ML023190043
| ML023190043 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 10/30/2002 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML023190043 (10) | |
Text
Oct.
30, 2002 C
V.'-
MANUAL HARD COPY DISTRIBUTION Page 1
of 1 33<
DOCUMENT TRANSMITTAL 2002-48920 USER INFORMATION:
XL*A+/-iv'Aur 3
EMPL#:23244 CA#:
0363 A-d-dress:
NUCSA2 Phone#: 254-3658 TRANSMITTAL INFORMATION:
O:
FLAIMXLAutM7L I"
10/30/2002 LOCATION:
-USNRC -i FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) x....AHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE:
10/11/2002 ADD MANUAL TABLE OF CONTENTS DATE:
10/29/2002 CATEGORY:
DOCUMENTS TYPE:
TRM ID:
TRM2 REPLACE:
REV:N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
A00DI
TRM APPROVED AMENDMENT TO UNIT 2 TECHNICAL REQUIREMENTS MANUAL EFFECTIVE DATE 10/4/02 Replace the following pages of the Technical Requirements Manual with the enclosed pages.
The revised pages are identified by Effective Date and contain vertical lines indicating the area of change.
REMOVE PAGES EFFECTIVE INSERT PAGES EFFECTIVE DATE DATE TRM / 2.0-9 04/1211999 TRM / 2.0-9 09/06/2002 TRM / 1.0-1 through 1.0-3 8/31/1998 TRM / 1.0-2 10/04/2002
A,
.SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title TOC 1.0 2.0 3.0 3.1 3.2 3.3 Effective Date TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 04/02/2002 08131/1998 10/04/2002 08/3111998 08/31/1998 06125/2002 04/12/1999 08/30/2001 09/06/2002 04/12/1999 06/16/2000 PLANT PROGRAMS Pages 2.0-1 Page TRM / 2.0-2 through TRM / 2.0-4 Pages TRM / 2.0-5 through TRM / 2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Pages TRM / 2.0-10 through TRM /2.0-12 Page TRM / 2.0-13 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2e_\\
Page TRM /3.0-3 Page TRM /3.0-4 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3 11-_6, Pages TRM /3.1-7 aridTRM /'3.1-8 Pages TRM / 3.1-9 nd TRM/,3.1-9a
- Page TRM / 3.1-*
Pages 3.1-11 'Throug h 3,11l 3 CORE OPERATING -LIMITS REPORT Pages',TRM /h3.2-2 through TRM /3.2-28 IN STRUMENTATION
_Pages TRM / 3.3-1 through TRM /3.3-3
"\\Page TRM / 3.3-4 Pages 3.3-5 through 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Pages TRM / 3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 through TRM / 3.3-15 Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-20 Pages 3.3-21 and 3.3-22 Pages TRM / 3.3-23 through TRM / 3.3-25 "04/08/1999 03/15/2002
.04/08/1999 08/31/1998 06/05/2002 02/18/1999 02/18/1999 08/31/1998 08/31/1998 03/26/2001
-07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 03/30/2001 12/14/1998 06/27/2001 06/14/2002 12/14/1998 08/31/1998 04/02/1999 EFFECTIVE DATE 10/04/2002 y
11" SUSQUEHANNA - UNIT 2 TRM /LOES-1
SUSQUEHANNA STEAM ELECTRIC STATION rLIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.4 3.5 3.6 3.7 3.8 Effective Date REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 10/23/1998 08/31/1998 08/31/1998 04/17/2000 08/31/1998 08/31/1998 01/07/2002 08/31/1998 07/06/2000 02/12/1999 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Page 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-8 Page TRM / 3.6-9 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-33 Pages TRM / 3.7-34 through TRM / 3.7-36 Pages 3.7-37 through 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Pages 3.7-43 through 3.7-48 Pages TRM / 3.7-49 and TRM / 3.7-50 Page TRM / 3.7-51 Pages TRM / 3.7-52 and TRM / 3.7-53 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Pages 3.8-3 and 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-8 Page TRM / 3.8-9 Page 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-11a Pages 3.8-12 through 3.8-14 Pages TRM / 3.8-15 through TRM /3.8-17 Page 3.8-18 Page TRM / 3.8-19 07/29/1999 08/31/1998 08/02/1999 01/21/2000 08/02/1999 11/16/2001 02/01/1999 08/31/1998 08/11/2000 08/31/1998 10/13/1998 03/09/2001 07/05/2000 07/29/1999 04/02/2002 08/31/1998 04/02/2002 08/31/1998 08/24/2001 08/31/1998 04/02/2002 04/02/2002 08/31/1998 04/02/2002 02/01/1999 04/02/2002 EFFECTIVE DATE 10/04/2002 SUSQUEHANNA -UNIT 2
-TRM / LOES-2
.SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 through 3.11-21 Pages TRM / 3.11-22 through TRM / 3.11-24 Pages 3.11-25 through 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 Effective Date 02/01/1999 0610611999 08/3111998 08/3111998 08/30/1998 09/1312002 06/0512002 04/07/2000 corrected 04/17/2002 08/31/1998 09/01/1998 08/31/1998 04/02/2002 09/01/1998 08/31/1998 02/05/1999 08/31/1998 EFFECTIVE DATE 10/04/2002 3.9 3.10 3.11 3.12 4.0 SUSQUEHANNA -UNIT 2 TRM I LOES-3
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3/4! ;
APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 Pages B 3.1-9 and B 3.1-10 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 03/15/2002 07/13/1999 08/31/1998 07/13/1999 02/18/1999 08/31/1998 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM/B 3.3-1 Page B 3.3-2 Page TRM/B 3.3-3 and TRM / B 3.3-3A Page TRM / B 3.3-4 Pages TRM / B 3.3-5 and TRM / B 3.3-5a Page TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b
-Page B 3.3-15 Page TRM/B 3.3-16 Pages B 3.3-17 through B 3.3-20 Pages TRM / B 3.3-21 through TRM I B 3.3-23 B 3.4' REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 B 3.6 04/07/2000 08/31/1998 12/29/2000 01/07/2002 12/17/1998 12/17/1998 03/30/2001 08/31/1998 06/25/2002 06/14/2002 06/14/2002 08/31/1998 04/07/2000 08/31/1998 04/02/1999 08/31/1998 10/15/1999 08/31/1998 08/31/1998 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Pages TRM / B 3.6-6 through TRM / B 3.6-9 07/26/2001 02/01/1999 08/3111998 09/23/1999 01/07/2002 05/25/2001 EFFECTIVE DATE 10/04/2002 B 3.0 B3.1 B 3.2 SUSQUEHANNA -UNIT 2 TRM / LOES-4
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM I B 3.7-10a Pages TRM / B 3.7-11 through TRM / B 3.7-14 Page TRM / B 3.7-14a Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 through TRMIB 3.7-21a Page TRM/B 3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM / B 3.7-32 Page TRM / B 3.7-33 Pages TRM / B 3.7-34 and TRM / B 3.7-35 B 3.8 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 Page TRM I B 3.8-2a Page TRM I B 3.8-3 Page TRM / B 3.8-3a Page TRM I B 3.8-4 Page TRM I B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-17 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Page TRM / B 3.10-6 and TRM /3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-a1 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a 08/31/1998 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 02/01/1999 08131/1998 05/11/2001 04/07/2000 08131/1998 03/09/2001 07/29/1999 07/05/2000 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/3111998 10/23/1998 08/31/1998 09/13/2002 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 11/01/1999 02/01/1999 08/31/1998 04/02/2002 04/02/2002 EFFECTIVE DATE 10/04/2002
-SUSQUEHANNA - UNIT 2 TRM / LOES-5
..SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Titre '
Effective Date Pages TRM / B 3.11-21 through TRM / B 3.11-23 Page TRM / B 3.11-23a Pages B 3.11-24 Page TRM / B 3.11-25 Pages B 3.11-26 through TRM / B 3.11-35 Pages TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 04/02/2002 04102/2002 08/31/1998 11/01/1999 08/31/1998 02/12/1999 02/05/1999 EFFECTIVE DATE 10/04/2002 SUSQUEHANNA -UNIT 2 TRM / LOES-6
1/4,
2?'
'
'A 1.0 USE AND APPLICATION 1.1 Definitions (continued)
SITE BOUNDARY SOLIDIFICATION SOURCE CHECK UNRESTRICTED AREA VENTILATION EXHAUST TREATMENT SYSTEM The SITE BOUNDARY shall be that line beyond which the land is not owned, leased, or otherwise controlled by the licensee. See FSAR Section 2.1.1.2.
SOLIDIFICATION shall be the conversion of radioactive wastes from liquid systems to a homogeneous (uniformly distributed), monolithic, immobilized solid with definite volume and shape, bounded by a stable surface of distinct outline on all sides (free-standing).
A SOURCE CHECK shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source.
An UNRESTRICTED AREA shall be any area at or beyond the SITE BOUNDARY access to which is not controlled by the licensee for purposes of protection of individuals from exposure to radiation and radioactive materials, or any area within the site boundary used for residential quarters or for industrial, commercial, institutional, and/or recreational purposes. See FSAR Section 2.1.1.3.
A VENTILATION EXHAUST TREATMENT SYSTEM shall be any system designed and installed to reduce gaseous radioiodine or radioactive material in.particulate form in effluents by passing ventilation or vent exhaust gases through charcoal adsorbers and/or HEPA filters for the purpose of removing iodines or particulates from the gaseous exhaust stream prior to the release to the environment (such a system is not considered to have any effect on noble gas effluents). Engineered Safety Feature (ESF) atmospheric cleanup systems are not considered to be VENTILATION EXHAUST TREATMENT SYSTEM components.
(continued)
EFFECTIVE DATE 10/04/2002 Definitions 1.1 I
SUSQUEHANNA -UNIT 2 TRM / 1.0-2
4i Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 4 of 7)
INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE TRIP FUNCTION TRIP SETPOINT LCO [-RO]
2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level 1 Z -129 inches(a) 2.2.3.2.2 3.3.5.1 Drywell Pressure - High
-< 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low,
> 413, < 427 psig injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure - Low,
>236 psig, decreasing Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low, Level 2
> -38 inches(a) 2.2.3.3.2 3.3.5.1 Drywell Pressure - High
< 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low a 36.0 inches above tank bottom 2.2.3.3.4 3.3:5.1 Reactor Vessel Water Level - High, Level 8
< 54 inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low, Level I 2 -129 inches 2.2.3.4.2 3.3.5.1 Drywell Pressure - High
- < 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer 5 102 seconds
-2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High 2:135, < 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump Discharge 2:121, < 129 psig Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 Z 13 inches Confirmatory 2.2.3A.7 3.3.5.1 ADS Drywell Pressure Bypass Timer
_ 420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)
2.2.3.5.1.1 3.3.8.1 Bus Undervoltage 2Ž823.2, 5 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay
> 0.4,5 0.6 seconds (continued)
(a) See Figure 2.2-1 EFFECTIVE DATE 09/06/2002 SUSQUEHANNA -UNIT 2 TRM / 2.0-9