Vogtle Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/26/2002 14:03:47 Report 22 1
BR2-FP
- FLOOD PROTECTION Baseline Inspections 09/09/2002 09/13/2002 Flood Protection Measures IP 7111106 1, 2 2
OUTGINSP - U-2 REFUELING OUTAGE INSPECTION Baseline Inspections 10/06/2002 11/09/2002 Refueling and Outage Activities IP 7111120 2
1 2515/145
- TI 2515/145 (U2) RE: BULLETIN 01-01 Safety Issues 10/07/2002 10/18/2002 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2001-01)
1 EB2-ISI
- INSERVICE INSPECTION-U2 Baseline Inspections 10/14/2002 10/18/2002 Inservice Inspection Activities IP 7111108 2
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 10/14/2002 10/18/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/14/2002 10/18/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/14/2002 10/18/2002 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/14/2002 10/18/2002 Performance Indicator Verification IP 71151 1, 2 2
PS-RP
- RADIATION PROTECTION Baseline Inspections 10/28/2002 11/01/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/28/2002 11/01/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/28/2002 11/01/2002 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/28/2002 11/01/2002 Performance Indicator Verification IP 71151 1, 2 4
EB2-MODS - MODIFICATIONS/10CFR50.59 Baseline Inspections 11/04/2002 11/08/2002 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 11/04/2002 11/08/2002 Permanent Plant Modifications IP 7111117B 1, 2 4
BR2-PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 11/12/2002 11/15/2002 Identification and Resolution of Problems IP 71152 1, 2 3
OL PREP
- INITIAL EXAM PREP Not Applicable 11/12/2002 11/15/2002 VOGTLE 1/INITIAL EXAMS AT POWER FACILITIES V23129 1
3 BR2-PI&R
- PROBLEM ID AND RESOLUTION (WEEK 2)
Baseline Inspections 12/02/2002 12/06/2002 Identification and Resolution of Problems IP 71152 1, 2 3
OL EXAM
- INITIAL EXAM Not Applicable 12/02/2002 12/13/2002 VOGTLE/EXAM AT POWER FACILITIES V23197 1
1 PS-SEC
- SECURITY Baseline Inspections 12/09/2002 12/13/2002 Access Authorization Program (Behavior Observation Only)
IP 7113001 1, 2 Baseline Inspections 12/09/2002 12/13/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 1, 2 Baseline Inspections 12/09/2002 12/13/2002 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)
IP 7113003 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Vogtle Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/26/2002 14:03:47 Report 22 1
- EP INSPECTION Baseline Inspections 06/16/2003 06/20/2003 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 06/16/2003 06/20/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 06/16/2003 06/20/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 06/16/2003 06/20/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 06/16/2003 06/20/2003 Performance Indicator Verification IP 71151 1, 2 2
- REQUAL INSPECTION Baseline Inspections 08/04/2003 08/08/2003 Licensed Operator Requalification IP 7111111B 1, 2 1
BR2-FP
- FLOOD PROTECTION Baseline Inspections 09/08/2003 09/11/2003 Flood Protection Measures IP 7111106 1, 2 1
EB2-ISI
- INSERVICE INSPECTION-U1 Baseline Inspections 09/22/2003 09/26/2003 Inservice Inspection Activities IP 7111108 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.