L-02-111, October 2002 Monthly Operating Report for Beaver Valley Units 1 & 2

From kanterella
(Redirected from L-02-111)
Jump to navigation Jump to search
October 2002 Monthly Operating Report for Beaver Valley Units 1 & 2
ML023240405
Person / Time
Site: Beaver Valley
Issue date: 11/07/2002
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-02-111
Download: ML023240405 (5)


Text

FENOC

,FrstEnergyNjeear Ope a ng Ccrmpan

  • Beaver Valley Power Station P. 0. Box 4 Shippingport,PA 15077 L-02-111 November 7, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of October 2002.

Respectfully, M. B. Bezilla/

Vice-President DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA 2-

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE November 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: October 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (YIM/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3- Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

In accordance with technical Specification 3.1.3.2, Note (3), the following is required to-be reported in this Monthly Operating Report. On 10/19/02 at 1424 hours0.0165 days <br />0.396 hours <br />0.00235 weeks <br />5.41832e-4 months <br />, after shutting down Containment Air Recirc Fan 11B, Control Rods B-1 0, C-9, D-1 0, D-1 1 and E-1 1 exceeded their indicated alignment with their

-respective banks by greater than 12 steps. Primary voltage readings confir-med that the rods were properly aligned. A calibration adjustment to the Analog Rod Position Indicators (ARPI's) for each rod in order to compensate for the change in Containment air temperature, was completed at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> on 10/19/02. All rods were returned to within 12 steps of their group step counters and declared operable.

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 11/01/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 Notes: Rated thermal power at

  • la. REPORTING PERIOD: OCTOBER 2002
  • BVPS-I was uprated from 2652 MWt*
  • to 2689 MWt on 10/20/01. Net *
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • MDC was also uprated from *
  • 821 MWe.
  • 821 810 MWe to
2. MAX. DEPENDABLE CAPACITY (Net MWe): * . ** * .* * *. *. * * * * *
  • THIS MONTH YEAR TO DATE CUMULATIVE 745.0 7296.0 232320.0 3a. HOURS IN REPORTING PERIOD:

745.0 7296.0 159378.4

3. NO. OF HRS. REACTOR WAS CRITICAL:

745.0 7296.0 156917.9

4. SERVICE HOURS GENERATOR ON LINE:

0.0 0.0 0.0

5. UNIT RESERVE SHUTDOWN HOURS:

620770.0 6009720.0 117675863.0

6. NET ELECTRICAL ENERGY GEN. (MWH}):

654820.0 6360540.0 125627326.0

7. GROSS ELECT. ENERGY GEN. (MWH):

2001352.0 19480963.0 387115768.5

8. GROSS THERMAL ENERGY GEN. (MWH):

100.0 100.0 69.0

9. UNIT AVAILABILITY FACTOR (M):

101.5 100.3 64.4

10. UNIT CAPACITY FACTOR (MDC) (M&):

0.0 0.0 15.8

11. UNIT FORCED OUTAGE RATE (%}):

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE November 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: October 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 10/4/02 at 1529 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.817845e-4 months <br /> with unusual atmospheric conditions present combined with limiting Condenser vacuum conditions with a fourth Cooling Tower Pump out of service, the Unit reduced output approximately 1.5% as a conservative measure in order to prevent challenging Turbine trip setpoints. As Condenser vacuum conditions improved and margin to the Turbine trip setpoints increased, the Unit incrementally raised output back to a nominal value of 100% at 2029 hours0.0235 days <br />0.564 hours <br />0.00335 weeks <br />7.720345e-4 months <br /> on 10/4/02. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 11/01/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 Notes: Rated thermal power at

  • la. REPORTING PERIOD: OCTOBER 2002
  • BVPS-2 was uprated from 2652 MWt*
  • to 2689 Mwt on 10/30/01. Net *
1. DESIGN ELECTRICAL RATING (Net MWe): 836
  • MDC was also uprated from *
  • 820 MWe to 831 MWe. *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 C * * * * * * * * * * * * * * * *
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 745.0 7296.0 131103.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 745.0 6736.6 108091.1
4. SERVICE HOURS GENERATOR ON LINE: 745.0 6669.9 107362.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 628611.0 5376095.0 83954187.0
7. GROSS ELECT. ENERGY GEN. (MWH): 659396.0 5668429.0 88743172.0
8. GROSS THERMAL ENERGY GEN. (MWH): 2000042.0 17295779.0 270703360.0
9. UNIT AVAILABILITY FACTOR (%): 100.0 91.4 81.9
10. UNIT CAPACITY FACTOR (MDC) (%): 101.5 88.7 77.3 II. UNIT FORCED OUTAGE RATE (%): 0.0 0.3 9.9

Text

FENOC

,FrstEnergyNjeear Ope a ng Ccrmpan

  • Beaver Valley Power Station P. 0. Box 4 Shippingport,PA 15077 L-02-111 November 7, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of October 2002.

Respectfully, M. B. Bezilla/

Vice-President DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA 2-

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE November 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: October 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (YIM/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3- Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

In accordance with technical Specification 3.1.3.2, Note (3), the following is required to-be reported in this Monthly Operating Report. On 10/19/02 at 1424 hours0.0165 days <br />0.396 hours <br />0.00235 weeks <br />5.41832e-4 months <br />, after shutting down Containment Air Recirc Fan 11B, Control Rods B-1 0, C-9, D-1 0, D-1 1 and E-1 1 exceeded their indicated alignment with their

-respective banks by greater than 12 steps. Primary voltage readings confir-med that the rods were properly aligned. A calibration adjustment to the Analog Rod Position Indicators (ARPI's) for each rod in order to compensate for the change in Containment air temperature, was completed at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> on 10/19/02. All rods were returned to within 12 steps of their group step counters and declared operable.

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 11/01/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 Notes: Rated thermal power at

  • la. REPORTING PERIOD: OCTOBER 2002
  • BVPS-I was uprated from 2652 MWt*
  • to 2689 MWt on 10/20/01. Net *
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • MDC was also uprated from *
  • 821 MWe.
  • 821 810 MWe to
2. MAX. DEPENDABLE CAPACITY (Net MWe): * . ** * .* * *. *. * * * * *
  • THIS MONTH YEAR TO DATE CUMULATIVE 745.0 7296.0 232320.0 3a. HOURS IN REPORTING PERIOD:

745.0 7296.0 159378.4

3. NO. OF HRS. REACTOR WAS CRITICAL:

745.0 7296.0 156917.9

4. SERVICE HOURS GENERATOR ON LINE:

0.0 0.0 0.0

5. UNIT RESERVE SHUTDOWN HOURS:

620770.0 6009720.0 117675863.0

6. NET ELECTRICAL ENERGY GEN. (MWH}):

654820.0 6360540.0 125627326.0

7. GROSS ELECT. ENERGY GEN. (MWH):

2001352.0 19480963.0 387115768.5

8. GROSS THERMAL ENERGY GEN. (MWH):

100.0 100.0 69.0

9. UNIT AVAILABILITY FACTOR (M):

101.5 100.3 64.4

10. UNIT CAPACITY FACTOR (MDC) (M&):

0.0 0.0 15.8

11. UNIT FORCED OUTAGE RATE (%}):

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE November 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: October 2002 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 10/4/02 at 1529 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.817845e-4 months <br /> with unusual atmospheric conditions present combined with limiting Condenser vacuum conditions with a fourth Cooling Tower Pump out of service, the Unit reduced output approximately 1.5% as a conservative measure in order to prevent challenging Turbine trip setpoints. As Condenser vacuum conditions improved and margin to the Turbine trip setpoints increased, the Unit incrementally raised output back to a nominal value of 100% at 2029 hours0.0235 days <br />0.564 hours <br />0.00335 weeks <br />7.720345e-4 months <br /> on 10/4/02. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 11/01/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 Notes: Rated thermal power at

  • la. REPORTING PERIOD: OCTOBER 2002
  • BVPS-2 was uprated from 2652 MWt*
  • to 2689 Mwt on 10/30/01. Net *
1. DESIGN ELECTRICAL RATING (Net MWe): 836
  • MDC was also uprated from *
  • 820 MWe to 831 MWe. *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 C * * * * * * * * * * * * * * * *
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 745.0 7296.0 131103.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 745.0 6736.6 108091.1
4. SERVICE HOURS GENERATOR ON LINE: 745.0 6669.9 107362.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 628611.0 5376095.0 83954187.0
7. GROSS ELECT. ENERGY GEN. (MWH): 659396.0 5668429.0 88743172.0
8. GROSS THERMAL ENERGY GEN. (MWH): 2000042.0 17295779.0 270703360.0
9. UNIT AVAILABILITY FACTOR (%): 100.0 91.4 81.9
10. UNIT CAPACITY FACTOR (MDC) (%): 101.5 88.7 77.3 II. UNIT FORCED OUTAGE RATE (%): 0.0 0.3 9.9