Summary of Public Meetings to Discuss the Manual Chapter 0350 Process at Davis-Besse
ML023400213
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/05/2002
From: Christine Lipa
NRC/RGN-III
To:
References
Download: ML023400213 (5)


Text

December 5, 2002 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1

SUBJECT:

SUMMARY

OF THE OCTOBER 16, 2002, PUBLIC MEETINGS TO DISCUSS THE MANUAL CHAPTER 0350 PROCESS AT DAVIS-BESSE On October 16, 2002, the Nuclear Regulatory Commission (NRC) held two public meetings at the Oak Harbor High School in Oak Harbor, Ohio. The first meeting was between the NRC Davis-Besse Oversight Panel and FirstEnergy Nuclear Operating Company (FENOC) to discuss recent inspection results and the licensees Return to Service Plan for Davis-Besse Nuclear Power Station. The agenda, meeting notice, transcript and the FENOC presentation can be found in ADAMS as ML022830838, ML022760561, ML023290391, and ML022960532; respectively. A list of NRC and licensee meeting participants can be found in Enclosure 1.

The second meeting was between the NRC and members of the public. During the meeting, the NRC summarized the discussion from the earlier meeting between the NRC and FENOC.

A public question and answer session followed the summary. The agenda, meeting notice, and transcript can be found in ADAMS as ML022810336, ML022760553, and ML023160406; respectively.

These documents and many others related to the reactor vessel head degradation can also be found on the NRCs website at http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation.html.

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 See Attached Distribution Enclosure

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML023400213.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME DPassehl:klg CLipa DATE 11/29/02 12/05/02 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encls: B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy State Liaison Officer, State of Ohio R. Owen, Ohio Department of Health Ohio Public Utilities Commission C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Emergency Management Agency S. Isenberg, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable Robert Purney The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown C. Koebel, President, Ottawa County Board of Commissioners The Honorable Joe Ihnat INPO D. Lochbaum, Union of Concerned Scientists

FirstEnergy Nuclear Operating Company cc w/encls: B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy State Liaison Officer, State of Ohio R. Owen, Ohio Department of Health Ohio Public Utilities Commission C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Emergency Management Agency S. Isenberg, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable Robert Purney The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown C. Koebel, President, Ottawa County Board of Commissioners The Honorable Joe Ihnat INPO D. Lochbaum, Union of Concerned Scientists ADAMS Distribution:

DFT S. Rosenberg, OEDO RidsNrrDipmlipb J. Caldwell, RIII B. Clayton, RIII DRPIII DRSIII PLB1 JRK1 DB0350

Enclosure 1 Meeting Participants NRC J. Grobe, Chairman, Davis-Besse Oversight Panel W. Dean, Deputy Director, Division of Engineering, NRR C. Lipa, Chief, Branch 4, Division of Reactor Projects A. Mendiola, Section Chief, Division of Licensing and Project Management, NRR J. Hopkins, Project Manager, NRR C. Thomas, Senior Resident Inspector, Davis-Besse FirstEnergy Nuclear Operating Company L. Myers, Chief Operating Officer R. Schrauder, Director - Support Services J. R. Fast, Plant Manager J. Powers, III, Director - Nuclear Engineering L. W. Pearce, Vice President, Quality Oversight M. Stevens, Director - Work Management