ML022180186
| ML022180186 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/05/2002 |
| From: | NRC/NRR/DLPM |
| To: | |
| Thomas E, NRR/DLPM, 415-3780 | |
| References | |
| TAC MB2190, TAC MB2191 | |
| Download: ML022180186 (4) | |
Text
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE 2.LPCI System (continued)
- f.
Manual Initiation
- 3.
High Pressure Coolant Injection (HPCI)
System
- a. Reactor Vessel Water Level-Low, Level 2
- b. Drywell Pressure High
- c. Reactor Vessel Water Level-High, Level 8
- d. Condensate Storage Tank Level-Low 2
1 per subsystem 4
4 2
2 C
SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 B
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 C
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 D
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 NA
> -45 inches
- 1.88 psig
- 55.5 inches
_ 36.0 inches above tank bottom (a) When the associated subsystem(s) are required to be OPERABLE.
(e)
With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 1 3.3-44 Amendment No.
-- 8, 204 1,2,3, 4(a), 5(a) 1, 2(e), 3(e) 1, 2(e),3(e) 1, 2(e), 3(e) 1, 2(e), 3(e)
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 3.
HPCI System (continued)
- e. Manual Initiation
- 4.
Automatic Depressurization System (ADS) Trip System A
- a. Reactor Vessel Water Level--Low Low Low, Level 1
- b. Drywell Pressure High
- c. Automatic Depressurization System Initiation Timer
- d. Reactor Vessel Water Level-Low, Level 3 (Confirmatory)
- e. Core Spray Pump Discharge Pressure-High C
SR 3.3.5.1.5 1,
2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 2 2
2 E
SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 E
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 F
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 E
SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 F
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 NA
> -136 inches
- 1.88 psig
< 114 seconds
> 11.5 inches
> 125 psig and
!5 165 psig (continued)
(e)
With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 1 Amendment No.
- 174, 204 1
1 3.3-45
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 4.
ADS Trip System A (continued)
- f.
Low Pressure Coolant Injection Pump Discharge Pressure-High
- g.
Automatic Depressurization System Drywell Pressure Bypass Actuation Timer
- h.
Manual Initiation
- 5.
ADS Trip System B
- a.
Reactor Vessel Water Level Low Low Low, Level 1
- b.
Drywell Pressure-High
- c.
Automatic Depressurization System Initiation Timer
- d.
Reactor Vessel Water Level-Low, Level 3 (Confirmatory)
- e.
Core Spray Pump Discharge Pressure-High 1,
2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 1, 2(e), 3(e) 2 2
2 2
2 2
F SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 F
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 F
SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 E
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 F
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 E
SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 F
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5
> 115 psig and
<135 psig
<450 sec NA
> -136 inches
< 1.88 psig
_ 114 sec
>11.5 inches
> 125 psig and f: 165 psig (continued)
(e)
With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 1 3.3-46 Amendment No.
1-78 204
ECCS Instrumentation 3.3.5.1 Table 3.3.5. 1-1 (page 3 of 5)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
System
- a. Reactor Vessel 1,
4 B
>-45inches Water Level--Low 2(e), 3(e)
SR 3.3.5.1.2 Low, Level 2 SR 3.3.5.1.4 SR 3.3.5.1.5
- b. Drywell Pressure-1,4 B
< 1.88 psig High 2(e),3(e)
SR 3.3.5.1.3 SR 3.3.5.1.5
- c.
Reactor Vessel 1
2 C
<55.5 inches Water Level--
2(e), 3(e)
SR 3.3.5.1.3 High, Level 8 SR 3.3.5.1.5
- d. Condensate 1,
2 D
>36.0 inches Storage Tank 2(e), 3(e)
SR 3.3.5.1.3 above tank bottom Level--Low SR 3.3.5.1.5
- e. Manual Initiation 1,
1 D
SR 3.3.5.1.5 NA 2(e), 3(e)
(continued)
(a) When the associated subsystem(s) are required to be OPERABLE.
(e)
With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 2 TS / 3.3-45 Amendment No.
178