License Renewal Inspections
ML022940148
Person / Time
Site: Fort Calhoun 
Issue date: 10/17/2002
From: Brockman K, Carpenter C
Office of Nuclear Reactor Regulation, NRC/RGN-IV/DRP
To: Kuo P, Webb Patricia Walker
Division of Regulatory Improvement Programs, NRC/RGN-IV/DRP
Wang H, NRR/RLEP/RLEP, 415-2958
References
Download: ML022940148 (10)


Text

October 17, 2002 MEMORANDUM TO: Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Wayne C. Walker, Inspection Team Leader Division of Reactor Projects Region IV FROM:

Cynthia A. Carpenter, Chief Inspection Program Branch Office of Nuclear Reactor Regulation Ken E. Brockman Director Division of Reactor Projects Region IV

SUBJECT:

FORT CALHOUN LICENSE RENEWAL INSPECTIONS Attached is the final version of the Fort Calhoun Station License Renewal Inspection Plan. The plan, which was developed jointly by NRR and Region IV, is hereby approved. You are directed to use this plan to prepare and conduct the license renewal inspections at Fort Calhoun.

Original signed by Date: 10/17/2002 Cynthia A. Carpenter, Chief Inspection Program Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation Original signed by PTKuo for Date: 10/8/2002 Ken E. Brockman Director Division of Reactor Projects Region IV

Attachment:

Fort Calhoun License Renewal Inspection Plan

MEMORANDUM TO: Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Wayne C. Walker, Inspection Team Leader Division of Reactor Projects Region IV FROM:

Cynthia A. Carpenter, Chief Inspection Program Branch Office of Nuclear Reactor Regulation Ken E. Brockman Director Division of Reactor Projects Region IV

SUBJECT:

FORT CALHOUN LICENSE RENEWAL INSPECTIONS Attached is the final version of the Fort Calhoun Station License Renewal Inspection Plan. The plan, which was developed jointly by NRR and Region IV, is hereby approved. You are directed to use this plan to prepare and conduct the license renewal inspections at Fort Calhoun.

Original signed by Date: 10/17/2002 Cynthia A. Carpenter, Chief Inspection Program Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation Original signed by PTKuo for Date: 10/8/2002 Ken E. Brockman Director Division of Reactor Projects Region IV

Attachment:

Fort Calhoun License Renewal Inspection Plan Distribution: See next page DOCUMENT NAME: G:\\Rlep\\Wang\\FCS INSPECTION PLAN.wpd OFFICE LA:RLEP:DRIP PM:RLEP:DRIP TL:RIV NAME H Berilla HB Wang WC Walker DATE 9/26/02 9/26/02 9/26/02 OFFICE SC:RLEP:DRIP D:DRP:RIV BC:IIPB:DIPM NAME S Lee KE Brockman(PTKuo for)

C Carpenter DATE 10/8/02 9/30/02 10/17/02 OFFICIAL RECORD COPY

DISTRIBUTION: Fort Calhoun License Renewal Inspection, Dated: October 17, 2002 Package: ML022940143 HARD COPY RLEP RF W. Burton H. Wang E-MAIL:

PUBLIC J. Johnson W. Borchardt D. Matthews F. Gillespie RidsNrrDe R. Barrett E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo C. Holden P. Shemanski H. Nieh G. Holahan H. Walker S. Black B. Boger D. Thatcher G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Smith (srs3)

T. Kobetz C. Munson RLEP Staff

FORT CALHOUN STATION LICENSE RENEWAL INSPECTION PLAN I

PURPOSE This inspection plan specifies methods for implementing Manual Chapter 2516 requirements for activities relating to 10 CFR Part 54 (herein after referred to as the rule) and the Fort Calhoun Station (FCS) license renewal inspection program. This plan defines the scope of the inspections planned to verify that FCSs license renewal program is in compliance with the requirements of the rule and is consistent with Omaha Public Power Districts (OPPDs) license renewal application (LRA) and the staffs safety evaluation of OPPDs LRA. The plan also provides guidance for inspection scheduling, inspector training, inspection activities, and resource requirements.

OPPDs LRA identified the systems and structures that OPPD determined were within the scope of the rule. Attachment 1 lists the systems and structures selected for this inspection.

The inspection team chose the items, after reviewing the scoping results provided in FCSs LRA, on the basis of their risk significance, uniqueness to FCS, and current issues. The scope and depth of inspections of these systems and structures may vary.

II OBJECTIVES The overall objective of this plan is to provide guidance for inspecting the implementation and effectiveness of the programs and activities associated with OPPDs license renewal program.

The inspection will verify that there is reasonable assurance that the effects of aging will be adequately managed so that the intended function(s) of structures and components (SCs), for which an aging management review is required, will be maintained consistent with the current licensing basis (CLB) during the period of extended operation. Region IV will implement the license renewal inspection plan (LRIP) at FCS before NRR approves OPPDs LRA to verify that OPPD meets the requirements of the rule and has implemented license renewal programs and activities consistent with the rule, the LRA, and the staffs safety evaluation report (SER) on the LRA.

III INSPECTION ACTIVITIES Each inspector will receive basic LRIP training. The inspectors will receive additional training on the FCS LRA and the staffs safety evaluation of the LRA. The training will be given before the inspections.

Inspection Procedure (IP) 71002, License Renewal Inspections, will be the primary procedure used to inspect OPPDs implementation of the requirements of the rule. IP 71002 is included for ready reference as Attachment 2.

1.

The systems and structures groups to be inspected are identified in Attachment 1 of this plan. The selection of these systems and structures is based on risk significance and the importance of the safety function performed. The inspection team will verify that OPPD has implemented the scoping methodology consistent with the rule and OPPDs methodology, as described in the LRA submitted by letter dated January 9, 2002. The inspection team will also inspect a sample of the systems and structures listed in ATTACHMENT Attachment 1 (systems and structures that OPPD concluded were not within the scope of the rule) in order to verify that there is reasonable assurance that all systems and structures within the scope of 10 CFR 54.4 have been identified.

2.

The implementation of the screening activities required under 10 CFR 54.21(a)(1) will be inspected by reviewing system boundaries on plant drawings, intended functions, and the active/passive and short-/long-lived characteristics of the SCs within the scope of OPPDs aging management review for the systems, structures, and commodity groups listed in Attachment 1.

3.

The inspection team will also walk down accessible portions of the systems and structures to identify any observable inconsistencies in the scoping and screening activities and any aging effects on the systems and structures that are not covered in the LRA. Aging effects identified by OPPD will be reviewed and evaluated during the NRR technical review. The inspection team will perform a sample audit of related maintenance records of the systems and structures listed in Attachment 1 to attempt to identify any previously unrecognized aging.

4.

The inspection team will inspect the aging management programs for approximately half of the aging effects in each of the systems and structures listed in Attachment 1. The inspection team will examine records for existing aging management programs to evaluate the programs effectiveness and will review plans for new aging management programs. The inspection team will then document its findings on the effectiveness of the aging management programs to maintain a systems intended function(s) consistent with the CLB for the period of extended operation.

5.

The Generic Aging Lessons Learned (GALL) report contains the NRC staffs generic evaluation of the existing plant programs and the technical bases for determining that the existing programs are adequate either without modification or with enhancements.

The inspection team will review OPPD documentation to verify, at least half of the aging management programs (AMPs) where OPPD claims they are consistent with the GALL report, to confirm that FCSs AMPs are consistent with the GALL report and will adequately manage aging effects during the period of extended operation.

IV INSPECTION SCOPE The FCS license renewal inspection activities will be implemented through three site inspections.

1.

The first inspection will last one week, or longer if necessary, and focus on the scoping and screening processes to verify that they have been implemented consistent with the rule, OPPDs methodology, and the staffs safety evaluation of OPPDs methodology.

This inspection should be performed after the staff has completed its safety evaluation of the scoping and screening methodology. but before the SER is issued. The inspection will verify that there is reasonable assurance that OPPDs scoping and screening processes have identified all of the SSCs for which an aging management review is required consistent with the requirements of the rule.

Preparation Week:

October 28 through November 1, 2002 Onsite Inspection:

November 4-8, 2002 Documentation Week:

November 11-15, 2002 2.

In the second inspection, the team will spend one week at the site, return to the region for one week to review documents, begin to write the inspection report, adjust the inspection plan, if needed, and go back to the site for another week. This inspection will examine aging management reviews and demonstration activities. To support the NRR review process, the second inspection will be performed just before the SER with open items (currently scheduled for April 2003) is issued.

Preparation Week:

December 30, 2002, through January 3, 2003 Onsite Inspection:

January 6-10 and 20-24, 2003 Documentation Week:

January 27-31, 2003 3.

If the regional administrator decides that the open inspection items from the first two inspections warrant a third inspection, the team will followup on previous inspection activities and inspect OPPD actions on any SER open items. This inspection will also focus on any portion of the LRA updated by the applicant as a result of recent plant modifications. The third inspection report will document the need for any future follow-up inspections.

V INSPECTION RESOURCES The inspection will need the following inspection resources:

1.

Inspectors



One team leader



Three inspectors from the region



One consultant with site-specific knowledge (preferably the resident inspector)



One or more support staff from the program office 2.

Skills The inspection team needs a cross-section of skills, including mechanical, material, civil, and electrical engineering skills.

The scope of the third inspection (and, thus, the resources) will depend on how many open issues remain from the previous inspection activities.

VI ADMINISTRATIVE 1.

The following inspection report numbers have been assigned to the license renewal inspections:

Scoping and Screening Inspection - IR 2002007 Aging Management Review - IR 2003007 NRC inspectors should charge inspection hours on the Human Resources Management System (formerly STAFIRE) using inspection report numbers listed above and one of the following activity codes:

LRP License Renewal Preparation/Documentation LRI License Renewal Inspection LRT License Renewal Travel The Fort Calhoun Station docket number is 50-285.

Attachments:

1. List of Systems and Structures to be reviewed during the inspections
2. Inspection Procedure 71002

FORT CALHOUN STATION LICENSE RENEWAL INSPECTION PLAN LICENSE RENEWAL SCOPING RESULTS FOR MECHANICAL SYSTEMS System Name System in License Renewal Scope?

Auxiliary Boiler Fuel Oil Yes Auxiliary Feedwater Yes Auxiliary Feedwater Pump Fuel Oil No Chemical and Volume Control Yes Component Cooling Water Yes Containment HVAC Yes Containment Isolation Yes Containment Spray Yes Control Room HVAC Yes Diesel Generators and Support Systems Yes Fire Protection Yes Instrument Air Yes Main Steam and Turbine Steam Extractions Yes Postaccident Sampling No Reactor Coolant, Reactor Vessel Internals, Reactor Vessel Yes Safety Injection Yes Service Air No Raw Water Yes Spent Fuel Pool Cooling Yes Ventilation Yes Condensate No

FORT CALHOUN STATION LICENSE RENEWAL INSPECTION PLAN LICENSE RENEWAL SCOPING RESULTS FOR STRUCTURES System Name System in License Renewal Scope?

Condensate Storage Tank Enclosures No Containments Yes Diesel Fuel Oil Tank Foundation Yes Emergency Diesel Generator Buildings Yes Intake Structures Yes Auxiliary Building Yes Switchyard No Turbine Building and Service Building Yes Safety Inspection and Refueling Water Tank Yes Building Piles Yes Component Supports Yes Duct Banks Yes

FORT CALHOUN STATION LICENSE RENEWAL INSPECTION PLAN LICENSE RENEWAL SCOPING RESULTS FOR ELECTRICAL/I&C SYSTEMS System Name System in License Renewal Scope?

125V DC Yes 4.16kV Electrical Yes 480V Electrical Yes Communications Yes Containment Electrical Penetrations Yes Generation and Distribution (includes Main, Auxiliary, and Startup Transformers and the Switchyard)

No Reactor Protection System Yes Engineering Safeguards Yes Radiation Monitoring Yes Qualified Safety Parameter Display System Yes 22 kV No