November 2002 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2
ML023540353
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/10/2002
From: Cayia A
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2002-0106
Download: ML023540353 (6)


Text

NMC Committed to Nuclear Excelle ->

Nuclear Management Company, LLC Point Beach Nuclear Plant 66 10 Nuclear Road Two Rivers, WI 54241 NRC 2002-0106 GL 97-02 December 10, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of November 2002.

Sincerely, Site Vice President KML Attachment cc:

J. D. Loock, PSCW NRC Region III NRC Senior Resident Inspector NRC Project Manager Jo7

Docket 50-266 and 50-301 NRC-2002-0106 ATTACHMENT 1 Letter from A. J. Cayia (NMC)

To Document Control Desk (NRC)

Re: Monthly Operating Reports

OPERATING DATA REPORT DOCKET NO.

50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 12/05/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD November - 2002

1.

2.

DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

YEAR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVER SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH) 720.0 720.0 0.0 363,682.0 7,245.6 7,220.5 0.0 3,601,571.0 230,855.4 227,314.5 846.9 105,177,091.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 515.0 510.0

3.
4.
5.

6.

MONTH

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-266 Point Beach, Unit 1 12/05/2002 Kim M. Locke 755-6420 REPORTING PERIOD:

November 2002 (Month/Year)

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain)

I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction

4. Continuation E. Operator Training/license Examination F.Administrative
5. Other (Explain)

G. Operational Error (Explain) H.Other (Explain)

SUMMARY

Unit 1 average daily power for the month of November was 505.1 MWe.

Licensee Event Reports (LERs) submitted to the NRC in November:

LER 266/2002-002-00 Unit 1 A-Train Reactor Protection Cable Routed in B-Train Cable Trays

OPERATING DATA REPORT DOCKET NO.

50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 12/05/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD November - 2002

1. DESIGN ELECTRICAL RATING (MWE-NET)
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

YEAR TO DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR WAS CRITICAL
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
5. UNIT RESERVER SHUTDOWN HOURS
6. NET ELECTRICAL ENERGY (MWH) 370,672.0 3,623,857.0 104,407,365.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 515.0 512.0 MONTH 720.0 720.0 0.0 7,227.4 7,191.6 225,009.1 222,021.7 0.0 302.2

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-301 Point Beach, Unit 2 12/05/2002 Kim M. Locke 755-6420 REPORTING PERIOD:

November 2002 (Month/Year)

(1) Reason A. Equipment Failure (Explain)

B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)

(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram

4. Continuation
5. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of October was 514.8 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC November:

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A