MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bndge, New Jersey 08038-0236 OCT 1 0 2002 LRN-02-0348 0 PSEG United States Nuclear Regulatory Commission Nuclear LLC Document Control Desk Washington, DC 20555 SALEM GENERATING STATIONS - UNIT I and 2 FACILITY OPERATING LICENSE DPR-70 and DPR-75 DOCKET NOS. 50-272 and 50-311 REQUEST FOR ADDITIONAL INFORMATION - RELIEF REQUEST SC-RR-A01 By letter dated July 8, 2002, PSEG Nuclear LLC (PSEG) submitted the subject relief request for Nuclear Regulatory Commission (NRC) approval. The relief request, SC RR-AO1, was submitted for the use of Code Case N-533-1, Alternative Requirements for VT-2 Visual Examination of Class 1, 2 and 3 Insulated PressureRetainingBolted Connections.
Subsequent discussions with NRC staff on October 101, 2002 resulted in identifying information that had been inadvertently omitted from the relief request. This information has been added and the relief request is re-submitted in entirety.
Should you have any questions regarding this request, please contact Mr. Howard Berrick at 856-339-1862.
- Si ngery Manager - Nuclear Safety and Licensing
Enclosure:
Relief Request SC-RR-AO1 95-2168 REV 7/99
OcCT 10 2oo2 Document Control Desk LRN 0348 C Mr. H. Miller Regional Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission ATTN- Mr. R. Fretz Licensing Project Manager - Salem Mail Stop 08B2 Washington DC 20555-001 USNRC Senior Resident Inspector - Salem (X24)
Mr. K.Tosch, Manager IV Bureau of Nuclear Engineering P.O. Box 415 Trenton, NJ 08625 Enclosure LRN-02-0348 Relief Request: SC-RR-AO1 Use of Code Case N-533-1 NRC Approved (Yes or No): Date: Ref:
Component Description Insulated, Pressure Retaining Bolted Connections on Class 1, 2, and 3 systems borated for the purpose of controlling reactivity.
ASME Section XI Class 1, 2, and 3 Code Requirement Paragraph IWA-5242 of the 1995 Edition, including the 1996 Addenda of Section XI, requires in part that insulation shall be removed from pressure-retaining bolted connections for VT-2 visual examination of systems borated for the purpose of controlling reactivity.
Similarly, Paragraph IWA-5242 of the 1986 Edition (without Addenda) of Section XI requires in part, that, insulation shall be removed from pressure-retaining bolted connections for visual examination VT-2 of systems borated for the purpose of controlling reactivity.
Basis for Relief Pursuant to 10 CFR 50.55a(a)(3)(i), relief is requested on the basis that the proposed alternative provides an acceptable level of quality and safety.
PSEG Nuclear, LLC requests relief to incorporate the alternate examination requirements of ASME Code Case N-533-1, titled 'Alternative Requirements, for VT-2 Visual Examination of Class 1, 2, and 3 Insulated Pressure Retaining Bolted Connections', for Salem Generating Station, Units 1 and 2.
For Class I Systems:
Salem Generating Station, Unit I Technical Specification 3.4.9.1 does not allow pressurization of the Reactor Coolant System to nominal operating pressure without a heat up.
Similarly, Salem Generating Station, Unit 2 Technical Specification 3.4.10.1 does not allow pressurization of the Reactor Coolant System to nominal operating pressure without a heat up.
Re-installation of insulation requires exposing personnel to the safety hazards of higher radiation dose, additional personnel support, and elevated temperatures (550 degrees F) and a pressure of 2235 PSI, which constitute a heat stress environment.
Resubmit SC-RR-AOI 100402.doc Page I 10/07/2002
-Enclosure LRN-02-0348 Relief Request: SC-RR-AOI Use of Code Case N-533-1 The activities will be conducted at the end of the outage and will have the effect of extending the refueling outage durations by a minimum of 2 days.
Boric acid leakage, leaves boric acid crystalline residue when evaporated, therefore it is not necessary to examine for boric acid leakage in conjunction with a pressure test.
For Class 2 & 3 Systems:
Re-installation of insulation requires exposing personnel to the safety hazard at elevated temperatures, which includes a heat stress environment.
Boric acid leakage, leaves boric acid crystalline residue when evaporated, therefore it is not necessary to examine for boric acid leakage in conjunction with a pressure test.
A similar relief was evaluated and previously granted for Salem Generating Station, Unit 2 for Insulated Pressure Retaining Bolted Connections on Class 1 systems borated for the purpose of controlling reactivity.
REFERENCE:
NRC Safety Evaluation for Relief From ASME Code on VT-2 Visual Inspection of Bolted Connections, Salem Nuclear Generating Station, Unit 2 (TAC No. M86246).
This relief will permit application of the alternative rules from Code Case N-533-1 for Unit 1, and extend the application of the alternative rules to Class 2 and 3 systems at Unit 2.
Based on the alternative requirements of Code Case N-533-1 and the approval of a similar Relief Request Salem Generating Station, Unit 2, there is reasonable assurance that structural integrity will be assured, and an acceptable level of quality and safety will be maintained during the Third Ten-Year Inspection Interval.
Alternate Requirements PSEG Nuclear, LLC proposes to fully implement the alternative requirements of Code Case N-533-1. This case requires that as an alternative to the requirements of IWA 5254 (a) to remove insulation from Class 1, 2, and 3 pressure-retaining bolted connections to perform VT-2 visual examinations, the following requirements shall be met:
(a) A system pressure test and VT-2 visual examination shall be performed each refueling outage for Class 1 connections and each period for Class 2 and 3 connections without removal of insulation. The affected insulated system shall have been at operating conditions for a minimum of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to commencement of the VT 2 visual examination.
(b) The insulation shall be removed from the bolted connection, each refueling outage for Class 1 connections and each period for Class 2 and 3 connections, and a VT-2 visual examination shall be performed. The connection is not required to be pressurized. Any evidence of leakage shall be evaluated in accordance with IWA-5250.
Resubmit SC-RR-AO1_100402.doc Page 2 10/07/2002
-Enclosure LRN-02-0348 Relief Request: SC-RR-AOI Use of Code Case N-533-1 Applicability This Relief Request is applicable to the following:
Salem, Unit I - Third Ten-Year Inservice Inspection Interval.
Salem, Unit 2 - Second Ten-Year Inservice Inspection Interval.
Resubmit SC-RR-AO1_100402.doc Page 3 10/07/2002