ES-301 Control Room and Facility Walk-Through Test Outline Form ES-301-2 Facility: Calvert Cliffs Units 1 and 2 Date of Examination:July 15, 2002 Exam Level: RO/SRO(I) Operating Test No: 1 B. 1 Control Room Systems System / JPM Title Type Safety Code* Function

a. 062 Parallel OC Diesel to 24 4KV Bus D/S 6 A4.06//3.9
b. 059 Recover From automatic feedwater isolation S/ D / A 4 (secondary)

A4.11 //3.4

c. 013 Respond to an inadvertent CIS S /M / A 2 A2.06 //3.7
d. 071. Waste Gas Discharge RMS checks S./N/A 9 A3.03//3.6
e. 002 Use procedures to correct Loss of Forced S / N/ L 4 (primary)

Circulation A2.03// 4.1 f 015 Null NI/DeltaT Power Indications S/N 7 A4.02 //3.9

g. 007 Bleed and feed operation to cool the Quench S/N 5 A1.01 thru Tank per 0-1-B 1.03 H/2.9, 2.7, 2.6 B.2 Facility Walk-Through
a. 029 Align system for alternate containment purge N/R /L 8 per 01-36 A2.03//2.7
b. 014 Monitor CEA positions per AOP 7H, alternate N/A 1 method. A2.02 //3.1
c. 061 Take local control of AFW pumps to feed N 4 (secondary)

S/Gs A2.04 //3.4

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrolroom, (S)imulator, (L)ow-Power, (R)CA

ES-301 Control Room and Facility Walk-Through Test Outline Form ES-301-2 Facility: Calvert Cliffs Units 1 and 2 Date of Examination:July 15, 2002 Exam Level: SRO(U) Operating Test No: 1 B. 1 Control Room Systems System / JPM Title Type Safety Code* Function

a. 062 Parallel OC Diesel to 24 4KV Bus D/S 6 A4.06 /13.9
b. 071. Waste Gas Discharge RMS checks S./NI A 9 A3.03 //3.8
c. 013 Respond to an inadvertent CIS D/S 2 A2.06 //4.0 d

e.

f.

g.

B.2 Facility Walk-Through

a. 029 Align system for alternate containment purge N/R/ L 8 per 01-36 A2.03 H 3.1
b. 014 Monitor CEA positions per AOP 71, alternate N/A 1 method. A2.02 //3.1 C.
  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrolroom, (S)imulator, (L)ow-Power, (R)CA

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-21C-3 (MODIFIED)

13. ý I "TASK: Parallel DG to a 4KV Bus IC, -3ý PURPOSE: Evaluate the Operator's ability to parallel OC DG to 24 4KV, after an emergency start JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR Rev. 1

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-21C-3 (MODIFIED)

ELEMENT STANDARD

(* = CRITICAL STEP)

PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the knowledge requirement of the Initial License class training program for the Diesel Generator System.

EVALUATION LOCATION:

___ PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE __DEMONSTRATE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

15 MINUTES _ MINUTES NO TASK LEVEL:

LEVEL 1 TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

OI-21C TASK STANDARDS:

This JPM is complete when the OC DG has been paralleled to 24 4KV bus and loaded to 1.000 MW.

Rev. 1

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-21C-3 (MODIFIED)

ELEMENT STANDARD

(* = CRITICAL STEP)

Simulator Setup

1. IC-13 Unit 1 100% power.
2. Emergency start the OC DG.

Rev. 1

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-21C-3 (MODIFIED)

ELEMENT STANDARD

(*= CRITICAL STEP'1 TIME START

[CUE: Initial Conditions and General Precautions have been met.

CAUTION: The OC DG should not be paralleled with a 4KV Bus during periods when power is suspect (for example during a severe storm).

Locate OI-21C, Step 6.7.B. 1. Same as element.

1. IF OC DG was paralleled to the 07 4KV Bus, Determines step is N/A.
2. IF OC DG was emergency started, Determines step is THEN PERFORM the following to select applicable.

parallel mode:

Same as element Same as element Same as element VERIFY 07 4KV Bus is Monitors 07 4KV bus de-energized by observing zero voltage on voltage.

07 4KV BUS VOLTS, 0-EI-0702.

CHECK the Synchroscope pointer on Same as element 1C 18B is NOT rotating.

Note to Evaluator: Frequency must be within .1 Hz of 60 to allow breakerto shut Rev. 1

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-21C-3 (MODIFIED)

ELEMENT STANDARD

= CRITICAL STEP)

h. ADJUST OC DG frequency to Monitors OC DG approximately 60 Hz using OC DG SPEED frequency.

CONTR, 0-CS-0705.

i. REMOVE the Sync Stick from OC DG Same as element OUT BKR, 0-CS-152-0703.

ICUE: After next step, when dispatched, PO reports all equipment running.

j. VERIFY the following equipment Dispatches PO to check RUNNING by observing the associated equipment.

red indicating light is illuminated on 0C188:

OC 1.HT RAD FAN SEL SW, 0-HS-10082 0C2 HT RAD FAN SEL SW, 0-HS-10102 OC I FO B/U PP SEL SW, 0-HS-10051 0C2 FO B/U PP SEL SW,'

0-HS-10061

k. RESET the following bus U/V flags: Dispatches operator to 07 4KV Bus reset flags 07 480V Bus
1. PLACE the selected OC DG 4KV Bus feeder breaker handswitch in PULL-TO LOCK.

Dispatches PO to shut Disc 189-2406.

-2406 as the PO.

Rev. 1

Page 6 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-21C-3 (MODIFIED)

ELEMENT STANDARD

(* = CRITICAL STEP)

5. PLACE the selected OC DG 4KV Bus feeder breaker handswitch to NORMAL:
6. INSERT the Sync Stick for the selected OC DG Inserts into sync jack for 4KV Bus feeder breaker. 152-2406 OCDG 24 4kv Bus fdr
7. ADJUST INCOMING VOLTS equal to Monitors incoming and RUNNING VOLTS using OC DG AUTO VOLT running volts. Lowers CONTR, 0-CS-0704. OC DG Auto Volt Contr as necessary to match incoming and running vlts.
8. ADJUST OC DG frequency so the Synchroscope Monitors synchroscope.

pointer is rotating slowly in the FAST direction using OC DG SPEED CONTR, 0-CS-0705.

Shuts 2-CS-152-2406 at approximately 5 degrees prior to the 12 o'clock position.

I l

CUE: wnen checked, annunciator is in alarm. (Unit 2) [ Raises OC DG Speed Contr and monitors OC

10. IMMEDIATELY ADJUST OC DG load using OC DG MW load.

DG SPEED CONTR, 0-CS-0705, to obtain between 0.45 MW AND 1.0 MW load on OC DG VAR/WATT, 0JI--0701B.

S11. CHECK annunciator "SEQUENCER Checks annunciator INITIATED" alarm is received. window in alarm.

4KV BUS PANEL 11/14 1C08 21/24 2C08

12. REMOVE the Sync Stick AND RETURN to Same as element Home Base.

Rev. 1

Page 7 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-21C-3 (MODIFIED)

ELEMENT STANDARD

(* = CRITICAL STEP)

13. LOAD OC DG as follows:
a. REFER to FIGURE 1, OC DIESEL Refers to FIGURE 1, OC GENERATOR ELECTRICAL LIMITS, DIESEL GENERATOR AND PERFORM the following: ELECTRICAL LIMITS.

(1) RAISE MW load by approximately Raises load with OC DG 1.0 MW, using OC DG SPEED SPEED CONTR, 0-CS CONTR, 0705.

0-CS-0705.

(2) MAINTAIN 0 to 500 KVARs using OC DG AUTO VOLT CONTR, 0-CS-0704 and FIGURE 1, OC DIESEL GENERATOR ELECTRICAL LIMITS.

(3) MONITOR the selected 4KV Bus voltage between 4.1 KV and 4.35 KV.

TIME STOP TERMINATING CUE: This JPM is complete when the OC DG has been paralleled to 24 4KV bus and loaded to 1.000 MW. No further actions are required.

Rev. 1

Page 8 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-21C-3 (MODIFIED)

TASK: Parallel DG to a 4KV Bus Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES (If yes, provide comments below) NO COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

Rev. 1

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

1. To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. The OC DG has been started, from the Control Room, with an Emergency Start signal.
b. The OC DG is carrying 07 4KV bus and the FDR BKR (152-0704) is open.
c. You are performing the duties of an extra Licensed Operator.
3. Initiating Cue: The CRS directs you to parallel OC DG to 24 4KV bus per the appropriate procedure, and load it to 1.0 MW. Are there any questions? You may begin.

Rev. 1

CCNPP LICENSED OPERATOR

.i/,t JOB PERFORMANCE MEASURE EOP-3-1 (BANK)

TASK: Restore Main Feedwater PURPOSE: Evaluates an Operator's Ability to Recover from Automatic Feedwater Isolation JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING Rev. 0

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-1 (BANK)

ELEMENT STANDARD

(* = CRITICAL STEP)

PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the knowledge requirement of the Initial License class training program for the Engineered Safety Features Actuation System.

EVALUATION LOCATION:

PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE DEMONSTRATE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

10 MINUTES MINUTES NO TASK LEVEL:

TRAIN/LEVEL 2 TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

EOP-3 TASK STANDARDS:

This JPM is complete when the SGIS is reset and a condensate booster pump is running with a flowpath to the S/Gs.

Rev. 0

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-1 (BANK)

ELEMENT STANDARD

= CRITICAL STEP)

Simulator Setup

a. IC-13, Ul, 100% power
b. Trip the Reactor, the Main Feed Pumps and the RCPs, cooldown using the TBVs until just before SGIS actuates, with TBV controller output at -7%.

(Process Variable on PIC4056 at 700.8 psig)

c. Insert Malfunctions AFW005, AFWOO10 1, AFWOO_02 for the trip of 13, 11 and 12 AFWPps
d. Stabilize the plant with SG levels at approximately -100" and freeze Rev. 0

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-1 (BANK)

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START Locate EOP-3, Step IV.G. Same as element.

1. IF, at ANY time, BOTH S/G levels are Monitors S/G levels on 1C03 or less than (-)350 inches SPDS. Monitors Tcold, 1C05 or OR TCOLD rises uncontrollably 5°F or 1C06.

greater, THEN initiate Once-Through-Cooling concurrently PER step J.

2. Block SGIS as follows: Determines step is N/A. Initiates Alternate Actions.

ALTERNATE ACTIONS ICUE: Determine if SGIS can be reset.I 2.1 IF SGIS actuates as a result of the Checks power available lights on for cooldown 12, 13, 15, 16 4kv busses AND the Non-Vital 4KV buses are energized, THEN reset the SGIS as follows:

a. Place the COND BSTR PPs in Places Condensate booster pump PULL TO LOCK. control switches in PTL.

Places MSIV handswitches in SHUT.

Places Feedwater isolation valve handswitches in SHUT.

0 11 & 12 Main Feed MOVs shut Note to Evaluator: Plantmay heat up after SGIS initiation,clearingSGIS block permissive alarms.

.-::; Places 11 and 12 S/G SGIS keyswitches in BLOCK. Checks that Annunciators C59 and C60 (SGIS A(B) BLOCKED) actuate.

Rev. 0

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-1 (BANK)

ELEMENT STANDARD

(*= CRITICAL STEP'*

(* = CRITICAL STEP)

CUE: IF SGIS block permitted alarms clear, THEN cue candidate "CRS directs continue with resetting SGIS, block SGIS when able" t the SOIS sign iPlaces 11 and 12 S/G SGIS keyswitches in RESET. Checks that Annunciators CG09 and GlO (ACTUATION SYS SGIS A(B)

TRIPPED) are clear.

e. Open the MSIV(s).

0Oen th SFW SOL valve s):

U. Sarta CON]) BSTRp, TIME STOP TERMINATING CUE: This JPM is complete when a COND BSTR PP is started and SGIS is reset. No further actions are required.

Rev. 0

Page 6 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-1 (BANK)

TASK: Restore Main Feedwater Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

YES NO (If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE:

DATE:

Rev. 0

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

I. To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrail safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. A total loss of all feedwater has occurred on Unit 1.
b. The reactor is tripped and EOP-0 is complete.
c. The CRS directed the RCPs be secured and a cooldown started prior to the EOP-3 brief
d. You are performing the duties of the Unit I CRO.
3. Initiating Cue: The CRS directs you to establish natural circulation and cooldown the RCS per EOP-3, Step IV.G. Are there any questions? You may begin.

Rev. 0

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-5 (MODIFIED)

TASK: Verify Validity of CIS Actuation PURPOSE: Evaluates an Operator's Ability to Determine the Validity of a CIS Actuation JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING Rev. 1

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-5 (MODIFIED 3)

ELEMENT STANDARD

(* = CRITICAL STEP)

PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the knowledge requirement of the Initial License class training program for the Engineered Safety Features Actuation System.

EVALUATION LOCATION:

PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE DEMONSTRATE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

10 MINUTES MINUTES NO TASK LEVEL:

TRAIN TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

Alarm Manual 1C08, G-06 TASK STANDARDS:

This JPM is complete when the reactor coolant pumps have been tripped and the report made to the CRS.

Rev. 1

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-5 (MODIFIED 3)

ELEMENT STANDARD

= CRITICAL STEP)

Simulator Setup

a. Reset simulator to IC-13, 100% power
b. Initiate malfunction ESFA009_01 and freeze simulator.
c. If performing JPMs in parallel, turn annunciator audible alarms off.

Rev. 1

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-5 (MODIFIED 3)

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START Locate and reference Alarm Manual for Same as element.

1C08, G-06.

1. PERFORM the following:

Checks pressure indications for pressure

> 2.8 psig on 1C09.

Determines that CIS actuation is NOT valid.

Determines only Channel A actuated.

Detemines step is N/A

c. IF the CIS is invalid Checks temperatures on 1C06 and the THEN MONITOR the RCPs plant computer.

Controlled Bleed-off and bearing temperatures while performing the following:

(1) IF the RCP Controlled Determines Controlled Bleed Off Bleed-off temperature(s) temperature(s) are NOT exceeding exceed 200'F or bearing 200'F or bearing temperature(s) are temperature(s) exceed exceeding 195°F.

195°F, THEN:

Rev. 1

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-5 (MODIFIED 3)

ELEMENT STANDARD

(* = CRITICAL STEP)

CUE: When candidate recommends resetting CIS, CRS concurs and orders CIS reset.

(2) With Shift Manager or Places 1-HS-3832 & 1-HS-2080 in Control Room SHUT per Attachment 4 of EOPs and Supervisor approval, reports handswitches are matched per RESET the CIS, using the attachment. Depresses Channel A Attachment 4 of EOPs CIS reset pushbutton on IC10 and as guidance, and notes that ACTUATION SYS CIS RETURN components TRIP alarm on C08 does NOT clear.

to their normal status.

Notifies CRS and recommends tripping the reactor.

CUE: CRS concurs and orders a reactor trip.

NOTE: The following steps are from EOP-0 Reactivity Safety Function.

EOP-O A. VERIFY THE REACTIVITY Pushes Reactor Trip pushbuttons CONTROL SAFETY on 1C05.

FUNCTION IS SATISFIED.

1. Depress ONE set of Pushes Reactor Trip pushbuttons on Manual REACTOR TRIP 1C05.

buttons.

2. Check the Reactor has Checks power indications tripped by the following: decreasing on 1C05.
  • Prompt drop in NI power Checks SUR indications negative on
  • Negative SUR 1C05.
3. Check that NO more than Check CEA indications on the CEA ONE CEA is NOT fully mimic or on CEAPDS determines inserted. all CEAs are inserted.

Rev. 1

Page 6 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-5 (MODIFIED 3)

ELEMENT STANDARD

(* = CRITICAL STEP)

4. Verify demineralized water makeup to the RCS is secured as follows:

"*11 and 12 RC M/U PPs are secured.

"*VCT M/U valve, 1-CVC-512 CV, is shut.

"*IF RCS Makeup is in Direct Determines RCS makeup is not in Lineup, THEN the RWT CHG the direct lineup..

PP SUCT, 1-CVC-504-MOV, is Reports "Reactivity Complete" to shut. the CRS CUE: If candidate continues to the Pressure and Inventory Safety Function, direct them to respond to the CIS.

ALARM MANUAL 1C08 G-06 1.C.(1).(c)

Reports all RCPs tripped to CRS.

TIME STOP TERMINATING CUE: This JPM is complete when the trip of all RCPs is reported to the CRS.

Rev. 1

Page 7 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-5 (MODIFIED 3)

TASK: Verify Validity of CIS Actuation Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES NO (If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

Rev. 1

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

I To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. Unit 1 is in Mode 1 at 100% power.
b. Annunciator 1C08 G-06 "Actuation Sys CIS Tripped" is in alarm window G-06 is in alarm.
c. You are performing the duties of the Unit 1 RO and CRO.
3. Initiating Cue: The CRS directs you to respond to the alarm. Are there any questions? You may begin.

Rev. 1

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-3G (UPGRADE)

TASK: Verify Validity of CIS Actuation PURPOSE: Evaluates an Operator's Ability to Determine the Validity of a CIS Actuation JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING Rev. 1

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-3G (UPGRADE)

TASK: Verify Validity of CIS Actuation PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the knowledge requirement of the Initial License class training program for the Engineered Safety Features Actuation System.

EVALUATION LOCATION:

PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE DEMONSTRATE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

10 MINUTES MINUTES NO TASK LEVEL:

TRAIN TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

Alarm Manual 1C08, G-06 TASK STANDARDS:

This JPM is complete when CIS has been reset, Instrument Air and Component Cooling have been restored to Containment.

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-3G (UPGRADE)

TASK: Verify Validity of CIS Actuation Simulator Setup

a. Reset simulator to IC-13, 100% power
b. Initiate malfunctions ESFA009_01 and then delete the malfunction after components reposition.
c. Place simulator in "freeze".
d. IF contacted to reset CIS from ESFAS, acknowledge request, but do NOT reset CIS.

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-3G (UPGRADE)

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START Locate and reference Alarm Manual for Same as element.

1C08, G-06.

1. PERFORM the following:

Checks pressure indications for pressure > 2.8 psig on 1C09.

Determines that CIS actuation is not valid.

No action taken - CIS invalid.

c. IF the CIS is invalid Checks temperatures on 1C06 and the THEN MONITOR the RCPs plant computer.

Controlled Bleed-off and bearing temperatures while performing the following:

(1) IF the RCP Controlled Determines that Controlled Bleed Off Bleed-off temperature(s) temperature(s) are NOT exceeding exceed 200'F or bearing 200'F AND bearing temperature(s) temperature(s) exceed are NOT exceeding 195 0 F.

195-F, THEN:

d. Informs CRS that CIS is invalid, requests resetting CIS.

Places 1-HS-3832 & 1-HS-2080 in SHUT per Attachment 4 of EOPs and reports handswitches are matched per the attachment. Depresses Channel A CIS reset pushbutton on IC10 and verifies ACTUATION SYS CIS TRIP alarm on C08 clears.

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-3G (UPGRADE)

ELEMENT STANDARD

(*= CRITICAL STEP')

(* = CRITICAL STEP)

Places 1-HS-2080 and 1-HS 3832 in OPEN and verifies each valve opens.

Verifies RCP temperatures are lowering.

TIME STOP TERMINATING CUE: This JPM is complete when Component Cooling and Instrument Air are restored to Containment. No further actions are required.

Page 6 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AM-1C08-3G (UPGRADE)

TASK: Verify Validity of CIS Actuation Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES NO (If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

I To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. Unit 1 is in Mode 1 at 100% power.
b. Annunciator 1C08 G-06 "Actuation Sys CIS Tripped" in alarm.
c. You are performing the duties of the Unit 1 RO and CRO.
3. Initiating Cue: The CRS directs you to respond to the alarm per the Alarm Manual for 1C08. Do you have any questions? You may begin.

Page 1 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-17B-1 (NEW) (441.

TASK: Verify RMS Operability for a Waste Gas Release PURPOSE: Evaluates an Operator's ability to align the Waste Gas System for a release" per OI-17B JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-17B-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the Initial License class classroom and simulator training.

EVALUATION LOCATION:

PLANT SIMULATOR CONTROI ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE DEMONSTRATE PERFCIRMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

15 MINUTES MINUTES NO TASK LEVEL:

TRAIN TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

OI-17B TASK STANDARDS:

This JPM is complete it has been determined what actions are required to perform a Waste Gas release with O-RI-2191 inoperable.

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-17B-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

1. Simulator Setup
a. IC-any
b. Enter Overrides
1. Override O-RI-2191 indication to 3.99, place arrow on indicator.

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-17B-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START Locate OI-17B Section 6.4.B Step 12 Without error

12. OPEN the WF DISCH ISOL valves using Same as element 0-HS-2191 AND 0-HS-2192 (1C33):
  • O-WGS-2191-CV 0-WGS-2191-CV
13. IF a rise in flow rate is indicated on Directs PO to monitor flow.

0-FI-2192 OR 0-FI-2193 (1C63) When report received on THEN... zero flow, determines step is N/A CUE: IF ABO contacted, no flow is indicated on 0-FI-2193.

14. IF the Gaseous Waste Dishcarge Radiation Checks 1-RI-2191 in Monitor 0-RI-2191 is out of service, service and determines step THEN... is N/A
15. PERFORM an RMS operability check on 0-RI 2191 by performing the following:

Places switch to CHECKSOURCE lt.s.:JL follows:

Determines no meter deflection occurred

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-17B-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

Considers the monitor out of service, Steps 15.c,d and e are not requiredto be performedif the RMS is declaredinoperable.

16. IF the Gaseous Waste Discharge Radiation Monitor, O-RI-2191 fails any part of its operability check in Step 15 OR is declared out of service in Step 14, THEN COMPLETE the following:

Same as element Z1'ua nXL me %aseous w aste Places Operate Selector Discharge Radiation Instrument Switch in LEVEL CAL Operate Selector Switch, 0-HS 2190 in the LEVEL CAL position.

Locates 01-35 Section 6.12

Page 6 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-17B-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

Determines ODCM requirement 3.3.3.9 Action 35 is required.

CHECK Technical Spec Determines no Technical for applicability. Specifications apply

c. CHECK TRM for applicability. Determines no Technical Requirements apply Checks ODCM Section 3.3.3.9 page 16 Locates table and determines Action 35 is applicable Notifies CRS or Shift Manager that discharge may continue if requirements of Action 35 are met.

TERMINATING CUE: This JPM is complete when the trainee states that the Waste Gas release can continue as long as Action 35 is completed.

No further actions are required.

TIME STOP

Page 7 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE OI-17B-1 (NEW)

TASK: Verify the operability for a Waste Gas release Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES NO (If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

1. To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. A Waste Gas discharge permit has been approved for releasing a WGDT.
b. You are performing the duties of a Unit 1 CRO.
3. Initiating Cue: 13 WGDT is being aligned for discharge per 0I-17B Section 6.4. Steps 6.4.B, 1 through 11 are complete. Begin on Step 12.

Are there any questions? You may begin.

CCNPP LICENSED OPERATOR R /.L. Page JOB PERFORMANCE MEASURE AOP-3E-1 (NEW)

TASK: Restart RCPs PURPOSE: Evaluates an Operator's Ability to Restart RCPs 5 jS(P JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-3E-1 (NEW)

TASK: Restart RCPs PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the Initial License class classroom and simulator training.

EVALUATION LOCATION:

PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

____ACTUAL PERFORMANCE __DEMONSTRATE PERFOt RMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL I'ASK:

TO COMPLETE JPM: TO COMPLETE JPM:

15 MINUTES _ MINUTES NO TASK LEVEL:

LEVEL 1 PERFORM TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

AOP-3E TASK STANDARDS:

This JPM is complete when the second RCP is started.

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-3E-1 (NEW)

TASK: Restart RCPs Simulator Setup

a. IC-1I
b. Cool down to approximately 520'F Tc.
c. Place TBV controller in Auto with a setpoint of 810#
d. Trip feeder breaker 252-1201, place in PTL and place ADV controller in manual.
e. Run until CET temperatures stabilize at less than 525 degrees F.

f Freeze simulator.

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-3E-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START.

Locate AOP-3E Section IV Step 1.7 Same as element

7. IF RCS temperature is between 525°F and Monitors Tc, IC05 or 3680 F, 1C06 THEN verify, that ALL of the following RCP restart criteria are met:
  • Verify electrical power is available to the Checks Pwr available light RCPs lit on U-2 RCP bus mimic, 1C19

"* RCP BUS

"* MCC-115(ALLRCPs)

"* MCC-105 (11A/IlBRCP)

ICUE: MCCs 115 and 105 are energized.

0 12/22 SERV BUS VOLTS is less than Check bus voltage, 1C 19 14.8 KV

  • 4 KV bus voltage is greater than 4100 Check U-2 4kv bus volts voltages,2C17 & 2C18
  • RCP CBO temperatures are less than Checks Groups 7 or 8 or 2000 F. Group 9 on Plant computer
  • RCS subcooling is greater than 30'F based on CET temperatures Check CET SCM, T1-133

& 134, IC05

  • At least ONE S/G available for heat removal

"* S/G level greater than (-)170 inches Check S/G NR or WR level on 1C03 orlC04

"* capable if being supplied with Check SGFP operating and feedwater feeding S/G

  • capable of being steamed Check ADVs or TBVs available

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-3E-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

"* PZR level is greater than 155 inches and Check Pzr lvi on LI-II OX NOT lowering or 110Y, 1C06

"* Tcold is less than 525'F Check Tc on TI-124, 1CO5

" RCS temperature and pressure are Refers to EOP Attach(l) greater than the minimum operating and determines RCS limits PER Attachment (1), RCP parameters are greater than PRESSURE / TEMPERATURE minimum RCP operating LIMITS of the EOP ATTACHMENTS. limits.

8. WHEN RCP restart is desired, AND RCP restart criteria are met, THEN start one RCP in a loop with a SG available for heat removal as follows:
a. On 1C07, verify that the RCP BLEED-OFF ISOL valves are open:

"* 1-CVC-505-CV

"* 1-CVC-506-CV

b. Verify that the "CCW FLOW LO" Checks RCP status panel alarm is clear. alarms clear, for RCP to be started.

W .Y -- "L &I&%, %-ILA, .1-11.1 . Checks RCP status panel PRESS LO" alarm is clear. alarms clear, for RCP to be started.

e. Operate the Oil Lift Pump for at least Same as element 60 seconds before starting the RCP.

Places sync stick in 252-1 1P02 or 252-13P02 un panei I U 19, verity that the Same as element synchroscope is NOT rotating.

Page 6 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-3E-1 (NEW)

ELEMENT STANDARD

= CRITICAL STEP)S Verify that the RCP is NOT Monitors motor ammeter cavitating by observing that running for stable current current is steady.

9. Operate Charging and Letdown to restore and maintain PZR level between 101 and Monitor Pzr Level on LI 180 inches. IlOXor l0Y, 1C06
10. Monitor RCP seal parameters following pump restart. Monitors RCP parameters on PC and 1C06
11. Allow backflow to equalize temperatures in the opposite loop. Monitors RCS temperatures, 1C06, until they are stable
12. Stan &econd. RUP in the same loop by performing the following actions:
  • a. Ensure RC? NPSfl requirements maintained PER ATTAC3M[ENT are Refers to EOP Attach(1)

(1),RCP PRESSURE and determines RCS fth parameters are greater than SOP ATTACHMNfs minimum RCP operating limits.

  • - b, Start an RCP PER Step 1.8 Palge22 Returns to Step 1.8, uses sync jack in breaker 252-13P02 or 252-1 1P02 ITERMINATING CUE: further This JPMactions are required.

is complete when the second RCP is started. No TIME STOP

Page 7 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-3E-1 (NEW)

TASK: Restart RCPs Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES (If yes, provide comments below) NO COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

1. To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. Unit 1 was shutdown for short maintenance outage.
b. The Unit was expected to be maintained in Mode 3 per OP-4.
c. A short time ago the RCP feeder breaker 152-1201 tripped.
d. AOP-3E has been implemented.
e. The cause of the tripped breaker has been determined. There is no common mode failure and the breaker is being repaired.
f. You are performing the duties of the Unit 1 RO.
3. Initiating Cue: The CRS has directed you to start Reactor Coolant Pumps from Unit 2 power supply per AOP-3E Section IV Step 1.7. Are there any questions? You may begin.

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-30-1 TASK: Nulling NI Pots to Delta T Pots PURPOSE: Evaluates an Operator's Ability to Null NI Pots to Delta T Pots JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING Rev. 0

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-30-1 TASK: Nulling NI Pots to Delta T Pots PERFORMER'S NAME:

APPLICABILITY:

SRO.RO PREREQUISITES:

Completion of the knowledge requirement of the Initial License class training program for the Engineered Safety Feature Actuation System.

EVALUATION LOCATION:

X PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE ____DEMONSTRATE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

10 MINUTES MINUTES NO TASK LEVEL:

TRAIN TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

OP-2 Rev 39 01-30 Rev 22 TASK STANDARDS:

This JPM is complete when the candidate has nulled the Channel A NI Pot to the Delta T Pot and cleared the Nuclear Delta T CH Deviation alarm.

Rev. 0

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-30-1 TASK: Nulling NI Pots to Delta T Pots Simulator Setup:

1. IC-20 (11% power)
2. Adjust NI power pots:

A 9.45 - 8.4%

B 9.25 - 8.5%

C 9.10 - 8.5%

D9.03 - 8.5%

3. Verify NI-Delta-T power alarm on 1C05 caused by CH A only
4. Borate CEAs out as required to clear primary PDIL and PPDIL alarms when pots are adjusted.

Rev. 0

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-30-1 ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START__

1. Identify and locate OP-2 Step 6.9.F Same as element.
2. WHEN Reactor power is between 10 Determines step is applicable. Refers and 12%, to 01-30 Step 6.9 THEN NULL the NI pot for each channel that NI power is reading less than Delta-T power PER 01-30, section titled, NULLING NI POTS TO DELTA T POTS. [B04121 01-30 Step 6.9.B CAUTION: Adjustment of an Excore NI Power Range Safety Channel renders the channel inoperable AND requires entry into Technical Specification Action Statement 3.3.1.
1. NULL the NI pot for each channel that Determines Channel A is causing NI power is reading less than Delta-T the NI-DeltaT alarm power, by performing Steps a. through i.

For a specific channel.

a. BYPASS the following RPS Inserts and rotates keys, checks trips for the channel to be bypass lights on adjusted:

TRIP UNIT BYPASS KEY HI POWER 1 HI RATE 2 TM/LO PRES 7 LOSS LOAS 8 AXIAL PWR 10

b. INDEPENDENTLY CHECK Requests a peer check that RPS Trip Units 1,2,7,8 & 10 are bypassed.

[CUE: Peer check is complete.I Same as element Rev. 0

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-30-1 ELEMENT STANDARD

(* = CRITICAL STEP)

Adjusts NI cal pot and verifies Nuclear Power Delta T power is zero.

LuI'.u the iocling oevice on tfl Lowers locking lever on Pot NUCLEAR PWR CALIBRATE potentiometer.

Rotates and removes Keys, verifies Bypass lights are off JANLJE~r-rrINIr-JLVN I L I .LILI..L. Requests a peer check that Trip Bypass Keys are removed from Trip Units 1,2,7,8

& 10.

CUE: Peer check is complete.

TIME STOP TERMINATING CUE: This JPM is complete when Channel A has been nulled and it is determined no other channels require being nulled. No further actions are required.

Rev. 0

Page 6 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-30-1 TASK: Nulling NI Pots to Delta-T pots.

Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES NO (If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

Rev. 0

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

1. To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. Unit 1 startup is in progress with the following conditions:

"* Power is approximately 11% and holding.

"* Nuclear Delta-T CH Deviation alarm is annuciated.

"* You are performing the duties of the U-I CRO.

3. Initiating Cue: The CRS directs you address the Nuclear Delta-T CH Deviation alarm per OP-2 step 6.9.F.2. Are there any questions? You may begin.

Rev. 0

CCNPP LICENSED OPERATOR 4,3 Page 1 JOB PERFORMANCE MEASURE 01lB-5 (NEW)

TASK: Feed and Bleed Operation to Cool the Quench Tank PURPOSE: Evaluates an Operator's Ability to Restore Quench Tank Parameters JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-IB-5 (NEW)

TASK: Feed and bleed to cool the Quench Tank PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the Initial License class EOP-0 classroom and simulator training.

EVALUATION LOCATION:

_ PLANT SIMULATOR CONTROL ROON EVALUATION METHOD:

__ ACTUAL PERFORMANCE __ DEMONSTRATE PERFORMANICE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

10 MINUTES MINUTES NO TASK LEVEL:

LEVEL 1 PERFORM TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

EOP-0 TASK STANDARDS:

This JPM is complete when Quench Tank parameters have been restored to their normal operating band.

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-1B-5 (NEW)

TASK: Feed and bleed to cool the Quench Tank Simulator Setup

a. Any IC
b. Insert malfunction RCS027_01 at 20% until Quench Tank level and pressure come into alarm (-5 seconds @ 100% power), then delete malfunction.
c. Feed and bleed quench tank until temperature is 119'F, level is 31",

pressure is 10 psig (all in alarm)

d. Pump RCDT, then freeze.

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-IB-5 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START Locate Alarm Manual 1-C06, Window E-0l

1. Perform the following:

Verifies all valves are shut ii_ a 1uKv is leaking or open and Determines step is N/A.

fails to shut when RCS pressure is reduced below its lift setpoint, THEN...

Locates 01- 1B, determines 6.8 is the correct section.

i*cwr LK to 1ecnmcai bpecmcations Determines step is N/A 3.4.11 and 3.4.12 for PORV operability requirements.

CUE: Initial conditions are met, begin at Step 6.8.B.

NOTE: Steps 6.8.B.1 and 6.8.B.2 may be performed in any order to minimize the amount of liquid or gaseous waste.

CAUTION: e Do NOT attempt to adjust the Quench Tank parameters until after the relief or safety valve has completed lifting.

The Sparger Nozzles will be uncovered at approximately 24 inches indicated level and the Quench Tank may experience a rapid increase in pressure if this occurs. The amount of time the Sparger Nozzles will be uncovered should be minimized.

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-IB-5 (NEW)

ELEMENT STANDARD

= CRITICAL STEP)

CUE: 1-SI-446-RV, 1-RCW-4252-RV, O-N2-238, 1-PS-6531-CV are shut and not leaking.

1. DRAIN the quench tank as follows:

Note to Evaluator: Pumping RCDT should not be necessary. If Trainee references this step, tell them it can be done after completion of Quench Tank operations.

a. PUMP the RCDT PER OI-17C as None necessary while draining the Quench Tank to maintain RCDT level below the Hi level alarm setpoint (45 inches)

{3}

mraming Ute yuench Tank below the low level alarm is acceptable during the bleed and feed due to the tank being refilled immediately.

d. DRAIN the Quench Tank to the Same as element desired level but not less than 15 inches.

Prior to level lowering <15' (3)

Same as element (3)

Page 6 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-1B-5 (NEW)

ELEMENT STANDARD

(*= CRITICAL STEP')

3. REPEAT Steps 6.8.B.1 and 6.8.B.2 until Determines repeat of steps is Quench Tank temperature is less than not necessary.

120'F AND the Quench Tank high temperature alarm is clear.

4. FILL OR DRAIN the Quench Tank to Verifies level approximately approximately 28.5 inches (between the 28.5".

high and low level alarm).

TERMINATING CUE: This JPM is complete when all alarms are clear, the DI and the quench tank drain valves are closed. No further actions are required.

TIME STOP

Page 7 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 0-11B-5 (NEW)

TASK: Feed and bleed to cool the Quench Tank Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES (If yes, provide comments below) NO COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

I. To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. The Quench Tank is in alarm with the following parameters:

Pressure is 10.0 psig Temperature is 11 90 F Level is 31"

b. You are performing the duties of the Unit 1 CRO.
3. Initiating Cue: Respond to the Quench Tank alarm. Are there any questions? You may begin.

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-36-1 (NEW)

TASK: Starting an Alternate Purge of Containment PURPOSE: Evaluates an Operator's ability to operate Containment purge hand switches locally.

JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING Rev. 2

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-36-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

PERFORMER'S NAME:

APPLICABILITY:

ABO PREREQUISITES:

Completion of the Initial License classroom and simulator training.

EVALUATION LOCATION:

_x_ PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE x_ DEMONSTRATE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JP M:

15 MINUTES _ MINUTES NO TASK LEVEL:

TRAIN TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

01-36 TASK STANDARDS:

This JPM is complete when key switches on breakers 52-20231 and 52-20311 are in TEST/ALT PURGE.

Rev- 2

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-36-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

CUE: Initial conditions are met, begin at Step 6.7.B. 1.

Locate 01-36 Section 6.7, Step B. 1 Without error NOTE:

  • All steps in this subsection apply only to controls and equipment on the unit to be vented.

"* The key will be captured in the Test/Alt Purge position.

"* The Purge Supp Fan Test/Alt Purge handswitch is located on breaker 52-10231 (52-20231).

-+:..:..* ::,*..:* : ~. ...::...:.. SAW LACEPurg a TS/L I.,.--:- . .: .. :-- : .::......

M ......

. ..... .. :. *... Simulates inserting key, places T2-ST/A290A ,.ST/ALLTRG in E.

TRG NOTE:

  • The key will becaptured.i the Test/Alt Purge position.

0 The Purge Exh Fan Test/Alt Purge handswitch is located on breaker 52-10311 (52-20311).

  • 2.. PLAC E Fait TEST/ALT Simulates inserting key, places PR hdwc (.HS::*:5289A:*::*:,::::,:i 2-HS-5289A in TEST/ALT PURGE.

Rev. 2

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-36-1 (NEW)

TASK: Starting an Alternate Purge of Containment Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES NO (Ifyes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

Rev. 2

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

1. To complete the task successfully, you must:
  • perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.
  • comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.
2. Initial Conditions:
a. Unit 2 is in a refueling outage.
b. An approved Containment purge permit is held by the CRO.
c. You have been given the required keys.
d. You are performing the duties of Unit 2 ABO.
3. Initiating Cue: You are directed by the CRO to perform 01-36 Section 6.7, Steps B. 1 and B.2. Are there any questions? You may begin.

Rev. 2

CCNPP LICENSED OPERATOR 13.3ý.q JOB PERFORMANCE MEASURE 01-36-1 (NEW)

TASK: Starting an Alternate Purge of Containment PURPOSE: Evaluates an Operator's ability to operate Containment purge hand switches locally.

JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING Rev. 2

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-36-1 (NEW)

ELEMENT STANDARD

(*=CRITICAL STEP)

(* = CRITICAL STEP)

PERFORMER'S NAME:

APPLICABILITY:

ABO PREREQUISITES:

Completion of the Initial License classroom and simulator training.

EVALUATION LOCATION:

x PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE x DEMONSTRA TE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

15 MiNUTES _ MINUTES NO TASK LEVEL:

TRAIN TOOLS AND EQUIPMENT:

None REFERENCE PROCEDURE(S):

01-36 TASK STANDARDS:

This JPM is complete when key switches on breakers 52-20231 and 52-20311 are in TEST/ALT PURGE.

Rev. 2

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-36-1 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

ItU: Initial conditions are met, begin at Step 6.7.B.1.

I Locate 01-3 6 Section 6.7, Step B. 1 Without error NOTE: "* All steps in this subsection apply only to controls and equipment on the unit to be vented.

"* The key will be captured in the Test/Alt Purge position.

"* The Purge Supp Fan Test/Alt Purge handswitch is located on breaker 52-10231 (52-20231).

Simulates inserting key, places 2-HS-5290A in TEST/ALT PURGE.

be captured in the Test/Alt Purge position.

  • The Purge Exh Fan Test/Alt Purge handswitch is located on breaker 52-10311 (52-20311).

AC1"Purg* Ex." 4- * .... Simulates inserting key, places

. .................... ............ 2-HS-5289A in TEST/ALT PURGE.

TERMINATING CUE: This JPM is complete when the CRO is informed that HS-5289A and 5290A are in TEST/ALT PURGE. No further actions required.

Rev. 2

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE 01-36-1 (NEW)

TASK: Starting an Alternate Purge of Containment Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE:

Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY?

YES NO (If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

Rev. 2

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

1. To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. Unit 2 is in a refueling outage.
b. An approved Containment purge permit is held by the CRO.
c. You have been given the required keys.
d. You are performing the duties of Unit 2 ABO.
3. Initiating Cue: You are directed by the CRO to perform 01-36 Section 6.7, Steps B. 1 and B.2. Are there any questions? You may begin.

Rev. 2

01-36 CONTAINMENT PURGE SYSTEM Rev. 25 Page 26 of 32 6.7 STARTING AN ALTERNATE PURGE OF CONTAINMENT A. Initial Conditions

1. RCS temperature is less than 2000 F on the unit to be purged.
2. Section 6.1 has been completed for the unit to be purged.
3. One Main Exhaust Fan is in operation on the unit to be purged.
4. Main Vent Gaseous Radiation Monitor RI-5415 is in operation on the unit to be purged, OR appropriate compensatory action has been taken PER ODCM Controls 3.3.3.9.
5. An approved Gaseous Waste Release Permit for containment purge has been received from Chemistry.
6. Radiation Safety Supervision has been notified of pending containment purge.
7. IF performing core alterations OR movement of irradiated fuel assemblies within the containment, THEN all four channels of Containment Area Radiation Monitors RI-5316A, B, C, and D are operable on the unit to be purged. (Tech Spec 3.3.7)

S~NOTE IfContainment pressure is greater than 0.30 PSIlG or less than (-)0.30 PSIG, then the H2 Purge system must be used.

8. Containment pressure is no less than (-)0.30 PSIG and no greater than 0.30 PSIG on the unit to be purged. [B0200]
9. Containment Radiation Monitoring System Sample Pumps are secured. (01-35)
10. Keys for the Purge Supp & Exh Fans Test/Alt Purge handswitches have been obtained.

B. Procedure NOTE

& All steps in this subsection apply only to controls and equipment on the unit to be vented.

  • The key will be captured in the Test/Alt Purge position.

0 The Purge Supp Fan Test/Alt Purge handswitch is located on breaker 52-10231 (52-20231).

1. PLACE Purge Supp Fan TEST/ALT PURGE handswitch, 1(2)-HS-5290A, in TEST/ALT PURGE.

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-7H-2 (NEW)

TASK: Monitor CEA Position PURPOSE: Evaluates an Operator's Ability to Verify CEA Position by Alternate Methods JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING Rev. 0

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-71[-2 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the knowledge requirement of the Initial License class training program for Nuclear Engineering Operating Procedures.

EVALUATION LOCATION:

_ PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE DEMONSTRATE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

15 MINUTES MINUTES NO TASK LEVEL:

TRAIN TOOLS AND EQUIPMENT:

AOP-7H Attachment 7 REFERENCE PROCEDURE(S):

AOP-7H TASK STANDARDS:

This JPM is complete when "full out" position indication is selected as the operable position indication system to replace pulse counting.

Rev. 0

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-711-2 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START Identify and locate AOP-7H Same as element.

Section IV.H. 1.b.

CUE: Hand candidate filled out Attachment 7, explain using "part length" pulse counter readings for Group 5 CEAs as indicated. Secondary position indication is 132.5 for each CEA listed.

1.b Perform verification of the two Same as element position indications at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to comply with TRM TVR 15.1.4.1:

ATTACHMENT (7)

1. Record the following... N/A, data given CUE: Provide blank copy of Computer Outage Log page for Coil Power Programmer.

Take Pulse Counter Readings, in CSR, and compares readings to Attachment (7) readings.

Determines CEAs have moved and discontinues method. Refers to AOP-7H Section IV.H.

Refers to TRM 15.1.4.

Reviews TRM and determines a Non-Conformance condition exists Rev. 0

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-711-2 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

Non-Conformance

.its Determines that CEAs shall be fully withdrawn or non-conformance ull condition B applied.

TIME STOP TERMINATING CUE: This JPM is complete when it is determined that the CEAs should be fully withdrawn to comply with the TRM. No further actions are required.

Rev. 0

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE AOP-7H-2 (NEW)

TASK: Monitor CEA Position Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES NO (If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

Rev. 0

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

1. To complete the task successfully, you must:
  • perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRS.

0 comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. Unit 1 is at 100% power and has been operating at full power for seven weeks.
b. The plant computer has "crashed" and is inoperable.
c. You are performing the duties of the Unit-I RO.
3. Initiating Cue: AOP-7H was implemented 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago. The CRS directs you to verify CEA position per Section IV.H. 1.b, Attachment 7, Step 2, using CEA pulse counter readings. For the purpose of this JPM, use the part length (retired in place) pulse counters instead of the actual Group 5 pulse counters. Are there any questions? You may begin.

Rev. 0

[ AOP-7H Rev 19 ATTACHMENT (7)

Page I of 6 CEA POSITIONMONITORING USING PULSE COUNTERS 1.. Record the following information on the tables below to establish baseline data:

0 Pulse Counter Reading on the individual breakers in the Cable Spreading Room

  • IF Secondary CEA Position is available, THEN record it in the appropriate column IF FULL OUT indication is used, THEN place the letters FO in the FULL OUT/FULL IN column
  • IF FULL IN indication is used, THEN place the letters FI in the FULL OUT/FULL IN column
2. Once every four hours, compare the Pulse Outage Logs with the Pulse Counter Readings Counter readings recorded on the Computer on this attachment to ensure NO CEAS have moved.
3. IF any CEAs have moved, THEN discontinue using this method of CEA position monitoring.

O 1 r 2 (Circle one)

(POWER SHAPING) SIMULATED REG GRP 5

CEA PULSE COUNTER SECONDARY CEA FULL OUT!/

READING POSITION FULL IN 110 1

-14r 0L \. ja ,

15 -

AOP-7H Rev 19 Page 22 of 24 IV. LOSS OF PLANT COMPUTER ACTIONS ALTERNATE ACTIONS H. VERIFY CEA POSITION.

NOTE When the Plant Computer is out of service, the following CEA functions are lost:

"* Digital display on 1(2)C05

"* Primary alarm functions

"* Computer printout

"* CEA group sequencing and overlap

1. Establish at least two means of CEA 1.1 IF two means of CEA position indication position indication perTRM 15.1.4, CEA are NOT established, POSITION INDICATION. THEN refer to TRM 15.1.4 for applicable actions.
a. The following means may be used:

"* CEA Voltage Divider reed switch position indication

" CEA "FULL OUT" or "FULL IN" reed switch position indication (only-if the CEA-is-fully withdrawn or fully inserted)

" CEA pulse counter readings PER ATTACHMENT (6), CEA POSITION MONITORING USING DAS OR ATTACHMENT (7), CEA POSITION MONITORING USING PULSE COUNTERS

b. Perform verification of the two position indications at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to comply with TRM TVR 15.1.4.1.

I

BALTIMORE GAS & ELECTRIC COMPANY CALVERT CLIFFS NUCLEAR POWER PLANT LOSS OF PLANT COMPUTER LOGS (UNIT 1 CONTROL Page 1 of ROOM) LOGSHEET From /_/ at.: To /_/ at IC07 CHARGING FLOW--FIA-212 42-94 GPM VCT LEVEL--LIC-226 9 0-110

- INCHES VCT PRESSURE--PIA-225 25-50 PSIG LETDOWN HX OUTLET TEMPERATURE- 100-120

-TIC-224 0F LETDOWN FLOW--FI.A-202 29-128 GPM 11 BAST LEVEL--LIA-206 110-136 INCHES 12 BAST LEVEL--LIA-208 110-136 INCHES UNIT 1 COIL POWER PROGRAMMER - SEE NOTE #1 CEA #10 PULSE COUNTER READI'NG

-lOCE-APULS-* .10CEPULSNUMERIC U CEA#1 PULSE COUNTER READING i i

i

-11CEAPULS i NUMERIC CEA #14 PUI4SE COUNTER READING

-14CEAPTULS NUMERIC CEA #15 PULSE COUNTER READING i 4 I1 I

-15CEAPULS i NUMERIC 4

LOSS OF PLANT COMPUTER LOGS (UNIT 1 CONTROL Page Cl ROOM) LOGSHEET NOTES & CO*MMENTS PAGE From l/ at To/ / at NOTES:

1. Record CEA Pulse Counter readings after initial Plant Computer Loss of the CEA Position is and following ail subsequent CEA movements.

determined by multiplying counter readings by .75 inches. the difference in

2. Attach Computer Outage Logs with the Daily Operating Logs fo r retention in Plant History.

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-9 (NEW)

TASK: Operate AFW PURPOSE: Evaluates an Operator's Ability to Operate the AFW Pumps locally per EOP-3.

JOB PERFORMANCE MEASURE CALVERT CLIFFS NUCLEAR POWER PLANT LICENSED OPERATOR TRAINING Rev. 0

Page 2 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-9 (NEW)

TASK: Operate AFW PERFORMER'S NAME:

APPLICABILITY:

RO and SRO PREREQUISITES:

Completion of the knowledge requirement of the Initial License class training program for Auxiliary Feedwater (AFW) and AFAS.

EVALUATION LOCATION:

X PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD:

ACTUAL PERFORMANCE DEMONSTRATE PERFORMANCE ESTIMATED TIME ACTUAL TIME TIME CRITICAL TASK:

TO COMPLETE JPM: TO COMPLETE JPM:

10 MINUTES MINUTES NO TASK LEVEL:

TRAIN TOOLS AND EQUIPMENT:

Working copy of EOP-3 REFERENCE PROCEDURE(S):

EOP-3 TASK STANDARDS:

This JPM is complete when 11 AFW pump discharge pressure is adjusted to 100 psig greater then S/G pressure.

Rev. 0

Page 3 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-9 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START__

Locate EOP-3,Section IV, Step H.4.b. 1 Same as element bi. Start 11 or 12 AFW PP locally as follows:

(1) Shut the S/G FLOW CONTR valves:

  • (11 S/G) 1-AFW-4511-CV Calls control room to ensure
  • (12 S/G) 1-AFW-4512-CV 1-AFW-4511-CV &

1-AFW-4512 CV are shut.

I CUE: 1-AFW-4511 and l-AFW-4512-CVs are shut. I Same as element Isolate the Instrument Air to the Turbine Governor controller(s) by shutting the following valves:

Opens the filter drain for 11 AFW pump controller Verity open 11 and 12"AI%

Main Steam Supply Valves:

"* 1-MS-109 Verifies 1-MS-109 is open

"* 1-MS-107 (6) Verify open 11 OR 12 THROTTLE/STOP valve:

S 1-MS-3986 Verifies 1-MS-3986 is open S 1-MS-3988 Calls CRO or ABO to open 1-MS-102 and 1-MS-105 Rev. 0

Page 4 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-9 (NEW)

ELEMENT STANDARD

(* = CRITICAL STEP)

I CUE: 1-MS-102 and 1-MS-105 are open.

Adjusts governor and monitors discharge pressure and steam supply pressure.

Contacts CRO and states AFW Pump is operating.

1CUE: 11 AFW pump discharge pressure is 100 psig greater than Steam Generator pressure. I TIME STOP:

TERMINATING CUE: This JPM is complete 11 AFW pump is operating at 100 PSI greater than S/G pressure.. No further actions are required.

Rev. 0

Page 5 CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE EOP-3-9 (NEW)

TASK: Operate AFW Document below any instances of failure to comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

NOTES:

DID A NEAR MISS OCCUR DUE TO INAPPROPRIATE PERSONNEL NO ACTIONS/INACTIONS OR PROCEDURAL QUALITY? YES (If yes, provide comments below)

COMMENTS:

The operator's performance was evaluated against the standards contained in this JPM and determined to be SATISFACTORY UNSATISFACTORY EVALUATOR'S SIGNATURE: DATE:

Rev. 0

CCNPP LICENSED OPERATOR JOB PERFORMANCE MEASURE DIRECTIONS TO TRAINEE:

1. To complete the task successfully, you must:

"* perform each critical element correctly. You must inform the evaluator of the indications you are monitoring. Where necessary, consider the evaluator to be the CRO.

"* comply with industrial safety practices, radiation safety practices and use of event free tools. NOTE: Violation of safety procedures will result in failure of the JPM.

2. Initial Conditions:
a. A complete Loss of Feed has resulted in a plant trip and EOP-3 is being entered.
b. 13 AFW pump has tripped and attempts to operate 11 and 12 AFW pumps from the Control Room have resulted in overspeed trips.
c. 11 AFW pump overspeed trip has been reset.
d. You are performing the duties of an extra CRO.
3. Initiating Cue: You have been instructed by the CRS to start 11 Auxiliary Feedwater pump locally per EOP-3,Section IV, Step H.4.b. 1. Do you have any questions? You may begin.