Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, SI)
Facility:
BVPS Unit I Task
Title:
Start [1RC-P-1A1 Reactor Coolant Pump Task No: 0062-001-01-013 JPM No: 2002 NRC S1 K/A
Reference:
Examinee:
003 A2.02 (3.7/3.9) 003 A3.04 3.6/3.6) 003 A4.06 (2.9/2.9 NRC Examiner:
Facility Evaluator:
Method of Testing:
Simulated Performance:
Classroom:
Actual Performance X
Simulator:
X Plant:
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
The plant is in Mode 3 preparing to enter Mode 2 to perform a reactor startup. Currently [1RC-P-1 B] and [1RC-P-1C] are in operation. Another Operator has begun 1OM-6.4.A, Reactor Coolant Pump Startup procedure completing all steps through IV.A.13. All systems and components are operating in their normal alignment to support pump operation.
[1 RC-P-1A] is started and proper operation verified per 1OM-6.4.A, Reactor Coolant Pump Startup.
None 1OM-6.4.A, Reactor Coolant Pump Startup, Rev. 20 1OM-6.4.ACR, Reactor Cool Pump Vibration High High, Rev. 2 1OM-6.4.A, Rev. 20 (marked up copy)
Tools:
Initiating Cue:
Time Critical Task:
Validation Time:
Stopwatch The Unit Supervisor directs you to start [1 RC-P-1A] beginning at Step IV.A.14 of 1OM-6.4.A.
NO 20 minutes N/A Date:
Appendix C Page 2 of 8 JOB PERFORMANCE MEASURE Start [1 RC-P-1A], Reactor Coolant Pump Simulator Setup Information Form ES-C-1 (R8, SI) 2002 NRC S1
Appendix C Page 3 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Start [1RC-P-1A], Reactor Coolant Pump 2002 NRC S1 (Denote critical steps with an asterisk)
Performance Step 1:
If starting the first RCP in a non-isolated loop AND the cold leg (Step IV.A.14.a) temperature of any non-isolated RCS loop is _ 3430F, verify the highest Reactor Coolant Loop to Steam Generator AT is < 50°F within 10 minutes of starting a reactor coolant pump.
Standard:
Candidate N/A's step. (3 rd pump to be started.)
Comments:
Performance Step 2:
(Step IV.A.14.b)
Standard:
Place control switch for [1 RC-P-1A] to START and Start a stopwatch.
Candidate locates pump control switch.
Places control switch to START position.
Starts the stopwatch.
Comments:
Performance Step 3:
Performance Step 3:
(Step IV.A.14.c)
Standard:
Observe the red running light is ON for oil lift pump.
Candidate locates pump indicating lights.
0 Verifies red light is ON.
Comments:
Appendix C Page 4 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Start [1 RC-P-1A], Reactor Coolant Pump 2002 NRC S1 Performance Step 4:
Verify the RCP starts approximately 2 minutes after the Bearing Lift (Step IV.A.14.d)
Oil Pump starts.
Standard:
Candidate locates pump indicating lights.
"* Verifies pump starts after approximately 2 minutes using a stopwatch.
"* Verifies red light is ON.
Comments:
Performance Step 5:
(Step IV.A.14.e)
Standard:
Verify on [1 RC-P-1A Amps] Reactor Coolant Pumps, the RCP starting amps drop off 10 to 30 seconds after the RCP breaker closes.
Candidate locates [1 RC-P-1A] ammeter.
0 Verifies starting amps drop off within 10 - 30 seconds.
Comments:
Performance Step 6:
(Step IV.A.14.f)
Standard:
Verify the bearing lift oil pump stops between 47.5 and 52.5 seconds.
after the RCP starts as indicated by the green light ON for the oil lift pump.
Candidate locates pump indicating lights.
Verifies green light is ON within 47.5 - 52.5 seconds after RCP start using a stopwatch.
Comments:
Appendix C Page 5 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Start [1 RC-P-1A], Reactor Coolant Pump 2002 NRC S1 Note: The following steps represent the alternate path for this JPM.
Performance Step 7:
Standard:
Respond to RCP high vibration alarms.
Candidate identifies high vibration condition from annunciators
[A3-126] and [A3-127].
Evaluator Note:
After identifying the vibration alarms, provide the Candidate with a copy of 1OM-6.4.ACR.
Comments:
Performance Step 8:
(Step 1.a & 1.b)
Standard:
Determine which RCP is affected (red alarm LED; alert for high alarm, danger for high-high alarm).
Candidate locates RCP vibration monitors.
Candidate verifies high vibration on 1 RC-P-1A.
Green LED is ON.
Shaft vibration > 20 mils or frame vibration > 5 mils.
Evaluator Note:
If asked, inform the Candidate that another Operator will monitor the control boards while checking vibration readings.
Comments:
Appendix C Page 6 of 8 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Start [1 RC-P-1A], Reactor Coolant Pump 2002 NRC S1 Performance Step 9:
If a high-high RCP vibration exists, then Immediately shutdown the (Step 2.b)
RCP.
Standard:
Candidate determines the plant is not in Mode 1 or 2 (JPM Initial Conditions).
Candidate places pump control switch to stop.
Verifies green light is ON.
Comments:
Terminating Cue:
When the Candidate stops the RCP, the evaluation for this JPM is complete.
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Start [1 RC-P-1A], Reactor Coolant Pump JPM No.:
Examinee's Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Form ES-C-1 (R8, SI) 2002 NRC S1 2002 NRC SI
Response
Result:
SAT UNSAT Examiners signature and date:
Appendix C Page 8 of 8 Form ES-C-1 (R8, SI)
JPM CUE SHEET Start [1RC-P-1A], Reactor Coolant Pump 2002 NRC S1 INITIAL CONDITIONS:
INITIATING CUE:
The plant is in Mode 3 preparing to enter Mode 2 to perform a reactor startup. Currently [1RC-P-1 B] and [1RC-P-1C] are in operation. Another Operator has begun 1OM-6.4.A, Reactor Coolant Pump Startup procedure completing all steps through IV.A.13. All systems and components are operating in their normal alignment to support pump operation.
The Unit Supervisor directs you to start [1 RC-P-1A] beginning at Step IV.A.14 of IOM-6.4.A.
Appendix C Facility:
Task
Title:
K/A Referen JOB PERFORMAN(
BVPS Unit 1 Emergency Borate The RCS ce:
004 A2.14 (3.8/3.9) 024 AA1.18 (3.7/3.6)
Examinee:
NRC Examiner:
Facility Evaluator:
N/A Date:
Method of Testing:
Simulated Performance:
Actual Performance X
Classroom:
Simulator:
X Plant:
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant is in Mode 1 at 17% power with all systems in their normal operating alignment. An event has occurred that caused [A4-124],
Rod Control Bank "D" Low-Low to alarm. This is a valid alarm.
Task Standard:
Emergency boration flow established at greater than 105 gpm in accordance with 1OM-7.4.S.
Required Materials:
None General
References:
1OM-7.4.S, Emergency Boration, Rev. 4 Handouts:
1OM-7.4.S, Rev. 4 Tools:
None Initiating Cue:
The Unit Supervisor directs you to take actions to emergency borate the RCS using 1OM-7.4.S.
Time Critical Task:
NO Validation Time:
20 minutes
.E MEASURE Form ES-C-1 (R8, SI)
Task No: 0071-038-01-013 JPM No: 2002 NRC S2 024AA1.17 (3.9/3.9) 024 AA2.01 (3.8/4.1)
Appendix C Page 2 of 8 Form ES-C-1 (R8, S1)
JOB PERFORMANCE MEASURE Emergency Borate The RCS 2002 NRC S2 Simulator Setup Information Setup:
Initialize IC-85.
Override MO V-1CH-350 to fail closed, green light ON, red light OFF.
Appendix C Page 3 of 8 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Emergency Borate The RCS 2002 NRC S2 (Denote critical steps with an asterisk)
Performance Step 1:
Ensure at least one [1CH-P-1A (1B) (1C)], Charging Pump High Head (Step IV.A.1)
Safety Injection, is running.
Standard:
Candidate locates pump controls and verifies one pump running.
0 Verifies red light is ON and white light is OFF.
Comments:
Performance Step 2:
(Step IV.A.2)
Standard:
Place Emergency Boration Isol VIv [MOV-1CH-350] control switch to OPEN.
Candidate locates valve control switch and places to open position.
0 Verifies red light is ON and green light is OFF.
Candidate determines that [MOV-1CH-350] has NOT opened.
Comments:
I Evaluator Note:
This step may be omitted.
Performance Step 3:
(Step IV.A.3)
Standard:
Place the online Boric Acid 2A (2B) Transfer Pump [1CH-P-2A (2B)]
control switch to FAST.
Candidate locates pump control switch and places in fast speed.
0 Verifies pump red light is ON.
Comments:
Appendix C Page 4 of 8 Form ES-C-1 (R8, Sl)
PERFORMANCE INFORMATION Emergency Borate The RCS 2002 NRC S2 Evaluator Note:
This step may be omitted.
Performance Step 4:
Verify [FI-1 CH-1 10], Emergency Boration flow greater than or equal to (Step IV.A.4) to 30 gpm.
Standard:
Candidate locates flow indicator.
Verifies "0" flow is indicated on FI-1CH-110.
Comments:
Note: The following steps begin the alternate path section of this JPM.
Evaluator Note:
If the Candidate attempts to have [MOV-1CH 350] opened locally, or align the blender to the charging pump suction, then CUE that the Shift Manager desires to use the RWST flowpath.
Performance Step 5:
(Step IV.A.5.a.1)
Standard:
Align the RWST to charging pump suction.
Open [MOV-1CH-115B] or[MOV-1CH-115D], RWST Disch to Chg Pumps Suct VIv.
Candidate locates valve control switches and places at least one control switch to the open position.
0 Verifies red light is ON.
Comments:
Appendix C Page 5 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Emergency Borate The RCS 2002 NRC S2 Performance Step 6:
(Step IV.A.5.a.2)
Standard:
Align the RWST to charging pump suction.
Close [MOV-1CH-115C] or [MOV-1CH-115E], VCT Outlet to Chg Pumps Suct VIv.
Candidate locates valve control switches and places at least one control switch to the close position.
Verifies green light is ON.
Comments:
Performance Step 7:
(Step IV.A.6)
Standard:
Place [FCV-ICH-122], Chg Flow to Regen Hx Inlet Control Vlv Place [FCV-1CH-122], Chg Flow to Regen Hx Inlet Control Vlv controller to MAN.
Candidate locates controller and depresses pushbutton.
Comments:
Performance Step 8:
(Step IV.A.6)
Standard:
If RWST is source of boric acid, establish >_ 105 gpm charging flow as indicated on [FI-1CH-122A], Charging Pump Flow.
Candidate locates flow indicator.
0 Verifies > 105 gpm indicated on FI-1CH-122A.
Comments:
Appendix C Page 5 of 8 Form ES-C-1 (R8, S)
PERFORMANCE INFORMATION Emergency Borate The RCS 2002 NRC S2 Performance Step 9:
(Step IV.A.7)
Standard:
Verify [PI-1 RC-455, 456 and 457], PRZR Press indicate < 2335 psig.
Candidate locates pressure indicators.
X Verifies < 2335 psig on PI-1RC-455, 456 and 457.
Performance Step 10:
Performance Step 10:
(Step IV.A.8)
Standard:
If the VCT level increases to the divert setpoint as indicated of
[LI-1 CH-1 15], Volume Control Tank Level, verify that the letdown flow is diverted to the Boron Recovery System.
Candidate monitors VCT level indicator.
0 Verifies valves position to divert as necessary.
Comments:
Performance Step 11:
(Step IV.A.9)
Standard:
If at power, verify Tavg returns to normal and the control bank returns to the maneuvering band in response to the boration.
Candidate locates control rod height on DRPI or step counters.
Verifies control rods are withdrawing or manually withdraws control rods.
Comments:
Terminating Cue:
When the Candidate verifies that the control rods are withdrawing, or begins to manually withdraw rods, the evaluation for this JPM is complete.
Comments:
Appendix C Page 7 of 8 Form ES-C-1 (R8, SI)
VERIFICATION OF COMPLETION Emergency Borate The RCS 2002 NRC S2 JPM No.:
Examinee's Name:
Examineres Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
2002 NRC S2
Response
Result:
SAT Examiner's signature and date:
UNSAT
Appendix C Page 8 of 8 Form ES-C-1 (R8, S1)
JPM CUE SHEET Emergency Borate the RCS 2002 NRC S2 INITIAL CONDITIONS:
INITIATING CUE:
The plant is in Mode 1 at 17% power with all systems in their normal operating alignment. An event has occurred that caused [A4-124],
Rod Control Bank "D" Low-Low to alarm. This is a valid alarm.
The Unit Supervisor directs you to take actions to emergency borate the RCS using 1OM-7.4.S.
Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, SI)
Facility:
BVPS Unit 1 Task
Title:
Transfer To Hot Lea Recirculation Task No: 0111-019-01-013 JPM No: 2002 NRC S3 K/A
Reference:
2.1.20 (4.3/4.2) 006 A4.05 (3.9/3.8) 006 A4.01 (4.1/3.9) 006 A4.02 (4.0/3.8)
Examinee:
Facility Evaluator:
Method of Testing:
NRC Examiner:
Date:
N/A Simulated Performance:
Classroom:
Actual Performance Plant:
Simulator:
X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
Tools:
Initiating Cue:
Time Critical Task:
Approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> have passed since the plant experienced a Loss of Coolant Accident. The crew has performed all required EOP actions. The plant is in cold leg recirculation. The decision has been made to transfer to hot leg recirculation.
Safety Injection System aligned for hot leg recirculation in accordance with 1OM-53A.1 ES-1.4.
Shorting Bars 1OM-53A.1.ES-1.4, Transfer To Simultaneous Cold Leg and Hot Leg Recirculation, Issue 1C, Rev. 1 1OM-53A.1.ES-1.4, Issue 1C, Rev. 1 None The Unit Supervisor directs you to align the plant for hot leg recirculation in accordance with EOP ES-1.4.
NO Validation Time:
X 20 minutes
Appendix C Page 2 of 8 Form ES-C-1 (R8, SI)
JOB PERFORMANCE MEASURE Transfer To Hot Leg Recirculation 2002 NRC S3 Simulator Setup Information Setup:
Initialize IC-87.
Appendix C Page 3 of 8 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Transfer To Hot Leg Recirculation 2002 NRC S3 (Denote critical steps with an asterisk)
Performance Step 1:
If not already performed, Verify valve lineup for cold leg recirculation.
(Step 1.a)
Standard:
Comments:
Performance Step 2:
Performance Step 2:
(Step 1.b.1)
Standard:
No action required. (Plant is in cold leg recirculation per JPM Initial Conditions).
Check the following:
Charging/HHSI Pumps-TWO RUNNING.
Candidate locates pump controls for both pumps.
H Verifies red light is ON for both pumps.
Comments:
Performance Step 3:
(Step 1.b.2)
Standard:
Check the following:
LHSI Pumps - AT LEAST ONE RUNNING.
Candidate locates pump controls for both pumps.
M Verifies red light is ON for at least one pump.
Comments:
Appendix C Page 4 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Transfer to Hot Leg Recirculation 2002 NRC S3 Evaluator Note:
Provide Candidate with shorting bars.
Performance Step 4:
Insert shorting bar into [MOV-1SI-869B], HHSI To Hot Legs Isol VIv (Step 1.c) jack.
Standard:
Comments:
Performance Step 5:
(Step 1.d)
Standard:
Candidate locates jack and installs shorting bar.
Initiate opening [MOV-1SI-869B], HHSI To Hot Legs Isol VIv.
Candidate locates valve control switch and places to the open position.
a Verifies red light is ON and green light is OFF.
Comments:
Performance Step 6:
(Step 1.e)
Standard:
Immediately close [MOV-1SI-867A, 867B], BIT Inlet Isol VIvs.
Candidate locates valve control switches and places to the close position.
n Verifies red lights are OFF and green lights are ON.
Comments:
Appendix C Page 5 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Transfer to Hot Leg Recirculation 2002 NRC S3 Performance Step 7:
Verify [F1-1SI-943], Hi Head SI To BIT Flow.
(Step 1.0 Standard:
Candidate locates flow indicator.
Verifies flow.
Comments:
Performance Step 8:
Insert shorting bar into [MOV-1SI-869A], HHSI To Hot Legs Isol VIv (Step 1.g) jack.
Standard:
Candidate locates jack and installs shorting bar.
Comments:
Performance Step 9:
Initiate opening [MOV-1SI-869A], HHSI To Hot Legs Isol VIv.
(Step 1.h)
Standard:
Candidate locates valve control switch and places to the open position.
Verifies red light is ON and green light is OFF.
Comments:
Appendix C Page 6 of 8 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Transfer to Hot Leg Recirculation 2002 NRC S3 Performance Step 10:
Immediately close [MOV-1SI-836], HHSI To RCL Cold Legs Isol VIv.
(Step 1.i)
Standard:
Candidate locates valve control switch and places to the close position.
Verifies red light is OFF and green light is ON.
Comments:
Performance Step 11:
Verify HHSI Hot Leg Hdr Flow on [FI-1SI-940] - INDICATED.
(Step 1.j)
Standard:
Candidate locates flow indicator.
Verifies flow.
Comments:
Performance Step 12:
Remove both shorting bars from jacks.
(Step 1.k)
Standard:
Candidate locates and removes shorting bars.
Comments:
Terminating Cue:
When the Candidate verifies HHSI flow is indicated, the evaluation for this JPM is complete.
Appendix C Page 7 of 8 Form ES-C-1 (R8, SI)
VERIFICATION OF COMPLETION Transfer to Hot Leg Recirculation 2002 NRC S3 JPM No.:
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
2002 NRC S3
Response
SAT UNSAT Examiner's signature and date:
Result:
Appendix C Page 8 of 8 Form ES-C-1 (R8, S)
JPM CUE SHEET Transfer to Hot Leg Recirculation 2002 NRC S3 INITIAL CONDITIONS:
INITIATING CUE:
Approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> have passed since the plant experienced a Loss of Coolant Accident. The crew has performed all required EOP actions. The plant is in cold leg recirculation. The decision has been made to transfer to hot leg recirculation.
The Unit Supervisor directs you to align the plant for hot leg recirculation in accordance with EOP ES-1.4.
Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, SI)
Facility:
BVPS Unit I Task
Title:
Calculate And Restore Containment Air Partial Pressure K/A
Reference:
Task No: 0121-008-04-011 JPM No: 2002 NRC S4 103 A1.01 (3.8/3.9)
Examinee:
NRC Examiner:
Facility Evaluator:
Method of Testing:
Simulated Performance:
Classroom:
Actual Performance X
Simulator:
X Plant:
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
Tools:
Initiating Cue:
Time Critical Task:
The plant is preparing to enter Mode 4 and containment total air pressure has just been reduced based on an MAO calculation of 10.0 psia. The computer points required for the calculation are out of service. The Ohio River water temperature is 730F.
Containment air partial pressure calculated, compared to Technical Specifications and actions initiated to restore to within limits.
Calculator and Steam Tables 1OM-54.3.L5, Surveillance Verification Log, Rev. 31 Technical Specifications 3.6.1.4 and Figure 3.6-1 1OM-12.4.E, Maintaining the Containment Vacuum, Rev. 2 1OM-54.3.L5, Rev. 31 Technical Specifications LCO 3.6.1.4 and Figure 3.6-1 1OM-12.4.E, Rev. 2 None The Unit Supervisor directs you to calculate containment air partial pressure and adjust as necessary to satisfy Technical Specification LCO 3.6.1.4.
NO Validation Time:
N/A Date:
20 minutes
Appendix C Page 2 of 8 Form ES-C-1 (R8, Si)
JOB PERFORMANCE MEASURE Calculate and Restore Containment Air Partial Pressure 2002 NRC S4 Simulator Setup Information
Appendix C Page 3 of 8 PERFORMANCE INFORMATION Calculate And Restore Containment Air Partial Pressure (Denote critical steps with an asterisk)
Performance Step 1:
Log Containment Dewpoint Temperatures.
(Item 119.a)
Standard:
Candidate determines computer points are Form ES-C-1 (R8, SI) 2002 NRC S4 out of service (from JPM Initial Conditions).
Candidate records readings.
CUE: Dewpoint temperatures are 54.50F, 54.40F, 54.80F and 54.70F respectively for computer points T0635A, T0655A, T0661A and T0675A.
Comments:
Performance Step 2:
(Item 119.b)
Standard:
Average of temperatures.
Candidate calculates average dewpoint temperature.
Evaluator Note:
Average dewpoint temperature equals 54.60F.
Comments:
Performance Step 3:
Performance Step 3:
(Item 119.c)
Standard:
Log Containment Pressure.
Candidate locates [PI-1CV-101A1, 10181] and records readings.
Comments:
Appendix C Page 4 of 8 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Calculate And Restore Containment Air Partial Pressure 2002 NRC S4 Performance Step 4:
Average of pressures.
(Item 119.d)
Standard:
Candidate calculates average total air pressure.
Evaluator Note:
Average pressure equals 10.1 - 10.3 psia.
Comments:
Performance Step 5:
(Item 119.e)
Standard:
Determine saturation pressure for Item 11 9.b from the saturate steam tables.
Candidate determines saturation pressure corresponding to dewpoint temperature from the steam tables.
Evaluator Note:
Saturation pressure equals 0.21 psia.
Comments:
Performance Step 6:
(Item 119.f Standard:
Calculate Air Partial Pressure (Item 119.d - Item 119.e).
Candidate subtracts saturation pressure from average containment total air pressure to determine calculated air partial pressure.
Evaluator Note:
Calculated air partial pressure equals 9.89 - 10.09 psia.
Comments:
Appendix C Page 5 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Calculate And Restore Containment Air Partial Pressure 2002 NRC S4 Performance Step 7:
Determine MAO from Technical Specification Figure 3.6-1.
Standard:
Candidate refers to Figure 3.6-1 and determines MAO based on river water temperature of 730F.
Evaluator Note:
MAO equals approximately 9.85 psia.
Comments:
Performance Step 8:
(Item 119.g)
Standard:
Verify calculated Air Partial Pressure is > 8.9 psia and < MAO.
Candidate determines that air partial pressure is NOT within limits (greater than MAO).
Candidate reports air partial pressure is above Technical Specifications limit.
CUE: As Unit Supervisor, direct the Candidate to lower containment pressure using 1OM-12.4.E.
Evaluator Note:
Provide the Candidate with a copy of 1OM-12.4.E and inform that the Initial Conditions are met.
Comments:
Appendix C Page 6 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Calculate And Restore Containment Air Partial Pressure 2002 NRC S4 Performance Step 9:
Start [1CV-P-1A (1B)], Cnmt Vac 1A (1B) Pump.
(Step IV.A.1)
Standard:
Candidate locates pump control switch and places in Start position.
0 Verifies red light is ON.
Evaluator Note:
If asked, direct Candidate to start [1CV-P-1A].
Comments:
Performance Step 10:
Verify open [TV-1 CV-150B], 1A Cnmt Vac Pump Cnmt Isol VIv.
(Step IV.A.2)
Standard:
Candidate locates valve indicating lights.
Verifies red light is ON and green light is OFF.
Comments:
Performance Step 11:
Verify air is being discharged by the following:
(Step IV.A.3.a) 0 Verify movement of [FTO-CV101], Cont Vac Integrated Flow.
Standard:
Candidate verifies air discharge through movement of FTO-CV101.
Evaluator Note:
No specific amount of flow is required.
Comments:
Terminating Cue:
When the Candidate verifies that air is being discharged, the evaluation for this JPM is complete.
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Calculate And Restore Containment Air Partial Pressure JPM No.:
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Form ES-C-1 (R8, SI) 2002 NRC S4 2002 NRC S4
Response
Result:
SAT UNSAT Examiner's signature and date:
Appendix C Page 8 of 8 Form ES-C-1 (R8, S1)
JPM CUE SHEET Calculate and Restore Containment Air Partial Pressure 2002 NRC S4 INITIAL CONDITIONS:
INITIATING CUE:
The plant is preparing to enter Mode 4 and containment total air pressure has just been reduced based on an MAO calculation of 10.0 psia. The computer points required for the calculation are out of service. The Ohio river water temperature is 730F.
The Unit Supervisor directs you to calculate containment air partial pressure and adjust as necessary to satisfy Technical Specification LCO 3.6.1.4.
Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, SI)
Facility:
BVPS Unit I Task
Title:
Transfer Bus 1AE From Emergency To Normal Feed Task No: 0362-007-01-013 JPM No: 2002 NRC S5 K/A
Reference:
064 A4.06 (3.9/3.9)
Examinee:
NRC Examiner:
Facility Evaluator:
Method of Testing:
Simulated Performance:
Classroom:
Actual Performance X
Simulator:
X Plant:
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
The Unit is in Hot Standby. EDG No. 1 is running and carrying the loads on 4KV Bus "IAE". Normal 4KV Bus "IA" is energized from the Unit Station Service Transformer. ACB 1E12 is closed and the 4KV Normal to emergency tie breakers, 1A10 and 1 E7 are open.
4KV Bus "IAE" is supplied from its normal feed and EDG No. 1 is shutdown in accordance with 1OM-36.4.Q.
None 1OM-36.4.Q, Transferring Emergency Busses 1AE And 1DF From Emergency Feed To Normal Feed, Rev. 7 1OM-36.4.Q, Rev. 7 None Tools:
Initiating Cue:
Time Critical Task:
Validation Time:
The Unit Supervisor directs you to transfer Bus "IAE" to Bus "1A" and shutdown EDG No. 1 in accordance with IOM-36.4.Q.
NO 25 minutes N/A Date:
Appendix C Page 2 of 9 Form ES-C-1 (R8, SI)
JOB PERFORMANCE MEASURE Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 Simulator Setup Information Setup:
Initialize IC-85.
Ensure EDG No. I speed droop is set at 55.
Appendix C Page 3 of 9 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 (Denote critical steps with an asterisk)
Evaluator Note:
If asked, inform Candidate that grid stability has been verified and Operations management has given permission to proceed.
Performance Step 1:
(Step IV.A.1)
Standard:
Place the Emerg Gen 1 Synchronizing Sel Sw to the ACB 1 E7 position.
Candidate locates and places selector switch to the ACB 1 E7 position.
Comments:
Performance Step 2:
Verify ANN A9-8, ACB 1E7 OR 1E9 IN SYNCHRONIZING MODE, Performance Step 2:
(Step IV.A.2)
Standard:
Verify ANN A9-8, ACB 1 E7 OR 1 E9 IN SYNCHRONIZING MODE, is ON.
Candidate verifies ANN A9-8 is ON.
Comments:
Performance Step 3:
Performance Step 3:
(Step IV.A.3)
Standard:
Check control switch 4KV Bus 1AE To 1A ACB I E7 is in the AFTER OPEN position.
Candidate locates and checks control switch is in the AFTER-OPEN position.
0 Verifies green target.
Comments:
Appendix C Page 4 of 9 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 Performance Step 4:
(Step IV.A.4)
Standard:
Close 4KV Bus 1A To 1AE ACB 1A10.
Candidate locates and momentarily places control switch to Close position.
0 Verifies 1A10 breaker red light is ON.
Evaluator Note:
If asked, inform Candidate that another Operator will perform independent verifications.
Comments:
Performance Step 5:
Performance Step 5:
(Step IV.A.5)
Standard:
Adjust the governor speed droop knob to 55 while maintaining frequency at approximately 60 Hz.
Candidate directs local operator to adjust speed droop knob to 55.
0 Maintains EDG frequency at approximately 60 Hz.
CUE: Speed droop is set at 55.
Comments:
Performance Step 6:
(Step IV.A.6)
Standard:
Using the Emerg Gen 1 Governor control switch, Adjust the generator speed UNTIL the Synchroscope needle is Rotating very slowly in the FAST direction.
Candidate locates and observes synchroscope rotation.
Adjusts governor control switch until the needle is rotating slowly in the fast direction.
Comments:
Appendix C Page 5 of 9 Form ES-C-1 (R8, Sl)
PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 Performance Step 7:
(Step IV.A.7)
Standard:
Using the Emerg Gen 1 Bolt Adjust, match generator voltage (Running) with the voltage on Bus 1A (Incoming).
Candidate locates generator voltmeter (Sync Volts Running Norm) and compares it to 4KV Bus 1A voltmeter (Sync Volts Incoming Norm).
Verifies generator voltage matches bus voltage Adjusts, if necessary not to exceed 130 volts.
Comments:
Performance Step 8:
(Step IV.A.8)
Standard:
When both synchronizing lights are completely dark AND the synchroscope needle is at 12 o'clock position, THEN Close 4KV Bus 1AE To 1AACB 1E7.
Candidate monitors both synchroscope lights and places breaker control switch to close position when needle is at 12 o'clock.
0 Verifies 1A ACB 1E7 breaker red light is ON.
Comments:
Performance Step 9:
(Step IV.A.9)
Standard:
Place the Emerg Gen 1 Synchronizing Sel Sw to the OFF position.
Candidate places selector switch to the OFF position.
Comments:
Appendix C Page 6 of 9 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 Performance Step 10:
Verify ANN A9-8, ACB 1E7 OR 1E9 IN SYNCHRONIZING MODE, (Step IV.A.9.a) is OFF.
Standard:
Candidate verifies ANN A9-8 is OFF.
Comments:
Performance Step 11:
(Step IV.A.10)
Standard:
Perform the following to clean out the exhaust system prior to shutting down the diesel generator, as necessary.
No action required.
CUE: The diesel has been running at full load for about 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Comments:
Performance Step 12:
(Step IV.A.11)
Standard:
Reduce load on the No. 1 Diesel Generator by Placing the Emerg Gen 1 Governor control switch intermittently to the LOWER position.
Candidate locates and intermittently places control switch to the lower position.
Monitors the following to ensure limits are not exceeded during the load decrease:
130 volts Between 0.8 and 1.0 power factor Comments:
Appendix C Page 7 of 9 Form ES-C-1 (R8, Si)
PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 Performance Step 13:
(Step IV.A.12)
Standard:
When the load on the No. I Diesel Generator has been reduced to less than 200 KW (as read on the Emerg Gen I Watts meter), THEN Open Emerg Gen 1 Circuit Breaker ACB 1E9.
Candidate reduces load to less than 200 KW and momentarily places breaker control switch to the trip position.
0 Verifies breaker ACB 1E9 white light is ON.
Comments:
Performance Step 14:
(Step IV.A.13)
Standard:
Verify the Emerg Gen 1 Motor Operated Gnd Sw DS1, is Open.
Candidate verifies green light is ON and red light is OFF.
Comments:
Performance Step 15:
Performance Step 15:
(Step IV.A.14)
Standard:
Shutdown [EE-EG-1], Emergency Diesel Generator No. 1 in accordance with 1OM-36.4.AG, "Diesel Generator No. 1 Start-Up And Shutdown".
No action required.
CUE: The Turbine Bldg. Operator will shutdown the diesel generator.
Comments:
Terminating Cue:
When the Candidate verifies the ground switch is open, the evaluation for this JPM is complete.
Appendix C Page 8 of 9 VERIFICATION OF COMPLETION Transfer Bus 1AE From Emergency To Normal Feed JPM No.:
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Form ES-C-1 (R8, Sl) 2002 NRC S5 2002 NRC S5
Response
Result:
SAT UNSAT Examiner's signature and date:
Appendix C Page 9 of 9 Form ES-C-1 (R8, S1)
JPM CUE SHEET Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 INITIAL CONDITIONS:
INITIATING CUE:
The Unit is in Hot Standby. EDG No. I is running and carrying the loads on 4KV Bus "IAE". Normal 4KV Bus "IA" is energized from the Unit Station Service Transformer. ACB 1E12 is closed and the 4KV Normal to emergency tie breakers, 1A10 and 1E7 are open.
The Unit Supervisor directs you to transfer Bus "IAE" to Bus "IA" and shutdown EDG No. 1 in accordance with 1OM-36.4.Q.
Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, SI)
Facility:
BVPS Unit 1 Task
Title:
Start A Containment Instrument Air Compressor Task No: 0341-003-01-013 JPM No: 2002 NRC S6 K/A
Reference:
078 K3.01 (3.1/3.4) 078 A3.01 (3.1/3.1)
Examinee:
Facility Evaluator:
Method of Testing:
NRC Examiner:
N/A Date:
Simulated Performance:
Actual Performance X
Classroom:
Simulator:
X Plant:
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
A LOCA has just occurred resulting in a Reactor Trip, Safety Injection, and Containment Phase A and Phase B Isolation. The stub busses have been reenergized following the CIB. Step 4 of ES-1.2, Post LOCA Cooldown and Depressurization is in progress. [1lA-C-1B], CNMT Instr Air Compressor is on clearance.
Start [ llA-C-1A], Containment Instrument Air Compressor in accordance with 1OM-53A.1.ES-1.2.
None 1OM-53A.1.ES-1.2, Post LOCA Cooldown And Depressurization, Issue 1C, Rev. 3 1OM-53A.1.ES-1.2, Issue 1C, Rev. 3 Tools:
None Initiating Cue:
Time Critical Task:
Validation Time:
The Unit Supervisor directs you to perform Step 4 of ES-1.2, Post LOCA Cooldown and Depressurization to restore containment instrument air.
NO 15 minutes
Appendix C Page 2 of 7 JOB PERFORMANCE MEASURE Start A Containment Instrument Air Compressor Simulator Setup Information Form ES-C-1 (R8, Si) 2002 NRC S6
Appendix C Page 3 of 7 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Start A Containment Instrument Air Compressor 2002 NRC S6 (Denote critical steps with an asterisk)
Performance Step 1:
CNMT Instr Air Compressor - AT LEAST ONE RUNNING.
(Step 4.a)
Standard:
Candidate verifies that no compressors are running.
Comments:
Performance Step 2:
(Step 4.a.1 RNO)
Standard:
Check at least one chiller [1VS-E-3A, B, C] in service.
Candidate checks annunciators are clear, or dispatches Turbine Bldg.
Operator to check chiller status.
CUE: Report as Turbine Bldg. Operator that 1VS-E-3A is in service.
Comments:
Performance Step 3:
(Step 4.a.2 RNO)
Standard:
Open [TV-1CC-11 OD, F2], CNMT Recirc CIg Coils AC/RW Outlet CNMT Isol VIv.
Candidate locates valve control switches and places to Open position.
0 Verifies red lights are ON and green lights are OFF.
Comments:
Appendix C Page 4 of 7 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Start A Containment Instrument Air Compressor 2002 NRC S6 Performance Step 4:
(Step 4.a.3 RNO)
Standard:
Open [TV-1CC-110E2, E3], CNMT Recirc CIg Coils AC Sys Inlet CNMT Isol VIvs.
Candidate locates valve control switches and places to Open position.
0 Verifies red lights are ON and green lights are OFF.
Comments:
Performance Step 5:
(Step 4.a.4 RNO)
Standard:
Start an available [I IA-C-1A (B)] CNMT Instr Air Compressor.
Candidate locates 1 IA-C-1A control switch and places to Start position.
N Verifies red light is ON.
Comments:
Performance Step 6:
(Step 4.a.5 RNO)
Standard:
If available, place the standby CNMT Instr Air Compressor in AUTO.
No action required. [1IA-C-IB] is on clearance (JPM Initial Conditions)
Comments:
Appendix C Page 5 of 7 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Start A Containment Instrument Air Compressor 2002 NRC S6 Performance Step 7:
(Step 4.b)
Standard:
CNMT instrument air header pressure on [PI-1 IA-106A] - GREATER THAN 85 psig.
Candidate checks instrument air header pressure > 85 psig, or Annunciator [A6-110] is not lit.
Comments:
Terminating Cue:
When the Candidate determines that containment instrument air pressure is increasing, the evaluation for this JPM is complete.
Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Start A Containment Instrument Air Compressor JPM No.:
Examinee's Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Form ES-C-1 (R8, S) 2002 NRC S6 2002 NRC S6
Response
SAT UNSAT Examiners signature and date:
Result:
Appendix C Page 7 of 7 Form ES-C-1 (R8, SI)
JPM CUE SHEET Start A Containment Instrument Air Compressor 2002 NRC S6 INITIAL CONDITIONS:
INITIATING CUE:
A LOCA has just occurred resulting in a Reactor Trip, Safety Injection, and Containment Phase A and Phase B Isolation. The stub busses have been reenergized following the CIB. Step 4 of ES-1.2, Post LOCA Cooldown and Depressurization is in progress. [I IA-C-1 B], CNMT Instr Air Compressor is on clearance.
The Unit Supervisor directs you to perform Step 4 of ES-1.2, Post LOCA Cooldown and Depressurization to restore containment instrument air.
Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, S1)
Facility:
BVPS Unit I Task
Title:
Place Overpressure Protection System In Service Task No: 0063-021-06-013 JPM No: 2002 NRC S7 K/A
Reference:
2.2.12 (3.0/3.4)
Examinee:
Facility Evaluator:
Method of Testing:
NRC Examiner:__
N/A Date:
Simulated Performance:
Classroom:
Actual Performance X
Simulator:
X Plant:
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
Tools:
Initiating Cue:
Time Critical Task:
The plant is performing a cooldown to Mode 5 and has stabilized in Mode 4 to place OPPS in service.
Valves 1 RC-1, 1 RC-28 and 1 RC-200 have been verified open from the Control Room status prints. PT-1 RC-402 and 403 are in service.
Satisfactorily stroke Pressurizer PORV [PCV-1 RC-455C] in accordance with 1OST-6.8.
Stopwatch Key 6 for OPPS switches 1OST-6.8, Placing Overpressure Protection System (OPPS) In Service, Rev. 12 1OST-6.8, Rev. 12 (marked up copy)
None The Unit Supervisor directs you to perform a stroke test of [1 PCV 1 RC-455C], PRZR PORV Relief Valve in accordance with Sections VII.B and VII.C of 1OST-6.8. The Initial Conditions are complete and all test preparations have been performed.
NO Validation Time:
20 minutes
Appendix C Page 2 of 9 JOB PERFORMANCE MEASURE Place Overpressure Protection System In Service Simulator Setup Information Form ES-C-1 (R8, SI) 2002 NRC S7
Appendix C Page 3 of 9 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 (Denote critical steps with an asterisk)
Evaluator Note:
Provide Candidate with a stopwatch, Key 6 for OPPS switches and a copy of 1OST-6.8.
Performance Step 1:
Verify [PT-1 RC-402 and 403], RCS Wide Range Pressure, are in (Step VII. B. 1) service by one of the following.
Standard:
No action required. Step is N/A per JPM Initial Conditions.
Comments:
Performance Step 2:
Verify nitrogen supply pressure for Overpressure Protection System Performance Step 2:
(Step VII.B.2)
Standard:
Comments:
Performance Step 3:
Ensure [MOV-I RC-537] PRZR PORV Isol MOV, is open to provide a Performance Step 3:
(Step VII.C. 1)
Standard:
Verify nitrogen supply pressure for Overpressure Protection System is _>
600 psig as follows:
Candidate verifies annunciators A4-7 and A4-8 are OFF.
Ensure [MOV-1 RC-537] PRZR PORV Isol MOV, is open to provide a flowpath to [PCV-1 RC-455D].
Candidate verifies valve red light is ON and green light is OFF.
Comments:
Appendix C Page 4 of 9 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 Performance Step 4:
Verify SPDS Computer Point [UZ2006] PRZR PORV ISOL VLV, (Step VII.C.2) indicates [MOV-1RC-535] OPEN.
Standard:
Candidate verifies computer point indicates valve is open.
Comments:
Performance Step 5:
Close [MOV-1RC-535], PRZR PORV Isol MOV.
(Step VII.C.3)
Standard:
Candidate locates valve control switch and places to Close position.
Verifies green light is ON and red light is OFF.
Comments:
Performance Step 6:
As [MOV-1 RC-535], PRZR PORV Isol MOV, is closing, verify (Step VII.C.4)
[UZ2006] indicates [MOV-1 RC-535] INTER position.
Standard:
Candidate verifies computer point indicates INTER position.
Comments:
Appendix C Page 5 of 9 Form ES-C-1 (R8, S)
PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 Performance Step 7:
Verify SPDS Computer Point, [UZ2006], PRZR PORV Isol VIv MOV (Step VII.C.5)
RC535, indicates [MOV-IRC-535] CLOSED.
Standard:
Candidate verifies computer point indicates CLOSED position.
Comments:
Performance Step 8:
(Step VII.C.6)
Standard:
Comments:
Performance Step 9:
Performance Step 9:
(Step VII.C.7.a)
Standard:
Verify SPDS Computer Point [PCV-1 RC-455C-2], PRZR PORV, Verify SPDS Computer Point [PCV-1 RC-455C-2], PRZR PORV, indicates CLSD.
Candidate verifies computer point indicates CLSD position.
Verify [PI-1 IA-1 06A], Containment Instrument Air Receiver pressure is >_ 95 psig.
Candidate locates [PI-1 IA-1 06A].
E Verifies pressure _> 95 psig.
Comments:
Appendix C Page 6 of 9 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 Performance Step 10:
Open AND time [PCV-1RC-455C], PRZR PORV Relief Vlv.
(Step VII.C.7.b.1)
Standard:
Candidate locates valve control switch.
- Opens and times using stopwatch.
- Verifies red light is ON and green light is OFF.
Comments:
Performance Step 11:
Verify SPDS computer point [PCV-1 RC-455C-2], PRZR PORV, (Step VII.C.7.b.2) indicates NT CLSD.
Standard:
Candidate verifies computer point indicates NT CLSD position.
Comments:
Performance Step 12:
Close [PCV-1 RC-455C], PRZR PORV Relief Viv.
(Step VII.C.7.b.3)
Standard:
Candidate locates valve control switch and positions to Close.
- Verifies green light is ON and red light is OFF.
Comments:
Appendix C Page 7 of 9 Form ES-C-1 (R8, S)
PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 Performance Step 13:
Record the opening stroke time of [PCV-1RC-455C], PRZR PORV (Step VII.C.7.b.4)
Relief VIv, on Data Sheet 1.
Standard:
Candidate records opening time on Data Sheet 1.
Comments:
Performance Step 14:
(Step VII.C.7.b.5)
Standard:
Comments:
Performance Step 15:
(Step VII.C.7.b.6)
Standard:
Place [PCV-I RC-455C], PRZR PORV Relief VIv, control switch to Place [PCV-1 RC-455C], PRZR PORV Relief Vlv, control switch to AUTO.
Candidate locates control switch and places to AUTO position.
When [PCV-1 RC-455C], PRZR PORV Relief Vlv, is closed, THEN open [MOV-1 RC-535], PRZR PORV Isol MOV.
Candidate locates control switch and places to Open position.
0 Verifies red light is ON and green light is OFF.
Comments:
Terminating Cue:
When the Candidate verifies [MOV-1 RC-535] is open, the evaluation for this JPM is complete.
Appendix C Page 8 of 9 VERIFICATION OF COMPLETION Place Overpressure Protection System In Service JPM No.:
Examinee's Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Form ES-C-1 (R8, SI) 2002 NRC S7 2002 NRC S7 N/A
Response
SAT UNSAT Examiners signature and date:
Result:
Appendix C Page 9 of 9 Form ES-C-1 (R8, SI)
JPM CUE SHEET Place Overpressure Protection System In Service 2002 NRC S7 INITIAL CONDITIONS:
INITIATING CUE:
The plant is performing a cooldown to Mode 5 and has stabilized in Mode 4 to place OPPS in service.
Valves 1 RC-1, 1 RC-28 and 1 RC-200 have been verified open from the Control Room status prints. PT-1 RC-402 and 403 are in service.
The Unit Supervisor directs you to perform a stroke test of [1 PCV 1 RC-455C], PRZR PORV Relief Valve in accordance with Sections VII.B and VII.C of 1OST-6.8. The Initial Conditions are complete and all test preparations have been performed.
Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, S)
BVPS Unit I Startup The Dedicated AFW Pump Task No: 0241-028-01-013 JPM No: 2002 NRC P1 K/A
Reference:
061K1.07 (3.6/3.8) 061A3.01 (4.2/4.2) 009EK3.22 (4.4/4.5)
Examinee:
NRC Examiner:
Facility Evaluator:
Method of Testing:
Simulated Performance:
X Classroom:
Simulator:
Actual Performance:
Plant:
X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
The Control Room is performing EOP FR-H.1, Response To Loss Of Secondary Heat Sink. A plant fire has disabled all 3 AFW pumps.
[1 FW-P-4], Dedicated AFW Pump is available and aligned to 1WT-TK-1 1. ERF Substation 4160V Bus "1 H" is energized from offsite power. The ERF diesel is not running.
[1 FW-P-4], Dedicated AFW Pump is started in accordance with EOP -K.
None 1OM-53A.1.2-K, Dedicated AFW Pump [1FW-P-4] Startup, Issue 1C, Rev. 0.
1OM-53A.1.2-K, Issue 1C, Rev. 0 None Tools:
Initiating Cue:
Time Critical Task:
Validation Time:
The Unit Supervisor directs you as an extra operator on shift to startup [I FW-P-4], Dedicated AFW Pump in accordance with steps 4 through 13 of EOP Attachment 2-K.
NO 20 minutes Facility:
Task
Title:
N/A Date:
Appendix C Page 2 of 8 JOB PERFORMANCE MEASURE Startup The Dedicated AFW Pump Simulator Setup Information Form ES-C-1 (R8, SI) 2002 NRC P1
Appendix C Page 3 of 8 Form ES-C-1 (R8, S)
PERFORMANCE INFORMATION Startup The Dedicated AFW Pump 2002 NRC P1 (Denote critical steps with an asterisk)
Evaluator Note:
All steps are performed from the Main Feed Reg. Valve Room, except Step 10 which is performed from the Turbine Bldg. basement.
Performance Step 1:
(Step 4)
Standard:
At DAFW Pump Control Panel [PNL-DAFWP1], Place the LOCAL TEST Switch to LOCAL and the ON-OFF Panel Switch to ON to energize the panel.
Candidate locates panel control switch and indicates placing to LOCAL position.
Comments:
Performance Step 2:
(Step 5)
Standard:
Check Closed [MOV-1 FW-160], DAFW [1 FW-P-4] Discharge Isol.
Candidate locates valve position indicating lights.
0 Indicates verifying green light is ON.
CUE: [MOV-1FW-160] is closed.
Comments:
Performance Step 3:
Performance Step 3:
(Step 6)
Standard:
Establish communications with the Control Room.
Candidate indicates method of contacting the Control Room.
CUE: Communications established.
Comments:
Appendix C Page 4 of 8 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Startup The Dedicated AFW Pump 2002 NRC P1
"* Performance Step 4:
Start [1 FW-P-4], Dedicated AFW Pump (Step 7)
Standard:
Candidate locates control switch and indicates placing to Start position.
Indicates verifying red light is ON.
Comments:
Performance Step 5:
Open [MOV-1FW-160], DAFW [1FW-P-4] Discharge Isol.
(Step 8)
Standard:
Candidate locates control switch and indicates placing to Open position.
Indicates verifying red light is ON.
Comments:
Performance Step 6:
Reset FWI (Both Trains).
(Step 9)
Standard:
No action required.
CUE:
FWI is reset on both trains.
Comments:
Appendix C Page 5 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Startup The Dedicated AFW Pump 2002 NRC P1 Performance Step 7:
Open [MOV-1FW-156A, B, C], 1A, 1B, IC SG Main FW Cnmt Isol.
(Step 10)
VIvs.
Standard:
No action required.
CUE: All valves are open.
Comments:
Performance Step 8:
Performance Step 8:
(Step 11)
Standard:
Throttle [FCV-1FW-479, 489, 499], 1A, 1B, 1C SG FW Bypass FCVs.
No action required.
CUE: All valves are throttled.
Comments:
Performance Step 9:
Performance Step 9:
(Step 12)
Standard:
Verify pump suction and discharge flow rises as indicated on
[FI-IFW-155B, 156].
Candidate locates FI-1FW-155B and 156.
CUE:
Flow is approximately 300 gpm and rising.
Comments:
Appendix C Page 6 of 8 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Startup The Dedicated AFW Pump 2002 NRC P1 Performance Step 10:
At [PNL-DAFWP2], Place the ON-OFF Switch to ON (Step 13.a)
(Turbine Bldg - 693').
Standard:
Candidate locates panel control switch and indicates placing to ON position.
CUE:
All pump parameters are satisfactory.
Comments:
Terminating Cue:
When the Candidate energizes PNL-DAFWP2, the evaluation for this JPM is complete.
Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Startup The Dedicated AFW Pump JPM No.:
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Form ES-C-1 (R8, SI) 2002 NRC P1 2002 NRC P1
Response
Result:
SAT UNSAT Examiner's signature and date:
Appendix C Page 8 of 8 Form ES-C-1 (R8, S)
JPM CUE SHEET Startup The Dedicated AFW Pump 2002 NRC P1 INITIAL CONDITIONS:
INITIATING CUE:
The Control Room is performing EOP FR-H.1, Response To Loss Of Secondary Heat Sink. A plant fire has disabled all 3 AFW pumps.
[I FW-P-4], Dedicated AFW Pump is available and aligned to 1WT-TK-1 1. ERF Substation 4160V Bus "l H" is energized from offsite power. The ERF diesel is not running.
The Unit Supervisor directs you as an extra operator on shift to startup [FW-P-4], Dedicated AFW Pump in accordance with steps 4 through 13 of EOP Attachment 2-K.
Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, SI)
Facility:
BVPS Unit I Task
Title:
Respond To SFP Low Level Alarm Task No: 0201-004-01-013 JPM No: 2002 NRC P2 K/A
Reference:
033K1.05 (2.7/2.8) 033K4.01 (2.9/3.2)
Examinee:
Facility Evaluator:
Method of Testing:
NRC Examiner:__
Date:
N/A Simulated Performance:
Classroom:
Simulator:
Actual Performance:
X Plant:
X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
Tools:
Annunciator [A6-3], SPENT FUEL POOL LEVEL LOW has just alarmed. Makeup is required to restore SFP level and clear the alarm. An Operator has been dispatched to observe level. The RWST level is at 50 feet and is not on recirculation purification.
Perform actions to restore SFP level in accordance with 1OM-20.4.AAC.
None 1OM-20.4.AAC, Spent Fuel Pool Level Low, Rev. 8 1OM-20.4.AAC, Rev. 8 None Initiating Cue:
Time Critical Task:
Validation Time:
The Unit Supervisor directs you as an extra Operator on shift to coordinate with the PO to add water to the SFP from the RWST in accordance with 1OM-20.4.AAC.
NO 20 minutes
Appendix C Page 2 of 7 JOB PERFORMANCE MEASURE Respond To SFP Low Level Alarm Simulator Setup Information Form ES-C-1 (R8, SI) 2002 NRC P2
Appendix C Page 3 of 7 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Respond To SFP Low Level Alarm 2002 NRC P2 (Denote critical steps with an asterisk)
Performance Step 1:
Initiate makeup from the RWST by performing the following:
(Step 3.a. 1)
Verify Closed or Close [1PC-1 18], Pri Water Sup To Spent Fuel Pool Isol.
Standard:
Candidate locates valve and indicates method of verifying valve is in the closed position.
CUE: [1PC-118] is closed.
Comments:
Performance Step 2:
Initiate makeup from the RWST by performing the following:
(Step 3.a.2)
Verify Closed or Close [IPC-146], Fuel Pool Purification Sys To RWST Recirc Sys Isol.
Standard:
Candidate locates valve and indicates method of verifying valve is in the closed position.
CUE: [1PC-146] is closed.
Comments:
Performance Step 3:
(Step 3.a.3)
Standard:
Initiate makeup from the RWST by performing the following:
a Open [1QS-37], Refuel Water to Fuel Pool Isol.
Candidate locates and indicates opening valve.
CUE: [1QS-37] is stuck closed and will not open.
Evaluator Note:
If Candidate requests direction from PO or the US, ask for the Candidate's recommendation.
Comments:
Appendix C Page 4 of 7 Form ES-C-1 (R8, S)
PERFORMANCE INFORMATION Respond To SFP Low Level Alarm 2002 NRC P2 Note: The following steps represent the alternate path for this JPM.
Performance Step 4:
(Step 3.c.1)
Standard:
Add primary grade water to the fuel pool as follows:
Stop any running [1QS-P-2A (2B)], Refueling Water Recirculating Pump to prevent dead heading.
No action required. (RWST is not on recirculation purification per JPM Initial Conditions.)
Comments:
Performance Step 5:
Performance Step 5:
(Step 3.c.2)
Standard:
Comments:
Performance Step 6:
Add primary grade water to the fuel pool as follows:
Performance Step 6:
(Step 3.c.3)
Standard:
Add primary grade water to the fuel pool as follows:
Using Control Room Status Prints, Check Open [1 BR-543], Pri Makeup to Fuel Pool CIg Isol.
Candidate requests PO to check valve position using Control Room Status Prints.
CUE:
[1 BR-543] is open.
Add primary grade water to the fuel pool as follows:
Verify Closed or Close [1QS-37], Refuel Water to Fuel Pool Isol.
No action required. (Valve previously cued as stuck closed in step 3.)
Comments:
Appendix C Page 5 of 7 Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION Respond To SFP Low Level Alarm 2002 NRC P2 Performance Step 7:
Add primary grade water to the fuel pool as follows:
(Step 3.c.4)
Verify Closed or Close [1PC-146], Fuel Pool Purification Sys To RWST Recirc Sys Isol.
Standard:
No action required. (Valve previously verified closed in step 2.)
Comments:
Performance Step 8:
Add primary grade water to the fuel pool as follows:
(Step 3.c.5)
Open [1PC-118], Pri Water Sup To Spent Fuel Pool Isol.
Standard:
Candidate locates and indicates method of unlocking and opening valve.
CUE: [1PC-118] is open.
Comments:
Performance Step 9:
(Step 3.c.6)
Standard:
Add primary grade water to the fuel pool as follows:
Throttle Open [1PC-145], Fuel Pool CIg Sys to RWST Recirc Isol.
Candidate locates and indicates throttling open valve.
CUE: [1PC-145] is throttled open.
CUE: As PO, inform Candidate that SFP level is slowly rising.
Comments:
Terminating Cue:
When the Candidate completes the lineup to add makeup water to the SFP, the evaluation for this JPM is complete.
Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Respond To SFP Low Level Alarm JPM No.:
Examinee's Name:
Examiner's Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Form ES-C-1 (R8, SI) 2002 NRC P2 2002 NRC P2
Response
Result:
SAT UNSAT Examiners signature and date:
Appendix C Page 7 of 7 Form ES-C-1 (R8, SI)
JPM CUE SHEET Respond To SFP Low Level Alarm 2002 NRC P2 INITIAL CONDITIONS:
INITIATING CUE:
Annunciator [A6-3], SPENT FUEL POOL LEVEL LOW has just alarmed. Makeup is required to restore SFP level and clear the alarm. An Operator has been dispatched to observe level. The RWST level is at 50 feet and is not on recirculation purification.
The Unit Supervisor directs you as an extra Operator on shift to coordinate with the PO to add water to the SFP from the RWST in accordance with 1OM-20.4.AAC.
Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, S1)
Facility:
BVPS Unit I Task
Title:
Locally Trip The Reactor Task No: 0011-021-01-013 JPM No: 2002 NRC P3 K/A
Reference:
001 K6.03 (3.7/4.2) 001A2.13 (4.4/4.6)
Examinee:
Facility Evaluator:
Method of Testing:
NRC Examiner:
Date:
N/A Simulated Performance:
X Classroom:
Actual Performance:
Simulator:
Plant:
X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Handouts:
Tools:
Initiating Cue:
Time Critical Task:
Validation Time:
A Unit trip has just been announced. The operating crew has entered FR-S. 1, Response To Nuclear Power Generation - ATWS after efforts to manually trip the reactor from the Control Room proved unsuccessful.
The reactor is locally tripped in accordance with EOP FR-S.1.
None 1OM-53A.1.FR-S.1, Response To Nuclear Power Generation ATWS, Issue 1C, Rev. 2 1OM-53A.1.FR-S.1, Issue 1C, Rev. 2 None The Unit Supervisor directs you as an extra Operator on shift to locally trip the reactor in accordance with EOP FR-S.1, Step 1.
NO 10 minutes
Appendix C Locally Trip The Reactor Page 2 of 5 Page 2 of 5 JOB PERFORMANCE MEASURE Simulator Setup Information Form ES-C-1 (R8, SI) 2002 NRC P3
Appendix C Page 3 of 5 Form ES-C-1 (R8, SI)
PERFORMANCE INFORMATION Locally Trip The Reactor 2002 NRC P3 (Denote critical steps with an asterisk)
Evaluator Note:
Remind Candidate to simulate all actions and I
PNOT to touch the reactor trip pushbuttons.
- Performance Step 1 :
(Step 1.e RNO)
Standard:
Open reactor trip breakers.
Candidate locates each breaker and indicates pressing the pushbutton to trip the breaker.
CUE: Both reactor trip breakers fail to open.
Comments:
Performance Step 2:
- Performance Step 2:
(Step 1.e RNO)
Standard:
Open rod drive MG sets output breakers.
Candidate locates each MG set output breaker and indicates turning the handle to open the breaker.
CUE: Both rod drive MG sets output breakers are open.
Comments:
Terminating Cue:
When the Candidate simulates opening the rod drive MG set breakers, the evaluation for this JPM is complete.
Appendix C Page 4 of 5 Form ES-C-1 (R8, SI)
VERIFICATION OF COMPLETION Locally Trip The Reactor 2002 NRC P3 JPM No.:
Examinee's Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
2002 NRC P3
Response
Result:
SAT Examiners signature and date:
UNSAT
Appendix C Page 5 of 5 Form ES-C-1 (R8, SI)
JPM CUE SHEET Locally Trip The Reactor 2002 NRC P3 INITIAL CONDITIONS:
INITIATING CUE:
A Unit trip has just been announced. The operating crew has entered FR-S.1, Response To Nuclear Power Generation - ATWS after efforts to manually trip the reactor from the Control Room proved unsuccessful.
The Unit Supervisor directs you as an extra Operator on shift to locally trip the reactor in accordance with EOP FR-S.1, Step 1.