Letter Sequence Approval |
---|
|
|
MONTHYEARML0235800252003-03-0404 March 2003 License Amendment 122 Approving Use of Alternative Source Term Radiological Calculations to Update Design Basis Analysis for Fuel Handling Accident as Described in USAR Project stage: Approval 2003-03-04
[Table View] |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARL-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 L-24-168, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-155, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 L-24-140, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter L-24-066, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency2024-04-15015 April 2024 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency L-24-083, Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification2024-04-15015 April 2024 Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification ML24088A1922024-03-28028 March 2024 Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24057A0782024-03-0101 March 2024 Amendments to Indemnity Agreements - Enclosure 2 ML24057A0772024-03-0101 March 2024 Conforming License Amendments - Enclosure 1 ML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, 'Rhr Suppression Pool Cooling' ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18214A6672018-08-22022 August 2018 FENOC Fleet - Perry Nuclear Power Plant, Unit No. 1 - Correction to the Issuance of Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules (CAC No. MG0136; EPID L-2017-LLA-0259) ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17163A3542017-06-29029 June 2017 Issuance of Amendment Concerning Adoption of Tstf-501, Revision 1, Relocation of Diesel Fuel and Lube Oil Volume Values to Licensee Control (CAC No. MF8693) (L-16-236) ML17139C3722017-06-19019 June 2017 Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179) ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17033A0142017-02-16016 February 2017 Issuance of Amendment Concerning Revision to Technical Specifications to Permit Installation of Upper Containment Pool Gate During Modes 1, 2, and 3 (CAC No. MF7476) (L-16-083) ML16158A3312016-09-14014 September 2016 Issuance of Amendment Concerning Revision to the Perry Nuclear Power Plant Emergency Plan ML16130A5362016-05-31031 May 2016 Issuance of Conforming Amendment Related to the Direct License Transfer of the Facility Operating License NPF-58 ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) ML15075A1392015-03-30030 March 2015 Issuance of Amendment Concerning Full Implementation of Alternative Source Term (TAC No. MF3197) (L-13-306) L-14-325, Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325)2015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML15075A0912015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML14205A6192014-08-29029 August 2014 Amendments to Indemnity Agreements (TAC MF0701, MF0702, MF0703, and MF0704) ML13136A1432013-05-16016 May 2013 Nucelar Power Plant, Unit 1 - Re-Issuance of Amendment Regarding Adoption of TSTF-275 and TSTF-300 ML13051B1442013-05-0606 May 2013 Issuance of Amendment Regarding Adoption of TSTF-275, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-Up, and TSTF-300 ML13017A4312013-04-18018 April 2013 Issuance of Amendment Revise Technical Specification 3.10.1, Inservice Leak, and Hydrostatic Testing Operation ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC 2024-03-01
[Table view] Category:Safety Evaluation
MONTHYEARML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22252A2212022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request IR-063 ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22187A2592022-07-12012 July 2022 Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22136A1132022-06-21021 June 2022 Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, 'Rhr Suppression Pool Cooling' ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21063A2532021-03-0505 March 2021 Issuance of Relief Request SR-2, Revision 0, from Certain Requirements of the ASME OM Code (EPID L-2021-LLR-0005 (COVID-19)) ML21063A1572021-03-0404 March 2021 Safety Evaluation for Alternative Request SR-2, Revision 0 Related to one-time Extension Snubbers Testing to ASME OM Code for the Fourth 10-year Inservice Interval at Perry Nuclear Power Plant Unit 1, Docket Nos. 50-440 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20363A0062021-01-29029 January 2021 Issuance of Relief Proposed Alternative Request Associated with Fourth 10-Year Inservice Inspection Interval ML20311A6582020-11-10010 November 2020 Issuance of Relief Proposed Alternative Request Associated with Fourth Ten Year Interval Inservice Inspection Interval ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20266G2652020-09-24024 September 2020 Correction Letter for Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20252A0262020-09-18018 September 2020 Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20189A0032020-07-10010 July 2020 Relief Request PR-3 for Fourth 10-Year Pump and Valve Inservice Testing Program ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML19072A0122019-03-15015 March 2019 Correction to License Amendment No. 184 Related to Adoption of Technical Specification Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML19072A0852019-03-15015 March 2019 Correction to Request for Alternatives Related to Inservice Testing Program for the Fourth 10 Year Inservice Testing Interval ML19029A0902019-02-25025 February 2019 Request for Alternatives Related to Inservice Testing Program for the Fourth 10-Year Inservice Testing Interval (EPID Nos. L-2018-LLR-0092, 0093, 0094, 0095, and 0096) ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML19037A0412019-02-25025 February 2019 Request for Alternative to Use ASME Code Case N-831 ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML18023A6252018-01-29029 January 2018 Approval of Alternative to Use BWRVIP Guidelines in Lieu of Certain ASME Code Requirements (CAC No. MG0149; EPID 2017-LLR-0112) (L-17-183) ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17270A0302017-10-16016 October 2017 Approval of Alternative to Use ASME Code Case N-513-4 for Repair of Emergency Service Water System Piping (CAC No. MG0130; EPID L-2017-LLR-0080)(L-17-278) ML17193A3822017-07-18018 July 2017 Correction to Safety Evaluation for License Amendment No. 177 2024-09-13
[Table view] |
Text
March 4, 2003 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A200 10 Center Road Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT 1 - ISSUANCE OF AMENDMENT (TAC NO. MB6928)
Dear Mr. Kanda:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 122 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit 1. This amendment is in response to your application dated December 9, 2002 (PY-CEI/NRR-2674L).
Pursuant to 10 CFR 50.67, Accident source term, this amendment approves the use of alternative source term radiological calculations to update the design basis analysis for the fuel handling accident as described in the Updated Safety Analysis Report. Regulatory Guide 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, was used in the application.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA by DPickett for/
Stephen P. Sands, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosures:
- 1. Amendment No. 122 to License No. NPF-58
- 2. Safety Evaluation cc w/encls: See next page
ML023580025 OFFICE PM:LPD3 LA:LPD3 SC:SPSB SC:SPLB NAME DVPickett for THarris FReinhart* EWeiss SSands DATE 01/31/03 01/31/03 01/09/03 01/14/03 OFFICE SC:RORP OGC SC:LPD3 NAME RDennig AHodgon LRaghavan for AMendiola DATE 01/23/03 01/31/03 3/3/03
- see previous concurrence Perry Nuclear Power Plant, Unit 1 cc:
Mary E. OReilly Ohio Emergency Management Agency FirstEnergy Corporation 2855 West Dublin Granville Road 76 South Main St. Columbus, OH 43235-7150 Akron, OH 44308 Mayor, Village of Perry Resident Inspectors Office P.O. Box 100 U.S. Nuclear Regulatory Commission Perry, OH 44081-0100 P.O. Box 331 Perry, OH 44081-0331 Dennis Clum Radiological Assistance Section Supervisor Regional Administrator, Region III Bureau of Radiation Protection U.S. Nuclear Regulatory Commission Ohio Department of Health 801 Warrenville Road P.O. Box 118 Lisle, IL 60532-4531 Columbus, OH 43266-0118 Sue Hiatt Zack. A. Clayton OCRE Interim Representative DERR 8275 Munson Ohio Environmental Protection Agency Mentor, OH 44060 ATTN: Mr. Zack A. Clayton P.O. Box 1049 Gregory A. Dunn Columbus, OH 43266-0149 Manager - Regulatory Affairs FirstEnergy Nuclear Operating Company Chairman Perry Nuclear Power Plant Perry Township Board of Trustees P.O. Box 97, A210 3750 Center Road, Box 65 Perry, OH 44081 Perry, OH 44081 William R. Kanda, Plant Manager Daniel Z. Fisher FirstEnergy Nuclear Operating Company Transportation Department Perry Nuclear Power Plant Public Utilities Commission P.O. Box 97, SB306 180 East Broad Street Perry, OH 44081 Columbus, OH 43215-3793 Mayor, Village of North Perry North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009 Carol OClaire, Chief, Radiological Branch
FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 122 License No. NPF-58
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the FirstEnergy Nuclear Operating Company (the licensee) dated December 9, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended to authorize revision of the Updated Safety Analysis Report (USAR) as set forth in the application for amendment by the licensee, dated December 9, 2002. The licensee shall update the USAR by adding a description of the methodology incorporating Alternative Source Term calculations to update the design basis analysis for the Fuel Handling Accident, as authorized by this amendment and in accordance with 10 CFR 50.71(e).
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by LRaghavan for/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Date of Issuance: March 4, 2003
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 122 TO FACILITY OPERATING LICENSE NO. NPF-58 FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-440
1.0 INTRODUCTION
By letter dated December 9, 2002, FirstEnergy Nuclear Operating company (the licensee),
requested changes to the Updated Safety Analyses Report (USAR) for the Perry Nuclear Power Plant. The licensee requested changes to the USAR using a selective implementation of the alternative source term (AST), as described in Regulatory Guide 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, and pursuant to 10 CFR 50.67, Accident Source Term. The proposed changes would revise the radiological consequence analyses for the postulated fuel handling accident (FHA) during refueling operations.
2.0 BACKGROUND
The current radiological consequence analysis for the postulated FHA for Perry is based on TID 14844 accident source term. In 1995, the staff published NUREG-1465, "Accident Source Terms for Light-Water Nuclear Power Plants." NUREG-1465 provides estimates of the accident source term that were more physically based and that could be applied to the design of future light-water power reactors. NUREG-1465 presents a representative accident source term for a boiling-water reactor (BWR) and for a pressurized-water reactor (PWR).
These source terms are characterized by the composition and magnitude of the radioactive material, the chemical and physical properties of the material, and the timing of the release to the containment.
The staff considered the applicability of the revised source terms in NUREG 1465 to operating reactors and determined that the current analytical approach based on the TID-14844 source term would continue to be adequate to protect public health and safety. Operating reactors licensed under that approach would not be required to re-analyze accidents using the revised source terms. The staff also determined that some licensees might wish to use AST analyses to support cost-beneficial licensing actions. The staff, therefore, initiated several actions to provide a regulatory basis for operating reactors to use the AST in design basis radiological consequence analyses. These initiatives resulted in the development and issuance of 10 CFR 50.67 and Regulatory Guide 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors..
A holder of an operating license issued prior to January 10, 1997, or a holder of a renewed license under 10 CFR Part 54 whose initial operating license was issued prior to January 10,
1997, is allowed by 10 CFR 50.67, "Accident Source Term," to voluntarily revise its current accident source term used in design basis radiological consequence analyses for a license amendment under 10 CFR Part 50.90. In this license amendment, the Perry licensee requested a selective implementation of the AST, as described in Regulatory Guide 1.183 pursuant to 10 CFR 50.67. In general, information provided by Regulatory Guides 1.183 is reflected in Chapter 15.0.1 of the Standard Review Plan (SRP), Radiological Consequence Analyses Using Alternative Source Term. In March 1999, the staff issued Perry License Amendment No. 103 which included the radiological consequence analysis for a loss-of-coolant accident (LOCA) using a full-scope implementation of an AST as a pilot plant representing operating reactors.
3.0 EVALUATION The current radiological consequence analysis for the postulated design basis FHA, which is provided in Perry USAR Section 15.7, is based on the accident source term described in TID-14844. The licensee re-evaluated the radiological consequences resulting from a postulated FHA in the spent fuel pool area and in the containment with the containment and the fuel handling building (FHB) open and without any credit for removal of fission products by the FHB and the fuel handling building ventilation system (FHBVS). The licensee concluded that the radiological consequences at the exclusion area boundary (EAB), at the low population zone (LPZ), and in the control room resulting from the postulated FHA in the spent fuel pool area and in the containment are still within the dose acceptance criteria specified in Standard Review Plan (SRP) 15.0.1, Radiological Consequence Analyses Using Alternative Source Terms, and those specified in 10 CFR 50.67.
The licensee reached this conclusion based upon the following assumptions:
(1) implementation of the AST, (2) conformance with the guidelines provided in Regulatory Guide 1.183, (3) no credit was taken for removal of fission products by the FHB, FHBVES, Annulus Exhaust Gas Treatment System (AEGTS), or Control Room Emergency Recirculation System.
(4) no credit was taken for either containment or FHB integrity, (5) no credit was taken for the isolation of the control room normal air intake, (6) a fission product decay period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (time period from the reactor shutdown to the first fuel movement),
(7) an overall decontamination factor of 200 for iodine in elemental and particulate forms in the spent fuel pool water with minimum water depth of 23 feet consistent with the guidelines provided in Regulatory Guide 1.183, (8) control room intake air dispersion factors ( /Q values) approved and accepted by the staff in Perry License Amendment Nos. 102 and 103 both issued in March 1999, (9) an unfiltered air in-leakage rate of 6600 cfm (normal flow rate plus 10% to conservatively maximize radioactivity input to the control room) for the first 36
seconds and 5400 cfm (normal makeup flow minus 10% to conservatively minimize the purging effect) for the remaining period of the accident (30 days),
(10) no credit was taken for using protective equipment or prophylactic drugs by the control room operator, and (11) all fuel rods in one fuel assembly (151 fuel rods) with an axial power peaking factor of 2.0 and a peak rod average fuel burnup of 62,000 MWD/MTU are damaged to the extent that its entire gap activity inventory of the damaged fuel rods is released to the surrounding water for single fuel assembly drop event consistent with the guideline provided in Regulatory Guide 1.183. (the corresponding maximum linear heat generation rate will not exceed 6.3 kW per foot)
The staff reviewed the licensees methods, parameters, and assumptions used in its radiological dose consequence analyses. To verify the licensees radiological consequence assessments, the staff performed its confirmatory radiological consequence dose calculations for the postulated FHA. The radiological consequences calculated by the staff are well within the dose criterion specified in 10 CFR 50.67 (a TEDE of 5 rem in the control room) and the dose acceptance criteria specified in SRP 15.0.1 (a TEDE of 6.3 rem at the EAB and LPZ).
Although the staff performed confirmatory dose calculations, the staffs acceptance is based on the licensees analyses. The results of the licensees radiological consequence calculations are provided in Table 1 and the major parameters and assumptions used by the licensee and accepted by the staff are listed in Table 2. The radiological consequences at the EAB, at the LPZ, and in the control room calculated by the licensee are also well within the dose criterion specified in 10 CFR 50.67 and meet the dose acceptance criterion specified in SRP 15.0.1.
By letter dated December 5, 2002, the licensee withdrew a previous application to implement the AST. Included in this letter was an update to a previous regulatory commitment made in support of License Amendment No. 102 (March 1999) which provided approval for handling irradiated fuel under Shutdown Safety controls at Perry. The original commitment was made to a draft version of NUMARC 93-01, Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. The following commitment was updated to commit to Revision 3 of NUMARC 93-01, Section 11.3.6.5. This ensures that a building closure plan is in effect and ventilation systems remain available to monitor and filter a release from a FHA.
In addition to the guidance of NUMARC 91-06, for plants which obtain license amendments to utilize shutdown safety administrative controls in lieu of Technical Specification requirements on primary or secondary containment operability and ventilation system operability during fuel handling or core alterations, the following guidelines should be included in the assessment of systems removed from service:
- During fuel handling/core alterations, ventilation system and radiation monitor availability (as defined in NUMARC 91-06) should be assessed, with respect to filtration and monitoring of releases from the fuel. Following shutdown, radioactivity in the RCS decays fairly rapidly. The basis of the Technical Specification operability amendment is the reduction in doses due to such decay.
The goal of maintaining ventilation system and radiation availability is to reduce doses even further below that provided by the natural decay, and to avoid unmonitored releases.
- A single normal or contingency method to promptly close primary or secondary containment penetrations should be developed. Such prompt methods need not completely block the penetration or be capable of resisting pressure. The purpose is to enable ventilation systems to draw the release from a postulated fuel handling accident in the proper direction such that it can be treated and monitored.
Based upon the above dose calculations and the licensees revised commitment, the staff finds that the licensees requested changes are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Ohio State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
This amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 or changes a surveillance requirement. The staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluent that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that this amendment involves no significant hazards consideration and there has been no public comment on such finding (68 FR 804). Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
6.0 CONCLUSION
The staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Jay Lee, NRR Date: March 4, 2003
TABLE 1 Radiological Consequences Expressed as TEDE (rem)
Design Basis Accident EAB(1) LPZ(2) Control Room Fuel handing accident 1.44 0.161 1.03 Dose criteria 6.3(3) 6.3(3) 5.0(4)
(1)
Exclusion area boundary, (2)
Low population zone (3)
SRP 15.0.1 (4) 10 CFR 50.67
Table 2 Parameters and Assumptions Used in Radiological Consequence Calculations Parameter Value Reactor power 3833 MWt Radial peaking factor 2.0 Fission product decay period 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Number of fuel assembly damaged 1 Fuel pool water depth 23 ft Fuel gap fission product inventory Noble gases excluding Kr-85 5%
Kr-85 10%
I-131 8%
Alkali metals 12%
Fuel pool decontamination factors Iodine 200 Noble gases 1 Duration of accident 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Meteorological Data Exclusion Area Boundary Time (hr) X/Q (sec/m3) 0-2 4.3E-4 Low Population Zone Distance 0 to 8 4.8E-5 8 to 24 3.3E-5 24 to 96 1.4E-5 96 to 720 4.1E-6 Control Room 0 to 8 3.5E-4 8 to 24 2.1E-4 24 to 96 1.1E-4 96 to 720 5.8E-5