ML022550612
| ML022550612 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/12/2002 |
| From: | Wilson M Dominion Nuclear Connecticut |
| To: | Conte R NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| 50-423/02301 50-423/02301 | |
| Download: ML022550612 (124) | |
Text
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
ESTABLISH FEED AND BLEED ON CHARGING PUMP COOLING (EOP 3501)
JPM ID Number:
P.01
(#137)
Revision:
2, Chg. 1*
10/19/99 II. Initiated:
John Deveau Developer 7/24/98 Date Steve Jwed Verified Cuin a
III. Reviewed:
Date Technical Reviewer 6 /l 8 /6Q Date IV. Approved:
Nuclear' faining Manager D7 a
1 of 8
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
JPM ID Number:
P.01 #137 Revision:
2, Chg. 1 Task
Title:
ESTABLISH FEED AND BLEED ON CHARGING PUMP COOLING (EOP 3501)
System:
CVCS (004)
Safety Function:
RCS Inventory Control (2)
Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
15 Alternate Path?
Task Number(s):
Applicable To:
No 344-05-064 SRO RO PEO K/A Number:
004-K1.18 K/A Rating:
2.9 /3.2 Method of Testing:
Simulated Performance:
X Actual Performance:
Location:
Classroom:
Simulator:
In-Plant::
X Task Standards:
Required Materials:
General
References:
Respond to a Loss of All AC Power while operating in Modes 5, 6, and Zero.
EOP 3501, Loss of All AC Power (Mode 5, 6, and Zero), Rev. 012 None
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 8
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
P.01 #137 Revision:
2, Chg. 1 Initial Conditions:
Initiating Cues:
The plant is in Mode 5. A loss of all AC power has occurred.
The control room team has progressed through EOP 3501.
Attempts are being made to establish injection flow using the charging pumps. Attempts to restore cooling to CCE have failed.
The US has directed you to locally initiate feed and bleed for CCE using the guidance of EOP 3501 step 13.b.1 RNO. The "A" charging pump is available.
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 8
PERFORMANCE INFORMATION JPM Number:
P.01 #137 Revision:
2, Chg. 1 Task
Title:
ESTABLISH FEED AND BLEED ON CHARGING PUMP COOLING (EOP 3501)
Start Time:
STEP 1
X Performance Step:
Locate hoses and water source Standards:
Candidate locates hoses and "Chicago" fittings in the Operations Department Locker.
There is a domestic water connection at 3DWS-V167 located by the eyewash station near the thermal regeneration chiller.
STEP 2
x Performance Step:
Connect a temporary hose from fire or domestic water (or any available water source) to the appropriate valve, so that makeup can be added to the surge tank: (Step 13.b RNO 1)
For pump A 3CCE*V29 For pump B 3CCE*V30 GRADE x
Standards:
Simulates connecting the hose to the domestic water connection and to valve 3CCE*V29 ("A" pump is the available CHS pump)
Grade:
SAT UNSAT 4 of 8
PERFORMANCE INFORMATION JPM Number:
P.01 #137 Revision:
2, Chg. 1 Task
Title:
ESTABLISH (EOP 3501)
FEED AND BLEED ON CHARGING PUMP COOLING STEP GRADE 3
x x
Performance Step:
Standards:
Close both charging pump cooler isolation valves (3CCE*V10 and 3CCE*V22) (Step 13.b RNO 2)
Candidate locates and simulates rotating the handwheel for 3CCE*V1 0 in the clockwise direction until the valve is fully closed.
GRADE x
Standards:
Rotates the handwheel for 3CCE*V22 in the clockwise direction until the valve is fully closed.
Grade:
SAT UNSAT STEP 4
x Performance Step:
Open the appropriate charging pump oil cooler outlet drain valve: (Step 13.b RNO 3)
For pump A 3CCE*V977 GRADE x
Standards:
Rotates the handwheel for 3CCE*V977 in the counter-clockwise direction until the valve is fully open.
5 of 8
PERFORMANCE INFORMATION JPM Number:
P.01 #137 Revision:
2, Chg. I Task
Title:
ESTABLISH FEED AND BLEED ON CHARGING PUMP COOLING (EOP 3501)
GRADE Standards:
Grade:
Rotates the handwheel 1/4 turn in the closed direction.
SAT UNSAT Comments:
For the next JPM step, Candidate should simulate adding water to the surge tank. He should check the level as indicated on #CCS-LIS-22A.
PIM1116 STEP GRADE 5
X X
Performance Step:
Standards:
Grade:
Add makeup using the temporary hose to maintain surge tank level. (Step 13.b RNO 4)
Opens the domestic water or fire header valve to the temporary hose and opens 3CCE*V29.
SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
6 of 8
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Evaluator:
P.01 #137 Revision:
2, Chg. 1 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
Validated Time (minutes):
YES NO X
15 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
7 of 8
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
P.01 #1 37 The plant is in Mode 5. A loss of all AC power has occurred. The control room team has progressed through EOP 3501. Attempts are being made to establish injection flow using the charging pumps.
Attempts to restore cooling to CCE have failed.
The US has directed you to locally initiate feed and bleed for CCE using the guidance of EOP 3501 step 13b.1 RNO. The "A" charging pump is available.
8 of 8
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
ESTABLISH SERVICE WATER TO TRAIN "A" CONTROL BUILDING CHILLED WATER CROSS TIE JPM ID Number:
P.02 New Revision:
0 II. Initiated:
2/4/02 Date IlI. Reviewed:
CQha Technical Reviewer (G /A g /10 Date IV. Approved:
Nu lea raining Manager
/Da 1 of 11
JOB PERFORMANCE MEASURE GUIDE e Unit 3 Student:
Facility:
Millstoni JPM ID Number:
P.02 New Revision:
0 Task
Title:
ESTABLISH SERVICE WATER TO TRAIN "A" CONTROL BUILDING CHILLED WATER CROSS TIE System:
Service Water System (076)
Safety Function:
Heat Removal (4.2)
Time Critical Task:
) YES
( X ) NO Validated Time (minutes):
15 Alternate Path?
Task Number(s):
Applicable To:
No 088-01-059 SRO X
0 Method of Testing:
76-K1.1 9 Simulated Performance:
K/A Rating:
3.6/ 3.7 X
Actual Performance:
Location:
Classroom:
Simulator:
In-Plant::
X Task Standards:
Required Materials:
General
References:
Establish and restore from Service Water supplying the Control Building (HVK) chilled water system.
OP 3314F, Control Building Heating, Ventilation, Air Conditioning and Chill Water, Rev. 019 P&IDs ES-1.2, Post LOCA Cooldown and Depressurization, Rev. 013
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 11
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
P.02 New Revision:
0 Initial Conditions:
Initiating Cues:
The unit has experienced a Loss of Coolant accident and is Using ES-1.2, Post LOCA Cooldown and Depressurization, to reduce RCS temperature and pressure. Both HVK Chillers have been damaged and are not operable.
The US has directed you to establish service water to Train A of Control Building chilled water cross tie using OP 3314F, Control Building Heating, Ventilation, Air Conditioning and Chill Water, section 4.23. A copy of the procedure section and applicable P&IDs have been provided for your use.
NOTES TO EVALUATOR
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 1 1
PERFORMANCE INFORMATION JPM Number:
P.02 New Revision:
0 Task
Title:
ESTABLISH SERVICE WATER TO TRAIN "A" CONTROL BUILDING CHILLED WATER CROSS TIE)
Start Time:
STEP 1
Performance Step:
Refer to Section 4.4 and stop Train A Control Building Air Conditioning Unit (step 4.23.1.a)
GRADE Standards:
Comments:
Grade:
Candidate refers to section 4.4 It is not intended that the candidate perform section 4.4 SAT UNSAT STEP GRADE 2
X x
Performance Step:
Standards:
UNLOCK and CLOSE 3HVK*V81, A chilled water expansion tank isolation valve (Step 4.23.1.b)
Candidate locates and simulates removing the locking device and rotating the handwheel for 3HVK*V81 in the clockwise direction until the valve is fully closed.
Grade:
SAT UNSAT 4 of 1 1
PERFORMANCE INFORMATION JPM Number:
P.02 New Revision:
0
~Task
Title:
ESTABLISH SERVICE WATER TO CHILLED WATER CROSS TIE)
TRAIN "A" CONTROL BUILDING STEP 3
X Performance Step:
OPEN 3HVK*V8, A control building chiller bypass valve (Step 4.23.1.c)
GRADE x
Standards:
Candidate locates and simulates rotating the handwheel for 3HVK*V8 in the counter-clockwise direction until the valve is fully open.
Grade:
SAT UNSAT STEP 4
x Performance Step:
Close the following valves:
(Step 4.23.1.d)
These steps are bulleted; the valves listed within step 4.23.1.d can be closed in any order.
Comment:
x x
Performance Step:
Standards:
GRADE 3HVK*V3, control building chiller unit A inlet isolation Candidate locates and simulates rotating the handwheel for 3HVK*V3in the clockwise direction until the valve is fully closed.
x x
Performance Step:
Standards:
GRADE 3HVK*V4, control building chiller unit A inlet isolation Candidate locates and simulates rotating the handwheel for 3HVK*V4 in the clockwise direction until the valve is fully closed.
5 of 11
PERFORMANCE INFORMATION JPM Number:
P.02 New Revision:
0 Task
Title:
ESTABLISH SERVICE WATER TO TRAIN "A" CONTROL BUILDING CHILLED WATER CROSS TIE) x Performance Step:
GRADE x
Standards:
3HVK*V6, control building chiller unit A outlet isolation Candidate locates and simulates rotating the handwheel for 3HVK*V6 in the clockwise direction until the valve is fiv closed x
Performance Step:
Standards:
GRADE x
3HVK*V7, control building chiller unit A outlet isolation Candidate locates and simulates rotating the handwheel for 3HVK*V7 in the clockwise direction until the valve is fuliv closnd x
x Performance Step:
Standards:
GRADE 3HVK*V991, chiller oil cooler A inlet isolation valve Candidate locates and simulates rotating the handwheel for 3HVK*V991 in the clockwise direction until the valve is fully closed.
x Performance Step:
3HVK*V989, chiller oil cooler A outlet isolation valve 6 of 11
PERFORMANCE INFORMATION JPM Number:
P.02 New Revision:
0 Task
Title:
ESTABLISH SERVICE WATER TO TRAIN "A" CONTROL BUILDING CHILLED WATER CROSS TIE)
GRADE x
Standards:
Candidate locates and simulates rotating the handwheel for 3HVK*V989 in the clockwise direction until the valve is fully closed.
STEP 5
x Performance Step:
Comment:
Performance Step:
Standards:
UNLOCK and OPEN the following valves:
(Step 4.23.1.e)
These steps are bulleted; the valves listed within step 4.23.1.e can be closed in any order.
3SWP*V100, control building A chilled water backup supply isolation valve Candidate locates and simulates unlocking and moving the operator for 3SWP*V100 in the counter-clockwise direction until the valve is fully open.
x GRADE x
Grade:
SAT UNSAT x
Performance Step:
3SWP*V101, control building A chilled water backup supply isolation valve GRADE x
Standards:
Candidate locates and simulates unlocking and moving the operator for 3SWP*V101 in the counter-clockwise direction until the valve is fully open.
7 of 11
PERFORMANCE INFORMATION JPM Number:
P.02 New Revision:
0 Task
Title:
ESTABLISH SERVICE WATER TO TRAIN "A" CONTROL BUILDING CHILLED WATER CROSS TIE)
Grade:
SAT UNSAT x
Performance Step:
Standards:
GRADE x
3SWP*V102, control building A chilled water backup supply isolation valve Candidate locates and simulates unlocking and moving the operator for 3SWP*V102 in the counter-clockwise direction until the valve is fully open.
Grade:
SAT UNSAT x
Performance Step:
Standards:
GRADE x
3SWP*V103, control building A chilled water backup supply isolation valve Candidate locates and simulates unlocking and moving the operator for 3SWP*V1 03 in the counter-clockwise direction until the valve is fully open.
Grade:
SAT UNSAT 8 of 11
PERFORMANCE INFORMATION JPM Number:
Task
Title:
P.02 New ESTABLISH SERVICE WATER TO CHILLED WATER CROSS TIE)
Revision:
0 TRAIN "A" CONTROL BUILDING STEP GRADE 6
Performance Step:
Standards:
Comment:
PLACE 3SWP*TIC35A, "CB CHLR SERV WTR," chiller condenser service water temperature controller, in "MANUAL," and SET at 0% output (no recirculation flow)(VP1)(step 4.23.1.f)
Candidate refers to step 4.23.1.f It is not intended that the candidate perform step 4.23.1.f. Provide the terminating cue.
Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
9 of 11
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Evaluator:
P.02 New Revision:
0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
Validated Time (minutes):
YES NO X
15 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for ImDrovement:
10 of 11
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
P.02 New The unit has experienced a Loss of Coolant accident and is Using ES-1.2, Post LOCA Cooldown and Depressurization, to reduce RCS temperature and pressure. Both HVK Chillers have been damaged and are not operable.
The US has directed you to establish service water to Train A of Control Building chilled water cross tie using OP 3314F, Control Building Heating, Ventilation, Air Conditioning and Chill Water, section 4.23. A copy of the procedure section and applicable P&lDs have been provided for your use.
11 of 11
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire JPM ID Number:
P.03 (#15A)
Revision:
5 II. Initiated:
Steve Js 01/31/02 Date Developer III.
Reviewed:
Technical Reviewer Dat e'-
Date IV. Approved:
Nuclea'raining Manager
~'Dat.6 1 of 17
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
JPM ID Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire System:
Emergency Diesel Generators (064)
Safety Function:
Electrical (6)
Time Critical Task:
) YES
( X ) NO Validated Time (minutes):
20 Alternate Path?
Task Number(s):
Yes 000-05-171 Applicable To:
SRO X
APE-068-AA1.10 K/A Rating:
3.7/3.9 Method of Testing:
Simulated Performance:
X Actual Performance:
Location:
Classroom:
Simulator:
In-Plant::
X Task Standards:
Reguired Materials:
General
References:
Respond to a Control Room, Cable Spreading Area, or Instrument Rack Room Fire..
EOP 3509.1, Attachment B, Rev. 6 EDG Control Mode selector switch keys 12B554 and ILCO 999NY1 E. (simulated)
None
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 17
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
P.03 (#15A)
Revision:
5 Initial Conditions:
Initiating Cues:
The plant has experienced a loss of Off-Site power and a fire requiring evacuation of the control room. Bus 34C is de-energized.
The US, at the ASP, has directed you to perform the Secondary Side PEO Actions on a Control Room Evacuation in accordance with EOP 3509.1, Attachment B. The Turbine Stop Valves have been verified Closed. You have a PEO Rounds Key and EDG Control Mode selector switch keys 12B554 & ILCO 999NY1 E.
- NOTES TO EVALUATOR
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire Start Time:
STEP 1
Performance Step:
Verify Turbine Stop Valves - CLOSED (step 1)
Performance Step:
Obtain Keys From The SM
- EDG A CONTROL MODE selector switch key (12B554)
- EDGB CONTROL MODE selector switch key (ILCO 999NY1E)
(step 2)
Proceeds to step 3 as step 1 & 2 already performed. Repeat Previous Cue if necessary.
GRADE Standards:
Grade:
SAT UNSAT STEP 2
X Performance Step:
Check Diesel Generator A Status
- a. Using key 12B554 from SM key ring, Unlock and Place the CONTROL MODE selector switch in LOCAL.
(step 3.a)
GRADE x
Standards:
Locate CONTROL MODE selector switch and simulates inserting key into switch.
4 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Fire Control Room Evacuation due to a dCue::
11,e I215541W4 is'nse-te GRADE x
Standards:
Simulates rotating the control mode selector switch to the LOCAL position.
GRADE Standards:
Simulates silencing and acknowledging alarm.
Grade:
SAT UNSAT STEP 3
x Performance Step:
Unlock and Place transfer switch 43FT1 in ISOLATE.
(step 3.b)
GRADE x
Standards:
Locates transfer switch 43FT1 and simulates inserting PEO Rounds key into lock, unlocking lock, and swinging the switch cover up.
GRADE x
Standards:
Simulates rotating transfer switch 43FT1 to the ISOLATE position.
Grade:
SAT UNSAT 5 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire STEP GRADE 4
x Performance Step:
Standards:
x Unlock and Place transfer switch 43FT in ISOLATE. (step 3.c)
Locates transfer switch 43FT and simulates inserting PEO Rounds key into lock, unlocking lock, and swinging the switch cover up.
GRADE x
Standards:
Simulates rotating transfer switch 43FT to the ISOLATE position.
SAT UNSAT Grade:
STEP GRADE 5
x x
Performance Step:
Standards:
Verify EDG A - RUNNING.
Proceeds to step 3.d RNO.
SAT UNSAT Grade:
STEP GRADE 6
X x
Performance Step:
Standards:
Grade:
Proceed to step 4.
(step 3.d.RNO)
Proceeds to step 4.
SAT UNSAT 6 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire STEP 7
Performance Step:
Check If Diesel Generator A Should Be Started From Local Control Panel (3EGS*PNLA)
Verify ASP operator desires EDG A -
STARTED (step 4.a)
GRADE Standards:
Grade:
Simulates establishing communications with the ASP operator to determine if starting of 'A' EDG local start desired.
SAT UNSAT STEP 8
X Performance Step:
Open EDG A service water outlet valve (3SWP*AOV39A) by venting (3SWP*HV39A). (step 4.b)
GRADE X
Standards:
Locates 3SWP*HV39A (next to flow indicator) and simulates rotating the handle to the "vent" position.
Grade:
SAT UNSAT Comments:
9ue:0N i
Comments:
7 of 17 If examinee checks flow indicator 3SWP-FIS41A again, provide the following cue:
SkRIaey If examinee climbs up the platform to
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire valve 3SWP*AOV39A to check the local indicator, provide the following cue:
ue.:,
The poi n
STEP 9
x Performance Step:
Place the UNIT/PARALLEL switch in UNIT (step 4.c)
GRADE x
Standards:
Locates the Unit/Parallel switch (EDG control panel) and simulates rotating the switch to the UNIT position if necessary.
Grade:
SAT UNSAT STEP 10 x
Performance Step:
Press ENGINE SHUTDOWN RESET pushbutton.
(step 4.d)
GRADE x
Standards:
Locates the Engine Shutdown Reset pushbutton (EGPA) and simulates pressing it to reset the engine shutdown.
GRADE Standards:
Grade:
Simulates silencing and resetting the alarm.
SAT UNSAT 8 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire STEP 11 X
Performance Step:
Place the ENGINE CONTROL switch in START.
(step 4.e)
GRADE x
Standards:
Locates the Engine Control switch (EGPA) and simulates rotating it to the Start position.
Grade:
SAT UNSAT STEP 12 x
Performance Step:
Verify emergency diesel generator A -
STARTS.
(step 4.f)
Locates EDG speed (tachometer) indicator and verifies engine speed, then proceeds to step 4.g RNO.
GRADE x
Standards:
Grade:
SAT UNSAT
.Cue D~Ie"sel speed1 is 0~ rpm.-"
STEP 13 X
Performance Step:
PRESS the lever on either air start Alternate Path:
control valve (3EGS*ASV1A or 3EGS*ASV2A).
(step 4.g RNO)
GRADE x
Standards:
Locates either air start control valve and using the attached lever, locks the lever around the pivot pin and pushes down on the valve.
9 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire GRADE X
Standards:
Silences, acknowledges and resets the alarms.
Grade:
SAT UNSAT Comments:
If examinee checks diesel speed provide the following cue.
ICQW Engine pe iRgs~
grp a
STEP 14 Performance Step:
Adjust the AUTO VOLTAGE CONTROL switch to maintain generator voltage - BETWEEN 3740 and 4580 volts.
(step 4.g)
GRADE Standards:
Grade:
Locates generator voltage meter (EGPA) and reads voltage.
SAT UNSAT
-Cu e:
Ie rIao vot ei45vls.
FGq L
I.
i>... +s-.z g 1.~.>^..5.w.A MP^...1~.....
10 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#1 5A)
Revision:
5 Task
Title:
Secondary Fire Side PEO Actions on a Control Room Evacuation due to a STEP 15 Performance Step:
Adjust the GOVERNOR CONTROL switch to maintain generator frequency
- BETWEEN 59.2 and 60.8 Hz.
(step 4.h)
GRADE Standards:
Grade:
Locates generator frequency meter (EGPA) and reads frequency.
SAT UNSAT Cidie;N penerawfrequency i 60.0 Hz.
STEP 16 x
Performance Step:
Fail Open diesel generator enclosure air supply dampers.
- Place circuit breaker 6 on 3SCV*PNL25(0) to OFF (step 4.)
GRADE x
Standards:
Grade:
Locates circuit breaker 6 on panel SCV*PNL25(0) and simulates placing it to the OFF position.
SAT UNSAT Cue:
ker STEP 17 x
Performance Step:
Place the GENERATOR BREAKER L/R switch in LOCAL.
(step 5.a)
GRADE x
Standards:
Locates the Generator Breaker Local/Remote switch and simulates placing it in the Local position 11 of 17
PERFORMANCE INFORMATION JPM Number:
Task
Title:
P.03 (#1 5A)
Revision:
5 Secondary Side PEO Actions on a Control Room Evacuation due to a Fire GRADE Standards:
Grade:
Simulates silencing and acknowledging the alarm.
SAT UNSAT 12 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire STEP 18 X
Performance Step:
Place the SYNCHRONIZING SWITCH to ON.
(step 5.b)
GRADE X
Standards:
Locates the synchronizing switch (EGPA) and simulates rotating it to the ON position.
Grade:
SAT UNSAT STEP 19 X
Performance Step:
Verify ASP operator desires the generator circuit breaker - CLOSED.
(step 5.c)
GRADE X
Standards:
Grade:
Simulates establishing communication with ASP to verify generator circuit breaker to be closed.
SAT UNSAT Comments:
Ensure the examinee understands they are to simulate the closing of the circuit breaker.
13 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Fire Side PEO Actions on a Control Room Evacuation due to a STEP 20 X
Performance Step:
Place the GENERATOR CIRCUIT BRKR control switch in CLOSE.
(step 5.d)
GRADE x
Standards:
Locates the generator circuit breaker control switch and simulates placing it in the Close position.
Grade:
SAT UNSAT STEP 21 Performance Step:
Place the SYNCHRONIZING SWITCH to OFF.
(step 5.e)
GRADE Standards:
Grade:
Simulates rotating the synchronizing switch (EGPA) to the OFF position.
SAT UNSAT STEP 22 Performance Step:
Report to ASP operator - EDG A READY TO LOAD.
(step 5.f)
GRADE Standards:
Grade:
Simulates establishing communications with the ASP operator and reports that the 'A' EDG is ready to load.
SAT UNSAT 14 of 17
PERFORMANCE INFORMATION JPM Number:
P.03 (#15A)
Revision:
5 Task
Title:
Secondary Side PEO Actions on a Control Room Evacuation due to a Fire Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
15 of 17
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Evaluator:
P.03 (#15A)
Revision:
5 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
YES NO X
Validated Time (minutes):
15 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
16 of 17
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
P.03 (#15A)
The plant has experienced a loss of Off-Site power and a fire requiring evacuation of the control room. Bus 34C is de-energized.
The US, at the ASP, has directed you to perform the Secondary Side PEO Actions on a Control Room Evacuation in accordance with EOP 3509.1, Attachment B. The Turbine Stop Valves have been verified Closed.
You have a PEO Rounds Key and EDG Control Mode selector switch keys 12B554 & ILCO 999NY1E 17 of 17
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET
- 1. JPM
Title:
LINE UP RHR IN THE INJECTION MODE (RESPOND TO AN RCS LEAK)
JPM ID Number:
S.01 (#135)
Revision:
1
- 11.
Initiated:
1/29/02 Date i
111.
Reviewed:
Technical Reviewer (I /A7 /
Date IV. Approved:
Nuclearraining Manager De 1 of 8
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
JPM ID Number:
S.01 (#135)
Revision:
1 Task
Title:
LINE UP RHR IN THE INJECTION MODE (RESPOND TO AN RCS LEAK)
System:
RHR (5)
Safety Function:
Heat Removal - Primary (4.1)
Time Critical Task:
(
Validated Time (minutes):
Alternate Path?
Task Number(s):
344-C 005-C Applicable To:
) YES
( X ) NO 10 No 05-014 01-002 X
005.A4.01 K/A Rating:
3.6 1 3.4 Method of Testing:
Simulated Performance:
X Actual Performance:
Location:
Task Standards:
Reguired Materials:
General
References:
Classroom:
Simulator:
X In-Plant::
Shift RHR to the Injection Mode IAW AOP 3555, Reactor Coolant System Leak.
AOP 3555, Reactor Coolant System Leak, Rev. 015 None
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 8
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
S.01 (135)
Revision:
1 Simulator Requirements:
- 1. Reset to IC-93 (IC27; EOL, A & B RHR running in Cooldown, OP 3208 Step 4.3.36, Mode 4)
- 2. Enter MALF RC03C, RCS Loop C Cold Leg Rupture at 0.04%
- 3. Place Sim Key #23 in the 3RHS*MOV8701B operator
- 4. Place SIM in RUN for -3 minutes.
- 5. Ensure B CHS pump running and 3CHS*FCV121 FULL OPEN.
- 6. Place the Simulator in Freeze. Go to run when the examinee is ready to begin Initial Conditions:
The plant is in Mode 4 with a plant cooldown in progress. Both trains of RHR are aligned in the cooldown mode. PZR level began to drop and the crew responded by entering AOP 3555, Reactor Coolant System Leak. The B CHS pump is running and the crew has throttled open the Charging Line Flow Control Valve.
Initiating Cues:
The Unit Supervisor directs you to line up the "A" train of RHR for injection using AOP 3555, Reactor Coolant System Leak, Step 3.
- NOTES TO EVALUATOR
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 8
PERFORMANCE INFORMATION JPM Number:
S.01
(#135)
Revision:
1
--.Task
Title:
LINE UP RHR IN THE INJECTION MODE (RESPOND TO AN RCS LEAK)
Start Time:
STEP 1
X Performance Step:
Place RHR pumps lined up for shutdown cooling in PULL-TO-LOCK (step 3.a)
Standards:
Places both RHR pump control switches in stop and then places both RHR pump control switches in Pull-To-Lock.
Grade:
Performance Step:
SAT UNSAT STEP 2
Check -ONE TRAIN OF RHR LINED UP FOR INJECTION (Step 3.b)
GRADE Standards:
Grade:
Verifies that both trains of RHR were aligned in the Shutdown Cooling Mode. Shifts to the Response Not Obtained column.
SAT UNSAT 4 of 8
PERFORMANCE INFORMATION JPM Number:
S.01
(#135)
Revision:
1 Task
Title:
LINE UP RHR IN THE INJECTION MODE (RESPOND TO AN RCS LEAK)
STEP 3
x Performance Step:
Close RHR Letdown Flow Control Valve (3CHS-HC128) (Step 4.a)
GRADE STEP GRADE X
4 X
X Standards:
Performance Step:
Standards:
Locates the controller on MB3 apron section and rotates the potentiometer to 0.0 (Full Closed)..
Close RHR Outer CTMT Isolation Valve (3RHS*MV8701 B) (Step 4.b)
Locates the motor operated valve on MB2 and places switch to close.
Green light on, Red light off.
Grade:
SAT UNSAT STEP 5
X Performance Step:
CLOSE RHR heat exchanger bypass valve (3RHS-FK618)(100%
output)(Step 4.c)
GRADE GRADE X
Standards:
X Performance Step:
X Standards:
X Performance Step:
X Standards:
Grade:
Locates the controller on MB2 and places the controller in manual and lowers to full demand (full lower).
CLOSE RHR heat exchanger outlet flow control valve (3RHS-HC606)(Step 4.c)
Locates the controller on MB2 and rotates the potentiometer to the 0%
demand position (10.0 position).
Place the "HX A FLOW CONT" switch in the "NORMAL" position. (Step 4.d)
Locates the control switch on MB2 apron section and places in the "NORM" position.
STEP 6
GRADE SAT UNSAT 5 of 8
PERFORMANCE INFORMATION JPM Number:
S.01 (#135)
Revision:
1 Task
Title:
LINE UP RHR IN THE INJECTION MODE (RESPOND TO AN RCS LEAK)
STEP 7
X Performance Step:
Adjust RHR heat exchanger bypass valve controller (3RHS-FK618) in manual to full open (0% output). (Step 4.e)
GRADE x
Standards:
Locates the controller on MB2 and presses the up arrow to the full up position which is the 0% demand position.
x x
Performance Step:
Standards:
Grade:
Performance Step:
Adjust RHR heat exchanger outlet flow valve controller demand (3RHS-HC606) to open (Step 4.e)
Locates the controller on MB2 and rotates the potentiometer to the 1 00%
demand position.
SAT UNSAT STEP 8
X OPEN RWST to RHR pump suction isolation valve (3SIL*MV8812A).
(Step 4.f)
GRADE X
Standards:
Grade:
Performance Step:
Locates the controller on MB2 and pushes "OPEN" pushbutton.
Observes red light on and green light off.
SAT UNSAT STEP 9
X Verify RHR cold leg injection isolation valve (3S[L*MV8809A) - OPEN. (Step 4.g)
GRADE x
Standards:
Locates controller on MB2 and verifies red light on and green light off.
Grade:
SAT UNSAT 6 of 8
PERFORMANCE INFORMATION JPM Number:
S.01
(#135)
Revision:
1 Task
Title:
LINE UP RHR LEAK)
IN THE INJECTION MODE (RESPOND TO AN RCS STEP GRADE 10 X
X Performance Step:
Standards:
Place RHR pump 3RHS*P1A in AUTO. (Step 4.h)
Rotates hand switch from Pull-To-Lock to "Off/Auto Start" position..
Grade:
SAT UNSAT STEP 1 1 GRADE X
Performance Step:
X Standards:
Grade:
Comments:
Initiate SI. (Step 4.i)
Locates and rotates either MB2 or MB4 SI switch to the "SI" position and releases the switch.
SAT UNSAT Examinee may verify RHR Pump "A" auto started at this point but it is not required to satisfy the critical nature of this step.
STEP 12 GRADE Performance Step:
Standards:
Grade:
Go to E-0, Reactor Trip or Safety Injection. (Step 4.j)
The candidate either announces the procedure transition or commences the immediate actions of E-O SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
7 of 8
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
S.01
(#135)
Revision:
1 Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
YES NO X
Validated Time (minutes):
10 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
8 of 8
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
S.01
(#135)
The plant is in Mode 4 with a plant cooldown in progress.
Both trains of RHR are aligned in the cooldown mode. PZR level began to drop and the crew responded by entering AOP 3555, Reactor Coolant System Leak. The B CHS pump is running and the crew has throttled open the Charging Line Flow Control Valve.
The Unit Supervisor directs you to line up the "A" train of RHR for injection using AOP 3555, Reactor Coolant System Leak, Step 3.
9 of 8
JOB PERFORMANCE MEASURE GUIDE I. JPM
Title:
PRESSURIZER PRESSURE CONTROL FOLLOWING REACTOR TRIP JPM ID Number:
S.02
(#50A)
Revision:
5, Chg. 2 3/19/01 II. Initiated:
A. Oxfurth Developer 3/11/97 Date Steve Jawed:n Verified Currert l/
111.
Reviewed:
3/6/02 Date Ca17l7 Technical Reviewer 6/17/0 ;
Date IV. Approved:
Nuclear ining Manager C // A
/batb
JOB PERFORMANCE MEASURE GUIDE a Unit 3 Student:
Facility:
Millstoni JPM ID Number:
S.02
(#50A)
Revision:
5, Chg. 2 Task
Title:
PRESSURIZER PRESSURE CONTROL FOLLOWING REACTOR TRIP System:
PRESSURIZER PRESSURE CONTROL (10)
Safety Function:
Rx Pressure Control (3)
Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
5 Alternate Path:
YES Task Number(s):
Applicable To:
000-05-124, 010-01-045 SRO RO PEO KIA Number:
027-AA1.01 K/A Rating:
4.0 / 3.9 Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
Required Materials:
General
References:
Respond to a Reactor Trip with No Safety Injection.
Manually Control PZR Pressure.
None.
EOP 35, ES-0.1, Reactor Trip Response, Rev. 19
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
S.02
(#50A)
Revision:
5, Chg. 2 Simulator Requirements:
- 1. Reset to IC-94 (IC-21, 100% steady state power.)
- 2.
Insert malfunctions RP02A and RP02B - reactor trip.
- 3. Place the simulator in "RUN". Allow the reactor trip to occur, throttle back AFW flow to approximately 150 gpm per SG by closing the MDAFW flow control valves and throttling the TDAFW flow control valves.
- 4. Acknowledge/reset alarms and place the simulator in "Freeze".
- 5. Insert malfunction RX06A, pressurizer spray valve PCV-455B auto control failure, at 50% severity over a ramp time of 120 seconds.
- 6. Under Simulator diagrams (left screen):
RX Sheet 13, component 3RCS-PK455B, select "auto" and then "activate" or Use I/O (RX) 3RCS-PK455B AUTO - ON This will keep controller PK455B in the "AUTO" position. The intent is to have an inadvertent reactor trip with a spray valve failing open after the simulator is placed in "RUN".
NOTE: This I/O will NOT to function if snapped and reset. If working from a snapped IC, delete and re-enter the I/O to ensure results.
- 7.
Place the simulator in "RUN" and verify RCS pressure is 2000 +/- 10 psig and decreasing. Place the simulator in "FREEZE".
- 8. After the examinee has received the initiating cues and initial conditions, place the simulator in "RUN".
Approximate setup time is 10 minutes.
JOB PERFORMANCE MEASURE GUIDE (Continued)
Initial Conditions:
Initiating Cues:
An inadvertent reactor trip has occurred. The control room team has completed the actions of E-0 and ES-0.1, through Step 4.
The US has directed you to check pressurizer pressure control using step 5 in EOP 35 ES-0.1. You will be responsible for acknowledging the alarms on MB4. During the performance of this JPM other annunciators may come in (i.e. condenser vacuum, etc.) The instructor will role play as a second control board operator and acknowledge/reset these alarms.
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
PERFORMANCE INFORMATION JPM Number:
S.02
(#50A)
Revision:
5, Chg. 2 Task
Title:
PRESSURIZER PRESSURE CONTROL FOLLOWING REACTOR TRIP Start Time:
NOTE:
If during the performance of this JPM, a Low Pressurizer pressure SI is actuated, the examinee automatically fails.
STEP 1
Performance Step:
Standards:
Check PZR Pressure Control Verify PZR pressure - GREATER THAN 1890 psia. (Step 4.a)
Checks pressurizer pressure greater than 1890 psia by observing pressure indication on meters:
GRADE RCS-PI455A RCS-PI456A RCS-PI457 RCS-PI458 OR Recorder PR455 Grade:
SAT UNSAT STEP GRADE 2
X x
Performance Step:
Standards:
Verify PZR pressure - STABLE AT OR TRENDING TO 2250 psia. (Step 4.b)
Notes that PZR pressure is less than 2250 psia and decreasing. Checks the RNO column and proceeds to step 5d.
Grade:
SAT UNSAT
PERFORMANCE INFORMATION JPM Number:
S.02
(#50A)
Revision:
5, Chg. 2 Task
Title:
PRESSURIZER PRESSURE CONTROL FOLLOWING REACTOR TRIP STEP GRADE 3
X X
Performance Step:
Standards:
Check PZR status: Check PZR pressure - LESS THAN 2250 psia.
Then proceed to step 5.d.
Monitors pressure and observes that pressure is less than 2250 psia.
Grade:
SAT UNSAT STEP 4
GRADE Performance Step:
Standards:
Comments:
Grade:
Comments:
Verify PZR PORVs - CLOSED.
(step 5.d)
Verifies PZR PORV valves closed by observing indicating lights as green ON, red OFF.
The examinee may also check PORV outlet temp (RCS-TI463) as approximately 1 1 0F and PRT parameters as confirmatory indications.
SAT UNSAT During JPM steps 5, 6 and 7, the examinee may decide to inform the US of problems and corrective actions taken in accordance with the procedure. This is not required for satisfactory completion of the step.
STEP 5
Performance Step:
Standards:
Verify PZR spray valves - CLOSED.
(Step 5.e)
Identifies that loop #1 PZR spray valve, RCS*PCV455B is OPEN.
GRADE Grade:
SAT UNSAT
PERFORMANCE INFORMATION JPM Number:
S.02
(#50A)
Revision:
5, Chg. 2 Task
Title:
PRESSURIZER PRESSURE CONTROL FOLLOWING REACTOR TRIP STEP 6
X Performance Step:
Proceed to RNO column CLOSE the spray valves.
IAlternate Path:
(Step 5.e RNO)
GRADE X
Standards:
Comments:
Depresses the "manual" pushbutton on controller RCS*PCV455B.
Observes the controller will not shift to
manual" ("auto" light stays lit and the
manual" light does not come on).
The examinee may depress the "UP ARROW'(A) and/or "DOWN ARROW'(V) pushbuttons to confirm the controller did not shift to "manual".
This is not required to complete the step. Additionally, the examinee may place the Master Pressure Controller (3RCS*PCV455A) in "MANUAL" and increase its output in an attempt to close the spray valve. Since the controller output is already at the maximum, this will have no effect and is not required for completion of the step.
Grade:
SAT UNSAT
PERFORMANCE INFORMATION JPM Number:
S.02
(#50A)
Revision:
5, Chg. 2 Task
Title:
PRESSURIZER PRESSURE CONTROL FOLLOWING REACTOR TRIP STEP 7
X Performance Step:
IF any spray valve can NOT be closed THEN STOP RCPs 1 and 2.
(Step 5.e RNO)
GRADE GRADE X
X Standards:
Standards:
Grade:
Rotates RCP 1 control switch RCS-P1A to the "STOP" position and observes the indicating lights shift to green ON, red OFF and amperage goes to zero.
Rotates RCP 2 control switch, RCS-P1 B to the "STOP" position and observes the indicating lights shift to green ON, red OFF and amperage goes to zero.
SAT UNSAT Comments:
Performance Step:
Standards:
Annunciators "RCP Loop 1 Flow Lo",
"RCP Loop 2 Flow Lo" and "RCP Low Speed" will alarm. The examinee should silence and acknowledge these alarms. This is not necessary to satisfy this critical step.
Verify PZR heaters - ENERGIZED.
(Step 5.f Verifies heater groups 3RCS*H1A, H1B, HIC, H1D and HME are on by observing the indicating lights as green OFF, red ON.
STEP 8
GRADE Grade:
SAT UNSAT
PERFORMANCE INFORMATION JPM Number:
S.02
(#50A)
Revision:
5, Chg. 2 9
Task
Title:
STEP PRESSURIZER PRESSURE CONTROL FOLLOWING REACTOR TRIP 9
Performance Step:
Inform the US that pressurizer pressure control has been checked.
GRADE Standards:
Reports to the US that pressurizer pressure control has been checked, RCPs 1 and 2 have been stopped and pressure is now stable. Also reports the problem with the spray valve, if not previously done.
Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
VERIFICATION OF JPM COMPLETION JPM Number:
S.02
(#50A)
Revision:
5, Chg. 2 Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
YES NO X
Validated Time (minutes):
5 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
S.02
(#50A)
An inadvertent reactor trip has occurred. The control room team has completed the actions of E-0 and ES-0.1, through Step 4.
The US has directed you to check pressurizer pressure control using step 5 in EOP 35 ES-0.1. You will be responsible for acknowledging the alarms on MB4.
During the performance of this JPM other annunciators may come in (i.e. condenser vacuum, etc.) The instructor will role play as a second control board operator and acknowledgeireset these alarms.
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 JPM ID Number:
S.03 (New)
Revision:
1 II. Initiated:
6112/02 Date III. Reviewed:
Technical Reviewer 6 //7/oa Date IV. Approved:
Nule ining Manager 6 /o Pato' 1 of 10
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
JPM ID Number:
S.03 (New)
Task
Title:
ENERGIZE THE AC EN\\/
Revision:
1 IERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 System:
AC Electrical Distribution (62)
Safety Function:
Electrical (6)
Time Critical Task:
) YES
( X ) NO Validated Time (minutes):
5 Alternate Path?
Task Number(s):
Applicable To:
Yes 000-05-097 SRO X
062.A2.05 K/A Rating:
2.9 /3.3 Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
Required Materials:
General
References:
Respond to a Loss of All AC Power ECA-0.0, Loss of All AC Power, Rev. 016 EOP 35 General Attachment, GA-3; Energizing 4.16 KV Bus From Offsite Power, Rev. 000 None
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 10
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
S.03 (New)
Revision:
1 Simulator Requirements:
- 1. Reset to IC-95 (IC: 21, 100% power, EOL)
- 3. Enter I/O (EG) IA-3ENSACB-A, CLOSE - FALSE, to prevent EDG A Output breaker from closing manually
- 4. Place the Simulator in Run
- 5. Enter MALF ED01, Loss of Offsite Power, run for 5 minutes, perform E-0, steps 1-3, and ECA-0.0, steps 1-4.
- 6. Remove MALF ED01
- 7. Place the Simulator in Freeze. Go to run when the examinee is ready to begin The plant has experienced a Loss of Offsite Power. The A EDG started but did not load. The B EDG started and catastrophically failed. The crew responded using E-0 and ECA-0.0 and has completed ECA-0.0 through step 4. CONVEX has restored offsite power which is available and reliable.
The Unit Supervisor directs you to restore power to any AC emergency bus starting at ECA-0.0, step 5.
Initial Conditions:
Initiating Cues:
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 10
PERFORMANCE INFORMATION JPM Number:
S.03 (New)
Revision:
1 Task
Title:
ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 Start Time:
STEP 1
Performance Step:
Standards:
Grade:
Energize AC emergency bus from it's emergency diesel generator:
START one emergency diesel generator (step 5.a)
Observes A EDG running. Observes that the EDG has NOT automatically close onto bus 34C. Candidate MAY observe degraded frequency SAT UNSAT STEP 2
X x
GRADE Performance Step:
Verify EDG output breaker - CLOSED (Step 5.b)
Alternate Path Observes that Bus 34C and 34D are Standards:
both de-energized. The candidate may try to close the A EDG Output Breaker since it is an automatic action which did not occur.
Candidate transitions to RNO column.
Grade:
SAT UNSAT STEP GRADE 3
X x
Performance Step:
Standards:
Grade:
CLOSE breaker (MB8) (Step 5.b RNO)
Candidate attempts to close the A EDG output breaker. When it will not close he transitions to step 5.c SAT UNSAT STEP 4
GRADE Performance Step:
Standards:
Grade:
Verify at least one AC emergency bus
- ENERGIZED (Step 5.c)
Observes that Bus 34C and 34D are both still de-energized.
SAT UNSAT 4 of 10
PERFORMANCE INFORMATION JPM Number:
S.03 (New)
Revision:
1 Task
Title:
ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 STEP 5
GRADE Performance Step:
Standards:
Grade:
Performance Step:
Proceed to step 5.e (Step 5.c RNO)
Candidate Proceeds to step 5.e.
SAT UNSAT STEP 6
Check offsite power - AVAILABLE (Step 5.e)
GRADE Standards:
Comment:
Grade:
Performance Step:
At MB8 observes any of the following:
- Grid frequency meter (upright)
- Grid voltage meter(upright)
- RSST "available" white lights (apron)
This information also given in initial conditions. Candidate may choose not to verify.
SAT UNSAT STEP 7
Using GA-3, energize emergency bus 34C or 34D through the RSST or the NSST (step 5.f)
GRADE Standards:
Grade:
Candidate Proceeds to GA-3.
SAT UNSAT STEP 8
Performance Step:
Check Energizing Bus 34C -
DESIRED (step 1 of GA-3)
GRADE Standards:
Grade:
Candidate Proceeds to step 2 based on previous cue.
SAT UNSAT 5 of 10
PERFORMANCE INFORMATION JPM Number:
S.03 (New)
Revision:
1 Task
Title:
ENERGIZE THE AC EMERGENCY DURING ECA - 0.0 BUS THROUGH THE RSSA STEP 9
X Performance Step:
Standards:
Energize Bus 34C. Place the following control switches in PULL-TO-LOCK (step 2.a)
- One Train A Service Water Pump
- RPCCW Pumps Train A
- Quench Spray Pump A
- Recirc Spray Pump A
- Recirc Spray Pump C
- Aux Building Filter A Locates the control switches for the following components and places the switch in stop and then in in PULL-TO-LOCK.
One Train A Service Water Pump
- RPCCW Pumps Train A
- Quench Spray Pump A
- Recirc Spray Pump A
- Recirc Spray Pump C
- Control Building Chiller A
- Aux Building Filter A GRADE X
Grade:
Performance Step:
SAT UNSAT STEP 10 Verify annunciator, "Bus 34C UNDERVOLTAGE" (MB8A 3-12) -
NOT LIT (step 2.b)
GRADE Standards:
Grade:
Observes annunciator MB8A 3-12, "Bus 34C UNDERVOLTAGE" not lit on MB8A.
SAT UNSAT 6 of 10
PERFORMANCE INFORMATION JPM Number:
S.03 (New)
Revision:
1 Task
Title:
ENERGIZE THE AC EMERGENCY DURING ECA - 0.0 BUS THROUGH THE RSSA STEP GRADE 11 X
x Performance Step:
Standards:
PRESS "BYPASS" on the bus 34C undervoltage block pushbutton.
(MB8R) (Step 2.c)
Locates pushbutton on MB8R, pushes button and observes white light go off.
Grade:
SAT UNSAT STEP 12 X
Performance Step:
Check undervoltage block white light -
NOT LIT. (Step 2.d)
GRADE x
Standards:
Observes white light NOT LIT on pushbutton on MB8R Grade:
SAT UNSAT STEP 13 GRADE Performance Step:
Standards:
Grade:
Check Power from RSSA -
AVAILABLE. (Step 2.e)
Observes white "power available" light LIT on MB8 SAT UNSAT STEP GRADE 14 X
x Performance Step:
Standards:
Grade:
Energize Bus 34C from RSSA Place RSSA sync selector switch in -
ON (Step 2.f.1)
Places or checks sync selector handle in synchronizing selector for RSSA to bus 34C on turns to ON position.
Observes INCOMING voltage meter register voltage at about 125 v.
SAT UNSAT 7 of 10
PERFORMANCE INFORMATION JPM Number:
S.03 (New)
Revision:
1 Task
Title:
ENERGIZE THE AC EMERGENCY BUS THROUGH THE RSSA DURING ECA - 0.0 STEP 15 x
Performance Step:
CLOSE RSSA supply breaker (RSSA*34C-2) (Step 2.f.2)
GRADE x
Standards:
Locates and turns RSSA*34C-2, RSSA supply breaker to the close position and releases. Observes breaker green light go OFF and red light go ON. Observes voltage on bus 34C at about 4000 v. Also may observe synchroscope RUNNING voltage go to about 125 v. Lights come on in the Control Room Grade:
SAT UNSAT STEP 16 Performance Step:
Place RSSA sync selector in - OFF.
(Step 2.f.3)
GRADE Standards:
Places or checks sync selector handle in synchronizing selector for RSSA to bus 34C on turns to OFF position.
Observes INCOMING and RUNNING voltage meters go to zero.
Grade:
SAT UNSAT Comments:
When candidate reads step 2.f.4 go to terminating cue and end the JPM.
Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
8 of 10
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Evaluator:
S.03 (New)
Revision:
1 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
YES NO X
Validated Time (minutes):
5 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for ImDrovement:
9 of 10
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
S.03 (New)
The plant has experienced a Loss of Offsite Power. The A EDG started but did not load. The B EDG started and catastrophically failed. The crew responded using E-0 and ECA-0.0 and has completed ECA-0.0 through step 4.
CONVEX has restored offsite power which is available and reliable.
The Unit Supervisor directs you to restore power to any AC emergency bus starting at ECA-0.0, step 5.
10 of 10
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
DROPPED ROD RECOVERY AT POWER JPM ID Number:
S.04
(#1 12)
Revision:
2 II. Initiated:
Steve Developer 2/13/02 Date Ill.
Reviewed:
Technical Reviewer ate 7 IC a Date IV. Approved:
Nucfear
- ning Manager Date 1 of 11
JOB PERFORMANCE MEASURE GUIDE e Unit 3 Student:
Facility:
MillstonE JPM ID Number: S.04
(#112)
R Task
Title:
DROPPED ROD RECOVERY AT POWER revision:
2 System:
Control Rod Drive System (001)
Safety Function:
Reactivity Control (1)
Time Critical Task:
) YES
( X ) NO Validated Time (minutes):
15 Alternate Path?
Task Number(s):
No 344-05-030. 344-05-041 Applicable To:
SRO X
RO X
PEO K/A Number:
014-A2.03 K/A Rating:
3.6/4.1 Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
Required Materials:
General
References:
Satisfactorily recover a dropped control rod while operating at power using Attachment B of AOP 3552.
AOP 3552, Malfunction of the Rod Drive System, Rev. 3 None
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 11
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
S.04
(#112)
Revision:
2 Simulator Requirements:
- 1)
Reset to IC-96 (IC-21, Full Power, EOL)
Ensure step counters will display the correct rod position.
Place the turbine on the load limiter.
- 2)
Place the simulator in "RUN."
Insert malfunction RD0301 @ 0%, Rod D-2 in Shutdown Bank A drops.
Acknowledge annunciators.
Rotate the Control Rod "SEL" switch to the "MAN" position.
- 3)
Check TAVE-TREF mismatch.
If mismatch is < -1 OF (neg.), no further setup action is required.
If mismatch is > -1 OF (neg.), adjust turbine load as necessary to reduce the mismatch to -1OF.
- 4)
Remove malfunction RD0301.
Place the simulator in "FREEZE."
After the examinee has received the initial conditions and initiating cues, place the simulator in "RUN."
Approximate simulator setup time is 5-7 minutes.
Initial Conditions:
Initiating Cues:
While operating at 100% power, one of the control rods dropped because of a blown gripper coil fuse. I&C has replaced the fuse and the plant is stable. A QPTR of 1.01 has been calculated.
The US has directed you to recover dropped rod D-2 in Shutdown Bank A using AOP 3552, Attachment B, steps 5-7.
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e.
"What are you looking at?" or "What are you observing?").
3 of 11
PERFORMANCE INFORMATION JPM Number:
S.04
(#1 12)
Revision:
2 Task
Title:
DROPPED ROD RECOVERY AT POWER Start Time:
STEP I
GRADE Performance Step:
Standards:
Grade:
Performance Step:
Standards:
Record affected group step counter position. (Step 5.a)
Determines that the dropped rod (D-2) is in Shutdown Bank A, Group 1.
Observes that the group step counter for this group reads 224-226 steps.
SAT UNSAT STEP 2
X GRADE X
Reset affected group step counter to zero. (Step 5.b)
Depresses the bottom pushbutton located on the right side of the affected group step counter (Shutdown Bank, Group 1).
Observes the step counter indication changes to "0" (zero).
Comments:
Grade:
It is acceptable for the examinee to go to the control rod disconnect box to determine which group the dropped rod is in.
SAT UNSAT STEP 3
Performance Step:
Align control rod disconnect switches:
Unlock and Open control rod disconnect switch box. (Step 5.c.1)
GRADE Standards:
Grade:
Opens door of rod disconnect switch box and (MB3R).
SAT UNSAT 4 of 11
PERFORMANCE INFORMATION JPM Number:
S.04
(#112)
Revision:
2 Task
Title:
DROPPED ROD RECOVERY AT POWER STEP 4
X Performance Step:
Place each rod disconnect switch for the affected bank, except the dropped rod, to the "ROD DISCONNECTED" position. (Step 5.c.2)
GRADE X
Standards:
Grade:
Except for rod D-2, positions the toggle switches for the remaining rods in Shutdown Bank A up to the "ROD DISCONNECTED" position. [UP] [9 switches]
SAT UNSAT STEP 5
X x
Performance Step:
Standards:
Place control rod bank SEL switch to the affected bank position. (Step 5.d)
Rotates control rod bank SEL switch to the "SBA" position.
GRADE Grade:
SAT UNSAT STEP 6
Performance Step:
Standards:
Recover Dropped Rod:
Check rod drop time - LESS THAN 1 HOUR.
(Step 6.a)
Verifies that less than one hour has elapsed since the rod dropped.
GRADE Performance Step:
Recover Dropped Rod:
Check power - LESS THAN OR EQUAL TO 50%, (Step 6.b) OR QPTR
< 1.02. (Step 6.b RNO)
Determines reactor power from available indications. QPTR of 1.01 was provided in the initiating cues.
GRADE Standards:
A of11 iss
=
5 of 11
PERFORMANCE INFORMATION JPM Number:
S.04
(#1 12)
Revision:
2 Task
Title:
DROPPED ROD RECOVERY AT POWER Performance Step:
Standards:
Recover Dropped Rod:
Adjust turbine load as necessary while withdrawing the dropped rod to minimize TAVG-TREF deviation.
(Step 6.c)
Coordinates with BOP operator to adjust turbine load as necessary while withdrawing the dropped rod to minimize TAVG-TREF deviation.
GRADE Grade:
SAT UNSAT STEP 7
X Performance Step:
Withdraw dropped rod until affected group step counter indicates the value recorded in step 5a. (Step 6.f0 GRADE X
Standards:
Comments:
Standards:
Positions and hold the "Control Rod Motion" switch in the "OUT" position.
Annunciator MB4C:4-8, "ROD CONTROL URGENT FAILURE" will alarm. The examinee should acknowledge this alarm.
Acknowledging the alarm is not required to complete the critical nature of this step.
While withdrawing rod D-2, check DRPI against the group demand position (step counter) to ensure they are within +/-12 steps.
GRADE 6 of 11
PERFORMANCE INFORMATION JPM Number:
S.04
(#112)
Revision:
2 Task
Title:
DROPPED ROD RECOVERY AT POWER Comments:
Comments:
Comments:
When rod D-2 moves to the DRPI 6-step position, annunicator MB4C:5-10, "ONE ROD BOTTOM" should clear.
When the group step counter demand position is in the range of 140-160 steps, annunciators MB4C:3-5, "PR UP DET Hi FLUX DEV/AUTO DEFEAT" and MB4C:3-6, "PR LO DET Hi FLUX DEV/AUTO DEFEAT" should clear.
As rod D-2 approaches the position of the remainder of Shutdown Bank A, annunciator MB4C:6-9, "ROD POSITION DEVIATION" should clear.
The examinee should acknowledge these alarms. Acknowledging these alarms is not required to complete the critical nature of this step.
GRADE Comments:
Standards:
Grade:
TAVG will increase 1-1.5 0F during rod D-2 withdrawal. This deviation should not require adjusting turbine load during the dropped rod recovery.
When the group step counter for Shutdown Bank A, Group 1 reaches 225 steps, releases the "Control Rod Motion" switch to the center "neutral" position.
SAT UNSAT 7 of 11
PERFORMANCE INFORMATION JPM Number:
S.04
(#112)
Revision:
2 Task
Title:
DROPPED ROD RECOVERY AT POWER STEP 8
X Performance Step:
Restore Rod Control System:
Place all lift coil disconnect switches for affected bank to ROD CONNECTED position. (Step 7.a)
GRADE X
Standards:
Opens control rod disconnect switch box on rear section of MB3.
Repositions toggle switches for all rods in Shutdown Bank A down to the "ROD CONNECTED" (unlabeled) position. [9 switches]
Grade:
SAT UNSAT STEP 9
Performance Step:
Standards:
Grade:
Restore Rod Control System:
Verify ROD CONTROL URGENT FAILURE (MB4C 4-8) annunciator -
LIT. (Step 7.b)
Verifies annunciator - LIT.
GRADE SAT UNSAT STEP 10 X
Performance Step:
Standards:
Restore Rod Control System:
Press ROD DRIVE RESET (Step 7.c)
Verify ROD CONTROL URGENT FAILURE (MB4C 4-8) annunciator -
NOT LIT. (Step 7.d)
Depresses ROD DRIVE RESET pushbutton on MB4.
GRADE x
Standards:
Verifies ROD CONTROL URGENT FAILURE (MB4C:4-8) annunciator -
NOT LIT.
8 of 11
PERFORMANCE INFORMATION JPM Number:
S.04
(#1 12)
Revision:
2 Task
Title:
DROPPED ROD RECOVERY AT POWER Comments:
When the ROD DRIVE RESET pushbutton on MB4 is depressed, annunciator ROD CONTROL URGENT FAILURE (MB4C:4-8) should clear. The examinee should acknowledge this alarm.
Acknowledging the alarm is not required to complete the critical nature of this step.
Grade:
SAT UNSAT STEP 11 GRADE GRADE Performance Step:
Standards:
Standards:
Standards:
Standards:
Grade:
Restore Rod Control System:
Place Control System Bank SEL switch in MAN Places control rod bank SEL switch in "MAN". (Step 7.e)
Determines that affected bank is NOT a control bank, moves to the RNO column at step 7f and proceeds to step 7i.
Requests l&C position Logic Cabinet master cycler count for proper group stepping.
Reports to US that rod D-2 has been recovered GRADE GRADE SAT UNSAT Stop Time:
9 of 11
VERIFICATION OF JPM COMPLETION JPM Number:
S.04
(#1 12)
Revision:
2 Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
Validated Time (minutes):
YES NO X
15 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
10 of 11
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
S.04
(#112)
While operating at 100% power, one of the control rods dropped because of a blown gripper coil fuse. I&C has replaced the fuse and the plant is stable. A QPTR of 1.01 has been calculated.
The US has directed you to recover dropped rod D-2 in Shutdown Bank A using AOP 3552, Attachment B, steps 5-7.
11 of 11
JOB PERFORMANCE MEASURE GUIDE I. JPM
Title:
SHIFT AFW SUCTION TO CST (DWST LO LEVEL)
JPM ID Number:
S.05
(#046)
Revision:
5 II. Initiated:
Steve Jackr6hII-6/12/02 Date Developer 4
III. Reviewed:
Technical Reviewer t
/e 7 A.72 Date IV. Approved:
Nucler raining Manager KA2
/ DatV' 1 of 11
JOB PERFORMANCE MEASURE GUIDE a Unit 3 Student:
Facility:
Millstoni JPM ID Number:
S.05
(#046)
Revision:
5 Task
Title:
SHIFT AFW SUCTION TO CST (DWST LO LEVEL)
System:
AFW (061)
Safety Function:
Heat Removal-Primary (4.2)
Time Critical Task:
) YES
( X ) NO Validated Time (minutes):
4 Alternate Path?
Task Number(s):
No 061-01-016 Applicable To:
SRO X
061-K4.01 K/A Rating:
4.1/4.2 Method of Testing:
Location:
Simulated Performance:
Actual Performance:
X Classroom:
Simulator:
X In-Plant::
Task Standards:
Required Materials:
General
References:
Satisfactorily complete shifting the AFW suction to condensate storage tank using OP 3322.
E-0 or ES-0.1 FOLDOUT PAGE EOP 35 General Attachment, GA-4, Transfer AFW Pump Suction and Fill DWST, Rev. 000 None.
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied. You may use any approved reference material normally available in the Control 2 of 11
JOB PERFORMANCE MEASURE GUIDE Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.
3 of 11
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
S.05
(#046)
Revision:
5 Simulator Requirements:
- 1.
RESET to IC-97 or (IC-21, full power, EOL)
- 2.
Insert malfunction RP02A and RP02B - reactor trip.
- 3.
Select "Audible Alarm Disable" and place the simulator in "RUN". Allow the simulator to stabilize following the reactor trip.
- 4.
Start both MDAFW pumps and close their respective flow control valves to each steam generator.
- 5.
Insert malfunction FW 23 - DWST rupture at 100%
(12,000 gpm leakage). When the "DWST LO" (MB6A, 1-1L) and "DWST LO-LO" (MB6A, 2-1) level alarms are both in
(-31,800 gallons). Acknowledge/clear annunciators, deselect "Audible Alarm Disable" and place the simulator in "Freeze".
- 6.
After the examinee has received the initiating cues and initial conditions, place the simulator in "RUN".
Approximate setup time is 15 minutes.
Initial Conditions:
Initiating Cues:
An inadvertent reactor trip has occurred. The control room team has transitioned from E-0 to ES-0.1. During this transition, it was noticed that DWST level dropped rapidly and the PEO reported a rupture in the tank. The MDAFW pumps are running, but their flow control valves are closed.
The US has directed you to apply E-0 foldout page criteria and shift A & B MDAFW pump suctions to the Condensate Storage Tank.
4 of 11
JOB PERFORMANCE MEASURE GUIDE (Continued)
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
5 of 11
PERFORMANCE INFORMATION JPM Number:
S.05
(#046)
Revision:
5 Task
Title:
SHIFT AFW SUCTION TO CST (DWST LO LEVEL)
Start Time:
STEP 1
Performance Step:
Standards:
Grade:
Performance Step:
AFW SUPPLY SWITCHOVER CRITERIA If DWST level decreases to LESS THAN 80,000gal, AFW pump suction must be shifted to the CST and the DWST filled using GA-4. (E-0 or ES-0.1 FOLDOUT PAGE)
Candidate uses either E-0 or ES-0.1 FOLDOUT PAGE and transitions to GA-4.
GRADE SAT UNSAT STEP 2
RESET ESF Actuation Signals, If Required
GRADE Standards:
Grade:
Performance Step:
Candidate observes MB4 and MB 2 annunciator panels and identifies that no ESF Actuation Signals have occurred. No reset required.
SAT UNSAT STEP 3
Check Transfer MD AFW Pump A Suction to CST - DESIRED (GA-4, step 2)
GRADE Standards:
Grade:
Candidate reviews initiating cue, as necessary, and proceeds to step 3.
SAT UNSAT 6 of 11
PERFORMANCE INFORMATION JPM Number:
S.05
(#046)
Revision:
5 Task
Title:
SHIFT AFW SUCTION TO CST (DWST LO LEVEL)
STEP 4
X Performance Step:
Transfer MD AFW Pump A Suction to the CST (GA-4, step 3.a)
RESET Aux feedwater Train A S/G Lo-Lo level, if required GRADE X
Standards:
Candidate RESETs the pushbutton for A MDAFW pump (MB5).
Observes annunciator MB5A 5-1, "AUX FWAUTO INITIATION RESET" Lit.
Grade:
Performance Step:
SAT UNSAT STEP 5
X Transfer MD AFW Pump A Suction to the CST (GA-4, step 3.b)
GRADE X
Standards:
Depresses the "OPEN" pushbutton for 3FWA*AOV23A and releases the pushbutton when the indicating lights shift to green OFF, red ON.
Grade:
SAT UNSAT STEP 6
X Performance Step:
Transfer MD AFW Pump A Suction to the CST (GA-4, step 3.c)
CLOSE DWST suction to MD AFW pump A (3FWA*AOV61A)
GRADE X
Standards:
Depresses the "CLOSE" pushbutton for 3FWA*AOV61A and releases the pushbutton when the indicating lights shift to green ON, red OFF.
Grade:
SAT UNSAT 7 of 11
PERFORMANCE INFORMATION JPM Number:
S.05
(#046)
Revision:
5 Task
Title:
SHIFT AFW SUCTION TO CST (DWST LO LEVEL)
STEP 7
Performance Step:
Standards:
Grade:
Check Transfer MD AFW Pump B Suction to CST - DESIRED (GA-4, step 4)
Candidate reviews initiating cue, as necessary, and proceeds to step 5.
GRADE SAT UNSAT STEP GRADE 8
X X
Performance Step:
Standards:
Transfer MD AFW Pump B Suction to the CST (GA-4, step 5.a)
RESET Aux feedwater Train B S/G Lo-Lo level, if required Candidate RESETs the pushbutton for A MDAFW pump (MB5).
Observes annunciator MB5A 5-1, "AUX FW AUTO INITIATION RESET" Lit.
Comment:
Grade:
Annunciator may not re-flash.
Observation of annunciator still lit and successful operation of the valves in this step is sufficient.
SAT UNSAT STEP GRADE 9
X X
Performance Step:
Standards:
Grade:
Transfer MD AFW Pump B Suction to the CST (GA-4, step 5.b)
Depresses the "OPEN" pushbutton for 3FWA*AOV23B and releases the pushbutton when the indicating lights shift to green OFF, red ON.
SAT UNSAT 8 of 11
PERFORMANCE INFORMATION JPM Number:
S.05
(#046)
Revision:
5 Task
Title:
SHIFT AFW SUCTION TO CST (DWST LO LEVEL)
STEP GRADE 10 X
x Performance Step:
Standards:
Grade:
Transfer MD AFW Pump B Suction to the CST (GA-4, step 5.c)
Depresses the "CLOSE" pushbutton for 3FWA*AOV61 B and releases the pushbutton when the indicating lights shift to green ON, red OFF.
SAT UNSAT Comment:
When candidate completes GA-4, step 5 go to the Terminating Cue.
Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
9 of 11
VERIFICATION OF JPM COMPLETION JPM Number:
S.05
(#046)
Revision:
5 Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
YES NO X
Validated Time (minutes):
5 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
10 of 11
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
S.05
(#046)
An inadvertent reactor trip has occurred. The control room team has transitioned from E-0 to ES-0.1. During this transition, it was noticed that DWST level dropped rapidly and the PEO reported a rupture in the tank. The MDAFW pumps are running, but their flow control valves are closed.
The US has directed you to apply E-0 foldout page criteria and shift A & B MDAFW pump suctions to the Condensate Storage Tank.
11 of 11
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
Title:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 JPM ID Number:
S.06 (#51 N)
Revision:
0, Chg. I 10/21/99 II. Initiated:
R. L. Lueneburg Developer 12/18/96 Date Steve J; 2/13/02 Date Verified Cui III. Reviewed:
Technical Reviewer t//7/
Date IV. Approved:
Nuclear ining Manager
~1//D: /
I--
1 of 9
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 Student:
JPM ID Number:
S.06 (#51N)
Revision:
0, Chg. 1 Task
Title:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 System:
ESFAS (013)
Safety Function:
RCS Inventory Control (2)
Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
5 Alternate Path?
Task Number(s):
Yes 000-05-084, 000-05-055 Applicable To:
SRO X
Method of Testin 01 3-A4.03 K/A Rating:
4.5 / 4.7 Simulated Performance:
Actual Performance:
X Location:
Task Standards:
Required Materials:
General
References:
Classroom:
Simulator:
X In-Plant::
Respond to a Rx Trip and/or Safety Injection Perform a Manual Safety Injection None.
E-0, Reactor Trip or Safety Injection, Rev. 21
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 10
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
S.06 (#51N)
Revision:
0, Chg. 1 Simulator Requirements:
- 1.
Reset to IC-21, full power, EOL, with Sim in FREEZE
- 2.
Enter malfunction RC09C to cause the "C" RCP to trip.
Also enter RP07A and RP07B to prevent an automatic SI.
Enter malfunction RC02A at 0.1% severity.
- 3.
Place the simulator in run for about 30 seconds until RCS pressure is at approximately 1950 psia. Place the master silence switch in the "silence" position. Ensure RCS pressure is decreasing at a rate that will produce an RCS pressure indication of less than 1890 psia when the examinee is performing step 4 of E-0.
- 4.
Place the simulator in FREEZE.
- 5.
Place the simulator in "run" after the examinee has read and understands the Initial Conditions and Initiating Cues.
Approximate simulator setup time is 6-8 minutes.
Initial Conditions:
Initiating Cues:
Just seconds ago, while the plant was operating at 100% power, the "C" RCP tripped. The US has placed the master silence switch in the "silence" position.
You are directed to carry out the first four (4) steps of E-0 from memory. The simulator will be placed in run when you are ready to begin.
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 10
PERFORMANCE INFORMATION JPM Number:
S.06 (#51 N)
Revision:
0, Chg. 1 Task
Title:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 Start Time:
STEP 1
X-Performance Step:
Verify Reactor Trip.
Check reactor trip and bypass breakers - OPEN Check rod bottom lights - LIT Check neutron flux -
DECREASING GRADE X
Standards:
Grade:
Observes that the reactor trip breakers are open, all rod bottom lights are lit and that reactor power is decreasing.
The reactor is tripped.
SAT UNSAT STEP 2
X Performance Step:
Verify Turbine Trip.
- a. Check all turbine stop valves -
CLOSED GRADE X
Standards:
Grade:
Looks at the stop valve meter indications on the EHC insert on MB7 and observes that all of the turbine stop valves are closed.
SAT UNSAT 4 of 10
PERFORMANCE INFORMATION JPM Number:
S.06 (#51N)
Revision:
0, Chg. 1 Task
Title:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 STEP 3
X Performance Step:
Verify Power to AC Emergency Busses:
- a. Check busses 34C and 34D - AT LEAST ONE ENERGIZED.
- b. Check busses 34C and 34D -
BOTH ENERGIZED.
GRADE X
X GRADE Standards:
Standards:
Grade:
Looks at the voltage indication for bus 34C on MB8 and observes that voltage is present. At least bus 34C is energized.
Looks at the voltage indication for bus 34D on MB8 and observes that voltage is present. Both busses 34C and 34D are energized.
SAT UNSAT STEP 4
X I Performance Step:
Alternate Path:
l Check if SI is Actuated.
- a. Verify Safety Injection Actuation annunciator - LIT.
GRADE Standards:
Grade:
Comments:
At MB4, observes that the Safety Injection Actuation annunciator is not lit. Shifts to the actions in the RNO column.
SAT UNSAT JPM steps 5 - 9 can be performed in any order. When the examinee obtains the indication that an SI is required. the expectation is that he will initiate the SI and therefore not check all of the parameters listed in steps 5 -
- 11. This is acceptable for satisfactory completion of this JPM.
5 of 10
PERFORMANCE INFORMATION JPM Number:
S.06 (#51 N)
Revision:
0, Chg. 1 Task
Title:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 STEP 5
X Performance Step:
Check if SI is required.
Ctmt pressure GREATER THAN 18 psia.
GRADE Standards:
Grade:
6 X
Performance Step:
Checks Ctmt pressure indications on MB2 and observes that Ctmt is approximately 14 - 15 psia and increasing. It is less than 18 psia.
SAT UNSAT STEP RCS pressure LESS THAN 1890 psia.
GRADE
_X Standards:
Standards:
Grade:
AT MB4, observes that the RCS pressure indicators and determines that RCS pressure is decreasing and below or rapidly approaching the SI initiation point of 1890 psia.
Informs the US that an SI is required based on RCS pressure.
GRADE SAT UNSAT GRADE X
Standards:
Rotates the Safety Injection switch at MB2 or MB4 to the actuate position.
Observes that the "Safety Injection Actuated" annunciator lights.
6 of 10
PERFORMANCE INFORMATION JPM Number:
S.06 (#51N)
Revision:
0, Chg. 1 Task
Title:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 STEP 7
GRADE Performance Step:
Standards:
Grade:
Performance Step:
PZR level LESS THAN 9%.
Observes the PZR level indications on MB4 and determines that PZR level is not less than 9%.
SAT UNSAT STEP 8
RCS subcooling LESS THAN 320F.
GRADE Standards:
Grade:
Checks subcooling using the plant process computer or the curves on the back of the clipboards and determines that RCS subcooling is not less than 32 degrees F.
SAT UNSAT STEP 9
Performance Step:
S/G pressure LESS THAN 660 psig.
GRADE Standards:
Grade:
Performance Step:
At MB5, observes that all S/G pressures are greater than 660 psig.
After checking all of the parameters, determines that an Si is not required.
SAT UNSAT STEP 10 x
By observation of ESF Group 2 Status Panel lights, Verify both trains of SI -
ACTUATED (Step 4.b)
GRADE x
Standards:
Grade:
At MB2, observes that all of the of ESF Group 2 Status Panel lights.
After checking all of the of ESF Group 2 Status Panel lights LIT, determines that both trains of SI are ACTUATED.
SAT UNSAT 7 of 10
PERFORMANCE INFORMATION JPM Number:
S.06 (#51N)
Revision:
0, Chg. 1 Task
Title:
PERFORMANCE OF THE IMMEDIATE ACTIONS IN E-0 STEP 11 X
Performance Step:
Check reactor trip and bypass breakers - OPEN (step 4.c).
GRADE X
Standards:
At MB4, observes that all reactor trip and bypass breakers are OPEN.
Grade:
SAT UNSAT STEP 12 Performance Step:
Reports that the first four steps of E-0 have been completed.
GRADE Standards:
Informs the examiner that he has completed the first four steps of E-0.
Grade:
SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.
Stop Time:
8 of 10
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Evaluator:
S.06 (#51 N)
Revision:
0, Chg. 1 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
YES NO X
Validated Time (minutes):
5 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
9 of 10
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
S.06 (#51 N)
Just seconds ago, while the plant was operating at 100% power, the "C" RCP tripped. The US has placed the master silence switch in the "silence" position.
You are directed to carry out the first four (4) steps of E-0 from memory. The simulator will be placed in "run" when you are ready to begin.
10 of 10
JOB PERFORMANCE MEASURE GUIDE I. JPM
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM JPM ID Number:
S.07
(#031)
Revision:
6 chg I II. Initiated:
G. A. Tait Developer 6/8/99 Date Steve J 6t/13 (a Date Verified III. Reviewed:
Technical Reviewer 6/18/02 Date IV. Approved:
Nuclea raining Manager te' 1 of 17
JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 Student:
Facility:
JPM ID Number:
S.07
(#031)
Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM System:
Process Radiation Monitoring (073)
Safety Function:
Instrumentation (7)
Time Critical Task:
(
) YES
( X ) NO Validated Time (minutes):
20 Alternate Path?
Task Number(s):
Applicable To:
No 088-01-005 SRO X
APE 060 AA1.02 GEN 2.1.20 K/A Rating:
2.9 /3.1 4.3 / 4.2 Method of Testing:
Simulated Performance:
Actual Performance:
X Location:
Classroom:
Simulator:
X In-Plant::
Task Standards:
Required Materials:
General
References:
Satisfactorily complete placing the upper levels of the Auxiliary Building on filtered exhaust in accordance with OP 3314A, "Auxiliary Building Heating, Ventilation and Air Conditioning" OP 3314A, "Auxiliary Building Heating, Ventilation and Air Conditioning", Revision 022-07 None.
- READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective(s) for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution were actually being performed.
2 of 17
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:
S.07
(#031)
Revision:
6 chg 1 Simulator Requirements:
Approximate setup time is 5 minutes.
- 1.
Reset to IC-98 (IC-21, 100% steady state, EOL.)
- 2.
Place the simulator in "RUN".
- 3.
Insert malfunction CV09 at 50% severity, 100 gpm leak in VCT.
- 4.
Insert malfunction CV10B at 0% severity, LT185 fails to 0%
(indicates a VCT level transmitter line leak). This will cause annunciator MB3A 4-10, VCT level Hi/Lo and MB3A 3-10, VCT Press Hi/Lo, to come in.
- 5.
After approximately 2 minutes, 3HVR-RE13 will reach the alarm setpoint and annunciators MB2B 2-8 and MB2B 3-9 will come in. Place the simulator in "Freeze".
- 6.
After the examinee has received the intial conditions and initiating cues, place the simulator in "RUN".
Initial Conditions:
Initiating Cues:
A leak on CHS*LT185 level transmitter line for the VCT has resulted in radiation monitor HVR-RE13 going into an alarm status. The control room team is carrying out the actions of AOP 3573, Radiation Monitor Alarm Response. One train of charging and RPCCW pump area ventilation is in service. The Waste Disposal Building ventilation and CTMT purge are not aligned to the AUX. Bldg. filters. General area ventilation is in service.
In carrying out the responses of AOP 3573, Radiation Monitor Alarm Response, the US has directed you to place the upper levels of the Aux. Bldg. on Manual Area Filtration per OP 3314A, Section 4.2.
The simulator instructor will acknowledge all alarms not associated with your task.
- NOTES TO EVALUATOR ****
- 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
- 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM Start Time:
STEP 1
Performance Step:
CAUTION This section supports response to high radiation in the upper levels of the Auxiliary Building (AOP 3573). This section establishes and maintains Auxiliary Building ventilation in the following alignment:
- One train of charging and CCP fans in operation
- 3HVR-FN7 discharging to normal exhaust path through 3HVR*AOD40A and 3HVR*AOD40B
- Waste Disposal Building ventilation and containment purge are not aligned to the Auxiliary Building filters If it becomes necessary to deviate from this alignment, Auxiliary Building upper level ventilation must be stopped as specified in Section 4.3 (Step 4.2.1 Caution)
GRADE Standards:
Reviews precaution.
Grade:
SAT UNSAT 4 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM STEP 2
GRADE Performance Step:
Standards:
Grade:
Performance Step:
CHECK 3HVR*AOD44A and 3HVR*AOD44B, charging and RPCCW pump normal exhaust dampers, open (VP1). (step 4.2.1)
Observes that the indicating lights for 3HVR*AOD44A and 3HVR*AOD44B are green OFF, red ON.
SAT UNSAT STEP 3
CHECK 3HVR*FN14A and 3HVR*FN13A OR 3HVR*FN14B and 3HVR*FN13B, charging and RPCCW pump supply and exhaust fans, one train running (VP1). (step 4.2.2)
GRADE Standards:
Observes that the indicating lights are green OFF red ON for 3HVR*FN14A and 3HVR*FN13A and green ON red OFF for 3HVR*FN14B and 3HVR*FN13B, the A train fans are running.
Grade:
Performance Step:
SAT UNSAT STEP 4
CHECK 3HVR*FN14A and 3HVR*FN14B, charging and RPCCW pump supply fans, in "AUTO"(VP1).
(step 4.2.3)
GRADE Standards:
Grade:
Observes that the "SPLY FANNEN DMPRS" control switches for 3HVR*FN14A and 3HVR*FN14B are aligned to the "AUTO" position.
SAT UNSAT 5 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM STEP 5
GRADE Performance Step:
Standards:
Grade:
Performance Step:
IF above lineup not established, Refer to Section 4.13 and PLACE one train of charging and RPCCW pump area ventilation in service. (step 4.2.4)
Proceeds to step 4.2.5 based upon lineup being verified established by previous procedure steps performed above.
SAT UNSAT STEP 6
VERIFY, Waste Disposal Building ventilation and containment purge, not aligned to Auxiliary Building filters.
- 3HVR*AOD65A, filter sply, closed
- 3HVR*AOD65B, filter sply, closed
- 3HVR*AOD29A, filter sply, closed
- 3HVR*AOD29B, filter sply, closed (step 4.2.5)
GRADE Standards:
Comment:
Grade:
Verifies:
3HVR*AOD65A, filter sply, closed 3HVR*AOD65B, filter sply, closed 3HVR*AOD29A, filter sply, closed 3HVR*AOD29B, filter sply, closed by observing green lights LIT and red lights OFF on all AODs This information was given as part of the initial turnover. Candidate may use initial information to skip this step.
SAT UNSAT 6 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REI 3) ALARM STEP 7
Performance Step:
Step 4.2.6 NOTE This section supports response to high radiation in the upper levels of the Auxiliary Building (AOP 3573).
Therefore, all general area ventilation is stopped to prevent pressurizing the Auxiliary Building. If lower level was left on during the shift in alignment, 3HVR-HVU2B would supply more air than 3HVR-FN7 could exhaust and an unfiltered discharge could occur.
GRADE Standards:
Grade:
Performance Step:
Reviews Note.
SAT UNSAT IF general area ventilation is in service, PERFORM the following (VP1):
STEP 8
X
- a.
STOP the following "AUX BLDG" "HVU's":
3HVR-HVU2A 3HVR-HVU2B
- b.
STOP the following "AUX BLDB" "EXH FANS":
- 3HVR-FN7 (step 4.2.6)
GRADE GRADE GRADE X
X X
Standards:
Standards:
Standards:
Rotates control switch for 3HVR-HVU2A to "STOP" position and observes the indicating lights shift to green ON, red OFF.
Rotates control switch for 3HVR-HVU2B to "STOP" position and observes the indicating lights shift to green ON, red OFF.
Rotates control switch for 3HVR-FN5 to "STOP" position and observes the 7 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 1---
Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-REI3) ALARM indicating lights shift to green ON, red OFF.
GRADE X
Standards:
Grade:
Comments:
Rotates control switch for 3HVR-FN7 to "STOP" position and observes the indicating lights shift to green ON, red OFF.
SAT UNSAT Operation of 3HVR-HVU2A and 3HVR-HVU2B may be performed in any sequence HOWEVER, BOTH 3HVR-HVU2A and 3HVR-HVU2B must be stopped prior to operation of 3HVR-FN5 or 3HVR-FN7. Operation of 3HVR-FN5, and 3HVR-FN7 may be performed in any sequence.
STEP 9
X Performance Step:
To shift Auxiliary Building filters to filtered alignment, PERFORM the following (VP1):
- a.
PRESS and HOLD "FILTER" pushbutton for the following dampers:
- 3HVR*AOD39A, normal exhaust
- 3HVR*AOD43A,filter supply damper
- b.
WHEN the following dampers reposition, RELEASE "FILTER" pushbuttons:
- 3HVR*AOD39A, normal exhaust, closes
- 3HVR*AOD43A, filter supply damper, opens 8 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031) _
Revision:
6 chg 1 I---
Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM
- c.
PRESS and HOLD "FILTER" pushbutton for the following dampers:
- 3HVR*AOD39B, normal exhaust
- 3HVR*AOD43B, filter supply damper
- d.
WHEN the following dampers reposition, RELEASE "FILTER" pushbutton"
- 3HVR*AOD39B, normal exhaust, closes
- 3HVR*AOD43B, filter supply damper, opens (step 4.2.7)
GRADE GRADE X
X Standards:
Standards:
Grade:
Depresses the "FILTER" pushbutton for filter/normal exhaust dampers 3HVR*AOD39A/43A and holds the button until the indicating lights shift to 3HVR*AOD39A, green ON, red OFF and 3HVR*AOD43A indicating lights shift to green OFF, red ON, THEN releases the pushbutton.
Depresses the "FILTER" pushbutton for filter/normal exhaust dampers 3HVR*AOD39B/43B and holds the button until the indicating lights shift to 3HVR*AOD39B, green ON, red OFF and 3HVR*AOD43B indicating lights shift to green OFF, red ON, THEN releases the pushbutton.
SAT UNSAT 9 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM STEP GRADE 10 Performance Step:
Standards:
VERIFY the following Auxiliary Building exhaust fan variable inlet vane controllers, in "AUTO" (VP1)
- 3HVR*PIC104A, "AUX BLDG EXH FAN"
- 3HVR*PIC104B, "AUX BLDG EXH FAN" (step 4.2.8)
Verifies indications for 3HVR*PIC1 04A indicate:
- AUTO light ON
- MANUAL light OFF GRADE Standards:
Verifies indications for 3HVR*PIC104B indicate:
- AUTO light ON
- MANUAL light OFF Grade:
SAT UNSAT STEP GRADE 11 Performance Step:
Standards:
NOTE During an actual high radiation condition, both trains of filtration are started to prevent some flow from bypassing the filters and being discharged through 3HVR*FN1 3A and 3HVR*FN13B, charging pump and component cooling water pump area exhaust fans, normal exhaust path.
3HVR-FN5 supplies more air to the suction of the filters than a single filter fan can exhaust. Therefore, both trains are required to prevent an unfiltered discharge. (Step 4.2.9 Note)
Reviews Note Grade:
10 of 17 SAT UNSAT
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM STEP 12 X
Performance Step:
To start Train A Auxiliary Building filter, PERFORM the following (VP1):
- a.
PLACE 3HVR*FN6A, filter exhaust fan, in "START" and HOLD.
- b.
WHEN the following occurs, RELEASE 3HVR*FN6A control switch:
- 3HVR*AOD20A, filter supply, opens
- 3HVR*MOD28A, filter exhaust, opens
- 3HVR*FN6A, exhaust fan, starts
- Filter bank heater, energizes (step 4.2.9)
GRADE X
Standards:
Rotates and maintains control switch for 3HVR*FN6A to "START" position until the following indications are observed:
- 3HVR*AOD20A, green light OFF, red light ON
- 3HVR*MOD28A, green light OFF, red light ON
- 3HVR*FN6A, green light OFF, red light ON
- FLT1A HTR green light OFF, red light ON
- FLT2A HTR green light OFF, red light ON Grade:
SAT UNSAT Comments:
The switch must be held for a minimum of five seconds to avoid an AUTO trip of the fan. If the fan trips and the examinee restarts it, the critical portion of this step is satisfied.
11 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 A--
Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM STEP 13 X
Performance Step:
To start Train B Auxiliary Building filter, PERFORM the following (VP1):
- a.
PLACE 3HVR*FN6B, filter exhaust fan, in "START" and HOLD.
- b.
WHEN the following occurs, RELEASE 3HVR*FN6B control switch:
- 3HVR*AOD20B, filter supply, opens
- 3HVR*MOD28B, filter exhaust, opens
- 3HVR*FN6B, exhaust fan, starts Filter bank heater, energizes (step 4.2.10)
GRADE X
Standards:
Grade:
Comments:
Rotates and maintains control switch for 3HVR*FN6A to "START" position until the following indications are observed:
- 3HVR*AOD20B, green light OFF, red light ON
- 3HVR*MOD28B, green light OFF, red light ON
- 3HVR*FN6B, green light OFF, red light ON
- FLT1 B HTR green light OFF, red light ON
- FLT2B HTR green light OFF, red light ON SAT UNSAT The switch must be held for a minimum of five seconds to avoid an AUTO trip of the fan. If the fan trips and the examinee restarts it, the critical portion of this step is satisfied.
12 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg I Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM STEP 14 X
Performance Step:
START the following "AUX BLDG" "EXH FANS" (VP1)
- 3HVR-FN7 (step 4.2.1 1)
GRADE GRADE x
x Standards:
Standards:
Grade:
Rotates the control switch for 3HVR-FN5 to "START" and observes the indicating lights shift to green OFF, red ON.
Rotates the control switch for 3HVR-FN7 to "START" and observes the indicating lights shift to green OFF, red ON.
SAT UNSAT Comments:
3HVR-FN5 and 3HVR-FN7 may be operated in any desired sequence.
STEP 15 X
Performance Step:
Performance Steps: START the following "AUX BLDG" "HVU's" (VP1)
- 3HVR-HVU2A 3HVR-HVU2B (step 4.2.12)
GRADE GRADE X
X Standards:
Standards:
Grade:
Rotates the control switch for 3HVR-HVU2A to "START" and observes the indicating lights shift to green OFF, red ON.
Rotates the control switch for 3HVR-HVU2B to "START" and observes the indicating lights shift to green OFF, red ON.
SAT UNSAT 13 of 17
PERFORMANCE INFORMATION JPM Number:
S.07
(#031)
Revision:
6 chg 1 Task
Title:
SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM Comments:
STEP 16 Performance Step:
3HVR-HVU2A and 3HVR-HVU2B may be operated in any desired sequence.
VERIFY the following annunciators, not lit:
- VP1A 1-6, "SLCRS/FUEL/AUX BLDG FLTR HTR TROUBLE"
- VP1A 3-6, "AUX BLDG VENT FN A LOCAL CNTL"
- VP1A 4-6, "AUX BLDG FNA AUTO TRIP/OVERCURRENT"
- VP1 B 1-3, "RX PLANT VENT PNL TROUBLE"
- VP1C 1-6, "SLCRS/FUELIAUX BLDG FLTR HTR TROUBLE"
- VP1C 3-6, "AUX BLDG VENT FN B LOCAL CNTL"
- VP1C 4-6, "AUX BLDG FN B AUTO TRIP. OVERCURRENT" (step 4.2.13)
GRADE Standards:
Grade:
Performance Step:
Verifies each of the above listed annunciator windows not lit.
SAT UNSAT STEP 17 Notify US that the upper levels of the Auxiliary Building have been placed on Manual Area Filtration in accordance with OP 3314A Section 4.2.
GRADE Standards:
Grade:
Informs the US that the upper levels of the Auxiliary Building have been placed on Manual Area Filtration in accordance with OP 3314A Section 4.2.
SAT UNSAT Terminating Cue: The evaluation for this JPM is concluded.
14 of 17
PERFORMANCE INFORMATION JPM Number:
Task
Title:
S.07
(#031)
Revision:
6 chg 1 SUBSEQUENT ACTIONS IN RESPONSE TO AUX. BLDG. RAD.
MON. (3HVR-RE13) ALARM Stop Time:
15 of 17
VERIFICATION OF JPM COMPLETION JPM Number:
S.07
(#031)
Revision:
6 chg 1 Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?
YES NO X
Validated Time (minutes):
20 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
16 of 17
STUDENT HANDOUT JPM Number:
Initial Conditions:
Initiating Cues:
S.07
(#031)
A leak on CHS*LT185 level transmitter line for the VCT has resulted in radiation monitor HVR-RE13 going into an alarm status. The control room team is carrying out the actions of AOP 3573, Radiation Monitor Alarm Response. One train of charging and RPCCW pump area ventilation is in service. The Waste Disposal Building ventilation and CTMT purge are not aligned to the AUX. Bldg. filters. General area ventilation is in service.
In carrying out the responses of AOP 3573, Radiation Monitor Alarm Response, the US has directed you to place the upper levels of the Aux. Bldg. on Manual Area Filtration per OP 3314A, Section 4.2.
The simulator instructor will acknowledge all alarms not associated with your task.
17 of 17