Letter Sequence Other |
---|
|
|
MONTHYEARML0214304642002-05-23023 May 2002 Request Telecon with Exelon Corp., Two Proposed Amendments Project stage: Other ML0224903302002-09-0505 September 2002 Technical Specification Pages 3.9-1, 3.9-2 & 3.9-3 for Amendment 229 Source Range Monitor Operability Project stage: Other ML0224804272002-09-0505 September 2002 Issuance of License Amendment Source Range Monitor Operability (Tac No. MB2890) Project stage: Approval 2002-05-23
[Table View] |
Technical Specification Pages 3.9-1, 3.9-2 & 3.9-3 for Amendment 229 Source Range Monitor OperabilityML022490330 |
Person / Time |
---|
Site: |
Oyster Creek |
---|
Issue date: |
09/05/2002 |
---|
From: |
NRC/NRR/DLPM |
---|
To: |
|
---|
References |
---|
TAC MB2890 |
Download: ML022490330 (3) |
|
|
---|
Category:Technical Specifications
MONTHYEARML21119A0642021-06-25025 June 2021 License Amendment 299 ML18221A4002018-10-17017 October 2018 Issuance of Amendment No. 294, Revise the Site Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MG0160; L-2017-LLA-0307) ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) RA-15-030, Submittal of Changes to Technical Specifications Bases2015-04-14014 April 2015 Submittal of Changes to Technical Specifications Bases ML14329A6252015-03-30030 March 2015 Issuance of Amendment Regarding Reactor Building Vital Area Access Control ML1019301722010-09-27027 September 2010 Issuance of Amendment Relocation of Surveillance Requirement Frequencies to a Licensee Controlled Document Based on TSTF-425, Revision 3 RA-10-028, Response to Request for Additional Information, License Amendment Request Regarding Relocation of Selected Technical Specification Surveillance Frequencies to a Licensee Controlled Document2010-04-16016 April 2010 Response to Request for Additional Information, License Amendment Request Regarding Relocation of Selected Technical Specification Surveillance Frequencies to a Licensee Controlled Document RA-09-029, Supplement to License Amendment Request Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action, and Clarification of A..2009-03-30030 March 2009 Supplement to License Amendment Request Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action, and Clarification of A.. RA-08-100, Special Report for Inoperability of Turbine Building High Range Radioactive Noble Gas Monitor2008-11-18018 November 2008 Special Report for Inoperability of Turbine Building High Range Radioactive Noble Gas Monitor ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0812303462008-05-30030 May 2008 Tec Specs to Amd 266/License DPF-16/Oyster Creek ML0810505452008-04-30030 April 2008 Technical Specification Pages for License Amendment No. 265 the Incorporation of TSTF-448, Revision 3, Control Room Habitability. (Tac MD5281) RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. RA-08-004, Technical Specification Change Request No. 348 - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)2008-03-10010 March 2008 Technical Specification Change Request No. 348 - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0802901792008-02-0101 February 2008 Oyster Creek,Technical Specifications, Corrected, Revised Pages of Facility Operating License No. DPR-16 RA-08-011, Response to Request for Additional Information - Exelon/Amergen Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement..2008-01-23023 January 2008 Response to Request for Additional Information - Exelon/Amergen Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement.. ML0729202902007-10-18018 October 2007 Technical Specification Change Request No. 374 - Revision to Mechanical Snubber Functional Testing Requirements ML0722501972007-08-0808 August 2007 Technical Specifications Pages Re Annual Radioactive Effluent Release Report Submittal Date ML0721302932007-07-27027 July 2007 Technical Specifications, Issuance of Amendment Request to Change Technical Specification Definition of Channel Calibration, Channel Check, and Channel Test RS-07-078, Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators2007-07-19019 July 2007 Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0713603392007-05-16016 May 2007 Technical Specification Change Request No. 327 - Modify Technical Specifications for Primary Containment Oxygen Concentration ML0711703892007-04-26026 April 2007 Technical Specifications Application of Alternate Source Term Methodology ML0633201962006-11-27027 November 2006 Technical Specification Change Request No. 341 - Revision to Required Submittal Date for Annual Radioactive Effluent Release Report ML0626101962006-09-13013 September 2006 Technical Specification Pages Re Increase Safety Valve As-Found Setpoint Tolerance from 1 Percent to 3 Percent ML0624404112006-09-0101 September 2006 Tech Spec Pages for Amendment 260 Regarding Revision to Electromatic Relief Valve Surveillance Requirement ML0623704752006-08-25025 August 2006 Technical Specifications - Deletion of Reporting Requirement in Facility Operating License ML0605500582006-02-22022 February 2006 Tech Spec Page for Amendment 258 Regarding Deletion of Reporting Requirement in Facility Operating License ML0600600152006-01-0404 January 2006 Technical Specifications, 1.0 Environmental Monitoring ML0529701902005-10-18018 October 2005 Technical Specification Change Request No. 328 - Modify Surveillance Requirements for Testing of Main Steam Line Electromatic Relief Valves ML0520000612005-07-14014 July 2005 Tech Spec Pages for Amendment 256 Capability Upgrade of a 69-KV Offsite Power Line to 230-KV ML0517802562005-06-23023 June 2005 Tech Spec Pages for Amendment, Reactor Building Closed Cooling Water Pump and Service Water Pump Trip Conditions ML0516002532005-06-0808 June 2005 Tech Spec Page for Amendment 254 Delete the TS Requirements to Submit Monthly Operating Reports and Annual Occupational Radiation Exposure Reports RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License2005-02-25025 February 2005 Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License ML0505900852005-02-24024 February 2005 Technical Specification Change Request No. 319 - Revision to Table 3.1.1 Notes Aa and Bb Regarding Reactor Building Closed Cooling Water Pump and Service Water Pump Trip Conditions RS-04-157, Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License2004-12-17017 December 2004 Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License ML0430803562004-11-0202 November 2004 Tech Spec Pages for Amendment 250 Main Steam Line Isolation Valve Leakage Testing ML0433100362004-10-20020 October 2004 Technical Specification, Control Rod Scram Time Testing Requirements ML0429203072004-10-13013 October 2004 Table, Run or Startup Mode (Except for Low Power Physics Testing) ML0427902182004-10-0404 October 2004 Technical Specifications, Modify Control Rod Scram Time Testing Surveillance Requirements ML0425301502004-08-27027 August 2004 Station,Technical Specification Change Request No. 331 - Safety Limit Minimum Critical Power Ratio ML0423604742004-08-19019 August 2004 Technical Specification for Oyster Creek ML0422301962004-08-0909 August 2004 Tech Spec for Oyster Creek, License Amendment No. 246, Elimination of Requirements for Hydrogen Monitors ML0421703712004-07-30030 July 2004 Technical Specifications, Sections 3.7 and 4.7, Auxiliary Electrical Power, and Added a New Section 6.8.5, Station Battery Monitoring and Maintenance Program ML0415600412004-07-13013 July 2004 Unit, 1, License Amendments 244 and 250 Re.: Amendments to Delete a License Condition Regarding the Long Range Planning Program ML0415305902004-05-27027 May 2004 Unit 1, Technical Specifications, Reflect Ownership Change ML0409002892004-03-29029 March 2004 Tech Spec Pages for Amendment 241 Regarding Increasing Flexibility in Mode Restraints ML0333201312003-11-24024 November 2003 Tech Spec Pages for Amendment 239 Regarding Startup Transformer and Emergency Diesel Generator Unavailability 2021-06-25
[Table view] |
Text
3.9 REFUELING Applicability: Applies to fuel handling operations during refueling.
Obiective: To assure that criticality does not occur during refueling.
Specification: A. Fuel shall not be loaded into a reactor core cell unless the control rod in that core cell is fully inserted.
B. During CORE ALTERATIONS the reactor mode switch shall be locked in the refuel position.
C. The refueling interlocks shall be OPERABLE with the fuel grapple hoist loaded switch set at <485 lb. during the fuel handling operations with the head off the reactor vessel. If the frame-mounted auxiliary hoist, the trolley-mounted auxiliary hoist or the service platform hoist is to be used for handling fuel with the head off the reactor vessel the load limit switch on the hoist to be used shall be set at <400 lb.
D. During CORE ALTERATIONS at least two (2) source range monitor (SRM) channels shall be OPERABLE and inserted to the normal operating level. One of the OPERABLE SRM channel detectors shall be located in the core quadrant where CORE ALTERATIONS are being performed, and another shall be located in an adjacent quadrant.
E. Removal of one control rod or rod drive mechanism may be performed provided that all the following specifications are satisfied.
- 1. The reactor mode switch is locked in the refuel position.
- 2. At least two (2) sources range monitor (SRM) channels shall be OPERABLE and inserted to the normal operation level. One of the OPERABLE SRM channel detectors shall be located in the core quadrant where the control rod is being removed and one shall be located in an adjacent quadrant.
F. Removal of any number of control rods or rod drive mechanisms may be performed provided all the following specifications are satisfied:
- 1. The reactor mode switch is locked in the refuel position and all refueling interlocks are OPERABLE as required in Specification 3.9.C. The refueling interlocks associated with the control rods being withdrawn may be bypassed as required after the fuel assemblies have been removed from the core cell surrounding the control rods as specified in 4, below.
- 2. At least two (2) source range monitor (SRM) channels shall be OPERABLE and inserted to the normal operation level. One of the OPERABLE SRM channel detectors shall be located in the core quadrant where a control rod is OYSTER CREEK 3.9-1 Amendment No.: 23, 43, 229
being removed and one shall be located in an adjacent quadrant.
- 3. All other control rods are fully inserted with the exception of one rod which may be partially withdrawn not more than two notches to perform refueling interlock surveillance.
- 4. The four fuel assemblies are removed from the core cell surrounding each control rod or rod drive mechanism to be removed.
- 5. The SHUTDOWN MARGIN requirements of Specification 3.2.A are met.
- 6. An evaluation will be conducted for each refuel/reload to ensure that actual core criticality of the proposed order of defueling and refueling is bounded by previous analysis performed to support such defueling and refueling activities, otherwise a new analysis shall be performed.
The new analysis must show that sufficient conservatism exists for the proposed order of defueling and refueling before such operation shall be allowed to proceed.
G. With any of the above requirements not met, cease CORE ALTERATIONS or control rod removal as appropriate, and initiate action to satisfy the above requirements.
OYSTER CREEK 3.9-2 Amendment No.: 23, 43, 178, 229
Basis: During refueling operations, the reactivity potential of the core is being altered. It is necessary to require certain interlocks and restrict certain refueling procedures such that there is assurance that inadvertcat criticality does not occur.
Addition of large amounts of reactivity to the core is prevented by operating procedures, which are in turn backed up by refueling interlocks (1) on rod withdrawal and movement of the refueling platform. When the mode switch is in the "Refuel" position, interlocks prevent the refueling platform from being moved over the core if a control rod is withdrawn and fuel is on a hoist. Likewise, if the refueling platform is over the core with fuel on a hoist control rod motion is blocked by the interlocks. With the mode switch in the refuel position only one control rod can be withdrawn (1, 2).
The one rod withdrawal interlock may be bypassed in order to allow multiple control rod removal for repair, modifications, or core unloading. The requirements for simultaneous removal of more than one control rod are more stringent than the requirements for removal of a single control rod, since in the latter case Specification 3.2.A assures that the core will remain subcritical.
Fuel handling is normally conducted with the fuel grapple hoist. The total load on this hoist when the interlock is required consists of the weight of the fuel grapple and the fuel assembly. This total is approximately 773 lbs. in the extended position in comparison to the load limit of 485 lbs. Provisions have also been made to allow fuel handling with either of the three auxiliary hoists and still maintain the refueling interlocks. The 400 lb load trip setting on these hoists is adequate to trip the interlock when one of the more than 600 lb. fuel bundles is being handled.
The source range monitors provide neutron flux monitoring capabilities with the reactor in the refueling and shutdown modes (3). Specifications 3.9.D, 3.9.E and 3.9.F require the OPERABILITY of at least two source range monitors during CORE ALTERATIONS and when control rods are to be removed. This requirement ensures that redundant monitoring capability is available to detect changes in the reactivity condition of the core.
REFERENCES:
(1) FDSAR, Volume I, Section VII-7.2.5 (2) FDSAR, Volume I, Section XIII-2.2 (3) FDSAR, Volume I, Section VII-4.2.2 and VII-4.3.1 OYSTER CREEK 3.9-3 Amendment No.: 23, 43, 229