ML022560243

From kanterella
Jump to navigation Jump to search
Agenda & Handout for Public Meeting Between NRC & Firstenergy Re Licensee’S Progress on Implementing Return to Service Plan, Davis-Besse
ML022560243
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/17/2002
From:
NRC/RGN-III
To:
References
Download: ML022560243 (9)


Text

PUBLIC MEETING BETWEEN U.S. NRC 0350 PANEL AND FIRSTENERGY OAK HARBOR, OHIO September 17, 2002, 2:00 pm EDT Purpose of Meeting: Discuss Licensees Progress on Implementing the Return to Service Plan AGENDA I.

Introduction and Opening Remarks II.

Summary of August 20th Public Meetings III.

Discussion of NRCs Restart Checklist and Status of NRC Inspections IV.

Licensee Presentation on the Status of Their Return to Service Plan V.

Adjourn NRC meeting with FENOC

<break>

VI.

Public Comments and Questions of NRC Local Members of the Public / Others VII.

Adjourn Meeting

U.S. NUCLEAR REGULATORY COMMISSION DAVIS-BESSE IMC 0350 PANEL

SUMMARY

OF AUGUST 20, 2002 PUBLIC MEETING II Davis-Besses Return to Service Plan Building Blocks

1. Reactor Vessel Head Resolution
2. Containment Health Assurance
3. System Health Assurance
4. Programs Compliance
5. Management and Human Performance Excellence
6. Restart Testing
7. Restart Action Plan
  • Transcripts of the August 20, 2002, 2:00 p.m. and 7:00 p.m. meetings are available on our web site.

http://www.nrc.gov/

U. S. Nuclear Regulatory Commission Manual Chapter 0350 Panel Davis-Besse Restart Checklist Item Number/

Cornerstone*

Description 1.

Adequacy of Root Cause Determinations 1.a IE Penetration Cracking and Reactor Pressure Vessel Corrosion 1.b IE Organizational, Programmatic and Human Performance Issues 2.

Adequacy of Safety Significant Structures, Systems, and Components 2.a IE Reactor Pressure Vessel Head Replacement 2.b BI Containment Vessel Restoration Following Reactor Pressure Vessel Head Replacement 2.c IE, MS, BI Structures, Systems, and Components Inside Containment 2.d IE, MS, BI Systems Outside Containment 3.

Adequacy of Safety Significant Programs 3.a ALL Corrective Action Program 3.b ALL Operating Experience Program 3.c ALL Quality Audits and Self-Assessments of Programs 3.d IE, MS, BI Boric Acid Corrosion Management Program 3.e IE, MS, BI Reactor Coolant System Unidentified Leakage Monitoring Program 3.f IE, MS, BI In-Service Inspection Program

3.g ALL Modification Control Program 4.

Adequacy of Organizational Effectiveness and Human Performance 4.a ALL Adequacy of Root Cause 4.b ALL Adequacy of Corrective Actions 4.c ALL Effectiveness of Corrective Actions 5.

Readiness for Restart 5.a IE, MS Systems Readiness for Restart 5.b IE Operations Readiness for Restart 5.c IE, MS, BI Test Program Development and Implementation 6.

Licensing Issue Resolution 6.a IE, BI Verification that Relief Requests A8 and A12 regarding the Shell to Flange Weld (previously submitted by letter dated September 19, 2000) is not Impacted by the Midland RPV Head 6.b IE, BI American Society of Mechanical Engineers (ASME) Code Relief Request for Failure to Maintain Original Radiographic Tests of the Midland Head to Flange Weld (Planned Relief Request A26) 6.c IE, BI ASME Code Relief Request for Inability to Radiographically Test 100% of the Midland Reactor Pressure Vessel Head to Flange Weld (Planned Relief Request A27) 6.d IE, BI Resubmit Relief Request A2 (previously submitted by letter dated September 19, 2000) for ASME Code for Inability to Perform 100% volumetric and surface examination of Head to Flange Weld 6.e IE, BI Reconciliation Letter that Demonstrates How the New Reactor Pressure Vessel Head Correlates With the ASME Code and QA Index for Section III and Section XI - Commitments

6.f IE, BI Verification Letter of Technical Specification Pressure/Temperature Curves for New Vessel Head -

Commitment 7.

Confirmatory Action Letter Resolution 7.a ALL Verification that Confirmatory Action Letter Items are Resolved, Including a Public Meeting to Discuss Readiness for Restart

  • Cornerstones:

IE - Initiating Events MS - Mitigating Systems BI - Barrier Integrity EP-Emergency Preparedness ORS - Occupational Radiation Safety PRS - Public Radiation Safety PP - Physical Protection ALL - Affects all cornerstones

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION OAK HARBOR, OHIO September 17, 2002, 7:00 pm EDT Purpose of Meeting:

Inform the Public of IMC 0350 Panel Activities One of the goals of this meeting is to receive comments / questions from all interested members of the public. To ensure we hear all comments, please limit comments or questions to 5 minutes each. We will follow the format from previous meetings where we start with local members of the public.

AGENDA II.

Introduction and Opening Remarks III.

Summary of Vessel Head Degradation Issue IV.

Summary of September 17 Public meeting V.

Comments/Questions from local members of the public VI.

Comments/Questions from all members of the public VI.

Adjourn Meeting

PUBLIC MEETING BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY OAK HARBOR, OH September 18, 2002, 9:00 am - 12:00 pm EDT Purpose of Meeting:

To discuss FirstEnergys Corrective Action Plan for Management and Human Performance Improvement.

AGENDA I.

Introduction and Opening Remarks II.

Summary of August 15, 2002 Meeting III.

Licensee Presentation IV. Adjourn NRC meeting with FENOC

<break>

V.

Public Comments and Questions of NRC Local Members of the Public / Others VI. Adjourn Meeting