Letter Sequence Other |
---|
TAC:MB5276, Elimination of Requirements for a Post Accident Sampling System - NEDO-3299 (Approved, Closed) |
|
MONTHYEARML0217101682002-06-0707 June 2002 Application for Technical Specification Improvement to Eliminate the Requirements for the Post Accident Sampling System Using the Consolidated Line Item Improvement Process Project stage: Request ML0222505862002-08-0909 August 2002 Tech Specs for Amendment 106 Elimination of Requirements for Post Accident Sampling System Project stage: Other ML0219603502002-08-0909 August 2002 Issuance of License Elimination of Requirements for Post Accident Sampling System Project stage: Approval 2002-06-07
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Va ML22033A3102022-03-0404 March 2022 Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements NMP2L2794, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 02022-01-11011 January 2022 Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 0 ML21295A7342021-11-15015 November 2021 Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21049A0062021-03-16016 March 2021 Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21077A0142021-03-16016 March 2021 License and Technical Specification Pages for Amendment No. 245, Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML19176A0862019-07-30030 July 2019 Issuance of Amendment No. 237 Changes to Containment Oxygen Concentration Requirements ML18344A4522019-01-11011 January 2019 Issuance of Amendment No. 234 Change to Remove Boraflex Credit from Spent Fuel Racks NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. ML18330A0952018-11-30030 November 2018 Correction Duplicate Subparagraph (N) on Technical Specification Page 204 That Occurred in Amendment No. 186 Issued January 25, 2005 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML18032A1772018-03-0606 March 2018 Issuance of Amendment No. 166 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-522 (CAC No. MF9804; EPID L-2017-LLA-0232) NMP2L2662, Supplemental Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-27027 December 2017 Supplemental Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML17324B1782017-12-21021 December 2017 Issuance of Amendment to Allow Greater Flexibility in Performing Surveillance Testing in Modes 1, 2, or 3 of Emergency Diesel Generators(Cac No. MF9579; EPID L-2017-LLA-0203) ML17152A3202017-06-30030 June 2017 Issuance of Amendments Emergency Plans Emergency Action Level HU1.5 ML17055A4512017-03-0909 March 2017 Issuance of Amendment Partial Length Fuel Rod Burnup ML16088A0532016-04-19019 April 2016 Issuance of Amendment License Amendment Request for Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual ML15352A1642016-03-17017 March 2016 Calvert Cliffs, Units 1 & 2 and Independent Spent Fuel Storage Installation; Nine Mile, Units 1 & 2 and R. E. Ginna - Issuance of Amendments Regarding the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel NMP2L2611, Response to Request for Additional Information by NRR to Support Review of Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2016-01-0808 January 2016 Response to Request for Additional Information by NRR to Support Review of Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual ML15341A3362016-01-0505 January 2016 Issuance of Amendment Technical Specifications for Safety Limit Minimum Critical Power Ratio NMP1L3064, Supplemental Response to Request for Additional Information - Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements....2015-12-22022 December 2015 Supplemental Response to Request for Additional Information - Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements.... ML15317A3072015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specification Task Force Traveler 425 ML15096A0762015-09-0202 September 2015 Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus ML15223B2502015-08-14014 August 2015 and Nine Mile Point Nuclear Station, Unit No. 2- Copy of License Amendment Nos. 313, 291, 118, and 150 ML15161A3802015-07-30030 July 2015 R. E. Ginna and Nine Mile Point, Unit 2 - Issuance of Amendments Regarding Implementation of Technical Specification Task Force Traveler 523, Generic Letter 2008-01, Managing Gas Accumulation (TAC Nos. MF4405 - MF4409) ML15167A3152015-07-0808 July 2015 Issuance of Amendments Change to TS Requirements Regarding Education and Experience Eligibility Requirements for Licensed Operators ML15110A0082015-05-26026 May 2015 Issuance of Amendment Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change ML15075A1592015-03-17017 March 2015 Correction Letter to Amendment No. 217 Diesel Generator Initiation - Degraded Voltage Time Delay Setting Change (Tac No. MF1022) ML15043A2702015-03-12012 March 2015 Issuance of Amendment Diesel Generator Initiation - Degraded Voltage Time Delay Setting Change ML14126A0032014-06-30030 June 2014 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14057A5542014-05-29029 May 2014 Issuance of Amendment Regarding Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML1233803362012-11-21021 November 2012 License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML1133000472011-12-22022 December 2011 NMP2 EPU - Operating License and Technical Specification Pages ML1133000412011-12-22022 December 2011 Cover Letter - Nine Mile Point Nuclear Station, Unit No. 2 - Issuance of Amendment Extended Power Uprate ML11208C3952011-07-20020 July 2011 License Amendment Requests Pursuant to 10 CFR 50.90: Revisions to the Technical Specifications Design Features Sections to Reflect Transfer of a Portion of Nine Mile Point Nuclear Station Site Real Property ML1018803332010-07-26026 July 2010 Issuance of Amendment No. 206 Modification of TS Section 3.2.7.1 and 4.2.7.1 ML1008904222010-03-22022 March 2010 License Amendment Request Pursuant to 10 CFR 50.90: Revision to Containment Spray System Nozzle Surveillance Frequency ML0926406812009-09-18018 September 2009 License Amendment Request Pursuant to 10 CFR 50.90: Revisions to Primary Coolant System Pressure Isolation Valve Requirements Consistent with Standard Technical Specifications - Tech. Spec. Sections 3.2.7.1 and 4.2.7.1 2024-09-20
[Table view] |
Text
PCIVs 3.6.1.3 Table 3.6.1.3-1 (page 1 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER PER VALVE LEAK RATE (SCFH) 2MSS*MOV111 1.875 2MSS*MOV1 12 2MSS*MOV208 0.625 2CMS*SOV74A, B (d) 0.2344 2CMS*SOV75A, B (d) 2CMS*SOV76A, B (d) 2CMS*SOV77A, B (d) 2DER*MOV119 (a) 2DER*RV344 2DER*MOV120 1.25 2DER*MOV130 0.625 2DER*MOV131 2DFR*MOV120 1.875 2DFR*MOV121 (b) 2DFR*RV228 2DFR*MOV139 0.9375 2DFR*MOV140 2WCS*MOV102 2.5 2WCS*MOV1 12 2FWS*V23A, B 12.0 2FWS*V12A, B 2CPS*AOV104 4.38 2CPS*AOV106 2CPS*AOV105 3.75 2CPS*AOV107 (continued)
(a) The combined leakage rate for these two valves shall be
(b) The combined leakage rate for these two valves shall be < 1.875 SCFH.
NMP2 3.6.1.3-14 Amendment94-, -04, 106
PCIVs 3.6.1.3 Table 3.6.1.3-1 (page 2 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER PER VALVE LEAK RATE (SCFH) 2CPS*SOV1 19 0.625 2CPS*SOV120 2CPS*SOV121 2CPS*SOV122 21AS*SOV164 0.9375 21AS*V448 21AS*SOV165 0.9375 21AS*V449 2GSN*SOV166 (c) 2GSN*V170 21AS*SOV166 (c) 21AS*SOV1 84 21AS*SOV167 (c) 21AS*SOV185 21AS*SOV168 (c) 21AS*SOV180 2CPS*SOV132 (c) 2CPS*V50 2CPS*SOV133 (c) 2CPS*V51 (c) The combined leak rate for these penetrations shall be < 3.6 SCFH. The assigned leakage rate through a penetration shall be that of the valve with the highest leakage rate in that penetration. However, if a penetration is isolated by one closed and de-activated automatic valve, closed manual valve, or blind flange, the leakage through the penetration shall be the actual pathway leakage.
(d) The LCO requirements and leakage rate limit shall apply until such time as a modification eliminates the potential secondary containment bypass leakage path.
NMP2 3.6.1.3-15 Amendment9--, 106
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.1 Offsite Dose Calculation Manual (ODCM) (continued)
Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (i.e., month and year) the change was implemented.
5.5.2 Primary Coolant Sources Outside Containment This program provides controls to minimize leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. The systems include the Low Pressure Core Spray, High Pressure Core Spray, Residual Heat Removal, Reactor Core Isolation Cooling, hydrogen recombiner, process sampling (the program requirements shall apply to the Post Accident Sampling System until such time as administrative controls provide for continuous isolation of the associated penetration(s) or a modification eliminates the potential leakage path(s)), containment monitoring and Standby Gas Treatment. The program shall include the following:
- a. Preventive maintenance and periodic visual inspection requirements; and
- b. Integrated leak test requirements for each system at 24 month intervals.
The provisions of SR 3.0.2 are applicable to the 24 month Frequency for performing integrated system leak test activities.
5.5.3 Deleted (continued)
NMP2 5.5-2 Amendment94, 106