(2:00-5:00 P.M.) Notice of Public Meeting to Discuss Firstenergy Nuclear Operating Co Performance & Progress on the Return to Service Plan as Part of the IMC 0350 Process
ML022760561
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/03/2002
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
References
Download: ML022760561 (4)


Text

October 3, 2002 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Date and Time of Meeting: Wednesday, October 16, 2002, 2:00 to 5:00 p.m. (EDT)

Location of Meeting: Oak Harbor High School Auditorium 11661 West State Route 163 Oak Harbor, OH 43449 Purpose of Meeting: Discuss licensee performance and progress on the Return to Service Plan as part of the IMC 0350 Process Category 3 This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

J. Grobe, Chairman, Davis-Besse Oversight Panel W. Dean, Deputy Director, Division of Engineering, NRR C. Lipa, Chief, Branch 4, Division of Reactor Projects A. Mendiola, Section Chief, NRR J. Hopkins, Project Manager, NRR J. Jacobson, Senior Mechanical Engineer, Division of Reactor Safety S. Thomas, Senior Resident Inspector, Davis-Besse Others as designated NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jan Strasma at 630-829-9663 or me at 630-829-9619 by COB October 11, 2002.

Approved By: /RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

B. W. Sheron, Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski, Director, Division of Licensing and Project Management, NRR G. Tracy, Chief, Division of Inspection Program Management, IOLB, NRR S. Rosenberg, Region III Coordinator, OEDO S. Bajwa, Project Directorate, Division of Licensing and Project Management, NRR D. Pickett, Project Manager, Project Directorate, Division of Licensing and Project Management, NRR G. E. Grant, Director, Division of Reactor Projects, RIII S. A. Reynolds, Deputy Director, Division of Reactor Projects, RIII J. A. Grobe, Chairman, IMC 0350 Oversight Panel R. J. Caniano, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief S. Thomas, SRI, Davis-Besse DRS Branch Chiefs (RNG, DEH, DLP1, KXR)

R. M. Lickus, Regional State Liaison Officer, RIII PMNS J. Kweiser, ORA P. Buckley, ORA DB0350

PUBLIC MEETING BETWEEN U.S. NRC OVERSIGHT PANEL AND FIRSTENERGY OAK HARBOR, OHIO October 16, 2002, 2:00 pm EDT Purpose of Meeting: Discuss Licensees Progress on Implementing the Return to Service Plan AGENDA I. Introduction and Opening Remarks II. Summary of September 17th and 18th Public Meetings III. Discussion of NRCs Restart Checklist and Status of NRC Inspections IV. Licensee Presentation on the Status of Their Return to Service Plan V. Adjourn NRC meeting with FENOC

<break>

VI. Public Comments and Questions of NRC Local Members of the Public / Others VII. Adjourn Meeting