant is preparing for startup.

"* The "B" CEDM MG set has been placed in service with its load contactor closed.

"* All TCBs are open except TCB-9, which is closed.

"* Both voltage droop circuits are on.

"* In-plant loads are powered from the RSST.

"* NO maintenance has been performed on "A" or "B" CEDM MG sets.

N/A 3

  • * *
  • NOTES TO EXAMINER * * * *
1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

Under NO circumstances must the examinee be allowed to manipulate any devices during the performance of this JPM.

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-013 TITLE:

Startup and Parallel CEDM MG Sets Performance Steps: Ensure bus 24C and 24D are receiving power from the same source.

Standards:

Examinee observes that 24C and 24D are powered from the RSST by indications on C-08 or states that initial conditions state that all in-plant loads are powered from the RSST.

Cue:

k Comments:

X Performance Steps: Place "MG-A" switch to "START" on C-04.

GRADE X

Standards:

Examinee states that they place "MG-A" hand switch to "START" or request that it be done by Control Room personnel.

Cue:

Comments:

4 START TIME:

STEP 1 GRADE STEP 2

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-013 TITLE:

Startup and Parallel CEDM MG Sets X Performance Steps: Place "A" CEDM MG "MOTOR INPUT" breaker to "ON" on C-29.

X Standards:

Examinee that they close the MG motor supply breaker by taking the handle on top left of C-29 to "ON".

Cue:

Ba is close Comments:

X Performance Steps: Place the "A" CEDM MG "INCOMING GENERATOR" synchronizing selector switch to "LOCAL".

SX Standards:

Examinee states that they pla selector switch on C-29 in "L(

Cue: TSwitch is in "'LOCAL".

W~

Comments:

5 STEP 3 GRADE STEP 4 GRADE

'ce the synchroscope

)CAL".

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-013 TITLE:

Startuo and Parallel CEDM MG Sets X Performance Steps: Start the "A" CEDM MG set by performing the following:

1. Press "LOCAL" "MOTOR ON" button and hold for approximately 4 to 5 seconds.
2. Release the "MOTOR ON" button.
3. Allow MG set to come up to rated speed (red "LOCAL" "MOTOR ON" light lit).
4. Observe rise in "LOCAL" "GENERATOR VOLTAGE" indication.
5. Approximately 170 seconds following start, listen for audible clunk (indicates starting winding deenergized).

X Standards:

e Examinee states that they press the "LOCAL" "MOTOR ON" pushbutton for 4-5 sec.

"* Examinee states that they observe the red "MOTOR ON" light illuminates when the MG set is at speed

"* Examinee states that they observe the voltage rise

"* Examinee states that they listen for the audible clunk during the start.

Cue:

Comments:

STEP 6 GRADE Performance Steps: Using "LOCAL" "GEN VOLTAGE ADJUSTMENT" switch, adjust output voltage as close as possible to 240 volts.

Standards:

Examinee states that they adjust output voltage to 240 volts using the "LOCAL" "GEN VOLTAGE ADJUSTMENT' switch.

Cue:

Comments:

6 STEP 5 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-013 TITLE:

Startup and Parallel CEDM MG Sets X Performance Steps: Place "A" CEDM MG "GENERATOR OUTPUT" breaker to "ON".

GRADE X

Standards:

Examinee states that they would close the MG output breaker by taking the handle on C-29 to "ON".

Cue:

'8reaker is cl~sed.

Comments:

Note: This step does NOT place the MG set on the bus.

X Performance Steps: If synchroscope is NOT at 12 o'clock and is NOT rotating, perform the following to get synchroscope to move:

"* Use "REMOTE" "GENERATOR VOLTAGE ADJUSTMENT" switch to raise "REMOTE GENERATOR VOLTS" to 250 VAC.

"* Use "LOCAL" "GENERATOR VOLTAGE ADJUSTMENT" switch to lower "LOCAL" "GENERATOR VOLTS" to 235 VAC.

X Standards:

1. Examinee states that they observe the synchroscope on C-29.
2. Examinee states that they use the "REMOTE" "GENERATOR VOLTAGE ADJUSTMENT" switch to raise voltage of the "B" MG set to 250 VAC and "LOCAL" "GENERATOR VOLTAGE ADJUSTMENT" switch to lower the voltage of the "A" MG set to 235 VAC.

Cue:

Comments:

7 STEP 7 STEP 8 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-013 TITLE:

Startup and Parallel CEDM MG Sets X Performance X

Standards:

Steps: When synchroscope is at approximately the 12 o'clock position, adjust both MG set output voltages to 240 VAC (the synchroscope should be nearly stationary).

Examinee states that they lower voltage of the "B" MG set to 240 VAC and raise voltage of the "A" MG set to 240 VAC to get the needle to stop at approximately the 12 o'clock position.

Cue:

Comments:

STEP 10 X Performance Steps: Press and hold "LOCAL" "LOAD ON" button and release when "LOCAL" "LOAD ON" light is lit.

X Standards:

Examinee states that they press the "LOAD ON" button until the "LOAD ON" light is lit.

Cue: 'The "LOAD) ON" gligt is lit.

Comments:

Performance Steps: Place "A" CEDM MG "INCOMING GENERATOR" synchronizing selector switch to "OFF".

GRADE Standards:

Examinee states that they place the synchroscope selector switch on C-29 to "OFF".

Cue:

Syncroscope selector switch is in "OFF".

Comments:

8 STEP 9 GRADE GRADE STEP 11

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-013 TITLE:

Startup and Parallel CEDM MG Sets Performance Steps: Press and Release "RESET" button.

Ensure relays "4TD", "LO AMP", "HI AMP", "OVR" and "SK" lights are not lit.

GRADE Comments:

Standards:

Examinee states that they open the back door of C-29, press the reset button, and observe designated relay lights are NOT lit.

Cue:

The relay lights are out.

If the rear door of panel C-29 CANNOT be opened due to operational/safety concerns, then the examinee may successfully complete this JPM by describing the location of the reset button relay lights. The reset button and relay lights are located in the approximate center of the panel.

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

9 STEP 12

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

Date Performed:

Operator:

Evaluator(s):

JPM-013 Rev.

6 For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes No X

Validated Time (minutes):

20 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

10

EXAMINEE HANDOUT JPM ID Number:

JPM-013 Initiating Cues:

Initial Conditions:

The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set.

"* The plant is preparing for startup.

"* The "B" CEDM MG set has been placed in service with its load contactor closed.

"* All TCBs are open except TCB-9, which is closed.

"* Both voltage droop circuits are on.

"* In-plant loads are powered from the RSST.

"* NO maintenance has been performed on "A" or "B" CEDM MG sets.

11

JOB PERFORMANCE MEASURE APPROVAL SHEET I.

JPM

Title:

Suppbyiiiiimergency Backup Airt, 2-CH-192 ID Number:

JPM-045 Revision:

6 II.

Initiated:

R.J.

Developer III. Reviewed:

IV. Approved:

Cognizant Plant Supervisor (Optional)

Nucrar Training Supervisor 8/28/02 Date Date Date

JOB PERFORMANCE MEASURE WORKSHEET Facility:

MP-2 JPM Number:

Examinee:

JPM-045 Task

Title:

Supplying Emergency Backup Air to 2-CH-1 92, System:

Plant Service Systems Time Critical Task:

Yes No X

Validated Time (minutes):

10 Task No.(s):

NUTIMS # 078-01-056 Applicable To:

K/A No.:

SRO X

078 K4.01 RO X

PEO K/A Rating:

2.7/2/9 Method of Testing:

Simulated Performance:

X Location:

Classroom:

Task Standards:

Required Materials (proceduresequipment):

General

References:

Actual Performance:

Simulator:

In-Plant:

X At the completion of this JPM, the examinee has demonstrated alignment of emergency backup air to 2-CH-1 92.

OP 2332B OP 2332B, Instrument Air System, Section 4.21 (Rev. 019-04) 2 Rev.

6

  • * *
  • READ TO THE EXAMINEE * * * *

/ will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

i *,*i* *,: + *!< is! * *< <* i * -i* *.*,,.

-* *+* *i*,¸ *-

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

JPM-045 Rev.

6 Initiatincq Cues:

Initial Conditions:

Simulator Reauirements:

The Unit Supervisor has directed you to supply emergency backup air to 2-CH-1 92.

The plant has tripped due to a complete loss of Instrument Air.

N/A 3

        • ,NOTES TO EXAMINER****
1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

Under NO circumstances must the examinee be allowed to manipulate any devices during the performance of this JPM.

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-045 TITLE:

Supplying Emergency Backup Air to 2-CH-192 START TIME:

STEP I GRADE

_ Performance Steps: Adjust backup air PCV, 2-IA-594, to minimum (fully counterclockwise).

Standards:

Examinee locates air bottle and 2-IA-594 and explains they would turn valve fully counterclockwise.

Cue:

Regulator valve is fuly counterlockwise.,

Comments:

STEP 2 GRADE X

x Performance Steps: Slowly open master stop C-4A, 2-IA-602.

Standards:

Examinee locates 2-lA-602 and explains they would slowly open it by turning it in the counterclockwise direction.

Cue:

Valve is open.

Comments:

STEP 3 GRADE X Performance Steps: Open master stop, 2-IA-593.

X Standards:

Examinee locates 2-lA-593 and explains they would open it by turning it in the counterclockwise direction.

Cue:

Valve is open.

Comments:

4

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-045 STEP 4 TITLE:

Supplying Emergency Backup Air to 2-CH-192 X Performance Steps: Adjust backup air PCV, 2-IA-594, clockwise and Establish 100 psig outlet pressure.

GRADE X

Standards:

Examinee simulates turning 2-lA-594 in the clockwise direction, while observing the PCV outlet pressure gauge, until 100 psig is achieved.

Cue:

Comments:

X Performance Steps: Slowly open master stop, 2-IA-596.

X Standards:

Examinee locates 2-lA-596 and explains they would open it by turning it in the counterclockwise direction.

Cue:

Comments:

Comments:

STOP TIME:

Examinee may also state the monitoring requirements while supplying backup air (daily or every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while in an EOP), but it is NOT required.

After this step is completed, the JPM is considered complete.

5 STEP 5 GRADE

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM-045 Rev.

6 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes Validated Time (minutes):

No X

10 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

6

EXAMINEE HANDOUT JPM ID Number:

JPM-045 Initiating Cues:

Initial Conditions:

The Unit Supervisor has directed you to supply emergency backup air to 2-CH-192.

The plant has tripped due to a complete loss of Instrument Air.

7

I JPM

Title:

JOB PERFORMANCE MEASURE APPROVAL SHEET Establish Manuzal Control of HydroenPurgei~alve ID Number:

JPM-137 Revision:

2 I1. Initiated:

R. J. Ashey Developer III.

Reviewed:

Tech nicakAiewer IV. Approved:

Cognizant Plant Supervisor (Optional)

Nude cTraining Supervisor 8D28/02 Date Date Date I/,s-O _

/ Dae A///ý,

JOB PERFORMANCE MEASURE WORKSHEET Facility:

MP-2 Examinee:

JPM Number:

JPM-137 Rev.

2 Task

Title:

Establish Manual Control of Hydrogen Purge Valve System:

Containment Integrity Time Critical Task:

Yes No X

Validated Time (minutes):

15 Task No.(s):

NUTIMS # 028-01-019 Applicable To:

K/A No.

SRO X

103 A4.01 K/A Rating 3.2*/3.3 Method of Testingq:

Simulated Performance:

X Location:

Classroom:

Actual Performance:

Simulator:

In-Plant:

X Task Standards:

At the completion of this JPM, manual established for 2-EB-99.

control has been Required Materials (procedures, equipment):

General

References:

OP 2313C, Section 4.7 OP 2313C, Containment Post-Incident Hydrogen Control, Section 4.7 (Rev. 019-02)

RO X

PEO

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET Initiatinq Cues:

Initial Conditions:

The US has directed you to take local manual control of 2-EB-99 and open the valve to initiate venting of Containment.

0 0

0 0

0 Simulator Requirements:

The plant is in MODE 5 with Containment integrity established.

2-EB-92 and 2-EB-99 are closed with associated fuse blocks tagged for work on valve indicating lights.

Containment pressure is +10 inches of water and rising slowly.

The Control Room has begun to initiate venting of Containment to EBFS.

2-EB-100 is open.

N/A

  • * *
  • NOTES TO EXAMINER * * * *
1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

Under NO circumstances must the examinee be allowed to manipulate any devices during the performance of this JPM.

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-137 TITLE: Establish Manual Control of Hydrogen Purge Valve START TIME:

STEP I

GRADE X

Performance Steps:

X Standards:

Obtain fork-shaped pry bar.

Examinee obtains fork-shaped pry bar located by EOP box on large column in 38'6" East Penetration Room.

Cue:

Comments:

STEP 2

GRADE Performance Steps:

Standards:

Ensure fuse block "FB-CFT-C01 R" (2-EB-99) is "OFF".

Examinee states that they request the Control Room to ensure fuse block is in "OFF OR Examinee observes fuse block FB-CFT-COIR in the "OFF" position.

Cue:

Comments:

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-137 TITLE: Establish Manual Control of Hydrogen Purge Valve STEP 3

GRADE Performance Ster Standards:

Ensure valve (2-EB-99), is closed.

Examinee states they observe local valve position indication to ensure valve is closed.

Cue:

Valve indicates cIosed.

Comments:

STEP 4

X Performance Steps:

As necessary, align manual operator shaft with valve stem.

GRADE X

Standards:

Examinee states they would ensure the alignment key (lever arm), on manual operator shaft was aligned with the key-way on the valve stem by adjusting the manual hand wheel as required.

Cue:

Comments:

STEP 5

X Performance Steps:

X Standards:

Loosen alien head screw on lever arm of manual operator shaft and engage lever arm.

Examinee states they would turn the allen head screw counterclockwise using locally mounted allen wrench and engage the lever arm.

Cue:

The lever arm is engaged.

Comments:

GRADE

)S:

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-137 TITLE: Establish Manual Control of Hydro-gen Purge Valve STEP 6

GRADE Performance Steps:

Standards:

Tighten allen head screw on lever arm of manual operator shaft until snug.

Examinee states that once the arm is engaged they would turn the allen screw clockwise to tighten it until snug.

Cue:

Allen jtrq sis.

Comments:

X Performance Steps:

X Standards:

Using fork-shaped pry bar, apply force to extend air actuator stem approximately 1/8 inch and remove pin connecting air actuator to valve stem.

Examinee states they would insert the pry bar onto the collar nut of the air actuator stem and apply force to extend the stem, then remove the pin.

Cue:

Pini*

e,,ob ed.:

Comments:

STEP 7

GRADE

PERFORMANCE INFORMATION JPM ID NUMBER: JPM-137 TITLE: Establish Manual Control of Hydrogen Purge Valve STEP 8

X Performance Steps:

Manually operate valve as directed.

GRADE X

Standards:

Examinee states they would turn the manual hand wheel to open the valve as indicated by the local position indicator.

Cue:

The valve is open.

Comments:

Comments:

After this step is completed, the JPM is considered complete.

NOTE:

Ensure pry bar is returned to it's original storage location.

STOP TIME:

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

JPM -137 Rev.

2 Date Performed:

Operator:

Evaluator(s):

For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes Validated Time (minutes):

No X

15 Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

EXAMINEE HANDOUT JPM ID Number:

JPM-137 Initiating Cues:

Initial Conditions:

The US has directed you to take local manual control of 2-EB-99 and open the valve to initiate venting of Containment.

"* The plant is in MODE 5 with Containment integrity established.

"* 2-EB-92 and 2-EB-99 are closed with associated fuse blocks tagged for work on valve indicating lights.

"* Containment pressure is +10 inches of water and rising slowly.

"* The Control Room has begun to initiate venting of Containment to EBFS.

"* 2-EB-100 is open.

JOB PERFORMANCE MEASURE APPROVAL SHEET I.

JPM

Title:

Shift fe~m "A" to "B" WasteGas Decay Tank:

ID Number:

JPM-225 Revision:

0 II.

Initiated:

R. J. Ashey Developer Ill. Reviewed:

Technical RevieW~

IV. Approved:

3, )OJ{C lWvYX 8/28/02 Date Date User Date

JOB PERFORMANCE MEASURE WORKSHEET Facility:

MP-2 Examinee:

JPM Number:

JPM-225 Rev.

0 Task

Title:

S$hift From "A" to "B" Waste Gas'ecay Tank System:

Radioactivity Release Time Critical Task:

Yes Validated Time (minutes):

Task No.(s):

NUTIMS # 071-01-035 Applicable To:

K/A No.:

SRO X

071 A4.05 K/A Rating:

2.6*/2.6*

Method of Testing:

Simulated Performance:

X Location:

Classroom:

Task Standards:

Required Materials (procedures,equipment):

General

References:

Actual Performance:

Simulator:

In-Plant:

X At the completion of this JPM the examinee has shifted from the "A" Waste Gas Decay Tank in service to the "B" Waster Gas Decay Tank in service.

OP 2337, Section 4.2 OP 2337, Section 4.2, Rev. 016-02 2

No X

10 RO X

PEO

        • READ TO THE EXAMINEE ****

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE WORKSHEET JPM Number:

JPM-225 Rev.

0 Initiating Cues:

Initial Conditions:

The US has directed you to remove the "A" Waster Gas Decay Tank from service and place the "B" Waste Gas Decay Tank in service.

The "A" Waste Gas Decay Tank pressure indicates 137 psig.

"B" Waste Gas Decay Tank pressure indicates 5 psig Simulator Requirements:

N/A NOTES TO EXAMINER

1.

Critical steps for this JPM are indicated with an "X". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.

2.

When examinee states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question examinee for details of simulated actions / observations (i.e. "What are you looking at?" or "What are you observing?").

4.

Under NO circumstances must the examinee be allowed to manipulate any devices during the performance of this JPM (in-plant only).

3

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-225 TITLE:

Shift From "A" to "B" Waste Gas Decay Tank START TIME:

Performance Steps: Mark the boxes in steps 4.2.5, 4.2.9, and 4.2.10 with the letter "A" (for the "A" waste Gas Decay Tank).

STEP I GRADE Standards:

Examinee records the letter "A" in the boxes for steps 4.2.5, 4.2.9, and 4.2.10.

Cue:

Comments:

Performance Steps: Mark the boxes in step 4.2.6.with the letter "B" (for the "B" Waste Gas Decay Tank).

STEP 2 GRADE Standards:

Examinee records the letter "B" in the boxes for steps 4.2.6.

Cue:

Comments:

Performance Steps: Record position of Waste Gas Compressor hand switches.

GRADE Standards:

Examinee records the position of the "A" and "B" of Waste Gas Compressor hand switches.

Cue:

Comments:

One compressor will be in AUTO, the other will be in STANDBY.

4 STEP 3


~

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-225 STEP 4 TITLE:

Shift From "A" to "B" Waste Gas Decay Tank X

Performance Steps: Place both Waste Gas Compressor hand switches in OFF position.

GRADE X

Standards:

Examinee states that they would place both Waste Gas Compressor hand switches on panel C-61 in the OFF position.

Cue:

Comments:

X Performance Ste X

Standards:

-ps: Close the following valves:

"* WASTE GAS DECAY TANK INLET VALVE, 2 GR-6.1A (C-61)

"* Decay Tank Inlet Stop, 2-GR-6A (local)

"* Pressure Control Valve Outlet Isolation, 2-GR-7A (local)

Examinee states that they would place the hand switch for the following valves in the CLOSE position and observe the only the green light is lit:

"* WASTE GAS DECAY TANK INLET VALVE, 2-GR

6. 1A, on C-61

"* Decay Tank Inlet Stop, 2-GR-6A, in the -25'6" elevation

"* Pressure Control Valve Outlet Isolation, 2-GR-7A, in the -25'6" elevation Cue:

Thevalves are closed and the green lights are lit.

Comments:

5 STEP 5 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-225 TITLE:

Shift From "A" to "B" Waste Gas Decay Tank X

Performance Steps: Ensure the following valves are closed:

"* DECAY TANK OUTLET CONTROL VALVE, 2 GR-8.1B (C-61)

"* Decay Tank Outlet Isolation, 2-GR-8A (local)

"* Decay Tank Outlet Stop, 2-GR-9A (local)

X Standards:

Examinee states that they would ensure the hand switch for the following valves were in the CLOSE position and observe that only the green light is lit:

"* WASTE GAS DECAY TANK OUTLET VALVE, 2-GR 8.1A, on C-61

"* Decay Tank Outlet Isolation, 2-GR-8A, in the -25'6" elevation

"* Decay Tank Outlet Stop, 2-GR-9A, in the -25'6" elevation Cue:

,Thevalvesare closed.

Comments:

6 STEP 6 GRADE

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-225 TITLE:

Shift From "A" to "B" Waste Gas Decay Tank STEP 7 X

Performance Steps: Open the following valves:

WASTE GAS DECAY TANK INLET VALVE, 2 GR-6.1B (C-61)

Decay Tank Inlet Stop, 2-GR-6B (local)

Pressure Control Valve Outlet Isolation, 2-GR-7B (local)

GRADE X

Standards:

Examinee states that they would place the hand switch for the following valves in the OPEN position and observe the only the red light is lit:

"* WASTE GAS DECAY TANK INLET VALVE, 2-GR 6.1B, on C-61

"* Decay Tank Inlet Stop, 2-GR-6B, in the -25'6" elevation

"* Pressure Control Valve Outlet Isolation, 2-GR-7B, in the -25'6" elevation Cue:

The valves are open~

Comments:

STEP 8 X

Performance Steps: Place Waste Gas Compressor switches back to the original position.

GRADE X

Standards:

Examinee states that they would place both Waste Gas Compressor hand switches on panel C-61 in the previously recorded position.

Cue:

Comments:

7

PERFORMANCE INFORMATION JPM ID NUMBER:

JPM-225 TITLE:

Shift From "A" to "B" Waste Gas Decay Tank X

Performance Steps: Record time and pressure of "A" and "B" Waste Gas Decay Tanks in the Rad Waste Log.

GRADE X

Standards:

Examinee states that they would obtain the Rad Waste Log and record the time and pressure when the "A" and "B" Waste Gas Decay Tanks were swapped.

Cue:

Thelnformation asbenoperfy logged.

Comments:

STEP 10 X

Performance Steps: Open Decay Tank Sample Stop, 2-GR-17, and request Chemistry to sample the "A" Waste Gas Decay Tank.

GRADE X

Standards:

Examinee state that they would open Decay Tank Sample Stop, 2-GR-17, and request Chemistry to sample the "A" Waste Gas Decay Tank.

Cue:,The, valve is open.

Comments:

Examinee may state that they would close Decay Tank Sample Stop, 2-GR-17, when sampling is complete.

Comments:

After this step is completed, the JPM is considered complete.

STOP TIME:

8 STEP 9

VERIFICATION OF JPM COMPLETION Job Performance Measure No.

Date Performed:

Operator:

Evaluator(s):

JPM-225 Rev.

0 For examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Yes No X

Validated Time (minutes):

Actual Time to Complete (minutes):

Result of JPM:

(Denote by an S for satisfactory or a U for unsatisfactory)

Areas for Improvement:

9 10 I

EXAMINEE HANDOUT JPM ID Number:

JPM-225 Initiatinq Cues:

Initial Conditions:

The US has directed you to remove the "A" Waster Gas Decay Tank from service and place the "B" Waste Gas Decay Tank in service.

The "A" Waste Gas Decay Tank pressure indicates 137 psig.

"B" Waste Gas Decay Tank pressure indicates 5 psig 10