APPENDIX A CHRONOLOGY This appendix contains a chronological listing of routine licensing correspondence between the U.S. Nuclear Regulatory Commission (NRC) staff and Duke Energy Corporation (Duke). This appendix also contains other correspondence regarding the NRC staffs review of the McGuire Nuclear Station, Units 1 and 2, (under docket Nos. 50-369, 50-370), and Catawba Nuclear Station, Units 1 and 2, (under docket Nos. 50-413, and 50-414.)
This appendix contains a chronological listing of routine licensing correspondence between the U.S. Nuclear Regulatory Commission (NRC) staff and Duke Energy Corporation (Duke). This appendix also contains other correspondence regarding the NRC staffs review of the McGuire Nuclear Station, Units 1 and 2, (under docket Nos. 50-369, 50-370), and Catawba Nuclear Station, Units 1 and 2, (under docket Nos. 50-413, and 50-414.)
May 8, 2001 In a letter (signed by S. Hoffman) NRC issued a public meeting notice for May 21, 2001. In this meeting, Duke planned to discuss schedules for planned license renewals for McGuire and Catawba Nuclear Stations.
ACN: ML011290008 June 5, 2001 In a letter (signed by C. Araguas) NRC issued a public meeting notice for June 20, 2001, between the NRC, Duke, VEPCo, and Exelon. In this meeting the licensees planned to continue discussions from prior meeting on May 21, 2001 on the review schedules for their planned license renewal applications. ACN: ML011560744 June 6, 2001 In a letter (signed by S. Hoffman) the NRC published a public meeting summary which was held on May 21, 2001, between the NRC, Duke, VEPCo, and Exelon regarding the review schedules for their planned license renewal applications. ACN: ML011590263 June 7, 2001 In a letter (signed by R. Prato) the summary of a telecommunication between the NRC, VEPCo, and Duke Energy Corporation was published and documented. The telecommunication was held on June 6, 2001.
Duke discussed integrated inspection schedule for the license renewal inspection activities planned for McGuire and Catawba Nuclear Stations.
ACN: ML011590499 June 13, 2001 In a letter (signed by M. S. Tuckman) Duke submitted its form and content of License Renewal Application (LRA) and Appendices for McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN:
ML011660301 June 13, 2001 In a letter (signed by M. S. Tuckman) Duke submitted its intent to apply to renew the operating licenses of McGuire and Catawba power stations.
In its submittal, Duke provided fourteen copies of the application. ACN:
ML011660138 A-1
June 13, 2001 In a letter (signed by M. S. Tuckman) Duke submitted two sets of marked flow drawings to aid the NRC in its review of Application to Renew the Operating Licenses of McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2. ACN: ML011660168 June 28, 2001 In a letter (signed by M. S. Tuckman) Duke submitted its applications to renew the operating licenses of McGuire and Catawba power stations. In its submittal, Duke provided one hard copy of the applications and 40 copies of applications on CDs. ACN: ML011840032 June 28, 2001 In a letter (signed by R. Franovich) NRC issued a public meeting notice for July 12, 2001. In this meeting, Duke planned to provide the NRC staff with a review of the license renewal applications for McGuire and Catawba Nuclear Stations, and to clarify the organization of the license renewal applications. ACN: ML011800037 July 10, 2001 In a letter (signed by R. Franovich) NRC published a public meeting summary which was held on June 20, 2001, between the NRC, Duke, VEPCo, and Exelon. This meeting was held to continue discussions from prior meeting on May 21, 2001 on the review schedules for their planned license renewal applications. ACN: ML011930405 July 24, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on July 19, 2001, to clarify information provided by Duke in its LRAs technical information Table 3.2-
- 4. ACN: ML012070063 July 26, 2001 In a letter (signed by R. Franovich) NRC published a public meeting summary which was held on July 12, 2001, between the NRC and Duke Energy Corporation regarding LRAs orientation for McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN: ML012080051 August 31, 2001 In a letter (signed by S. Hoffman) NRC issued a public meeting notice for September 19, 2001, between the NRC, Nuclear Energy Institute, SNC, HNP, FPL, Duke, VEPCo, and Exelon. In this meeting the licensees planned to discuss the review status of their LRA. ACN: ML012430275 September 10, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on August 21, 2001, to clarify information provided by Duke in its LRAs on the Boraflex Monitoring Program in Appendix B. ACN: ML012530283 A-2
October 3, 2001 In a letter (signed by R. Franovich) NRC issued a public meeting notice for October 18, 2001, between the NRC and Duke Energy Corporation (Duke) to discuss Scoping Methodology audit in support of license renewal application review for McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN: ML012770008 October 10, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on September 12, 2001, to clarify information provided by Duke in its LRAs on several waste treatment and disposal systems. ACN: ML012830102 October 15, 2001 In a letter (signed by R. Franovich) the summary of two telecommunication between the staff and Duke Energy Corporation was published and documented. These telecommunications were held on September 18 and 20, 2001, to clarify information provided by Duke in its McGuire and Catawba LRAs, regarding scoping of structures and components in the fire protection systems. ACN: ML012880370 October 21, 2001 In a letter (signed by S. Hoffman) NRC issued a public meeting summary which was held on September 19, 2001, between the NRC, Nuclear Energy Institute (NEI), SNC, FPL, VEPCo, Duke, and Exelon regarding the status of license renewal activities. ACN: ML012840369 November 2, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on October 3, 2001, to clarify information provided by Duke in its McGuire and Catawba LRAs, regarding scoping of structures and components in the fire protection systems. ACN: ML013060438 November 14, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on October 11, 2001, to clarify information provided by Duke in its McGuire and Catawba LRAs, regarding containment systems. ACN: ML013190029 November 14, 2001 In a letter (signed by C. Grimes) NRC provided Nuclear Energy Institute, Union of Concerned Scientists, and current license renewal applicants with their proposed staff guidance on station blackout scoping for comments. ACN: ML013180508 November 15, 2001 In a letter (signed by R. Franovich) NRC issued a public exit meeting summary which was held on October 19, 2001, between the NRC and Duke Energy Corporation (Duke) regarding scoping methodology audit in support of license renewal application review for McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN: ML013190507 A-3
November 23, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on October 11, 2001, to clarify information presented in the LRAs pertaining to aging management programs for structures. ACN: ML013310117 November 23, 2001 In a letter (signed by C. Grimes) NRC provided Nuclear Energy Institute, Union of Concerned Scientists, and current license renewal applicants with proposed changes to GALL report - Concrete for comments. ACN:
ML013300426 November 23, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on October 15, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Appendix B, Inservice Inspection Plan. ACN: ML013300361 November 30, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on October 25, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Section 3.5. ACN: ML013370544 November 30, 2001 In a letter (signed by R. Prato) NRC issued a public meeting notice for December 12, 2001, between the NRC, VEPCo, Duke, Exelon, and Nuclear Energy Institute to discuss license renewal emerging issues.
ACN: ML013370001 December 3, 2001 In a letter (signed by C. Grimes) NRC provided Nuclear Energy Institute, Union of Concerned Scientists, and current license renewal applicants with the license renewal issue - scoping of seismic II/I piping for comments. ACN: ML013380013 December 11, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on October 30, 2001, to clarify information presented in the LRAs pertaining to aging management programs for mechanical systems and components. ACN:
ML013460154 December 11, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on November 8, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Section B.3.12, Fire Protection Program. ACN: ML013460269 A-4
December 12, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on October 25, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Appendix B. ACN: ML013460417 December 13, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on November 5, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Appendix B on aging management program for mechanical systems and components. ACN: ML013470364 December 14, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on December 3, 2001, to clarify information presented by Duke on its McGuire and Catawba LRAs, Section B.3.6. ACN: ML013520129 December 14, 2001 In a letter (signed by S. Hoffman) NRC issued a public meeting notice for January 8, 2002, between the NRC, SNC, FPL, VEPCo, Duke, and Exelon. In this meeting, the review status and other activities associated with LRAs will be discussed. ACN: ML013510294 December 18, 2001 In a letter (signed by R. Prato) NRC issued a public meeting notice for January 10, 2002, between the NRC, VEPCo, Duke, Exelon, and Nuclear Energy Institute to discuss license renewal station blackout issues. ACN:
ML013600335 December 27, 2001 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on November 13, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Sections 2.5, 3.6, and B.3.19. ACN: ML013650428 January 10, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on November 20, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Section 4.6. ACN: ML020110099 January 11, 2002 In a letter (signed by D. Solorio) NRC issued a public meeting notice for January 15, 2002, where Nuclear Energy Institute and current license renewal applicants planned to follow-up on the January 10, 2002 meeting regarding the license renewal station blackout issue. ACN:
ML020110589 January 15, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and A-5
documented. The telecommunication was held on November 28, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Sections 2.3.2 and 2.3.3. ACN: ML020170132 January 15, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on November 27, 2001, to clarify information presented by Duke in its McGuire and Catawba LRAs, Sections 2.3.4, 2.3.3.27, 2.3.3.34, and 2.3.3.36. ACN: ML020160418 January 17, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 2.5, 3.6, and B.3.19 of McGuire and Catawba LRAs. ACN: ML020180061 January 17, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 2.1 and B.2 of McGuire and Catawba LRAs. ACN: ML020220034 January 17, 2002 In a letter (signed by P. Kang) NRC issued a public meeting notice for February 14, 2002, between the NRC, NEI, and current license renewal applicants to discuss revised sections of Chapters II and III of the GALL report on aging management of concrete elements. ACN: ML020220005 January 17, 2002 In a letter (signed by R. Prato) NRC issued a public meeting summary which was held on December 12, 2001, between the NRC, VEPCo, Duke, Exelon, and Nuclear Energy Institute (NEI) regarding license renewal Emerging Issues. ACN: ML020300004 January 22, 2002 In a letter (signed by R. Prato) NRC published a public meeting summary which was held on January 10, 2002, between the NRC, VEPCo, Duke, Exelon, Nuclear Energy Institute, and Nuclear Information and Resource Service regarding the scope of station blackout specific to license renewal. ACN: ML020220351 January 23, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 2.2 of McGuire and Catawba LRAs.
ACN: ML020290102 January 23, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 2.3.2 of McGuire and Catawba LRAs. ACN: ML020240249 January 24, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 3.3 of McGuire and Catawba LRAs.
ACN: ML020240265 January 28, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 2.3.3 of McGuire and Catawba LRAs. ACN: ML020320212 A-6
January 28, 2002 In a letter (signed by C. Grimes) NRC provided Nuclear Energy Institute, Union of Concerned Scientists, and current license renewal applicants with their proposed guidance on aging management of fire protection systems comments. ACN: ML020320437 January 28, 2002 In a letter (signed by C. Grimes) NRC requested comments from Nuclear Energy Institute, Union of Concerned Scientists, and current license renewal applicants on the revised proposed guidance on station blackout scoping. ACN: ML020300294 January 28, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 3.2 of McGuire and Catawba LRAs.
ACN: ML020320010 January 28, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Appendix B, Aging Management Programs (Mechanical Systems), of McGuire and Catawba LRAs. ACN:
ML020310200 January 28, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 2.3.1, 3.1, 4.2, 4.3, 4.7.1, and Appendix B of McGuire and Catawba LRAs. ACN: ML020310255 January 28, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Sections 2.4, 3.5, 4.6, 4.7.3, and Appendix B of McGuire and Catawba LRAs. ACN: ML020320165 January 30, 2002 In a letter (signed by R. Franovich) the NRC staff requested additional information (RAI) regarding Section 3.1 and Appendix B, section B.3.27 of McGuire and Catawba LRAs. ACN: ML020350542 January 31, 2002 In a letter (signed by P. Kang) NRC issued a public meeting notice for February 14, 2002, between NRC, NEI, and current license renewal applicants in order to discuss station blackout issues related to license renewal. This meeting is a follow-up to discussions initiated in public meeting held on January 10 and 15, 2002. ACN: ML020320079 February 5, 2002 In a letter (signed by P. Kang) NRC published a public meeting summary which was held on January 15, 2002, between the NRC, NEI, and current license renewal applicants. This meeting was held to continue the discussion that began with the January 10, 2002 on Station Blackout issues related with license renewal. ACN: ML020380195 February 11, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on January 9, 2002, to clarify information presented by Duke in its McGuire and Catawba LRAs, Sections 3.1, B.3.1, B.3.26, B.3.27, B.3.31, and 4.2.1. ACN:
ML020420453 A-7
February 13, 2002 In a letter (signed by D. Solorio) NRC published a public meeting notice for February 25, 2002, between the NRC, NEI, and current license renewal applicants. Implementation details of the license renewal interim staff guidance process will be discussed. ACN: ML020460082 February 21, 2002 In a letter (signed by S. Hoffman) NRC published a public meeting summary which was held on January 8, 2002, between the NRC, SNC, FPL, VEPCo, Duke, and Exelon regarding the progress of license renewal application reviews. ACN: ML020560022 February 25, 2002 In an e-mail communication (sent by R. Gill) Duke informs NRC that they have no comment on the summary of a telecommunication between the NRC and Duke which was held on February 21, 2002, to clarify information found in the LRAs for McGuire and Catawba. ACN:
ML021440327 February 27, 2002 In an e-mail communication (sent by R. Gill) Duke requested clarification of NRC staffs request for additional information (RAI) 2.3-4. ACN:
ML021440321 March 1, 2002 In a letter (signed by M. S. Tuckman) Duke submitted its response to the NRC staffs request for additional information (RAIs) dated January 17 and 23, 2002, regarding the scoping and screening methodology of McGuire and Catawba LRAs. ACN: ML020640428 March 1, 2002 Letter from Duke signed by M. S. Tuckman responding to request for additional information (RAIs) on scoping and screening methodology, plant level scoping results. ACN: not given yet March 1, 2002 In a letter (signed by C. Grimes) NRC requested comments from Nuclear Energy Institute Union of Concerned Scientists, and current license renewal applicants on the revised proposed guidance on station blackout scoping. ACN: ML020600100 March 6, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on February 21, 2002, to clarify information presented by Duke in its McGuire and Catawba LRAs, Section 2.4.2. ACN: ML020660073 March 7, 2002 In a letter (signed by P. Kang) NRC published a public meeting summary which was held on February 14, 2002, between the NRC, NEI, and current license renewal applicants regarding revised guidance on station blackout scoping. ACN: ML020700212 March 8, 2002 In a letter (signed by M. S. Tuckman) Duke submitted its response to the NRC staffs request for additional information (RAIs) dated January 17, 2002, regarding Sections 2.5, 3.6, and Appendix B Section B.3.19 of McGuire and Catawba LRAs. ACN: ML020740025 A-8
March 11, 2002 In a letter (signed by M. S. Tuckman) Duke submitted its response to the NRC staffs request for additional information (RAIs) dated January 28, 2002, regarding Sections 2.4, 3.5, 4.6, 4.7.3, and Appendix B of McGuire and Catawba LRAs. ACN: ML020770266 March 13, 2002 In a letter (signed by S. Hoffman) NRC published a public meeting notice for April 8, 2002, between the NRC, NEI, and current license renewal applicants to discuss the status of the renewal applications and generic license renewal activities. ACN: ML020720270 March 15, 2002 In a letter (signed by K. S. Canady) Duke submitted its response to the NRC staffs request for additional information (RAIs) dated January 23 and 28, 2002, regarding aging management review of auxiliary systems and of engineered safety features including aging management programs for mechanical systems for McGuire and Catawba LRAs. ACN:
ML020810451 March 15, 2002 In a letter (signed by C. Grimes) NRC requested comments from Nuclear Energy Institute Union of Concerned Scientists, and current license renewal applicants on the License Renewal Issue: Guidance on 54.4 (a)
(2) Scoping. ACN: ML020770026 March 22, 2002 In a letter (signed by P. Kang) NRC published a public meeting notice for April 10, 2002, between the NRC, NEI, and current license renewal applicants to discuss revised sections of Chapter II and III of the GALL report on aging management program of concrete elements and other ongoing emerging issues related to license renewal. ACN: ML020840411 March 22, 2002 In a letter (signed by P. Kang) NRC published a public meeting notice for April 10, 2002, between the NRC, NEI, and current license renewal applicants to discuss the staff proposed guidance for aging management of fire protection systems in the GALL report. ACN: ML020840444 April 1, 2002 In a letter (signed by D. Matthews) NRC submitted a copy of the revised staff position on scoping station blackout equipment for license renewal and clarified the use of alternate ac power sources. ACN: ML020920464 April 4, 2002 In a letter (signed by P. Kang) NRC published a public meeting summary which was held on February 14, 2002, between the NRC, NEI, and current license renewal applicants regarding revisions to GALL Chapters II and III. ACN: ML020940312 April 5, 2002 In a letter (signed by C. Grimes) NRC informed NEI and current license renewal applicants of its Staffs Response to Industrys Proposed Changes to GALL Chapters II and III on Aging Management of Concrete Elements. ACN: ML020980194 A-9
April 5, 2002 In an e-mail communication (sent by G. Robison) Duke submitted slides for Duke/NRC Management Meeting to be held on April 8, 2002. ACN:
ML021440276 April 5, 2002 In an e-mail communication (sent by G. Robison) Duke clarified information found on their slides pertaining to the request for additional information (RAI). The applicants e-mail clarification to staffs questions is docketed and available to public. ACN: ML021440270 April 15, 2002 In a letter (signed by M.S. Tuckman) Duke submitted its response to the NRC staffs request for additional information (RAIs) dated January 23 and 28, 2002 and March 1, 8, and 15, 2002, regarding Sections 2.1-2a, 2.1-2b, 2.3.1,2.3.2, 2.3.3, 3.1, 3.2-1, 3.3-1, 3.3-2, 4.2, 4.3, 4.7.1, B.3.19-1, B.3.19-2, and several sections of Appendix B of McGuire and Catawba LRAs. ACN: ML021120015 April 22, 2002 In a letter (signed by P. Kang) NRC published a public meeting summary which was held on April 10, 2002, between the NRC, NEI, and current license renewal applicant regarding staff guidance on license renewal Issues. ACN: ML021120407 April 22, 2002 In a letter (signed by N. Dudley) NRC published a public meeting summary which was held on April 8, 2002, between the NRC, OPPD, FPL, VEPCo, Duke, and Exelon regarding the progress of license renewal application reviews. ACN: ML021130114 May 2, 2002 In an e-mail communication (sent by R. Franovich) NRC submitted its staff comments on responses to request for additional information (RAI) in AMR for Aux Systems (Section 3.3 of LRA). The NRCs e-mail response to Dukes responses is docketed and available to public. ACN:
ML021440217 May 5, 2002 In a letter ( signed by V. McCree) NRC sent Duke Energy Corporation their Inspection Report. ACN: ML021280003 A-10
May 6, 2002 In an e-mail communication (sent by R. Gill) Duke informed NRC of where they could find the power head inspection letter as it relates to Dukes response to NRC staffs request for additional information (RAIs)
B.3.9-1. ACN: ML021440263 May 6, 2002 In an e-mail communication (sent by R. Gill) Duke submitted its follow-up response to the NRC staffs request for additional information (RAI) 2.3.3.8-7. The applicants e-mail response to staffs questions is docketed and available to public. ACN: ML021440229 May 10, 2002 In an e-mail communication (sent by G. Robison) Duke submitted its response to the NRC staffs request for additional information (RAIs) associated with auxiliary systems. The applicants e-mail response to staffs questions is docketed and available to public. ACN: ML021440236 May 10, 2002 In an e-mail communication (sent by R. Nader) Duke discussed fire protection scoping RAIs. ACN: ML021440245 May 14, 2002 In an e-mail communication (sent by R. Franovich) NRC requested additional information on TLAAs 4.2.1 and 4.2.2. ACN: ML021440255 May 16, 2002 In an e-mail communication (sent by R. Franovich) Duke requested the status of fire protection and Section (a)(2)regarding nonsafety-related systems. The applicants e-mail request to staff is docketed and available to public. ACN: ML021440259 June 7, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on May 24, 2002, to clarify information provided by Duke in its LRA Section 2.1. ACN:
ML021620457 June 7, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on May 28, 2002, to clarify information provided by Duke in its LRA Section 3.5. ACN:
ML021700648 June 19, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on June 5, 2002, to clarify information provided by Duke in its LRA Section B.3.26. ACN:
ML021700621 June 19, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on June 4, 2002, to clarify information provided by Duke in its LRA Section 4.3. ACN:
ML021750433 A-11
June 24, 2002 In a letter (signed by R. Franovich) the summary of a telecommunication between the staff and Duke Energy Corporation was published and documented. The telecommunication was held on May 29, 2002, to clarify information provided by Duke in its LRA Sections 3.6 and B.3.19. ACN:
ML021620496 June 25, 2002 In a letter (signed by M. S. Tuckman) Duke submitted Amendment I to the application to renew the facility operating licenses of McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN: ML021840126 June 25, 2002 In a letter (signed by M. S. Tuckman) Duke submitted a drawing MCFD-01-01 which is part of Amendment I to the application to renew the facility operating licenses of McGuire and Catawba Nuclear Stations, Units 1 and
- 2. ACN: ML021920158 June 26, 2002 In a letter (signed by M. S. Tuckman) Duke submitted its response to the NRC staffs request for additional information (RAIs) dated January 17, 2002, regarding Sections 2.5-1 and 2.5-2 of McGuire and Catawba LRAs.
ACN: ML021840103 June 26, 2002 In a letter (signed by R. Franovich) NRC provided Duke potential safety evaluation report open items regarding the license renewal application for McGuire and Catawba Nuclear Stations, Units 1 and 2. ACN:
ML021770454 July 9, 2002 In a letter (signed by M. S. Tuckman) Duke submitted its response to the NRC staffs request for additional information (RAIs) dated June 26, 2002, regarding 29 open items and 10 confirmatory items found during the process of preparing its Safety Evaluation Report on the McGuire and Catawba LRAs. ACN: ML021960467 A-12
APPENDIX B REFERENCES This appendix contains a listing of references used in the preparation of the Safety Evaluation Report prepared during the review of the license renewal application for McGuire 1 and 2, Docket Numbers 50-369 and 50-370, and Catawba 1 and 2, Docket Numbers 50-413 and 50-414.
American Society of Mechanical Engineers (ASME)
ASME Boiler and Pressure Vessel Code,Section III, Subsection NB, Class 1 Components.
ASME Boiler and Pressure Vessel Code,Section III, Subsection NG, Core Support Structures.
ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWB, Requirements for Class 1 Components of Light-Water Cooled Power Plants.
ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWC, Requirements for Class 2 Components of Light-Water Cooled Power Plants.
ASME Boiler and Pressure Vessel Code,Section XI, Appendix G, Fracture Toughness Criteria for Protection Against Failure.
ASME Boiler and Pressure Vessel Code, Code Case N-481, Alternative Examination Requirements for Cast Austenitic Pump Casings,Section XI, Division 1.
Department of Energy - National Laboratories Sandia Contractor Report SAND96-0344, Aging Management Guideline for Commercial Nuclear Power Plants - Electrical Cable and Terminations, Prepared by Ogden Environmental and Energy Services, Inc., printed September 1996 Duke Energy Corporation Correspondence Letter from W. R. McCollum (Duke) to the U.S. Nuclear Regulatory Commission Document Control Desk, ". . . Response to NRC Bulletin 2001-01: Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles," August 28, 2001.
Letter from M. S. Tuckman (Duke) to the U.S. Nuclear Regulatory Commission Document Control Desk, "Response to Requests for Additional Information in Support of the Staff Review of the Application to Renew the Operating Licenses of McGuire Nuclear Station, Units 1 and 2, and Catawba Nuclear Station, Units 1 and 2," March 1, 2002.
B-1
Reports McGuire Nuclear Station Updated Final Safety Analysis Report Catawba Nuclear Station Updated Final Safety Analysis Report Submittal Application to Renew the Operating Licenses of McGuire Nuclear Station, Units 1 and 2, and Catawba Nuclear Station, Units 1 and 2, dated June 13, 2001.
Technical Document Specifications DPS-1274.00-00-001, Revision 2, dated September 3, 2000, License Renewal Technical Information Development Guide.
CNS-1274.00-00-001, Revision 2, dated September 3, 2000, License Renewal Technical Information Development Guide.
MCS-1274.00-00-001, Revision 2, dated September 3, 2000, License Renewal Technical Information Development Guide.
CNS-1274.00-00-0002, Revision 5, dated September 12, 2001, Systems and Structures Scoping for License Renewal, Catawba Nuclear station Units 1 & 2.
MCS-1274.00-00-0002, Revision 5, dated September 12, 2001, Systems and Structures Scoping for License Renewal, McGuire Nuclear station Units 1 & 2.
CNS-1274.00-00-0003, Revision 1, dated June 1, 2000, Mechanical component Screening and Aging Management Review Methodology for License Renewal, Catawba Nuclear station Units 1
& 2.
MCS-1274.00-00-0003, Revision 1, dated June 1, 2000, Mechanical component Screening and Aging Management Review Methodology for License Renewal, McGuire Nuclear station Units 1
& 2.
CNS-1274.00-00-0007, Revision 1, dated June 8, 2001, Structures and Structural Components Screening and Aging Management Review for License Renewal, Catawba Nuclear station Units 1 & 2.
MCS-1274.00-00-0007, Revision 1, dated June 8, 2001, Structures and Structural Components Screening and Aging Management Review for License Renewal, McGuire Nuclear station Units 1 & 2.
CNS-1274.CF-00-0001, Revision 2, dated April 23, 2001, Feedwater System Component Screening and Aging Management Review for License Renewal, Catawba Nuclear station Units 1 & 2.
B-2
Electric Power Research Institute (EPRI) and Materials Reliability Program (MRP)
EPRI Report TR-105714, Volumes 1, Revision 4, and Volume 2, Revision 4 PWR Primary Water Chemistry Guidelines, January 1999.
EPRI Report TR-102134, Revision 5, PWR Secondary Water Chemistry Guidelines, December 1999.
EPRI Report TR 107621, Revision 1, Steam Generator Examination Guidelines, September 1997.
EPRI Report NSAC-202L, Revision 2, Recommendations for an Effective Flow Accelerated Corrosion Program, December 1998.
EPRI Report TR-103834-P1-2, Effects of Moisture on the Life of Power Plant Cables, Part 1:
Medium-Voltage Cables, Part 2: Low-Voltage Cables, prepared by Ogden Environmental and Energy Services Company, Final Report, August 1994 MRP Topical Report TP-1001491, Part 2, PWR Materials Reliability Program Interim Alloy 600 Safety Assessment for US Power Plants (MRP-44), May 2001.
Miscellaneous Aging and Life Extension of Major Light Water Reactor Components, edited by V.N. Shah and P.E. MacDonald, 1993, Elsevier Science Publishers Nuclear Energy Institute (NEI)
NEI 95-10, Revision 2, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule, Nuclear Energy Institute, August 2000.
NEI 97-06, Steam Generator Program Guidelines, 1997.
Nuclear Management and Resources Council (NUMARC)
Pressurized Water Reactor Containment Structures License Renewal Industry Report, NUMARC Report Number 90-01, Nuclear Management and Resources Council, Revision 1, September 1991.
Class I Structures License Renewal Industry Report, NUMARC Report Number 90-06, Nuclear Management and Resources Council, Revision 1, December 1991.
US Nuclear Regulatory Commission (NRC)
Bulletins (BL)
BL 88-09, Thimble Tube Thinning in Westinghouse Reactors, July 26, 1988.
B-3
BL 2001-001, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, August 3, 2001.
BL 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, March 18, 2002.
Code of Federal Regulations ( 10 CFR) 10 CFR 50.36, Technical Specifications, U.S. Nuclear Regulatory Commission.
10 CFR 50.48, Fire Protection, U.S. Nuclear Regulatory Commission.
10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants, U.S. Nuclear Regulatory Commission.
10 CFR 50.55a, Codes and Standards, U.S. Nuclear Regulatory Commission.
10 CFR 50.61, Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events, U.S. Nuclear Regulatory Commission.
10 CFR 50.62, Requirements for Reduction of Risk from Anticipated Transients without Scram (ATWS) Events for Light-water-cooled Nuclear Power Plants, U.S. Nuclear Regulatory Commission.
10 CFR 50.63, Loss of All Alternating Current Power, U.S. Nuclear Regulatory Commission 10 CFR 50.90, Application for Amendment of License or Construction Permit, U.S. Nuclear Regulatory Commission.
10 CFR Part 50, Appendix G, Fracture Toughness Requirements, U.S. Nuclear Regulatory Commission.
10 CFR Part 50, Appendix H, Reactor Vessel Material Surveillance Program Requirements, U.S. Nuclear Regulatory Commission.
10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, U.S. Nuclear Regulatory Commission.
Correspondence Letter from C. I. Grimes (NRC) to D. J. Walters (NEI), License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components, May 19, 2000.
Letter from W. T. Russell (NRC) to W. Rasin (NUMARC, [NEI]), Safety Evaluation for Potential Reactor Vessel Head Adaptor Tube Cracking, November 19, 1993.
B-4
Generic Letters (GL)
GL 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components In PWR Plants, March 17, 1988.
GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations, April 1, 1997.
GL 97-06,"Degradation of Steam Generator Internals, December 30, 1997.
Information Notices (IN)
IN 87-44, Thimble Tube Thinning in Westinghouse Reactors, September 16, 1987.
IN 2001-05, Through-Wall Circumferential Cracking of Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzles at Oconee Nuclear Station, Unit 3, April 30, 2001.
Technical Reports NUREG/CR-5576, Survey of Boric Acid Corrosion of Carbon Steel Components in Nuclear Plants, June 1990.
NUREG/CR-6048, Pressurized-Water Reactor Internals Aging Degradation Study, September 1993.
NUREG/CR-6754, Review of Industry Responses to NRC Generic Letter 97-06 on Degradation of Steam Generator Internals, December 2001.
Regulatory Guides (RG)
RG 1.43, Control of Stainless Steel Weld Cladding of Low-Alloy Steel Components, May 1973.
RG 1.44, Control of the Use of Sensitized Stainless Steel, May 1973.
RG 1.99, Revision 2, Radiation Embrittlement of Reactor Pressure Vessel Materials, May 1988.
RG 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, March 2001.
Westinghouse Topical Reports (WCAP)
WCAP-12866, Bottom Mounted Instrumentation Flux Thimble Wear, 1991.
WCAP-14574-A, License Renewal Application: Aging Management Evaluation for Pressurizers, December 2000.
B-5
WCAP-14577, Revision 1-A, License Renewal Application: Aging Management Evaluation for Reactor Internals, March 2001.
WCAP-14901, Revision 0, Background and Methodology for Evaluation of Reactor Vessel Closure Head Penetration Integrity for the Westinghouse Owners Group, July 1997.
WCAP-15117, Analysis of Capsule V and the Dosimeters from Capsules U and X from the Duke Power Company Catawba Unit 1 Reactor Vessel Surveillance Program, October 1998.
WCAP-15243, Analysis of Capsule V and the Capsule Y Dosimeters from the Duke Energy Catawba Unit 2 Reactor Vessel Radiation Surveillance Program, September 1999.
WCAP-15253, Duke Power Company Reactor Cavity Neutron Measurement Program for William B. McGuire Unit 1 Cycle 12, July 1999.
WCAP-15334, Duke Power Company Reactor Cavity Neutron Measurement Program for William B. McGuire Unit 2 Cycle 12, November 1999.
B-6
APPENDIX C PRINCIPAL CONTRIBUTORS NAME RESPONSIBILITY C. Araguas Technical Support R. Architzel Plant Systems H. Ashar Structural Engineering G. Bagchi Structural Engineering S. Baily Technical Support A. Baltazar Technical Support N. Barnett Administrative Support E. Barnhill Administrative Support R. Barrett Technical Support W. Bateman Technical Support L. Bell Administrative Support B. Boger Technical Support W. Burton Technical Support J. Calvo Technical Support C. Casto Technical Support P.Y. Chen Mechanical Engineering S. Chey Administrative Support S. Coffin Technical Support A. Coggins Legal Counsel B. Crowley Region II Inspector D. Cullison Plant Systems D. Cummings Legal Counsel J. Cushing Technical Support J. Davis Materials Engineering C. Dorsey Administrative Support N. Dudley Technical Support T. Eaton Plant Systems B. Elliot Reactor Systems R. Elliott Plant Systems A. Fernandez Legal Counsel J. Fair Mechanical Engineering R. Franovich Project Manager Z. Fu Technical Support G. Galletti Technical Support A. Gill Electrical Engineering G. Georgiev Structural Engineering J. Golla Plant Systems C. Grimes Technical Support J. Guo Plant Systems J. Hannon Technical Support C-1
M. Hartzman Technical Support G. Hatchett Plant Systems J. Heck Legal Counsel S. Hoffman Technical Support G. Holahan Technical Support C. Holden Technical Support C. Julian Region II Inspector P. Kang Technical Support M. Khanna Materials Engineering V. Klco Technical Support P. Kleene Technical Editing J. Knox Electrical Engineering S. Koenick Technical Support P.T. Kuo Management Oversight C. Lauron Structural Engineering J. Lazevnick Electrical Engineering A. Lee Technical Support S. Lee Technical Support J. Lehning Technical Support C. Li Plant Systems Y. Li Technical Support L. Lund Technical Support K. Manoly Technical Support D. Matthews Technical Support J. Medoff Materials Engineering J. Moore Legal Counsel L. Moore Region II Inspector C. Munson Structural Engineering J. Nakoski Technical Support D. Nguyen Electrical Engineering D. Oudinot Plant Systems K. Parczewski Chemical Engineering J. Peralta Technical Support R. Prato Backup Project Manager T. Quay Technical Support K. Rico Technical Support J. Rajan Mechanical Engineering M. Razzaque Reactor Systems B. Rogers Technical Support S. Saba Electrical Engineering P. Shemanski Electrical Engineering S. Sheng Mechanical Engineering A. Smith Materials Engineering D. Solorio Technical Support J. Strosnider Technical Support O. Tabatabai Backup Project Manager D. Thatcher Technical Support B. Thomas Technical Support J. Tsao Mechanical Engineering C-2
S. Uttal Legal Counsel P.K. VanDoorn Region II Inspector H. Walker Technical Support H. Wang Technical Support S. Weerakkody Technical Support A. Williamson Technical Support CONTRACTORS Contractor Technical Area Brookhaven National Laboratory Aging Management Reviews Pacific Northwest National Laboratory Aging Management Reviews C-3