ML023240359

From kanterella
Jump to navigation Jump to search
Draft - Section a Operating
ML023240359
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/21/2002
From: Pisano L
Constellation Energy Group, Constellation Nuclear
To: Caruso J, Miller H
NRC Region 1
Conte R
References
50-220/02-303, NMP-97939 50-220/02-303
Download: ML023240359 (89)


Text

P.O. Box 63 Lycoming, New York 13093 NMP-97939 Energy Group Constellation Nine Mile Point August 21, 2002 Nuclear Station Mr. Hubert J. Miller Regional Administrator USNRC Region I 475 Allendale Road King of Prussia, PA 19406 ATTENTION: Mr. John Caruso

SUBJECT:

NINE MILE POINT UNIT 1 INITIAL OPERATOR ADMINISTRATIVE TOPICS EXAMINATION SUBMITTAL Mr. Miller:

In response to the NRC Corporate Notification Letter dated June 4, 2002, arrangements were made for the administration of licensing examinations at Nine Mile Point, Unit 1 during the week of September 30, 2002. The examinations are being prepared based on the guidelines in Revision 8, Supplement 1, of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors." To meet the examination schedule, Nine Mile Point Nuclear Station is required to furnish the examination for review and approval. Enclosed are the examination, test items, outlines and quality checklists for the Category A Topics.

Please withhold these examination materials from public disclosure until after the examinations have been completed.

If you have any questions regarding the examination outline submittal, please contact Mr. Jerry Bobka (Facility Contact) at 315-349-2569 or Mr. Ron Thurow (General Supervisor of Operations Training) at 315-349-1182.

Sincerely, Louis E. Pisano Manager Nuclear Training LEP/crr

( ( (

Cat A Admin Exam From Original Outline Submittal To Submitted With Exam [ ReasonlJustification Modification Material (Initial) Initiated By SRO Exam A A.1.1 JPM A.1.1 JPM Two questions submitted vice NRC/Plant Staff a JPM. Utilized JPM from SRO B Exam.

A.1.2 JPM A.1.2 JPM Replaced JPM based on Plant Staff operations validation identified no significant decisions were required.

A.3 Q.1 A.3 Q.1 Environmental release Plant Staff question submitted, revised to reflect a radiological release.

A.3 Q.2 A.3 Q.2 Question too similar to B NRC/Plant Staff exam. Used same KA but shifted focus to an emergency entry.

A.4 JPM A.4 JPM Added PAR to classification. NRC RO B Exam A.1 QI and Q2 A.1 JPM Questions to close to A exam. NRC Added one JPM.

A.1 Q3 A.1 Q3 Scram report covered by NRC operating exam. Replaced with another question.

A.1 Q4 A.1 Q.4 Question too similar to RO A Plant Staff Q4; replaced.

A.2 QI and Q2 A.2 JPM Original questions were Plant Staff potential overlap with SRO A JPM A.2; replaced with clearance JPM.

A.3 Q.1 A.3 Q.1 Original question was GET NRC level knowledge replaced with higher cognitive question.

A.3 Q.2 A.3 Q.2 Too close to SRO A test item; NRC SRO A test item modified.

Nine Mile Point Unit 1 NRC Exam Outline Modification Summary Aug 20, 2002 Page 2 of 3 Document Submitted With exam submittal and summarizes changes after outline submittal.

( .

(

Cat A Admin Exam From Original To Submitted With Exam Reason/Justification Modification Outline Submittal Material (Initial) Initiated By SRO B Exam A.1 JPM A.1 JPM JPM too similar to A exam, NRC new JPM submitted.

A.1 JPM A.1 JPM JPM too similar to A exam, NRC new JPM submitted.

A.2 JPM A.2 JPM JPM too similar to A exam, NRC new JPM submitted.

A.3 Q.1 and Q.2 A.3 Q.1 and Q.2 Too similar to A exam NRC questions. Question 1 modified and Q.2 replaced.

A.4 JPM A.4 JPM Added PARs. NRC Nine Mile Point Unit 1 NRC Exam Outline Modification Summary Aug 20, 2002 Page 3 of 3 Document Submitted With exam submittal and summarizes changes after outline submittal.

( ( C The following is a summary of changes made during exam development. These changes resulted in modifications to the submitted outlines.

Nine Mile Point Unit I Outline Chanqes Cat A Admin Exam From Original To Submitted With Exam ReasonlJustification Modification Outline Submittal Material Initial Initiated By RO Exam A A.1 Q.1 A.1 Q.1 Questions were leading and Plant Staff too easy. Modified questions kept same KA A.1 Q.2 A.1 Q.2 Question was low level of Plant Staff difficulty; new question submitted at higher cognitive level.

A.1. Q.3 A.1 Q.3 Exam item is same as original. Plant Staff Modified question to improve focus and solicit specific response.

AI. Q.4 A.1 Q4 Exam item is the same as Plant Staff original. Question stem focus improved.

A.2 Q.1 and Q.2 A.2 JPM Questions were leading. NRC/Plant Staff Converted question to JPM.

A.3 Q.1 A.3 Q.1 Similar question used on RO B Plant Staff exam. New question submitted.

A.3 Q.2 A.3 Q.2 No significant action required; Plant Staff replaced with different question same KA.

Nine Mile Point Unit 1 NRC Exam Outline Modification Summary Aug 20, 2002 Page 1 of 3 Document Submitted With exam submittal and summarizes changes after outline submittal.

Facility: Nine Mile Point # I Date of Examination: 09/30/2002 Examination Level (circle one): SRO Operating Test Number: Cat A Test A Administrative Topic/Subject Describe method of evaluation:

Description 1. ONE Administrative JPM, OR

2. TWO Administrative Questions A.1 2.1.1 Reactivity Management JPM - Determine reactivity event severity level and DER requirements for an APRM miscalibration event.

References:

GAP-OPS-05 Conduct of 2.1.34 Operations JPM - SRO Actions for exceeding CDI conductivity.

References:

GAP-CHE-0 1, N 1-CTP-D 106 A.2 Surveillance 2.1.14,2.2.12 Testing JPM - Given a completed Surveillance Test, N1-ST-MIA, Liquid Poison Pump

  1. 11 Operhbility Test, complete the "Acceptance Criteria" and "SSS Review" sections as applicable.

References:

NI-ST-M1A, Technical Specifications A.3 Control of Releases 2.3.11 Q. I. Given the following:

" The plant is operating at rated power. .b

"* Wind gusts of up to 90 mph hav-p-b6n reported.

( " Reactor Building differentia',4,ressure is positive.

a. What are the required actioE e nditions?

References:

NI-EOP-5; _NL-ARPTI, window 3-4; Ni-OP-10 A.3 Radiation Work 2.3.10 Permit Q.2. The plant has experienced an emergency, with the following:

" Access to the RWCU Heat Exchanger Room s required to respond to the emergency.

"* A Radiation Work Permit is currently not available for the room.

"* RP Supervision is not available (back-shift)

b. What are the requirement(s) for initial emergency entry into this area in lieu of an RWP?

References:

GAP-RPP-08 Sections 4.2; GAP-RPP-02 Section 3.2 Attached survey map for the RWCU Heat Exchanger Room.

A.4

{

Emergency Action Levels and Classifications 2.4.29, 2.4.41 JPM - Emergency Plan Classification with PAR's

References:

Emergency Plan Draft Exam Submittal Document Aug 2002 Created on 07/10/02 7:29 AM

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Determine Reactivity Event Severity Level and DER requirement for Revision: 0 APRM Miscalibration Event.

Task Number:

Approvals:

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration Control Date Performer: (RO/SRO/AO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 10 minutes Time Critical T NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

Exam A JPM SRO A. 1.1 - I- August 2002

Recommended Start Location: (Completion time based on the start location)

Main Control Room or any other location with available reference material Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:

"* Self verification shall be demonstrated.

"* (Independent/Peer/No other) verification shall be demonstrated.

References:

1. GAP-OPS-05
2. NUREG 1123 Knowledge and Abilities 2.1.1 Tools and Equipment:
1. None.

Exam A JPM SRO A. 1.1 August 2002

Task Standard:

Determines event is Severity Level 3 and a DER is required.

Initial Conditions:

  • The plant is at 100% power when it was determined that an administrative error was made during a surveillance test procedure. The error has resulted in all APRMs being improperly calibrated and not within the Technical Specification required calibration limits (non-conservative direction).
  • The shift entered the required Technical Specification and re-calibration was completed within 20 minutes using a corrected procedure.

Initiating Cues:

"(Operator's name), determine the Reactivity Event Severity Level, if any and identify if a DER is required to be written due to this event."

Performance Steps Standard Grade I

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O 1/Operations Manual) providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure T.S. 3.6.2 and GAP-OPS-05 obtained. Sat/Unsat and review/utilize the correct section of the Tech spec reviewed & GAP-OPS-05 section procedure. 3.13 referenced.

Note: Candidate may not refer to the Tech Spec, if aware of the one hour action requirement, since the Initial Conditions state that Tech Specs were entered.

3. Determine action required to correct T.S. 3.6.2 Table 3.6.2.a. and note (o) Sat/Unsat within one hour.
4. With action being taken within T.S. limits Identify Severity Level 3 applicable for Pass/Fail determine Severity Level 3 appropriate "Improper calibration or bypass of RPS, rod block instrumentation, or other reactivity control systems corrected in accordance with Technical specifications".
5. With Severity Level 3 selected determine Refer to step 3.13.2 and identify a DER shall Pass/Fail that a DER is required. be generated.

Terminating Cue: Severity Level 3 and DER required identified.

RECORD STOP TIME Exam A JPM SRO A. 1.1 August 2002

Initial Conditions:

"* The plant is at 100% power when it was determined that an administrative error was made during a surveillance test procedure. The error has resulted in all APRMs being improperly calibrated and not within the Technical Specification required calibration limits (non-conservative direction).

"* The shift entered the required Technical Specification and re-calibration was completed within 20 minutes using a corrected procedure.

Initiating Cues:

"(Operator's name), determine the Reactivity Event Severity Level, if any and identify if a DER is required to be written due to this event."

Exam A JPM SRO A. 1.1 August 2002

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE Fitle: SRO actions Ifor exceeding CDI Conductivity - Action Level 1 Revision: 0 Task Number:

Approvals:

Date /

General Supervisor General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration Control Date Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator e.Sxpected Completion Time: 10 min. Time Critical Task: No Alternate Path Task: No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

Exam A SRO JPM A. 1.2 I

Recommended Start Location: (Completion time based on the start location)

Simulator or other designated site.

Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

I. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a

2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:

"* Self verification shall be demonstrated.

"* No other verification shall be demonstrated.

References:

1. GAP-CHE-01, Enclosure #2
2. NUREG K/A General Knowledges and Abilities 2.1.34 (2.9)

Tools and Equipment:

1. GAP-CHE-01, Enclosure #1
2. NI-CTP-D106, Attachment #2 Task Standard:

Determine Action Level status and take appropriate action(s) for a given value of CDI Conductivity.

Exam A SRO JPM A. 1.2 2

Initial Conditions:

1. The Reactor is operating at 100% power.
2. You have just been handed a Chemistry Report.

initiating Cues:

"(Operator's name), determine the required actions (if any) using the information provided in this Station Water Chemistry Summary sheet."

Performance Steps Standard Grade Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O 1/Operations Manual) providing correction if necessary RECORD START TIME Cue: As the Chemistry Technician, give the candidate the attached completed copy of the Station Water/Chemistry Summary sheet.
2. Obtain a copy of the reference procedure and GAP-CHE-01 obtained. Sat/Unsat review/utilize the correct section of the Enclosure I is referenced.

procedure.

3. Determines Action Level I is exceeded Using the supplied Chemistry Analysis information and Enclosure 1;

"* Determines that Action Level I HAS been Pass/Fail exceeded under Section III.

"* Determines that Action Level 3 HAS Pass/Fail NOT been exceeded using the same section.

Enters Section 3.2.1 ofGAP-CHE-01. Sat/Unsat

4. Performs appropriate Notifications. Notifies the following personnel that CDI has Sat/Unsat exceeded ACTION LEVEL 1;

"* SSS

"* Chemistry Manager

"* Operations Manager

"* Plant Manager, AND

"* Engineering Services Branch Manager.

Exam A SRO JPM A. 1.2

Performance Steps Standard Grnde CUE: Role playing as the SSS and all the called Managers, acknowledge the Candidate's report of the CDI Conductivity exceeding Action Level 1.

CUE: As the SSS, tell the Candidate that troubleshooting will begin to determine the cause.

Terminating Cue: An Action Level has been chosen and the appropriate notification for that level have been made.

RECORD STOP TIME Exam A SRO JPM A. 1.2 4

Initial Conditions:

1. The Reactor is operating at 100% power.

-2. You have just been handed a Chemistry Report.

Initiating Cues:

"(Operator's name), determine the required actions (if any) using the information provided in this Station Water Chemistry Summary sheet."

Exam A SRO JPM A. 1.2 5

C2  !

ATTR .CHIMENT 2 STATION WATER CHEMISTRY/

SUMMARY

SHEET CONDUCTIVITY

/mhos/cm Dissolved Oxygen ppb Turbidity FLOW THRU CR SP Uncorrected Corrected CR SP Grab JTU Cond./Temp I CDI 0O /ZT O. 0. 2'7/1/-' 0. /,'r z/0 20 O./00 CDO 0. Off? o.o(,o 0, 6*238/..8 MS 0.68 . (00_ _ _ __ _ _ _ _ _ _ _

FW 0.08C 0. O7 d6O'?283t.3 0.060 -7s - o.O8 CDI Acid ,0. -__10554_ . 0.00 _

CDM 11 0__

.8,21,/'9. O.06?

CDM 12 O./o8s/4.7 0 c,0 00 CDM 13 _.0,, / .,_q.7 0 _, _5-_

CDM 14 __0. / .7 ,_"

CDM 15 O.!0,*(/'I.S 0oC.

o0 CDM 16 _____ .q/4,~n___._Or_

7/Ii.

CST _ __ 6 8/9s' '. 5_-S" COMMENTS TECHNICIAN DATE SUPERVISOR DATE Page 8 N1-CTP-D106 Rev 01

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Acceptance Criteria and SSS Review of Liquid Poison Revision: 0 Pump 11 Operability Test (TS)

Task Number:

Approvals:

Date r/

-m General Supervisor General Supervisor Date Operations Training (Designee) Operations (Designee)

/

Configuration Control Date Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Locatior I: Plant Simulator Expected Completion Time: 10 min Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

Exam A JPM SRO A2 - I- August 2002

Recommended Start Location: (Completion time based on the start location)

Main Control Room or any other location with available reference material Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:

0 Self verification shall be demonstrated.

3. During Training JPM:

"* Self verification shall be demonstrated.

"* (Independent/Peer/No other) verification shall be demonstrated.

References:

1. NI-ST-M1A
2. Technical Specifications 3.1.2.a.
3. NUREG 1123 Knowledge & Abilities 2.1.14, 2.2.12 Tools and Equipment:
1. Marked up copy ofN1-ST-M1A with flow rate calculation of 27.5 gpm.

Exam A JPM SRO A2 August 2002

Task Standard:

Identifies Liquid Poison is Inoperable and that pump flow rate falls into Required Action Range requiring immediate pump Inoperability and inform IST Department.

Initial Conditions:

1. N1-ST-M1A has been completed and requires operations and SSS review
2. Instructor to ask operator for any questions.

Initiating Cues:

"(Operator's name), Complete and review the Operations Review and SSS Review sections of the provided surveillance N1-ST-MIA and determine component Operability and any actions required."

Performance Steps Standard Standard ('ýrndý

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat!Unsat EvaluatorAcknowledge repeatback (GAP-OPS-O I/Operations Manual) providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure Provided NI-ST-M1A obtained. Section 10.0 Sat/Unsat and review/utilize the correct section of the referenced.

procedure.

0

3. Review in Step 10.1.1 data recorded on (9 Sat box checked. Sat/Unsat step 8.20 and check Sat for discharge pressure
4. Review in Step 10.1.1 data recorded on (9 Unsat box checked. Pass/Fail step 8.22.3 and check Unsat for flow rate
5. Review in Step 10.1.2 data recorded 1285 psig recorded in MEASURED VALUE Sat/Unsat measured value from step 8.20 and check and ACC box checked ACC Discharge Pressure
6. Review in Step 10.1.2 data recorded 27.5 gpm recorded in MEASURED VALUE Sat/Unsat measured value from step 8.22.3 and check and RA** box checked RA** for Flow Rate
7. Review in Step 10.1.3 data recorded on (9 Sat box checked. Sat/Unsat step 8.21 and check Sat for motor amps
8. Review in Step 10.2 data recorded in (_ Unsatisfactory. Pass/Fail section 10.1 and check Unsatisfactory Exam A JPM SRO A2 August 2002

Performance Stevs Standard Grade Performance Steps Standard Grade

9. Identify that Liquid Poison pump is Identifies component is Inoperable Pass/Fail inoperable initiate a WR and immediately Identifies need to initiate a WR.

notify Plant Manager or alternate.. Identifies immediate notification of Plant Manager or alternate is required.

CUE: Acknowledge notification of inoperable Liquid Poison pump as the Plant Manager when reported.

10. Identify that IST Department is to be Identifies that IST Department must be Sat/Unsat notified. notified 11 Identifies the following actions must be Actions identified Sat/Unsat performed:

"* Enter it in the ESL

"* Enter TS 3.1.2.a.

"* Make entry into SSS log

"* Place a yellow hold out on pump

"* Write a PID

"* Notify Manager Operations or designee Cue: Acknowledge report Terminating Cue: Identifies Liquid Poison is Inoperable and that pump flow rate falls into Required Actions Range requiring T.S. action and surveillance required reports and notifications.

RECORD STOP TIME Exam A JPM SRO A2 August 2002

Initial Conditions:

1. N1-ST-M1A has been completed and requires operations and SSS review Initiating Cues:

"(Operator's name), Complete and review the Operations Review and SSS Review sections of the provided surveillance Ni -ST-M1A and determine component Operability and any actions required."

Exam A JPM SRO A2 August 2002

Nine Mile Point 1 Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A" Test: A Examination Level SRO Administrative Topic A.3 Subject

Description:

Control Of Releases Question Number: 1 Question:

Given the following:

"* The plant is operating at rated power.

"* Wind gusts of up to 90 mph have been reported.

"* Reactor Building differential pressure is positive.

a. What are the required actions for these conditions?

SAT UNSAT Answer:

a. The following actions are required:
  • Enter N1-EOP-5 and monitor Reactor Building differential pressure.
  • Verify ventilation system lineup.
  • Start RBEVS per N1-OP-10.

Technical Reference(s):

N1-EOP-5 N1-ARP-L1, window 3-4 Nl-OP-10 K/A #: Importance: I 2.3.11 3.2 fComments:

If Ni-SOP-10 is referenced for high wind, no actions are required until wind speed is

> 100 mph

Nine Mile Point I Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A" Test: A Examination Level SRO Administrative Topic A.3 Subject

Description:

Radiation Work Permit Question Number: 2 Question:

The plant has experienced an emergency, with the following:

"* Access to the RWCU Heat Exchanger Room is required to respond to the emergency.

"* A Radiation Work Permit is currently not available for the area.

"* RP Supervision is not available (back-shift).

What are the requirement(s) for initial emergency entry into this area in lieu of an RWP?

SA T UNSAT Technical Reference(s):

GAP-RPP-08 Sections 4.2; GAP-RPP-02 Section 3.2 Attached survey map for the RWCU Heat Exchanger Room.

K/A #:- Importance:

2.3.10 3.3

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Emergency Classification With PARs Revision: 0 Task Number:

Approvals:

/ dt e /

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration Control Date Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 10 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

Exam A JPM SRO A4 -I- August 2002

Recommended Start Location: (Completion time based on the start location)

Main Control Room or any other appropriate location with proper references.

Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:

"* Self verification shall be demonstrated.

"* No other verification shall be demonstrated.

References:

1. EPIP-EPP-08, Offsite Dose Assessment And Protective Action Recommendations
2. EPIP-EPP-20, Emergency Notifications
3. EAL Matrix Exam A JPM SRO A4 August 2002

Tools and Equipment:

1. EAL Matrix Task Standard:

Given a set of plant conditions, classify the emergency.

Initial Conditions:

1. The plant is under accident conditions.
2. A Site Area Emergency has been declared based on plant conditions.
3. The Chemistry Technician has reported the following release data:

"* Dose assessment for ground level release rate is 58 Curies per second (Ci/second)

"* Dose assessment for elevated level release rate is 502 Ci/second

"* Wind speed is 8 mph

"* Wind direction is from the East South East (1500)

"* Pascal Stability Class is E Initiating Cues:

"(Operator's name), Take the required actions as the Emergency Director."

Performance Steus Stnndnrd Standard 1- 11

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O l/Operations Manual) providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure EAL Matrix obtained. Section 6.0 referenced.

EPIP-EPP-08 Att. I referenced Sat/Unsat and review/utilize the correct section of the procedure. EPIP-EPP-20 Att. IA referenced

3. Review and complete EPIP-EPP-08 Using given plant data, determine that a Pass/Fail Attachment 1 Table 1.1 and Table 1.2 data General Emergency exists based upon for existing plant conditions. calculated total release (ground release +

elevated release).

4. Review and complete EPIP-EPP-20 Using the given plant data, complete the Part Pass/Fail Attachment 1A, Part I -Notification Fact I - Notification Fact sheet with PARs to sheet. evacuate ERPAs 1, 2, 3, 26, and 27 and shelter remaining ERPAs Terminating Cue: Part 1 - Notification Fact sheet is completed for the General Emergency classification and PAR's are made.

RECORD STOP TIME Exam A JPM SRO A4 August 2002

Initial Conditions:

1. The plant is under accident conditions.
2. A Site Area Emergency has been declared based on plant conditions.
3. The Chemistry Technician has reported the following release data:

"* Dose assessment for ground level release rate is 58 Curies per second (Ci/second)

"* Dose assessment for elevated level release rate is 502 Ci/second.

"* Wind speed is 8 mph

"* Wind direction is from the East South East (150')

"* Pascal Stability Class is E Initiating Cues:

"(Operator's name), Take the required actions as the Emergency Director."

Exam A JPM SRO A4 August 2002

ES-301 Administrative Topics Outline Form ES-30 1-1 Facility: Nine Mile Point # 1 Date of Examination: 09/30/2002 Examination Level (circle one): SRO Operating Test Number: Cat A Test B Administrative Topic/Subject Describe method of evaluation:

Description 1. ONE Administrative JPM, OR

2. TWO Administrative Questions A. I System 2.1.12 Operability JPM -- Given a failed LPRM determine the effect on APRM operability including any required actions.

References:

Tech Specs, NI-OP-38C Thermal 2.1.10,2.1.25 Limits JPM -- Calculate core thermal limits with a backup pressure regulator failed.

Evaluation

Reference:

N1-OP-31, COLR A.2 Equipment 2.1.13,2.1.24 Control JPM - Review/approve a Clearance boundary for CRD Pump 11 Oil Coolers Cooling Water Relief Valve.

References:

GAP-OPS-02; N I-OP-5; C- 18016-C A.3 Radiation Work 2.3.10 Permit Q. I The plant is at rated power, with the following:

"* TIP traces are in progress for LPRM calibration

"* As TIP detector #3 is being withdrawn from the core, the drive mechanism fails with the detector in the TIP Room but not yet in its chamber shield

"* The SSS has directed that the detector be withdrawn to the chamber shield using the manual handcrank, if possible

"* The SSS has determined that no emergency or urgent operational conditions exist, and has directed a brief entry into the TIP Room to ensure no mechanical interference exists in the associated TIP drive tube.

"* Inner TIP Room Area Radiation Monitors are in an alarmed condition

a. What individual(s) is(are) responsible for approving entry into the TIP Room?
b. Identify locations where the operator can get a key that will grant access to the TIP Room, during emergency and non-emergency conditions?

References:

GAP-RPP-08,GAP-RPP-02 Section 3.2 Draft Exam Submittal Document Aug 2002 Exam B NMPI Section A Outline NEW.doc

A.3 Control of Releases 2.3.6 Q.2. Given the following:

"* An emergency has been declared.

"* The Offsite Release has exceeded the Site Area Emergency levels.

"* Turbine Building ventilation has tripped.

a. What actions are required to mitigate the Offsite Release?
b. Why?

References:

EOP-6 Radioactive Release Control, EOP Bases.

A.4 Emergency Action 2.4.29, 2.4.41 Levels and C lassiatons JPM - Emergency Plan Classification. with PARs Classifications

References:

Emergency Plan Draft Exam Submittal Document Aug 2002 Exam B NMPI Section A Outline NEW.doc

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

LPRM Failure / APRM Operability Determination Revision: 0 Task Number: 341-017-03-03-1 Approvals:

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration Control Wte Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 15 min Time Critical Task: Alternate Path Task:

Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

NRC ADMIN EXAM B SRO JPM A. 1.1 August 2002

Recommended Start Location: (Completion time based on the start location)

N/A Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
  • 0**
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:

"* Self verification shall be demonstrated.

"* (Independent/Peer/No other) verification shall be demonstrated.

References:

1. N1-OP-38C
2. TECH SPEC 3.6.2.a(9)(b) and 3.6.2.g(3)
3. NUREG-1123 General Knowledge and Abilities 2.1.12 (4.0)

Tools and Equipment:

1. None NRC ADMIN EXAM B SRO JPM A. 1.1 August 2002

Task Standard: Determines APRM 13 is inoperable.

Initial Conditions:

1. The reactor is operating at 100% power.
2. LPRM detector 12-17C has failed downscale.
3. The Equipment Status Log indicates the following LPRMs are inoperable and bypassed: 28-33A,28-33B, 04-25C,20-33D, 20-09C,20-09D, 20-25A.
4. Instructor to ask operator for any questions.

Initiating Cues:

"(Operator's name), what are the required actions for this condition?

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O 1/Operations Manual) providing correctionif necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure and Ni -OP- 3 8C obtained. Sat/Unsat review/utilize the correct section of the Precautions & limitations reviewed & section procedure. H.3.0 referenced.
3. Confirm LPRM can be bypassed per "* Completes Attachment 5 by placing an X Sat/Unsat Technical Specifications, using Attachment for each inoperable detector in Block 1.
5. "* Complete Block 2 by placing a check mark in the NO block for each APRM.

"* Complete Block 3 by checking YES for APRM 13 and NO for all other APRMs.

"* Complete Block 4 by placing a check mark in the NO block for each APRM.

4. Determines APRM 13 is inoperable. Complete Block 5 as YES for > than 2 C level Pass/Fail detectors marked for APRM 13
5. Evaluates Technical Specifications for "* Refers to Technical Specification 3.6.2a Pass/Fail inoperable APRM 13. and Table 3.6.2a(9)(b) APRM and note (e).

"* Determines minimum number of operable instrument channels per Operable Trip System is met.

"* No LCO entry is required.

NRC ADMIN EXAM B SRO JPM A. 1.1 August 2002

Performance Steos Stnndzrd PromnetesStanda~rd C1rrI Terminating Cue: APRM 13 is declared inoperable and technical specification impact is evaluated.

RECORD STOP TIME Work Practices Competencies

a. Communications Per GAP-OPS-01. Sat/Unsat
b. Verification of Actions Per Operations Manual. Sat/Unsat
c. Procedural Compliance/Placekeeping Per Operations Manual. Sat/Unsat Per NIP-PRO-0 1.
d. Safety Compliance Per NIP-OSH-0 1. Sat/Unsat
e. Radiation Protection Compliance Per GAP-RPP-01. Sat/Unsat Per GAP-RPP-02.

Per NDD-ALA.

NOTE: UNSAT in any competency area requires oral remediation of unsat area and / or reevaluation of work practices using the Work Practices JPM (O1-REQ-SJE-WPJ-1-00).

NRC ADMIN EXAM B SRO JPMA.1.1 August2002

Initial Conditions:

1. The reactor is operating at 100% power.
2. LPRM detector 12-17C has failed downscale.
3. The Equipment Status Log indicates the following LPRMs are inoperable and bypassed: 28-33A,28-33B, 04-25C,20-33D, 20-09C,20-09D, 20 25A.

Initiating Cues:

"(Operator's name), what are the required actions for this condition?

NRC ADMIN EXAM B SRO JPM A. 1.1 August 2002

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Thermal Limit Calculation with Backup Pressure Regulator failed. Revision: 0 Task Number:

Approvals:

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration ControlDt Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 10 min Time Critical Task: Alternate Path Task:

Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

NRC ADMIN EXAM B SRO JPM A. 1.2 August 2002

Recommended Start Location: (Completion time based on the start location)

N/A Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:

"* Self verification shall be demonstrated.

"* (Independent/Peer/No other) verification shall be demonstrated.

References:

1. N1-OP-31
2. COLR
3. NUREG 1123 Generic Knowledge and Abilities 2.1.10 (3.9)&2.1.25(3.1)

NRC ADMIN EXAM B SRO JPM A. 1.2 August 2002

Tools and Equipment:

None Task Standard:

Calculates core thermal limits with backup pressure regulator failed.

Initial Conditions:

1. The reactor is operating at 85% power.
2. Core flow is 54 Mlb/hr.
3. The Backup Pressure Regulator has been declared Inoperable. 7?'
4. Instructor to ask operator for any questions.

Initiating Cues:

"(Operator's name), determine any req uired core operating restrictions for this condition?

Performance Steps ~ S~tandard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O 1/Operations Manual) providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure and N1-OP-31 obtained. Sat/Unsat review/utilize the correct section of the Precautions & limitations reviewed & section procedure. H.3.0 referenced.
3. Determine that COLR thermal limit "* Refers to N1-OP-31 Step 3.1 and reviews Sat/Unsat restrictions are applicable. COLR section for operation without a backup pressure regulator for applicable MFLPD and MFLCPR thermal limit
4. Determines MFLPD thermal limit is .85.

restrictions.

Pass/Fail 7-

"* Refers to COLR Section 3.1 and Figure 27 to determine that MFLPD limit =

FRTP for these conditions.

5. Determines MCPR thermal limit is 1.706. "* Refers to COLR Section 2.1.2 and Figure Pass/Fail 26 to determine MCPR limit is 1.45/FRTP

= 1.706 (+/-.01)

NRC ADMIN EXAM B SRO JPM A. 1.2 August 2002

Performance Steos Standard *r*cl*

PromnetesStandard ralr2 d

Terminating Cue: New MCPR and MFLPD thermal limits are calculated.

RECORD STOP TIME Work Practices Competencies

a. Communications Per GAP-OPS-01. Sat/Unsat
b. Verification of Actions Per Operations Manual. Sat/Unsat
c. Procedural Compliance/Placekeeping Per Operations Manual. Sat/Unsat Per NIP-PRO-0 1.
d. Safety Compliance Per NIP-OSH-01. Sat/Unsat
e. Radiation Protection Compliance Per GAP-RPP-01. Sat/Unsat Per GAP-RPP-02.

Per NDD-ALA.

NOTE: UNSAT in any competency area requires oral remediation of unsat area and / or reevaluation of work practices using the Work Practices JPM (O1-REQ-SJE-WPJ-1-00).

NRC ADMIN EXAM B SRO JPM A. 1.2 August 2002

Initial Conditions:

1. The reactor is operating at 85% power.
2. Core flow is 54 Mlb/hr.

"3. The Backup Pressure Regulator has been declared Inoperable.

Initiating Cues:

"(Operator's name), determine any required core operating restrictions for this condition?

NRC ADMIN EXAM B SRO JPM A. 1.2 August 2002

Nine Mile Point 1 Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A" Test: B Examination Level SRO Administrative Topic A.3 Subject

Description:

Radiation Work Permit Question Number: 1 Question:

The plant is at rated power, with the following:

"* TIP traces are in progress for LPRM calibration

"* As TIP detector #3 is being withdrawn from the core, the drive mechanism fails with the detector in the TIP Room but not yet in its chamber shield

"* The SSS has directed that the detector be withdrawn to the chamber shield using the manual handcrank, if possible

"* The SSS has determined that no emergency or urgent operational conditions exist, and has directed a brief entry into the TIP Room to ensure no mechanical interference exists in the associated TIP drive tube.

"* Inner TIP Room Area Radiation Monitors are in an alarmed condition

a. What individual(s) is(are) responsible for approving entry into the TIP Room?
b. Identify locations where the operator can get a key that will grant access to the TIP Room, during emergency and non-emergency conditions?

SAT UNSAT Answer:

a. For the conditions given, the SSS and RP Supervision must approve entry into the TIP Room.
b. Because no emergency exists, the operator must obtain the key from the Radiation Protection Department. During emergency conditions, SSS may authorize use of the master keys in the "break-to-enter" key box located in the Control Room.

Technical Reference(s):

GAP-RPP-08 Sections 3.2, 3.4, and 3.5; GAP-RPP-02 Section 3.7 K2A #: I3.mpotnce:

2.3.10 13.3 Comments:

    • mi ILaIUI I veIc Administrative Topic A.3 Subject

Description:

Control Of Releases Question Number: 2 S9 Question:

Given the following:

"* An emergency has been declared.

"* The Offsite Release has exceeded the Site Area Emergency levels.

a. What actions a required to mitigate the Offsite Release?
b. Why?

SAT UNSAT Answer:

a. Take the following actions:

"* Activate the Emergency Plan if required.

"* Operate Turbine Building ventilation.

"* Isolate primary systems discharging outside primary and secondary containment not needed for EOP's.

b. Turbine Building ventilation elevates and monitors the release from the Turbine Building and controls temperature and radiation levels in the Turbine Building.

Isolating primary systems discharging is an attempt to stop the leakage.

ITechnical Reference(s):

Ni-EOP-6, Radioactive Release Control, EOP Bases KIA #: I mportance:

2.3.11 3.2 Comments:

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Emergency Classification with PARs Revision: 0 Task Number: 344-902-05-03 Make Protective Action Recommendations as necessary per EPPs Approvals:

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration Control DateU Performer: (SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 10 min Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if anycritical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

Exam B JPM SRO A4 August 2002

Recommended Start Location: (Completion time based on the start location)

Main Control Room or any other appropriate location with proper references.

Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:

"* Self verification shall be demonstrated.

"* No other verification shall be demonstrated.

References:

1. EPIP-EPP-08, Offsite Dose Assessment And Protective Action Recommendations
2. EPIP-EPP-20, Emergency Notifications
3. EAL Matrix Exam B JPM SRO A4 August 2002

Tools and Equipment:

1. Marked up copy of Part I - Notification Fact Sheet which lists wind speed, wind direction and stability class.

Task Standard:

Given a set of plant conditions, determine Protective Action Recommendations (PAR's) and complete Part I Notification Fact Sheet.

Initial Conditions:

1. The plant has experienced a transient.
2. Drywell radiation levels have just been reported as 4.2 E6 R/hr.

Initiating Cues:

"(Operator's name), Take the required actions as the Emergency Director."

Performance Steps Standard *r2 do Standard rade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O I/Operations Manual) providing correction if necessary.

RECORD START TIME

2. Review EALs. Refer to EAL 1.3.3 for the elevated drywell Sat/Unsat radiation levels.
3. Declare a General Emergency per EAL General Emergency declared Pass/Fail 1.3.3.

Cue: As the Control Room Communicator provide the candidate with the attached Part I - Notification Fact sheet containing wind speed, direction and stability data.

Blocks 2 - 6 contain NOT an exercise, NMP 1, Sat/Unsat General Emergency, current time/date, and

4. Complete the Part 1 - Notification Fact No Release in progress Sheet blocks 2 - 6
5. Review EPIP-EPP-08 Attachment I Table Evacuate ERPAs 1, 2, 3, 61 11, 26, and 27 Pass/Fail 1.2 data for existing plant/weather conditions and shelter the remaining ERPAs.

to determine ERPA's to be evacuated and sheltered.

Exam B JPM SRO A4 August 2002

Performance Steos Standard PromneSesStandard (rv tj ý "6. Complete Part 1 - Notification Fact Sheet Part I - Notification Fact Sheet is completed Pass/Fail blocks 8 - 10

7. Indicates approval of Part I - Notification Signs the "Approved By (SSS/ED or Sat/Unsat Fact Sheet PAR's by signing the ED/RM)" line on the bottom of the Part I "Approved By (SSS/ED or ED/RM)" line Notification Fact Sheet..

on the bottom of the form.

Terminating Cue: PARs corrected for given plant conditions and Part I - Notification Fact Sheet approved.

RECORD STOP TIME Exam B JPM SRO A4 August 2002

Initial Conditions:

1. The plant has experienced a transient.
2. Drywell radiation levels have just been reported as 4.2 E6 R/hr.

Initiating Cues:

"(Operator's name), Take the required actions as the Emergency Director."

Exam B JPM SRO A4 August 2002

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Nine Mile Point # I Date of Examination: 09/30/2002 Examination Level (circle one): RO Operating Test Number: Cat A Test A Administrative Topic/Subject Describe method of evaluation:

Description 1. ONE Administrative JPM, OR

2. TWO Administrative Questions A.1 Plant Parameter 2.1.2,2.1.9 Verification Q.1. The plant is at rated power when you are made aware of the following:

Cue: give the candidate yesterday's and today's OD-7 printouts.

The only evolution completed between these OD-7 edits was weekly control rod exercises.

a. What are the Reactor Operator's required actions for these conditions?

References:

GAP-OPS-05 Section 4.8 and N1-OP-5 2.1.2,2.1.23 Q.2. The plant is shutdown, with the following:

  • A maintenance evolution requires both SFP loops to be secured.
  • Condensate Transfer is available
  • Spent fuel pool temperature is currently 80F.

"* "Time to 140F" from N1-ODP-OPS-0108 is 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

a. What is the maximum time allowed for this maintenance evolution?

References:

N1-OP-6 Precautions and Limitation 8.0, and Section H. 10.0 A. I OATC Duties 2.1.1,2.1.2 Q.3. The plant has experienced a hydraulic Anticipated Transient Without Scram (ATWS), with the following:

"* The CSO has left the Control Room to supervise alternate control rod insertion activities

"* An unexpected annunciator alarms on a Main Control Room back panel

a. Is the ATC RO permitted to acknowledge this alarm?
b. What are the responsibilities of the person responding to this alarm?

References:

Operations Manual Sections 3.3.5 and 4.1 2.1.1,2.1.9 Q.4. The plant is at rated power, with the following:

"* I&C reports that transmitter XS-LVA-I has failed

"* The SSS directs I&C to defeat the XS-LVA- 1 input signal to Annunciator A 1-3-4

a. What actions are required in the Control Room once I&C reports the input signal from XS-LVA-1 has been defeated?

References:

GAP-OPS-01 Section 3.10.7; N1-ARP-Al Window 3-4 Draft Exam Submittal Document Aug 2002 Created on 07/10/02 7:29 AM

A.2 Surveillance 2.2.12 Testing JPM - Verify acceptance criteria for Ni-ST-C 13

References:

NI-ST-C13 Control of Releases 2.3.11 Q. 1. Given the following:

  • The plant is operating at rated power.
  • Wind gusts of up to 90 mph have been reported.
  • Reactor Building differential pressure is positive.
a. What are the required actions for these conditions?

References:

NI-EOP-5; NI-ARP-L1, window 3-4; NI-OP-10 Radiation Work 2.3.10 Permit Q.2. The plant has experienced an emergency, with the following:

  • Access to the RWCU Heat Exchanger Room s required to respond to the emergency.
  • A Radiation Work Permit is currently not available for the room.
  • RP Supervision is not available (back-shift)
a. What are the requirement(s) for initial emergency entry into this area in lieu of an RWP?

References:

GAP-RPP-08 Sections 4.2; GAP-RPP-02 Section 3.2 Attached survey map for the RWCU Heat Exchanger Room.

A.4 Emergency Plan 2.4.39 JPM - Search and Rescue, for a reported missing person

References:

EPIP-EPP-03 ATTACHMENT 1 Draft Exam Submittal Document Aug 2002 Created on 07/10/02 7:29 AM

Examination Level RO Administrative Topic A. 1 Subject

Description:

Plant Parameter Verification Question Number: 1 Question:

The plant is at rated power when you are made aware of the following:

Cue: hand the candidate yesterday's and today's OD-7 printouts The only evolution completed between these OD-7 edits was weekly control rod exercising.

a. What are the Reactor Operator's required actions for these conditions?

SAT UNSAT Answer:

a. Control rod 22-27 is "mispositioned." The required actions include:
  • Notify the SSS, the Reactor Engineer and the General Supervisor Operations.
  • Confirm all other control rods are at their desired position.
  • Determine how long the control rod has been mispositioned.

Technical Reference(s):

GAP-OPS-05, Sections 4.8 and N1-OP-5 Section H.4.0 K/A #: Importance:

2.1.2 3.0 2.1.9 2.5 Comments:

Nine Mile Point 1 Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A"Test: 1 Examination Level RO Administrative Topic A. 1 Subject

Description:

Plant Parameter Verification Question Number: 2 Question:

The plant is shutdown, with the following:

"* A maintenance evolution requires both Spent Fuel Pool Cooling loops to be secured.

"* Condensate Transfer is available

"* Spent Fuel Pool temperature is currently 80F.

"* "Time to 140F" from N1-ODP-OPS-0108 is 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

a. What is the maximum time this maintenance evolution can be planned for?

SAT UNSAT Answer:

a. 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> Based on the equation 140F - 80F 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> The maximum temperature allowed by P&L 8.0 is 125F.

Therefore, 125F - 80F = 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1OF/hr Technical Reference(s):

N1-OP-6 Precaution and Limitation 8.0, and Section H.10.0 K/A #:Importance:

2.1.2 3.0 2.1.23 3.9 Comments:

uperauing I est i-qumuer UdL A I UZ L Examination Level RO Administrative Topic A. 1 Subject

Description:

OATC Duties Question Number: 3

[Question:

The plant has experienced an Anticipated Transient Without Scram (ATWS), with the following:

"* The CSO has left the Control Room to supervise control rod insertion activities.

"* An unexpected annunciator alarms on a Main Control Room back panel.

"* You (as the ATC RO) and the SRO are the only operators in the Control Room.

a. Is the ATC RO permitted to respond to this annunciator?
b. What are the responsibilities of any person responding to this alarm?

SAT UNSAT Answer:

a. The ATC RO is permitted to acknowledge back-panel alarms during non routine responses or emergencies (i.e. ATWS).
b. The responsibilities of the responding operator would include:
  • Acknowledge the alarm by depressing the ACKNOWLEDGE pushbutton.
  • Report the alarm to the CRS.
  • Perform associated applicable ARP actions.
  • Brief the CRS on the ARP actions taken OR planned.
  • WHEN the alarm condition clears, reset the alarm by depressing the ACKNOWLEDGE pushbutton.

Technical Reference(s):

Operations Manual Sections 3.3.5 and 4.1 K2A #: Importance:

2.1.1 3.7 2.1.2 3.0 Comments:

Nine Mile Point 1 Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A" Test: A Examination Level RO Administrative Topic A. 1 Subject

Description:

OATC Duties Question Number: 4 Question:

The plant is at rated power, with the following:

"* I&C reports that transmitter XS-LVA-1 has failed

"* The SSS directs I&C to defeat the XS-LVA-1 input signal to Annunciator Al-3-4

a. What actions are required in the Control Room once I&C reports the input signal from XS-LVA-1 has been defeated?

SAT UNSAT Answer:

a. Make an entry in the Defeated Annunciator Log and identify the condition by placing a transparent yellow sticker on annunciator window 3-4.

Technical Reference(s):

GAP-OPS-o0 Section 3.10.7, NI-ARP-AI Window 3-4 KIA #: Importance:

2.1.1 3.7 2.1.9 2.5 Comments:

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

~-

Title:

Verify Acceptance Criteria for Ni-ST-C 13. Revision: 0 Task Number:

Approvals:

/ý51 /

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 10 min Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

Exam A RO JPM A.2 Recommended Start Location: (Completion time based on the start location)

Main Control Room or any other location with available reference material Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:

0 Self verification shall be demonstrated.

3. During Training JPM:

"* Self verification shall be demonstrated.

"* (Independent/Peer/No other) verification shall be demonstrated.

References:

1. Nl-ST-C13
2. Technical Specifications 3.1.2.a.
3. NUREG 1123 Knowledge & Abilities 2.2.12 Tools and Equipment:
1. Marked up copy of Nl-ST-C13 with total leakage out of tolerance at 20.2 gpm.

Exam A RO JPM A.2 Task Standard:

Identifies that total leakage is through Reactor Shutdown Cooling system valves exceeds the Acceptance Criteria.

Initial Conditions:

1. Ni-ST-C13 has been completed and requires operations review.
2. Surveillance Test Ni-ST-C13 has been completed through step 9.6.
3. The person performing the test is ill and you have been asked to complete the Operations review.
4. Instructor to ask operator for any questions.

Initiating Cues:

"(Operator's name), review the Surveillance Test for satisfactory completion."

Performance Steps Standard Grade Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O l/Operations Manual) providing correctionif necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure Provided Ni-ST-C13 obtained. Section 10.1 Sat/Unsat and review/utilize the correct section of the referenced.

procedure.

3. Transcribe data from steps 8.1, 8.2 and 8.3 Step 10.1.1 completed. Sat/Unsat into step 10.1.1
4. Review data in step 10.1.1 and check Sat U Sat boxes checked. Pass/Fail for corrected leakage rates.
5. Transcribe data from steps 8.1, 8.2 and 8.3 Step 10.1.2 completed. Sat/Unsat into step 10.1.2
6. Review data in step 10.1.2. Identify total leakage for the shutdown Pass/Fail cooling valves is greater than 20.0 gpm.
7. Reports the unsatisfactory results Notifies the SSS Sat/Unsat Cue: As the SSS, acknowledge the report Terminating Cue: Identifies unsatisfactory completion of the Surveillance test to the SSS.

RECORD STOP TIME Exam A RO JPM A.2 Initial Conditions:

1. Ni -ST-C 13 has been completed and requires operations review.
2. Surveillance Test Ni-ST-C 13 has been completed through step 9.6.
3. The person performing the test is ill and you have been asked to complete the Operations review.
4. Instructor to ask operator for any questions.

Initiating Cues:

"(Operator's name), review the Surveillance Test for satisfactory completion. "

Exam A RO JPM A.2 upLJýIatria I INqUIluju

,um t.al /A I esi: M Examination Level RO Administrative Topic A.3 Subject

Description:

Control Of Releases Question Number: 1 Question:

Given the following:

"* The plant is operating at rated power.

"* Wind gusts of up to 90 mph have been reported.

"* Reactor Building differential pressure is positive.

a. What are the required actions for these conditions?

SAT UNSAT Answer:

a. The following actions are required:
  • Enter N1-EOP-5 and monitor Reactor Building differential pressure.
  • Verify ventilation system lineup.
  • Start RBEVS per NI-OP-10.

Technical Reference(s):

N1-EOP-5 N1-ARP-L1, window 3-4 NI-OP-10 KlA #: iImportance:

2.3.11 2.7 Comments:

If NI-SOP-10 is referenced for high wind, no actions are required until wind speed is

> 100 mph

Nine Mile Point I Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A" Test: A Examination Level RO Administrative Topic A.3 Subject

Description:

Control Of Releases Question Number: 1 Question:

Given the following:

"* The plant is operating at rated power.

"* Wind gusts of up to 90 mph have been reported.

"* Reactor Building differential pressure is positive.

a. What are the required actions for these conditions?

SAT UNSAT Answer:

a. The following actions are required:
  • Enter N1-EOP-5 and monitor Reactor Building differential pressure.
  • Verify ventilation system lineup.
  • Start RBEVS per N1-OP-10.

Technical Reference(s):

N1 -EOP-5 N1-ARP-L1, window 3-4 Nl-OP-10 K/A #: importance:

2.3.11 2.7 Comments:

If N1-SOP-lO is referenced for high wind, no actions are required until wind speed is

> 100 mph

Subject

Description:

Radiation Work Permit Question Number: 2 Question:

The plant has experienced an emergency, with the following:

"* Access to the RWCU Heat Exchanger Room is required to respond to the emergency.

"* A Radiation Work Permit is currently not available for the area.

"* RP Supervision is not available (back-shift).

What are the requirement(s) for initial emergency entry into this area in lieu of an RWP?

SAT UNSAT Technical Reference(s):

GAP-RPP-08 Sections 4.2; GAP-RPP-02 Section 3.2 Attached survey map for the RWCU Heat Exchanger Room.

SK/AA #I Importance:

2.3.10 2.9

SURVEY MAP North Non-Regenerative Heat Exchange 2 600 600 300

-- 4

  • I -- _ I Survey Instruments:

RO-2 #6074 (9.13.1)

2. 0 = Smear Location
3. # General Area *# * # 2 P"Contact 27
1. - = Rope/Area Boundary Unless Noted 4. # # 30c
5. A# = Neutron (mRemlhr) 6. FAS = Air Sample 7. Large Area Wipe 28
8. FA = Area Rad Monitor 9. FV i = VAMP Number )'= Readings in mRem/hr. /3= Readings in mRad/hr. 29 30

.,marks:

No Beta Detected G/A unless otherwise noted 31 M. Gilbert Dose: 66 mRem Date:

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Search and Rescue of a Missing Individual Revision: 0 Task Number:

Approvals:

0* /

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration Control Date Performer: (RO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 15 min Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

Exam A JPM RO A4 I

Recommended Start Location: (Completion time based on the start location)

Main Control Room or any other appropriate location with proper references.

Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:

"* Self verification shall be demonstrated.

"* No other verification shall be demonstrated.

References:

1. EPIP-EPP-03, Search And Rescue Tools and Equipment:

None Exam A JPM RO A4 2

Task Standard:

Search and Rescue Team has been dispatched, all required notifications have been made, and Chief Shift Operator (CSO) Search/Rescue Operations Checklist has been completed.

Initial Conditions:

1. You are the CSO.
2. The plant is operating at rated power with all systems operating normally.
3. A Maintenance worker contacts the Control Room to report that one of his co-workers is missing.

Initiating Cues:

"(Operator's name), Perform appropriate actions for the CSO in response to the report of the missing person."

Performance Steps Standard Grade Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O 1/Operations Manual) providing correctionif necessary.

RECORD START TIME

2. Obtains a copy of the reference procedure Obtains EPIP-EPP-03. Sat/Unsat and reviews/utilizes the correct section of References Section 3.2 and Attachment 1, the procedure. Chief Shift Operator (CSO) Search/Rescue Operations Checklist.

NOTE: During the performance of this JPM, if the candidate requests individual's names which must be input into the CSO Search/Rescue Operations Checklist, inform the candidate that names are not required, just the name of the respective department.

3. Fills out top section of CSO Search/Resci ie Enters "NAME", "DATE", and checks the Sat/Unsat Operations Checklist. "UNIT 1" block.
4. Performs Step 1 of CSO Search/Rescue Circles the term "is not", and checks the Sat/Unsat Operations Checklist. "COMPLETE" block.
5. Performs Step 2 of CSO Search/Rescue Enters'a i*ntance in the blank space Sat/Unsat Operations Checklist. provided, and checks the "COMPLETE" block
6. Performs Step 3 of CSO Search/Rescue , Enters "Maintenance" in the blank space Sat/Unsat Operations Checklist. provided, and checks the "COMPLETE" block. 'P,. h. S Exam A JPM RO A4 3

Performance SteDs Standzrd *roA*

NOTE: If asked by the candidate, indicate that the last known location of the missing individual was Elevation 250' of the Turbine Building.

7. Performs Step 4 of CSO Search/Rescue "* Enters "Elevation 250' of the Turbine Sat/Unsat Operations Checklist. Building" in the blank space provided.

"* Checks the "COMPLETE" block.

8. Performs Step 5 of CSO Search/Rescue Because the individual has not been located Sat/Unsat Operations Checklist. yet, checks the "N/A" block OR skips the step until the individual is located.
9. Performs Step 6 of CSO Search/Rescue Enters "NONE" in the blank space provided Sat/Unsat Operations Checklist. OR checks the "N/A" block.
10. Performs Step 7 of CSO Search/Rescue S Notifies SSS of missing individual.

Pass/Fail Operations Checklist. 0 Checks the "COMPLETE" block.

Cue: As the SSS, acknowledge report of a missing individual.

11. Performs Step 8 of CSO Search/Rescue
  • Notifies Maintenance Supervisor of Pass/Fail Operations Checklist. missing i vidual
  • Enters Maintenance" in the blank space provided
  • Checks the "COMPLETE" blook.

Cue: As the Maintenance Supervisor, acknowledge report of missing individual.

12. Performs Step 9 of CSO Search/Rescue "* Notifies Security of missing individual, Pass/Fail Operations Checklist. requests that an ACAD be run.

"* Checks the "COMPLETE" block.

Cue: As security, acknowledge report of missing individual and ACAD run request.

Cue: As security, inform the candidate that the results of the ACAD run indicate that the individual is still on-site.

13. Performs Steps 9.a and 9.b of CSO "* Checks the "N/A" block of Step 9.a.

Sat/Unsat Search/Rescue Operations Checklist. "* Checks the "COMPLETE" block.

14. Performs Step 10 of CSO Search/Rescue "* Pages missing individual using the Merge Pass/Fail Operations Checklist. Mode to have them contact the Unit 1 Control Room. 0

"* Checks the "COMPLETE" block.

Cue: If asked, inform the candidate that the missing individual did NOT respond.

Exam A JPM RO A4 4

Performance Steps Standard Grade

15. Performs Step 11 of CSO Search/Rescue 0 Waits 2 minutes.

Sat/Unsat Operations Checklist. 0 Checks the "COMPLETE" block.

16. Performs Step 12 of CSO Search/Rescue "* Re-pages missing individual using Merge Pass/Fail Operations Checklist. Mode to have them contact the Unit I Control Room. q , -, -4c,,

"* Checks the "COMPLETE" block.

Cue: If asked, inform the candidate that the missing individual did NOT respond.

17. Performs Step 13 of CSO Search/Rescue Waits an additional 2 minutes, then performs Pass/Fail Operations Checklist. the following:
  • Sounds the Unit 1 station alarm.
  • Checks the "COMPLETE" block.
  • Makes the following announcement using the Merge Mode:

"Attention,Attention allpersonnel, This is not a Drill, if anyone know the.

present location of "Maintenance" ' -,)

please contact the Unit I Control Room. I repeat this is not a drill"

  • Checks the "COMPLETE" block.
  • Repeats the sounding of the station alarm and the announcement,
  • Checks the "COMPLETE" block.
  • Leaves Gaitronics in Merge Mode.
  • Checks the "COMPLETE" block.
18. Performs Step 14 of CSO Search/Rescue Performs the following: Pass/Fail Operations Checklist. S Sounds the Unit 1 station alarm.

S Checks the "COMPLETE" block.

0 Makes the following announcement using the Merge Mode:

"Attention,Attention allpersonnel, This is not a Drill, The Fire Brigade shall reportto the ControlRoom for Search and Rescue Operations" I repeat this is not a drill" 0 Checks the "COMPLETE" block.

0 Repeats the sounding of the station alarm and the announcement.

0 Checks the "COMPLETE" block.

S Leaves Gaitronics in Merge Mode.

S Checks the "COMPLETE" block.

19. Performs Step 14.a of CSO Search/ Rescue Checks all "N/A" blocks in Step 14.a. Sat/Unsat Operations Checklist.

Exam A JPM RO A4 5

Performance Steps Standard Grade Perfrmace SepsStanardGrade

20. Performs Step 15 of CSO Search/Rescue Directs Search and Rescue Team Leader to Pass/Fail Operations Checklist. coordinate search and rescue activities with Security until individual is located.

Cue: As the Search and Rescue team leader, acknowledge direction to coordinate search and rescue activities with Security until individual is located.

Cue: As Search and Rescue Team Leader, Inform the candidate that offsite assistance is required.

21. Performs Step 16 of CSO Search/Rescue Performs the following: Pass/Fail Operations Checklist. "* Contacts Oswego County 911 Center using phone at 343-1313 OR by radio.

"* Checks the "COMPLETE" block.

"* Notifies Security of request for offsite assistance.

"* Checks the "COMPLETE" block.

Cue: As Oswego County 911 Center, acknowledge request for rescue assistance.

Cue: As Security, acknowledge report of request for offsite assistance.

Cue: Wait 2 minutes, and as the Search and Rescue Team Leader, inform the candidate that the missing individual has been located and is fine.

22. If the candidate previously skipped Step 5 "* Enters "fine" (or similar) in the blank Sat/Unsat of the CSO Search/Rescue Operations space provided.

Checklist, they should return to Step 5 and "* Checks the "COMPLETE" block.

complete it at this time.

23. Performs Step 17 of CSO Search/Rescue "* Notifies the Unit 2 CSO that the missing Pass/Fail Operations Checklist. individual has been located.

"* Checks the "COMPLETE" block.

Cue: As the Unit 2 CSO, acknowledge the report that the missing individual has been located.

Exam A JPM RO A4 6

Performance Steos Standard t-'.r.clo PromneSesStandard C~,i rI

24. Performs Step 18 of CSO Search/Rescue Performs the following: Pass/Fail Operations Checklist. 0 Sounds the Unit 1 station alarm.

0 Makes the following announcement using the Merge Mode and checks the "COMPLETE" block:

"Attention, attention allpersonnel, This is not a drill, Search andRescue operationsare completed. I repeat Search and Rescue operations are completed" 0 Checks the "COMPLETE" block.

0 Removes Gaitronics from Merge Mode.

S Checks the "COMPLETE" block Cue: As the SSS, inform the candidate to terminate from Search and Rescue operations.

26. Performs Step 20 of CSO Search/Rescue Checks the "COMPLETE" block and routes Sat/Unsat Operations Checklist. CSO Search/Rescue Operations Checklist to EP Department.

Cue: Acknowledge routing of CSO Search/Rescue Operations Checklist to EP Department.

Terminating Cue: Identifies routing of CSO Search/Rescue Operations Checklist to EP Department.

RECORD STOP TIME Exam A JPM RO A4 7

Initial Conditions:

1. You are the CSO
2. The plant is operating at rated power with all systems operating normally
3. A Maintenance worker contacts the Control Room to report that one of his co-workers is missing Initiating Cues:

"(Operator's name), Perform appropriate actions for the CSO in response to the report of the missing person."

Exam A JPM RO A4 8

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Nine Mile Point # I Date of Examination: 09/30/2002 Examination Level (circle one): RO Operating Test Number: Cat A Test B Administrative Topic/Subject Describe method of evaluation:

Description 1. ONE Administrative JPM, OR

2. TWO Administrative Questions A. I Plant Startup 2.1.7,2.1.20 Activities JPM - RPV Level Verification.

Reference:

N 1-OP-43A A. I Conduct of Operations 2.1.1,2.1.3 Q. 1. You are a licensed reactor operator and just returned to the station from a three-month (January-March of this year) assignment at INPO in Atlanta.

Your last stood watch on December 1 of last year.

What requirements must be met before you assume the shift as CSO?

References:

S-ODP-TQS-0101 2.1.1, 2.1.2 Q.2. Given the following:

"*This is Day 2 of your 4-Day rotation (12-hour days).

"*During your shift, a complex evolution is started but can not be completed.

"*As the ATC RO you are requested to stay over two hours to complete the evolution.

What are the administrative requirement(s) to allow you to complete this evolution?

References:

GAP-FFD-02 Section 3.3.2 A.2 Equipment 2.2.13 Control JPM -- Develop a Clearance Boundary

References:

GAPS-OPS-02, C-18016-C Draft Exam Submittal Document Aug 2002 Exam B NMPI Section A Outline NEW.doc

A.3 ALARA 2.3.2 Q.1. Given the following:

"* A Cleanup System Pump seal failure has resulted in isolation of the system.

"* A RWP has been developed to allow inspection and local isolation of the pump.

"* The ALARA review indicates an estimated exposure of 1.5 REM.

"* The required ALARA reviews and pre-job briefing are completed prior to entry.

"* Upon completion of the local isolation, the total job exposure is 2.5 REM due to difficulty closing an isolation valve.

What additional ALARA actions, if any, are required for this situation?

References:

S-RAP-ALA-0102 A.3 Radiation Work 2.3.10 Permit Q.2 The plant is at rated power, with the following:

"* TIP traces are in progress for LPRM calibration

"* As TIP detector #3 is being withdrawn from the core, the drive mechanism fails with the detector in the TIP Room but not yet in its chamber shield

"* The SSS has directed that the detector be withdrawn to the chamber shield using the manual handcrank, if possible

"* The SSS has determined that no emergency or urgent operational conditions exist, and has directed a brief entry into the TIP Room to ensure no mechanical interference exists in the associated TIP drive tube.

"* Inner TIP Room Area Radiation Monitors are in an alarmed condition

a. What individual(s) is(are) responsible for approving entry into the TIP Room?
b. Identify locations where the operator can get a key that will grant access to the TIP Room, during emergency and non-emergency conditions?

References:

GAP-RPP-08 Sections 3.2, 3.3, and 3.5; GAP-RPP-02 Section 3.7 A.4 Emergency Plan 2.4.29 JPM - Contaminated Injured Worker requiring transport to Oswego Hospital.

References:

EPIP-EPP-04 Draft Exam Submittal Document Aug 2002 Exam B NMPI Section A Outline NEW.doc

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

RPV Level Verification Revision: 0 Task Number:

Approvals:

/ c171o /

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee) 6/

Configuration Control Date Performer: (RO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 15 min. Time Critical Task: No Alternate Path Task:

No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if.any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

NRC Administrative Exam B RO/JPM A. 1.1 I- August 2002

Recommended Start Location: (Completion time based on the start location)

Any designated site.

Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:

0 Self verification shall be demonstrated.

3. During Training JPM:

"* Self verification shall be demonstrated.

"* No other verification shall be demonstrated.

References:

1. N1-OP-43A
2. NUREG K/A General Knowledges and Abilities 2.1.7 (3.7)/2.1.20 (4.3)

Tools and Equipment:

1. None Task Standard:

Verify RPV level indications during startup.

NRC Administrative Exam B RO/JPM A. 1.1 August 2002

Initial Conditions:

1. A plant startup is in progress following refueling.
2. RPV Level Instrumentation Backfill has been removed from service at 0800 today.
3. 28.1-02, BV-REF LEG FILL 1 / 2 FLTRS-HDR INLET is closed.
4. At 1200 today the following computer point indications are observed:

"* Computer Point D377 Reactor Water Lvi (11) is indicating 72 inches.

"* Computer Point D378 Reactor Water LvI (12) is indicating 78 inches.

Initiating Cues:

1. "(Operator's name), determine operability of RPV water level instruments and inform the SSS of your determination."

Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O 1/Operations Manual) providing correctionif necessary RECORD START TIME
2. Obtain a copy of the reference procedure and N1-OP-43A is obtained. Sat/Unsat review/utilize the correct section of the procedure. Step 1.31 and Attachment 10 are identified as Sat/Unsat correct steps.
3. Determines that Attachment 10 requires
  • Reviews Step 1.31 and executes step Sat/Unsat completion. 1.31.3 to complete Attachment 10.

CUE: When Attachment 10 is identified as requiring completion hand candidate the marked up Attachment 10.

4. Determines the RPV Level Mismatch. "* Records Time as 1200. Sat/Unsat

"* Records Computer Point D377 as 72 inches. Sat/Unsat

"* Records Computer Point D378 as 78 inches. Sat/Unsat

"* Calculates Deviation D378 - D377 as 6 inches. Pass/Fail

"* Determines Mismatch between original deviation and current deviation as 5 Pass/Fail inches.

"* Determines Mismatch is > 4 inches and Pass/Fail UNSAT.

NRC Administrative Exam B RO/JPM A. 1.1 August 2002

Performance Steps Standard Grade Pe c S.re Reviews Note 3 of Attachment 10 and

5. Determines ADS, HPCI, and FZWL must be determines that ADS, HPCI, and FZWL must Pass/Fail declared inoperable. be declared inoperable.
6. Informs SSS of results of RPV Level Informs SSS that RPV Level Verification is Sat/Unsat Verification.. Unsat and LCOs for ADS, HPCI, and FZWL must be entered CUE: As the SSS acknowledge the results of the RPV Level Verification and required LCO entries.

Terminating Cue: Completed N1-OP-43A Attachment 10 RPV Level Verification and informed SSS of required entries into LCOs for ADS, HIPCI and FZWL.

RECORD STOP TIME NRC Administrative Exam B RO/JPM A. 1.1 August 2002

Initial Conditions:

1. A plant startup is in progress following refueling.
2. RPV Level Instrumentation Backfill has been removed from service at 0800 today.
3. 28.1-02, BV-REF LEG FILL 1 / 2 FLTRS-HDR INLET is closed.
4. At 1200 today the following computer point indications are observed:

"* Computer Point D377 Reactor Water Lvl (11) is indicating 72 inches.

"* Computer Point D378 Reactor Water Lvl (12) is indicating 78 inches.

Initiating Cues:

1. "(Operator's name), determine operability of RPV water level instruments and inform the SSS of your determination."

NRC Administrative Exam B RO/JPM A. 1.1 August 2002

Nine Mile Point I Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A" Test: B Examination Level RO Administrative Topic A. 1 Subject

Description:

Conduct of Operations Question Number: 1 Question:

You are a icensed reactor operator and have just returned to the station from a three month (January-March of this year) assignment at INPO in Atlanta. You last stood watch on December 1 of last year.

What requirements must be met before you may assume the shift as the CSO?

SAT UNSAT Answer:

Step 3.9, Inactive License Holders, of the S-ODP-TQS-0101 Administrative Controls for Maintaining Active License Status at Nine Mile Point, states "Inactive license holders shall be certified by the Manager Operations to have met the conditions of 10 CFR55.53(f) by a License Reactivation Form Attachment 4"

" Qualification and status of the license of licensee are current:

- Meet requalification-training requirements per NTP-TQS-102.

- Be currently trained on use SCBA.

- Have a current SCBA fit test on file.

- Have a current Scott Full Face fit test on file.

- Have a current NRC-396 on file (NRC Medical examination)

- Have a current respiratory physical examination on file.

- Have corrective lenses available for use in Scott Air Paks.

- Logged in SSS log.

"* A minimum of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of shift functions under the direction of an operator in the position to which the operator will be assigned is completed. The 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> must include a complete tour of the plant AND review of all shift turnover procedures.

The 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> shall be in the same calendar quarter.

ITechnical Reference(s):

S-ODP-TQS-0101 KIA #: Importance:

2.1.1 3.7 2.1.3 3.0 Comments:

Nine Mile Point I Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A"Test: B Examination Level RO Administrative Topic A. 1 Subject

Description:

Control Of Working Hours Question Number: 2 Question:

Given the following:

"* This is Day 2 of your 4-Day rotation (12-hour days).

"* During your shift, a complex evolution is started but can not be completed.

"* As the ATC RO you are requested to stay over two hours to complete the evolution.

What are the administrative requirement(s) to allow you to complete this evolution?

SAT UNSAT Answer:

An Overtime Deviation Request form would have to be filled out and approved to allow completion of the assignment because 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period would be exceeded.

Step 3.2.1 of GAP-FFD-02, Control of Working Hours, states "Individuals identified in Section 1.1 should not be permitted to work, excluding shift turnover time and non working lunch breaks, more than:

  • 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight
  • 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period
  • 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period
  • 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period.

Technical Reference(s):

GAP-FFD-02, Section 3.3.2 KIA #.. Importance:,

2.1.1 3.7 2.1.2 3.0 Comments:

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Develop a Clearance Boundary CRD Pump 11 Oil Coolers Cooling Water Relief Valve Revision: 0 Task Number: 299-902-03-50-3-00 -- Developing Clearance Boundaries Approvals:

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

Configuration Control Date Performer: (RO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 15 min. Time Critical Task: No Alternate Path Task:

No Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

NRC Administrative Exam B RO/JPM A.2.1 - I- August 2002

Recommended Start Location: (Completion time based on the start location)

Main Control Room or other designated site.

Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:
  • Self verification shall be demonstrated.
3. During Training JPM:

"* Self verification shall be demonstrated.

"* No other verification shall be demonstrated.

References:

1. GAP-OPS-02
2. C-18016C
3. NUREG K/A General Knowledges and Abilities 2.2.13 (3.6)/2.1.24 (2.8)

Tools and Equipment:

1. None Task Standard:

Develop a Clearance boundary.

NRC Administrative Exam B RO/JPM A.2.1 August 2002

Initial Conditions:

1. The Plant is operating at 100%.
2. Maintenance has requested a Clearance be placed on 28-24 PSV-CRD PUMP 11 OIL COOLERS COOLING WATER RELIEF VALVE.
3. The SSS has just handed you the Clearance Request Form for this job.
4. CRD PUMP 11 is shut down and CRD PUMP 12 is operating. rip Ini tiating Cues:
1. Provide candidate with Attachment 5, Clearance Request Form an lank Tag List, Attachment 7
2. "(Operator'sname), Develop a Clearance boundary for the requ ted Clearance. bxtb he-appripriateT;2 b a ,rarern ,dr iList.

Return the cohp.eted Tag List to the SSS for review." o Performance Steps Standard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O 1/Operations Manual) providingcorrection if necessary RECORD START TIME
2. Obtain a copy of the reference procedure and GAP-OPS-02 is obtained. Sat/Unsat review/utilize the correct section of the procedure. C-18016-C is referenced Sat/Unsat
93. Indicate power supplies needed for
  • Includes 28-15 control switch CRD pump Clearance boundary. 11 (Reference Tag) Sat/Unsat
  • Includes 28-15 CLOSE FUSE installed in OFF position. Pass/Fail
  • 28-15 MTR BKR -11 CRD PMP breaker in DISCONNECT. Pass/Fail
  • 28-15 TRIP FUSE installed in OFF position. Pass/Fail NRC Administrative Exam B RO/JPM A.2.1 August 2002

Standard Grade Performance Step~s Sadrrd

.4. Indicate valves needed for Clearance 0 Includes 53-17 CRD-27 BV-11 CRD Pass/Fail boundary. Pump Suction closed.

  • Includes 28-31 CRD- 1 STOP CK - 11 CRD PUMP DISCHARGE TO CRD SYS Pass/Fail closed.
  • Includes 28.1-38 CRD-45 BV-GEMAC REF LEG FILL FROM 11 CRD PMP Pass/Fail closed.

0 53-26 CRD-3 STOP CK-1 1 CRD PUMP MIN FLOW RECIRC TO CST closed. Pass/Fail

  • Includes 53-18 CRD-73B BV-11 CRD NOTE: Since the Pump Casing Drain is not PUMP BRG & OIL CLG WATER indicated on the print the operator may elect RETURN (Note: 73A and 75B may be Pass/Fail to place a NOTE on the Clearance indicating used in lieu of 73B) d ( -/;cI the system is not drained in lieu of the casing
  • Includes 28-06 VENT 11 CRD PUMP drain being listed. Pass/Fail open, 28-07 VENT 11 CRD PUMP open.

0 CRD Pump 11 Casing Drain removed. Sat/Unsat CUE: If SSS permission is requested to use TCV 28-23 as an isolation boundary, permission is DENIED.

5. Return the Tag List Attachment 7 to the Returns Attachment 7 to the SSS. Sat/Unsat SSS.

CUE: As the SSS acknowledge the receipt of the Tag List.

Terminating Cue: Completed GAP-OPS-02 Tag List, Attachment 7 is returned to the SSS.

RECORD STOP TIME NRC Administrative Exam B RO/JPM A.2.1 August 2002

Initial Conditions:

1. The Plant is operating at 100%.
2. Maintenance has requested a Clearance be placed on CRD Pump 11 Oil Coolers Cooling Water Relief Valve 28-24 PSV.
3. The SSS has just handed you the Clearance Request Form for this job.
4. CRD Pump 11 is secured and CRD Pump 12 is in service.

Initiating Cues:

1. Provide candidate with Attachment 5, Clearance Request Form and Blank Tag List, Attachment 7
2. "(Operator's name), Develop a Clearance boundary for the requested Clearance. Indicate the appropriate boundaries, vents/drains, power supplies, and required positions for a safe clearance on a Tag List. Return the completed Tag List to the SSS for review."

NRC Administrative Exam B RO/JPM A.2.1 August 2002

Nine Mile Point I Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A" Test: B Examination Level RO Administrative Topic A.3 Subject

Description:

ALARA Question Number:

Question:

Given the following:

"* A Cleanup System Pump Seal failure has resulted in isolating the system.

"* A RWP has been developed to allow inspection and local isolation of the pump.

"* The ALARA review indicates an estimated exposure of 1.5 REM.

"* The required ALARA reviews and pre-job briefing are completed prior to entry.

"* Upon completion of the local isolation, the total job exposure is 2.5 REM due to difficulty closing an isolation valve.

What additional ALARA actions, if any, are required for this situation?

SAT UNSAT Answer: 4 0, ALAI-A RbEVIEW,, requires a post job ALARA review oLCP 0.0. IA) 01 0-rt-%r-/-*-u- iuz on jobs that exceed the estimate exposure by 1.5. The total exposure for this job is greater than 1.5 times the estimate (1.5x 1.5 = 2.25) and a post job ALARA review is required.

Technical Reference(s):

S-RAP-ALA-01 02 K2A #: mportancej 2.3.2 2.5

Nine Mile Point 1 Category "A" - Examination Outline Cross Reference Operating Test Number Cat "A" Test: B Examination Level RO Administrative Topic A.3 Subject

Description:

Radiation Work Permit Question Number: 2

[Question:

The plant is at rated power, with the following:

"* TIP traces are in progress for LPRM calibration

"* As TIP detector #3 is being withdrawn from the core, the drive mechanism fails with the detector in the TIP Room but not yet in its chamber shield

", The SSS has directed that the detector be withdrawn to the chamber shield using the manual handcrank, if possible

"* The SSS has determined that no emergency or urgent operational condition exist, and has directed a brief entry into the TIP Room to ensure no mechanical interference exists in the associated TIP drive tube

"* Inner TIP Room Area Radiation Monitors are in an alarmed condition

a. What individual(s) is(are) responsible for approving entry into the TIP Room?
b. Identify locations where the operator can get a key that will grant access to the TIP Room, during emergency and non-emergency conditions?

SAT UNSAT Answer:

a. For the conditions given, the SS.and RP Supervision must approve entry into the TIP Room.
b. Because no emergency exists, the operator must obtain the key from the Radiation Protection Department. During emergency conditions, SSS may authorize use of the master keys in the "break-to-enter" key box located in the Control Room.

ITechnical Reference(s):

GAP-RPP-08 Sections 3.2, 3.3, and 3.5; GAP-RPP-02 Section 3.7 KIA #: IImportance:

2.3.10 2.9 Comments:

("

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Medical Emergency (CSO Actions) Revision: 0 Contaminated Injured Worker Requiring Transport to Oswego Hospital Task Number:

Approvals:

General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

M# IŽAA  !ý6cqgN\)

Configuration Control Date Performer: (RO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant Simulator Expected Completion Time: 10 min Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature: Date:

Exam B JPM RO A4 -I- August 2002

Recommended Start Location: (Completion time based on the start location)

Main Control Room or any other appropriate location with proper references.

Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SSS / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SSS / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated. Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a 0".
2. During Evaluated JPM:

0 Self verification shall be demonstrated.

3. During Training JPM:

"* Self verification shall be demonstrated.

"* No other verification shall be demonstrated.

References:

1. EPIP-EPP-04, Personnel Injury Or Illness Tools and Equipment:

None Exam B JPM RO A4 August 2002

Task Standard:

Performs the CSO actions of EPIP-EPP-04 including the CSO Checklist for a medical emergency in response to a contaminated injured worker requiring medical attention and transport to a medical facility.

Initial Conditions:

1. You are the CSO.
2. The unit is in a refueling outage with fuel movements in progress.
3. The Fuel Handling SRO notifies you that an operator fell about 3 feet from the refueling bridge to the floor.
4. The injured worker is currently unconscious, has a compound fracture of leg right leg, and is bleeding from the head.

Initiating Cues:

"(Operator's name), Perform required CSO actions for this event."

Performance Steps Standard Grade l

1. Provide repeat back of initiating cue. Proper communications used for repeat back Sat/Unsat EvaluatorAcknowledge repeat back (GAP-OPS-O 1/Operations Manual) providing correction if necessary.

RECORD START TIME

2. Obtains a copy of the reference procedure Obtains EPIP-EPP-04. Sat/Unsat and reviews/utilizes the correct section of References Section 3.1 and Attachment 1, CSO the procedure. Medical Emergency Checklist.
3. Fills out top two sections of CSO Medical Enters "NAME", "DATE", checks the Sat/Unsat Emergency Checklist. "UNIT 1" block, "TIME OF NOTIFICATION" and "LOCATION OF MEDICAL EMERGENCY" (Refuel Floor).

NOTE: During the performance of this JPM, if the candidate makes emergency announcements using the GAItronics, the GAItronics must always be placed in the Merge Mode.

4. Performs Step I of CSO Medical " Notifies Fire Brigade by phone, radio, OR Pass/Fail Emergency Checklist. GAItronics to request response.

"* Checks the "COMPLETE" block.

5. Performs Step 2 of CSO Medical 0 Notifies SSS of medical emergency.

Pass/Fail Emergency Checklist. 0 Checks the "COMPLETE" block.

Cue: Acknowledge the report as SSS.

Exam B JPM RO A4 August 2002

Performance Steps Standard Grade Cue: As the Fire Brigade Leader, report that the Fire Brigade is at the scene. Report that the worker is contaminated Request RP and medical assistance. Request an ambulance, and have the hospital setup the Radiation Emergency Area (REA).

6. Performs Step 3.A of CSO Medical

"* Contacts RP and directs them to report to Pass/Fail Emergency Checklist. the Refuel Floor

"* Checks the "COMPLETE" block Cue: As Radiation Protection, acknowledge direction to report to Refuel Floor.

7. Performs Step 3.B.1 of CSO Medical "* Contacts Oswego County 911 Center using Pass/Fail phone at 343-1313 and requests an Emergency Checklist.

ambulance be sent to the Nine Mile Point Unit 2 Security Access

"* Notifies Oswego County 911 Center that injured person is potentially contaminated

"* Checks the "COMPLETE" block Cue: As Oswego County 911 Center acknowledge the request/report

"* Contacts Site Security Supervisor and Pass/Fail

8. Performs Step 3..B.2 of CSO Medical requests a security force member be sent to Emergency Checklist.

the Refuel Floor, and provides information relative to pending arrival of ambulance.

"* Checks the "COMPLETE" block.

Cue: As Site Security Supervisor, acknowledge request/report.

9. Performs Step 3.B.3 of CSO Medical

"* Contacts Oswego Hospital using phone at Pass/Fail 349-5522.

Emergency Checklist.

"* Checks the "COMPLETE" block.

"* Informs Oswego Hospital that there is one patient.

"* Checks the "COMPLETE" block.

"* Requests Oswego Hospital setup an REA

"* Checks the "COMPLETE" block.

"* When requested, informs Oswego Hospital Sat/Unsat Cue: Role-play as Oswego Hospital and request status of patient. that patient is currently unconscious, has a compound fracture of leg right leg, and is Cue: Role-play as Oswego Hospital and bleeding from the head.

request that RP accompany patient to the "* Acknowledges Oswego Hospital request hospital. for RP to accompany patient to hospital.

"* Contacts Medical Department by phone, Pass/Fail

10. Performs Step 3.C of CSO Medical radio, OR GAItronics.

Emergency Checklist.

"* Checks the "COMPLETE" block.

Exam B JPM RO A4 August 2002

Performance Steps Standard Grade Cue: As Medical Department, acknowledge request.

11. Performs Step 3..D of CSO Medical

" Determines NMPC vehicle will NOT be Pass/Fail Emergency Checklist. needed (ambulance is on the way).

"* Checks the "N/A" block.

12. Performs Step 3.E of CSO Medical "* Requests the SSS contact the RP on-call Pass/Fail Emergency Checklist. supervisor and request that RP supervision and an RP Technician report to the hospital.

" Checks the "COMPLETE" block.

Cue: Acknowledge the request as SSS.

Cue: Inform CSO that RP on-call supervisor has been contacted.

13. Performs Step 3.F of CSO Medical

"* Directs Site Security Supervisor to contact Pass/Fail Manager, Nuclear Communications and Emergency Checklist.

Public Affairs and provide details of the incident.

"* Checks the "COMPLETE" block.

Cue: As Site Security Supervisor, acknowledge the direction.

Cue: As the Fire Brigade Leader, report that the worker is in the ambulance with RP and the ambulance has left the protected area.

14. Performs Step 3.G of CSO Medical "* Informs the SSS that the medical Pass/Fail Emergency Checklist. emergency has been terminated,

"* Checks the "COMPLETE" block.

Cue: Acknowledge the report as SSS.

Terminating Cue: Completion of CSO Medical Emergency Checklist.

RECORD STOP TIME Exam B JPM RO A4 August 2002

Initial Conditions:

1. You are the CSO.
2. The unit is in a refueling outage with fuel movements in progress.
3. The Fuel Handling SRO notifies you that an operator fell about 3 feet from the refueling bridge to the floor.
4. The injured worker is currently unconscious, has a compound fracture of leg right leg, and is bleeding from the head.

Initiating Cues:

"(Operator's name), Perform required CSO actions for this event."

Exam B JPM RO A4 August 2002