ML022670682

From kanterella
Jump to navigation Jump to search

Steam Generator Inspections 2C12 Update with NRC 06/03/2002
ML022670682
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/19/2002
From:
Southern California Edison Co
To:
Office of Nuclear Reactor Regulation
Wang A, NRR/DLPM, 415-1445
Shared Package
ml022670195 List:
References
TAC MB4659
Download: ML022670682 (18)


Text

SONGS Unit 2 Steam Generator Inspections 2C12 Update with the NRC June 3, 2000

SONGS Unit 2 Background Two (2) steam generators Supplied by Combustion Engineering Designated SG 88 & 89 SG88 - 8626 tubes in service (180 sleeved)

SG89 - 8585 tubes in service (103 sleeved)

Recent Exam Outages Current Refueling Outage (2C 12) 14.7 EFPY Prior Refueling Outage (2C11) 13.3 EFPY Prior Refueling Outage (2C10) 11.7 EFPY Prior Mid-cycle Exam (2M9) 10.8 EFPY

  • Prompted by PWSCC at dented intersections Prior Refueling Outage (2C9) 10.1 EFPY

& Performed chemical cleaning of secondary side 08/19/2002 2

SONGS Steam Generator 08/19/2002 3

Completion Status as of 6/3/2002

"* Bobbin ECT Inspection - Complete

"* +Point ECT Inspection - Complete in SG89, testing continues in SG88, 98% Complete

"* Sludge Lancing/Visual Insp - Complete SG89, setting up SG88

"* In-situ Testing - In progress SG89, 2 locations

"* Sleeving - Following In-situ

"* Plugging - Following Sleeving 08/19/2002 4

Discussion Points (DP)

DP-1) Discuss whether any primary to secondary leakage existed in this unit prior to shutdown

- No primary to secondary leakage was detected prior to shutdown of this unit DP-2) Discuss the results of secondary side hydrostatic tests

- No hydrostatic tests planned since no primary 08/19/200O secondary leakage during operation 5

DP-3) Description of Areas Examined Bobbin Exam Full length exam of in-service tubes (100%)

Rotating Exams (+Point)

- Hot leg top-of-tubesheet locations (100%)

- Cold leg top-of-tubesheet locations (20%)

- Rows 1 thru 3 U-bend locations (100%)

- Installed sleeves (100%)

- Special Interest Locations -10,050 locations

"* Non-quantifiable bobbin indications (I-codes) -400 locations

"* Dents > or = 2volts (100%) -8600 locations

"* Dings > or = 5 volts at hot leg locations -200 locations

  • Tube wear at supports (100%) -850 locations 08/19/2002 6

Secondary Side Inspections

  • Visual inspection for foreign objects, prior to and upon completion of sludge lancing.
  • Two loose parts identified and retrieved from SG89 08/19/2002 7

DP-4) Inspection Results and Repair Candidates as of 6/2/02 SG 88 SG 89 TSH Circ, Axial, Volumetric

-81

'49 TSC Circ, Axial, Volumetric 0 Freespan Axial

-6^07 Tube Support Axial

-23

-13 Tube Support Wear(>44%TW)

~0

-0 Tube Support Wear(Preventative)

--14

-23 Preventative

-?

-?

Total Repairs

-124

.-92 08/19/2002 8

DP-5) Tube Repair Criteria and Techniques

"* Repair

- All indications exceeding Technical Specification repair criteria

- All crack-like indications

"* Sleeves will be installed in tubes with crack-like indications top-of-tubesheet within the sleeve extent

"* Circumferentially oriented indications will be stabilized or sleeved 08/19/2002 9

DP-6) Repair History 2C10 2Cll 2C12 TSH Circs TSH Axial TSC Axial Freespan Axial Support Axial Support Wear Preventative U-bend Volumetric Total Repairs SG 88/89 SG 88/89 SG 88/89 08/19/2002 Cause 58 34 66 26

-47

-30 36 23 36 38

-34

-17 1

0 0

0

-0 A0 8

7 4

9

-6

-7 15 13 15 8

-23

-13 18 12 11 22

-14

-23 1

8 0

4

-?

0 0

0 0

-0

-0 0

5 0

2

~0

-2 137 102 132 109

-124

~92 10

DP-7) New Inspection Findings Discuss, in general, the new inspection findings

- During the 2C12 inspection, no damage mechanisms that were new to SONGS-2 were detected

- All mechanisms were previously detected and included in the degradation assessment and the operational assessment.

08/19/2002 11

DP-8) In-situ Pressure Testing

"* Utilizing latest EPRI and CEOG guidelines for candidate selection and testing

"* All tubes meeting criteria are tested

"* Have in-situ pressure tested 74 tubes at SONGS during seven prior inspections

  • One tube in SG89 selected based on EPRI screening criteria
  • Tubes in SG88 still under review 08/19/2002 12

TUBE AND EDDY CURRENT INFORMATION IN-SITU TESTRESULTS TUBE INFORMATION PLUSPOINT DATA Max.PDA GPM @ GPM @ GPM @ NOPD PRESURE REGION ROW COL LOCATION LENGTH VOLTS Depth DeApt ORIENTATION NOPD MSLB POST MSLB 3xNOPD Depth SONGS-2 IN SITU PRESSURE TEST LIST S/G 89 Jun-2002 08/19/2002.........

.13 TUBE AND EDDY CURRENT INFORMATION IN-SITU TESTRESULTS "TUBEINFORMATION PLUS POINT DATA Max.

PDA GPM @ GPM @ GPM @ NOPD PRESURE ROW COL LOCATION LENGTH VOLTS Depth Depth ORIENTATION NOPD MSLB POST MSLB 3xNOPD

% Depth EGGCRATE 13 119 061+018 018 0.24 71%

WA OD Axial-I 1

165R U DBHI+9 91 t NA N/A NIA N/A DATA QUALIlY BEND 113

DP-9) Tube Pull Plans Describe tube pull plans and preliminary results No tube pulls are planned based on the inspection results 08/19/2002 14

DP-10) Assessment of Tube Integrity From Previous Cycle Fourth application of multi-cycle, fully probabilistic(Monte Carlo) methods to Operational Assessment for SONGS Unit 2 in accordance with EPRI Tube Integrity Assessment Guidelines Results for 2C12 in good agreement with OA projections Expect to pass Condition Monitoring performance criteria 08/19/2002 15

DP-11) Assessment of Tube Integrity for Next Cycle Plan to continue use of multi-cycle, fully probabilistic(Monte Carlo) methods for Operational Assessment for SONGS Unit 2 in accordance with EPRI Tube Integrity Assessment Guidelines 08/19/2002 16

DP-12) 2C 12 Milestone Schedule Open breakers Primary manways off Begin ECT End ECT Insitu Begin repairs End repairs Primary manways on Close breakers 08/19/2002 17 5/20 5/23 5/24 6/5 6/5 6/5 6/11 6/17 6/22

DP-13) IP2 Lessons Learned

"* Actions taken in response to identifying a new degradation mechanism No new mechanism identified this outage

"* Actions taken to ensure data noise levels are acceptable Continue to use HF probe in U-bend region (2nd time)

Reviewed EPRI data set vs. SONGS tubing

"* Data quality issues and need for criteria to address data quality EPRI Rev 6 addressing SONGS participating 08/19/2002 18