ML022460322
ML022460322 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 08/15/2002 |
From: | Gosekamp M Entergy Nuclear Vermont Yankee |
To: | Conte R NRC/RGN-I/DRS/OSB |
Conte R | |
References | |
50-271/02301 50-271/02301 | |
Download: ML022460322 (14) | |
Text
Record of Rejected K/As Form ES-401-10 ES-401 Reason for Rejection Tier / Group Randomly Selected KIA i/2z§goPL A perNJC l9)& R la'i0%ec1 eEl w/th 'SbC/
I L.
I
_ __ I
_ _ I I.
I_ i.
I ,
I i
_ _ _ I I
_ _ I I
_ _ _ j.I I
.I NUREG-1021, Revision 8, Supplement I 46 of 46
DRrf%
" C cn. .+i;,-n Form FR-AC 1-1 CCs An^1.- F{UU- -S JrIerlluilIVUI1 . ...
O-4UI ILV, ___-.
Facility: Vermont Yankee Date of Exam: Aug 12, 2002 Exam Level: SRO K/A Category Points Tier Group Point K K K K K A A A A G Total 1 2 l3 4 5 6 1 2 3 4 A~mlm~ yLt5 4 6 4 4 4 t:wg*
Abnormal Plant- -
Evolutions 2 3 3 3 2 2 -1 3 16**
8 7 8 6 7 7 Totals 3 2 2 2 2 2 2 2 2 1 3 2 2.
l - - - - - - - -
Plant l -
Systems 2 1 1 1 1 2 1 1 1 1 1 2 13 3 0 0 0 1 0 1 1 0 0 0 1 4 Tier 4 3 3 4 4 4 4 3 3 2 6 40 Totals
- 3. Generic Knowledge and Abilities Cat 1 Cat 2 Cat 3 1 Cat 4 l 7 Note: 1. Ensure that at least two topics from every K/A category are sampled within each tier (i.e., the "Tier Totals" in each K/A category shall not be less than two).
2.** The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by +/- I from that specified in the table based on NRC revisions. The final exam must total 100 points.
- 3. Select topics from many systems; avoid selecting more than two or three K/A topics from a given system unless they relate to plant-specific priorities.
- 4. Systems/evolutions within each group are identified on the associated outline.
- 5. The shaded areas are not applicable to the category/tier.
6.* The generic K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system.
- 7. On the following pages, enter the K/A numbers, a brief description of each topic, the topics' importance ratings for the RO license level, and the point totals for each system and category. K/As below 2.5 should be justified on the basis of plant-specific priorities. Enter the tier totals for each category in the table above.
Facility: Vermont Yankee BWR SRO Examination Outline Printed: 07/24/2002 ES - 401 Emergency and Abnormal Plant Evolutions - Tier I / Group 1 Form ES-401-1 E/APE # E/APE Name / Safety Function KI K2 _3 Al A2 G KA Topic Imp. Points 295006 SCRAM/ I _X 2.4.29 - Knowledge of the emergency plan. 4.0 I 295006 SCRAM/ 1 v I I I I AI . . .-
I
Facility: Vermont Yankee BWR SRO Examination Outline Printed: 07/24/2002 ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 1 E/APE l E/APE Name / Safety Function Form ES-401-1 Ki 1(2 K3 Al A2 G KA Topic 295024 High Drywell Pressure / 5 X EKI .01 - Drywell integrity: Plant-Specific
. Points 295024 High Drywell Pressure / 5 X EK2.17 - Auxiliary building isolation logic:
Plant-Specific 3.3 I I I 2952 High Drywell Pressure / 5 XEK3 .01 - Drywell spray operation: Mark-I&I 4.0 II I 295025 High Reactor Pressure / 3 X EAI.07 - ARI/RPT/ATWS: Plant-Specific 4.1 295026 Suppression Pool High Water Temperature /5 X EK2.03 - Suppression chamber pressure: Mark-I&II I1 295026 3.6 Suppression Pool High Water Temperature / 5 X 2.1.33 - Ability to recognize indications for system operating parameters which are entry-level conditions 4.0 for technical specifications.
295031 Reactor Low Water Level / 2 X EA2.02 - Reactor power 2901 Reactor Low Water Level / 2 4.2*
X EK3.03 -Spray cooling 4.4*
295037 SCRAM Condition Present and Reactor Power Above APRM Downscale or X EA 1.06 - Neutron monitoring system Unknown / 1 4.1 295038 High Off-Site Release Rate / 9 X 2.4.7 - Knowledge of event based EOP mitigation 4.1 strategies.
500000 500000 High Containment Hydrogen Concentration /5 High Containment Hydrogen Concentration /5 X
X EA2.02 - Oxygen monitoring system availability EA 1.06 - Drywell sprays 3.5 3.4 2
K/A Category Totals: 5 4 6 4 4 4 Group Point Total: 27 2
BWR SRO Examination Outline Printed: 07/24/2002 Facility: Vermont Yankee ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 2 Form ES-401-1 E/APE # E/APE Name / Safety Function K1 K2 K3 Al A2 G KA Topic Imp. Points 295002 Loss of Main Condenser Vacuum / 3 X 2.1.6 - Ability to supervise and assume a management 4.3 1 role during plant transients and upset conditions.
295004 Partial or Complete Loss of D.C. Power / 6 X _ AA2.04 - System lineups 3.3 1 295004 Partial or Complete Loss of D.C. Power / 6 X AK3.01 - tLoad shedding: Plant-Specific 3.1 1 295005 Main Turbine Generator Trip / 3 X 2.4.7 - Knowledge of event based EOP mitigation, 3.8 1 strategies.
295005 Main Turbine Generator Trip / 3 X AK2,08 - A.C. electrical distribution.: 3.3 1 295008 High Reactor Water Level /2 X AK2.04 - PCIS/NSSSS: Plant-Specific 3.3 1 295008 High Reactor Water Level / 2 X AK3.05 - HPCI turbine trip: Plant-Specific 3.6 1 295012 High Drywell Temperature / S X AK1.01 - Pressure/temperature relationship 3.5 1 295018 Partial or Complete Loss of Component Cooling X AA 1.03 - Affected systems so as to isolate damaged 3.4 1 Water / 8 portions 295021 Loss of Shutdown Cooling / 4 X AK3.04 - Maximizing reactor water cleanup flow 3.4 1 295021 Loss of Shutdown Cooling / 4 X AK2.04 - Component cooling water systems: 3.1 1 Plant-Specific 295022 Loss of CRD Pumps / I X AKI.0I - Reactor pressure vs. rod insertion capability 3.4 295028 High Drywell Temperature / - X EAL.01 - Drywell spray: Mark-I&II 3.9 1 295029 High Suppression Pool Water Level / 5 X EA2.03 - Drywell/containment water level 3.5 1 1
Facility:
BWR SRO Examination Outline Printed: 07/24/2002 Vermont Yankee ES - 401 Emergenev and Abnormal Plant Vvnhitinne Tim- i / rl - i_ rcs Xnr r E/APE # E/APE Name / Safety Function -- KI 2 K3 Al A2 G KA Topic Imp. Points 295033 High Secondary Containment Area Radiation Levels X EKI.03 - tRadiation releases 4.2* I 9
295034 Secondary Containment Ventilation High Radiation / X 2.2.15 - Ability to identify and utilize as-built design 2.9 I 9 and configuration change documentation to ascertain expected current plant configuration and operate the plant._ _ _ _
K/A Category Totals: 3 3 3 2 2 3 Group Point Total: 16 2
BWR SRO Examination Outline Printed: 07/24/2002 Facility: Vermont Yankee ES - 401 Plant Systems - Tier 2 / Group 1 Form ES-401-1 Sys/Ev # System / Evolution Name KI K2 K3 K4 K5 K6 Al A2 A3 A4 G KA Topic Imp. Points 202002 Recirculation Flow Control System / I X K1 .10 - Rod pattern 2.6 1 203000 RHR/LPCI: Injection Mode (Plant X K1.16 - Component cooling water systems 3.2 1 Specific) /22 _
203000 RHR/LPCI: Injection Mode (Plant X K6.01 - A.C. electrical power 3.7 1 Specific) /2 209001 Low Pressure Core Spray System / 2 X K4.05 - Pump minimum flow 2.6 1 209001 Low Pressure Core Spray System /2 X K5.04 - Heat removal (transfer) mechanisms 2.9 1 211000 Standby Liquid Control System / I X 2.4.16 - Knowledge of EOP implementation 4.0 I hierarchy and coordination with other support
_ procedures.
211000 Standby Liquid Control System / I X K2.02 - Explosive valves 3.2* 1 215005 Average Power Range Monitor/Local X A3.06 - Maximum disagreement between flow 3.1 1 Power Range Monitor System / 7 ____ _ comparator channels: Plant-Specific 215005 Average Power Range Monitor/Local X A4.04 - LPRM back panel switches, meters and 3.2 1 Power Range Monitor System / 7 indicating lights 217000 Reactor Core Isolation Cooling X 2.2.10 - Knowledge of the process for 3.3 1 System (RCIC) /2 determining if the margin of safety, as defined in the basis of any technical specification is reduced by a proposed change, test or
__ _ experiment.
218000 Automatic Depressurization System / X A2.02 - Large break LOCA 3.6* 1
_________ 3 ____________________ ______
I
BWR SRO Examination Outline Printed: 07/24/2002 Facility: Vermont Yankee ES - 401 Plant Qvef-m - Tier / 9rn--r I
-- J =I , ~
"IJu JUJ Form 1hj-4U1-1 Sys/Ev # System / Evolution Name K1 K2 _3 K4 K5 K6 Al A2 A3 A4 G KA Topic Imp. Points 223001 Primary Containment System and X K2.08 - Containment cooling air handling units:
Auxiliaries /5_ 3,0* 1 Plant-Specific 223001 Primary Containment System and X K6.08 - Containment atmospheric control 3.4 1 Auxiliaries / 5 223002 Primary Containment Isolation X K1.06 - Recirculation system 3.2 I System/Nuclear Steam Supply Shut-Off/ 5 223002 Primary Containment Isolation X A 1.03 - SPDS/ERIS/CRIDS/GDS: 2.8* 1 System/Nuclear Steam Supply Plant-Specific Shut-Off/ 5 226001 RHR/LPCI: Containment Spray X 2.3.2 - Knowledge of facility ALARA program. 2.9 I System Mode / 5 _ _ _
241000 Reactor/Turbine Pressure Regulating X K3.01 - Reactor power 4.1 I System/33 - _
261000 Standby Gas Treatment System / 9 X A1.04 - Secondary containment differential 3.3 1
. __ pressure 261000 Standby Gas Treatment System / 9 X A3.03 - Valve operation 2.9 262001 A.C. Electrical Distribution / 6 X K3.03 - D.C. electrical distribution 3.2 1 262001 A.C. Electrical Distribution / 6 X K5.02 - Breaker control 2.9 1 290001 Secondary Containment / 5 X K4.02 - Protection against over pressurization: 3.5 I Plant-System 2
BWR SRO Examination Outline Printed: 07/24/2002 Facility: Vermont Yankee ES - 401 K/A Category Totals: 3 2 2 2 2 2 2 2 2 1 3 Group Point Total: 23 3
BWR SRO Examination Outline Printed: 07/24/2002 Facility: Vermont Yankee ES - 401 Plant Systems - Tier 2 / Groun 2 lForm F.SI-A(I1-1 Sys/Ev # System / Evolution Name KI K2 K3 K4 K5 K6 Al A2 A3 A4 G KA Topic Imp. Points 201001 Control Rod Drive Hydraulic System / X 2.2.33 - Knowledge of control rod 2.9 1 I _ _ programming.
214000 Rod Position Information System / 7 X K5.01 - Reed switches 2.8 1 219000 RHR/LPCI: Torus/Suppression Pool X K4.05 - Pump minimum flow protection 3.2 1 Cooling Mode /5 234000 Fuel Handling Equipment / 8 X 2.1.11 - Knowledge of less than one hour 3.8 1 technical specification action statements for
___ __ systems.
259001 Reactor Feedwater System / 2 X A2.06 - Loss of A.C. electrical power 3.2 1 259001 Reactor Feedwater System / 2 X A3.07 - FWRV position 3.2 1 263000 D.C. Electrical Distribution /6 X K3.03 - Systems with D.C. components (i.e. 3.8 1
___ _ _ _valves, motors, solenoids, etc.)
271000 Offgas System / 9 X A4.05 - Station radioactive release rate 3.9 1 272000 Radiation Monitoring System / 7 X K2.03 - Stack gas radiation monitoring system 2.8 1 272000 Radiation Monitoring System / 7 X K6.03 - A.C. power 3.0 1 286000 Fire Protection System / 8 X KI.05 - Main generator hydrogen system: 3.1I Plant-Specific 286000 Fire Protection System / 8 X K5.05 - Diesel operations 3.1* I 1
BWR SRO Examination Outline Printed: 07/24/2002 Facility: Vermont Yankee EN - 4U1 Plant Systems - Tier 2 / Group 2 Form ES-401-1 S sfEv# System / Evolution Name KI K2 K3 K4 K5 K6 Al A2 A3 A4 G KATopic Imp. Points 290003 Control Room HVAC / 9 X A1.04 - Control room pressure 2.8 1 K/A CategoryTotals: 1 1 1 1 2 1 1 1 1 1 2 Group Point Total: 13 2
BWR SRO Examination Outline Printed: 07/24/2002 Facility: Vermont Yankee ES - 401 Plant SYstems - Tier 2 / Group 3 F~nrm .R4)-
._- ~u~r- - *v Sys/Ev # System / Evolution Name K1 K2 K3 K4 K5 K6 Al A2 A3 A4 G KA Topic Imp. oints 215001 Traversing In-Core Probe / 7 X K6.04 - Primary containment isolation system: 3.4 I Mark-I&II(Not-BWRI) 233000 Fuel Pool Cooling and Clean-up /9 X K4.07 - Supplemental heat removal capability 2.9 1 239001 Main and Reheat Steam System /3 X 2.2.17 - Knowledge of the process for managing 3.5 1
- . - - - -. - -. _ - _._ _ mr eiakn actlyivtIl during power Qporation._
256000 Reactor Condensate System / 2 X A I.10 - Condenser vacuum 3.1 K/A Category Totals: 0 0 0 1 0 1 1 0 0 0 1 Group Point Total: 4 I
Generic Knowledge and Abilities Outline (Tier 3)
Printed: 07/24/2002 BWR SRO Examination Outline Facility: Vermont Yankee Form ES-401-5 Generic Category KA KA Topic Imp. Points Conduct of Operations 2.1.11 Knowledge of less than one hour technical specification action statements for systems.
3.8 1 2.1.33 Ability to recognize indications for system operating parameters which are entry-level 4.0 1 conditions for technical specifications.
2.1.28 Knowledge of the purpose and function of major system components and controls.
3.3 1 2.1.29 Knowledge of how to conduct and verify valve lineups.
3.3 I 2.1.23 Ability to perform specific system and integrated plant procedures during different modes 4.0 1 of plant operation.
Category Total: 5 Equipment Control 2.2.22 Knowledge of limiting conditions for operations and safety limits.
4.1 2.2.25 Knowledge of bases in technical specifications for limiting conditions for operations and 3.7 I safety limits.
2.2.27 Knowledge of the refueling process.
3.5 1 2.2.11 Knowledge of the process for controlling temporary changes.
3.4* I Category Total: 4 qfliaf- Irn.---- I
,xV..LRJS I VUI 2.3.10 Ability to perform procedures to reduce excessive levels of radiation and guard against 3.3 1 personnel exposure.
2.3.6 Knowledge of the requirements for reviewing and approving release permits.
3.1 I 2.3.1 Knowledge of 10 CFR 20 and related facility radiation control requirements.
3.0 1 2.3.2 Knowledge of facility ALARA program.
2.9 1 Category Total: 4 I
Generic Knowledge and Abilities Outiinie (1ier 3)
Printed: 07/24/2002 BWR SRO Examination Outline Facility: Vermont Yankee Form ES-401-5 Generic Category KA KA Topic Imp. Points Emergency Plan 2.4.8 Knowledge of how the event-based emergency/abnormal operating procedures are used in 3.7 1 conjunction with the symptom-based EOPs.
2.4.11 Knowledge of abnormal condition procedures.
3.6 1 2.4.15 Knowledge of communications procedures associated with EOP implementation.
3.5 1 2.4.46 Ability to verify that the alarms are consistent with the plant conditions.
3.6 1 Category Total: 4 Generic Total:
17 2