ML022340489

From kanterella
Jump to navigation Jump to search
Letter Regarding Public Meeting Summaries Held on 08/07/02 Re Brown Ferry Unit 1 Restart Project
ML022340489
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 08/20/2002
From: Fredrickson P
NRC/RGN-II
To: Scalice J
Tennessee Valley Authority
Shared Package
ML022340431 List:
References
Download: ML022340489 (6)


Text

August 20, 2002 Tennessee Valley Authority ATTN: Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING SUMMARIES - BROWNS FERRY UNIT 1 RESTART PROJECT AND THE SCHEDULE FOR MAJOR MILESTONES - BROWNS FERRY DOCKET NO. 50-259

Dear Mr. Scalice:

This refers to the two meetings conducted at your request at the Region II Office in Atlanta, Georgia, on August 7, 2002. The first meetings purpose was to discuss the Browns Ferry Unit 1 Restart Project. Enclosure 1 contains a list of attendees and Enclosure 2 is the presentation handout. Discussions during this management meeting included the following topics: Browns Ferry regulatory history, scope of work required for unit 1 restart, and the regulatory framework plans for restart. The second meeting discussed the Unit 1 schedule for completing engineering/design change packages (civil, electrical and mechanical) and the implementation of modifications for the purpose of planning regional base inspections. contains a list of attendees. Both meetings were informative and did not result in specific action items or decisions.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning these meetings, please contact me at (404) 562-4530.

Sincerely,

/RA/

Paul E. Fredrickson, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-259 License No.: DPR-33

Enclosures:

(See page 2)

TVA 2

Enclosures:

1. List of Attendees
2. Handout - Browns Ferry Nuclear Plant - Unit 1 Restart cc w/encls:

Karl W. Singer State Health Officer Senior Vice President Alabama Dept. of Public Health Nuclear Operations RSA Tower - Administration Tennessee Valley Authority Suite 1552 Electronic Mail Distribution P. O. Box 303017 Montgomery, AL 36130-3017 James E. Maddox, Acting Vice President Engineering and Technical Services Chairman Tennessee Valley Authority Limestone County Commission Electronic Mail Distribution 310 West Washington Street Athens, AL 35611 Ashok S. Bhatnagar Site Vice President Distribution w/encls: (See page 3)

Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution Robert J. Adney, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution Robert G. Jones, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority Electronic Mail Distribution Timothy E. Abney, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

TVA 3 Distribution w/encls:

W. Long, NRR C. Evans (Part 72 Only)

RIDSNRRDIPMLIPB PUBLIC OFFICE DRP/RII SIGNATURE PTaylor:vyg NAME pt DATE 8/20/2002 E-MAIL COPY? YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML022340489.wpd

List of Attendees NRC/TVA Unit 1 Restart Management Meeting Nuclear Regulatory Commission L. Reyes, Regional Administrator, Region II (RII)

B. Mallett, Deputy Regional Administrator, RII R. Borchardt, Associate Director for Inspection and Programs, Office of Nuclear Reactor Regulation (NRR) [telecon]

K. Jabbour, License Project Manager, Division of Licensing Project Management, Project Directorate II-2, NRR L. Plisco, Director, Division of Reactor Projects (DRP), RII V. McCree, Deputy Director, DRP, RII P. Fredrickson, Chief, Reactor Projects Branch 6 (RPB), DRP, RII S. Cahill, Chief, RPB 2, DRP, RII B. Holbrook, Senior Resident Inspector, Browns Ferry, RPB 6, DRP, RII P. Taylor, Senior Project Engineer, RPB 6, DRP, RII C. Casto, Director, Division of Reactor Safety, (DRS), RII H. Christensen, Deputy Director DRS, RII M. Lesser, Chief Engineering Branch 2, DRS, RII J. Blake, Senior Project Manager, DRS, RII C. Julian, Technical Assistant, DRS, RII R. Hamilton, Health Physicist, Plant Support Branch, DRS, RII Browns Ferry (TVA)

A. Bhatnagar, Site Vice President J. Rupert, Unit 1 Restart Manager J. Valente, Unit 1 Engineering Manager T. Abney, Site Licensing & Industry Affairs Manager S. Tanner, Unit 1 Nuclear Assurance Manager Members of Public S. Spires, Business Writer, Huntsville Times NRC/TVA Unit 1 Restart Scheduling Meeting Nuclear Regulatory Commission S. Cahill, Chief, RPB 2, DRP, RII B. Holbrook, Senior Resident Inspector, Browns Ferry, RPB 6, DRP, RII P. Taylor, Senior Project Engineer, RPB 6, DRP, RII C. Casto, Director, DRS, RII H. Christensen, Deputy Director, DRS, RII M. Lesser, Chief Engineering Branch 2, DRS, RII Enclosure 1

2 J. Blake, Senior Project Manager, DRS, RII R. Hamilton, Health Physicist, Plant Support Branch, DRS, RII K. Jabbour, License Project Manager, Division of Licensing Project Management, Project Directorate II-2, NRR E. Kleeh, Reactor Operations Engineer, Division of Inspection and Programs, NRR Browns Ferry (TVA)

J. Rupert, Unit 1 Restart Manager J. Valente, Unit 1 Engineering Manager T. Abney, Licensing & Industry Affairs Manager S. Tanner, Unit 1 Nuclear Assurance Manager