NRC FORM 658 U.S. NUCLEAR REGULATORY COMMISSION (9-1999)
TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed or hand-printed) by the person who announced the meeting (i.e., the person who issued the meeting notice). The completed form, and the attached copy of meeting handout materials, will be sent to the Document Control Desk on the same day of the meeting; under no circumstances will this be done later than the working day after the meeting.
Do not include proprietary materials.
DATE OF MEETING The attached document(s), which was/were handed out in this meeting, is/are to be placed
/ 7.
/
in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:
Docket Number(s) 50
- a 7
/
Plant/Facility Name J-
?/L,.., 4I. 6)
AS>
TAC Number(s) (if available)
A 4:1 Reference Meeting Notice
///z Z.2Cpz3" Purpose of Meeting (copy from meeting notice)
/7 L* (
NAME OF PERSON WHO ISSUED MEETING NOTICE TITLE OFFICE DIVISION BRANCH Distribution of this form and attachments:
Docket File/Central File PUBLIC NRC FORM 658 (9-1999)
PRINTED ON RECYCLED PAPER This form was designed using InForms
--Entergy Vermont Yankee Extended Power Uprate NRC/Entergy Meeting Rockville, Maryland December 11, 2002
-Entergy Agenda
"* Introductions
"* Meeting Objectives
"* Opening Remarks
"* Project Overview CPPU Licensing Topical Report Approach MELLLA Plus Current Status
"* NRC Submittals/Reviews Required Approvals/Schedule Review Expectations/Interactions
"* Radiological Analyses
"* Open Discussion 12/10/2002 2
-Entergy Introductions/Meeting Objectives
Introductions
Meeting Objectives
"* Inform NRC staff of Entergy's proposed plan, schedule, and approach for implementing an extended power uprate
"* Discuss submittal approach
"* Gain NRC insights from previous uprates 12/10/2002 3
AM - Etergy Project Overview
° 20% Uprate (from 1593 to 1912 MWt)
- 10%-15% increase in Phase 1 (2004)
- Full 20% increase in Phase 2 (following RFO-25, Fall 2005)
- Constant Reactor Pressure
- General Electric Tasked with NSSS Engineering and T/G Supply Scope
- Stone &Webster Tasked with BOP Engineering Scope 12/10/2002 4
-- Entergy Project Overview
"* CPPU Licensing Topical Report Approach
- CPPU LTR Rev 2, November 2002 VY Transition to GE-14 Fuel
- 1 st GE-1 4 Fuel Loaded October 2002
- License Changes
"* Core Thermal Power
"* Credit Containment Overpressure for NPSH, if Required
"* Tech Spec Instrument Setpoints
"* MELLLA Plus
- M+ LTR Rev 1, August 2002 12/10/2002 5
---En tergy Project Overview
- Current Status
- EPU Feasibility Study Complete
- ARTS/MELLLA Project Underway
- EPU/MELLLA Plus Project Underway
- Alternate Source Term Project - Started
- Benchmarking/Operating Experience 12/10/2002 6
-=--
Entergy VYNPS Submittal
"* Power Uprate Safety Analysis Report High Quality, Complete, Consistent
- Benchmarked BWR's (within and outside Entergy)
- Takes Into Account Previous EPU RAI's Minimizes Licensing Basis Changes
"* MELLLA Safety Analysis Report Based on Previous ARTS/MELLLA Submittals
"* MELLLA Plus Safety Analysis Report
- Based on Brunswick Submittal 12/10/2002 7
- -:-En tergy NRC Submittals/Reviews
"* ARTSIMELLLA Submittal 04/03, Desire License Amendment/SER by 02/04 (Outage)
"° Alternate Source Term Submittal 07/03, Desire License Amendment/SER by 03/04 (Outage)
"* Extended Power Uprate Submittal 09/03, Desire License Amendment/SER by 07/04
"* MELLLA+
Submittal 01/04, Desire License Amendment/SER 01/05 12/10/2002 8
-- Entergy Review Expectations/Interactions
"* Work to the Schedule
"* Regular Communications
"* Periodic NRC-Entergy Meetings
"* Expeditious RAI Resolution 12/10/2002 9
- None 12/10/2002 10
AMEntergy Radiological Analyses Full Alternative Source Term Implementation (separate submittal)
- DBA Accident Analyses (CRDA, FHA, LOCA and MSLB)
- Convert to Industry Standard X/Q's for Control Room Dose 12/10/2002 11