FirstEnergy Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 Docket Number 50-346 License Number NPF-3 Serial Number 2802 August 9, 2002 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Semiannual Fitness-For-Duty Report, January - June, 2002 Ladies and Gentlemen:
Pursuant to 10 CFR 26.7 1(d), "Recordkeeping Requirements," First Energy Nuclear Operating Company (FENOC) submits the semiannual Fitness-For-Duty (FFD) report for the period of January through June 2002, for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). provides FENOC's DBNPS FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by FENOC based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by FENOC.
Should you have any questions or require additional information, please contact Mr. Patrick J.
McCloskey, Manager - Regulatory Affairs, at (419) 321-8450.
Sincerely, Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company BLS/s Attachments cc:
J. E. Dyer, Regional Administrator, NRC Region Ill S. P. Sands, NRC Project Manager C. S. Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board
Docket Number 50-346 License Number NPF-3 Serial Number 2802 First Energy Nuclear Operating Company Davis-Besse Nuclear Power Station Fitness-For-Duty Report January - June 2002
Docket Number 50-346 License Number NPF-3 Serial Number 2802 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 First Energy Nuclear Operating Company Company Davis-Besse Location June 30, 2002 6 Months Ending (419) 321-8450 Phone P. J. McCloskev. Manaaer - Regulatory Affairs Contact Name Cutoffs: Screen/Confirmation (nq/ml)
Marijuana Cocaine Opiates 50/15 300/150 300/300 ADDendix A to 10 CFR 26 Amphetamines Phencyclidine Alcohol (%BAC) 1000/500 25/25 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 817 0
510 Categories Tested Positive Tested Positive Tested Positive Pre-Access 106 0
0 0
1271 8/10 Post Accident 0
0 0
0 0
0 Observed Behavior 2
0 0
0 22 5/5 Random 196 1/1 0
0 123 0
Follow-up 16 0
0 0
61 0
Other 0
0 0
0 0
0 Total 320 1/1*
0 0
1477 13/15*
Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal tamines Clidine to test Licensee Employees 1
0 0
0 0
0 0
Long-Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 5
3 0
0 0
7 1
Total 6
3 0
0 0
7 1
17i
- Indicates results according to NRC policy for cutoff levels on the left side and Company policy on the right One contractor tested positive for two different drugs.
Docket Number 50-346 License Number NPF-3 Serial Number 2802 FENOC MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY FENOC Personnel Referred to EAP Management Sanctions 0
1
"**One contractor tested positive for two different drugs.
FENOC does not perform onsite initial drug screening tests; therefore, there are no unconfirmed positive results on which to base management actions.
FENOC FITNESS-FOR-DUTY REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (January - June 2002).
Contractor Personnel 0
15**
Docket Number 50-346 License Number NPF-3 Serial Number 2802 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419) 321-8450 at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None N/A