MONTHYEARML0214200592002-02-0404 February 2002 Part a - Susquehanna Steam Electric Station, Supplement to Proposed Amendment No. 239 to License NPF-14 & Proposed Amendment No. 204 to License NPF-22, HPCI Automatic Transfer to Suppression Pool Logic Elimination Project stage: Supplement ML0209803402002-04-0808 April 2002 Request for Additional Information High-Pressure Coolant Injection Pump Automatic Suction Transfer Project stage: RAI ML0209400902002-04-0808 April 2002 Memo to File - Request for Additional Information Faxed to the Licensee Elimination of High Pressure Coolant Injection (HPCI) Automatic Suction Transfer (Tac Nos. MB2190 and MB2191) Project stage: RAI ML0210702902002-04-22022 April 2002 Request for Additional Information High-Pressure Coolant Injection (HPCI) Pump Automatic Suction Transfer Project stage: RAI ML0212905232002-05-17017 May 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0215101602002-05-21021 May 2002 Request for Additional Information Faxed to the Licensee Susquehanna Steam Electric Station, Units 1 and 2, Elimination of Automatic High Pressure Coolant Injection Pump Suction Transfer to the Suppression Pool Project stage: RAI ML0214803492002-05-28028 May 2002 RAI Faxed to the Licensee Susquehanna Steam Electric Station, Units 1 and 2, Elimination of Automatic High Pressure Coolant Injection Pump Suction Transfer to the Suppression Pool (TAC Nos. MB2190 & MB2191) Project stage: RAI PLA-5488, Supplement 4 to Proposed Amendment No. 239 and Proposed Amendment No. 204 HPCI Automatic Transfer Suppression Pool Logic Elimination2002-06-0606 June 2002 Supplement 4 to Proposed Amendment No. 239 and Proposed Amendment No. 204 HPCI Automatic Transfer Suppression Pool Logic Elimination Project stage: Supplement ML0221801862002-08-0505 August 2002 Technical Specifications, Issuance of Amendment High Pressure Coolant Injection Pump Automatic Transfer to Suppression Pool Logic Elimination (TAC Nos. MB2190 & MB2191) Project stage: Approval ML0220000642002-08-0505 August 2002 Issuance of Amendment High Pressure Coolant Injection Pump Automatic Transfer to Suppression Pool Logic Elimination (TAC Nos. MB2190 & MB2191) Project stage: Approval 2002-05-17
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARPLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses ML23010A1082023-01-15015 January 2023 Issuance of Amendment No. 268 Change to Control Rod Technical Specifications PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence ML22294A1502022-11-17017 November 2022 Issuance of Amendment Nos. 284 and 267 Relocating Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program ML22146A2072022-07-15015 July 2022 Issuance of Amendment Nos. 281 and 264 Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR - NON-PROPRIETARY - ML22101A0282022-03-30030 March 2022 Revised Technical Specification Bases Unit 1 Manual ML20342A2372021-02-18018 February 2021 Issuance of Amendment Nos. 279 and 261 Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements ML20297A5642020-12-22022 December 2020 Issuance of Amendment Nos. 277 and 259 Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules PLA-7866, Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-78662020-06-25025 June 2020 Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-7866 ML19248A8442020-01-17017 January 2020 Issuance of Amendment Nos. 275 and 257 Temporary Changes to Allow Replacement of Emergency Service Water System Piping ML19232A0692019-08-0808 August 2019 Technical Specification Bases Unit 2 Manual ML19232A0682019-08-0808 August 2019 Technical Specification Bases Manual ML19155A2642019-07-16016 July 2019 Issuance of Amendment Nos. 273 and 255 Adoption of TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19154A0602019-06-24024 June 2019 Issuance of Amendment Nos. 272 and 254 Technical Specifications to Adopt TSTF-501, Revision 1, Relocated Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML19052A0082019-03-0505 March 2019 Correction to Technical Specifications Page 3.3-45 (Unit 1) and Page 3.6-11 (Unit 2) for Administrative Errors Introduced During the Issuance of Amendment Nos. 271 and 253 ML18222A2032018-09-26026 September 2018 Issuance of Amendment Nos. 271 and 253 Revising Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MG0269 and MG0270; EPID L-2017-LLA-0306) PLA-7733, Correction of Technical Specification Typographical Error for TS 3.6.4.1 (PLA-7733)2018-09-11011 September 2018 Correction of Technical Specification Typographical Error for TS 3.6.4.1 (PLA-7733) ML18017A2272017-12-15015 December 2017 Technical Specification Bases Manual ML18017A2282017-12-15015 December 2017 Technical Specifications Bases Manual ML17221A2892017-08-0909 August 2017 Draft TSTF-542-Variations ML17187A2972017-07-28028 July 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Issuance of Amendments Revising Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF9154 and MF9155) PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A2017-05-17017 May 2017 Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A ML17067A4442017-03-27027 March 2017 Issuance of Amendments Secondary Containment Access Openings ML16005A2342016-05-20020 May 2016 Issuance of Amendments Adoption of TSTF-425 ML16062A2162016-03-28028 March 2016 Issuance of Amendments Emergency Action Level Scheme Change PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-4252016-01-29029 January 2016 Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7406, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-11-11011 November 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 ML15267A3812015-11-0202 November 2015 Issuance of Amendments Approval of Cyber Security Plan Milestone 8 ML15243A1402015-09-30030 September 2015 Issuance of Amendments Revisions to Technical Specification 3.4.10, Reactor Coolant System Pressure and Temperature (P/T) Limits PLA-7334, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-07-0202 July 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7299, Response to Request for Additional Information on Technical Specification Changes to RCS Pressure and Temperature (P/T) Limits2015-04-0606 April 2015 Response to Request for Additional Information on Technical Specification Changes to RCS Pressure and Temperature (P/T) Limits PLA-7119, PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force...2014-10-27027 October 2014 PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force... ML14316A6062014-10-27027 October 2014 PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force... ML14111A0522014-05-14014 May 2014 Issuance of Amendments Regarding Change to Technical Specification Surveillance Requirement 3.5.1.12 ML14036A2572014-02-26026 February 2014 Issuance of Amendment Change to Allow Only One Manual Trip System to Be Operable for the Residual Heat Removal Shutdown Cooling System in Modes 4 and 5 ML14042A1152014-01-29029 January 2014 License Amendment Request - Increase of the Allowable Gas Treatment System Maximum Flow Rates from Secondary Containment ML13361A0872013-12-11011 December 2013 Revision 112 to Technical Specification Bases Manual PLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage ML11221A2712011-09-0808 September 2011 License Amendment, Issuance of Amendment Adoption of TSTF-514, Revision 3 ML11251A1532011-08-24024 August 2011 Technical Requirements Manual, Rev. 69 and Table of Contents, Rev. 20 ML11251A1522011-08-24024 August 2011 Revision 68 to Technical Requirements Manual PLA-6642, Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances2010-11-10010 November 2010 Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances ML1020103852010-07-12012 July 2010 Revision 100 to Technical Specifications Bases Unit 2 Manual ML1020104112010-07-12012 July 2010 Revisions to Technical Specification Bases Manual ML1012605332010-04-28028 April 2010 Technical Specification Bases Manual ML1011003942010-04-0606 April 2010 Technical Specifications Bases Unit 2 Manual, Rev. 98 ML0932901772009-11-24024 November 2009 Technical Specifications for Susquehanna Steam Electric Station, Unit 2 ML0929501102009-11-0909 November 2009 License Amendment, Changed Technical Specification Table 3.3.5.1-1 for ECCS Instrumentation for CST and Editorial Changes to TS 3.10.8.f 2023-07-27
[Table view] |
Text
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE 2.LPCI System (continued) 1,2,3, 2 C SR 3.3.5.1.5 NA
- f. Manual Initiation 4(a), 5(a) 1 per subsystem
- 3. High Pressure Coolant Injection (HPCI)
System
- a. Reactor Vessel 1, 4 B SR 3.3.5.1.1 > -45 inches Water Level-Low, 2(e), 3(e) SR 3.3.5.1.2 Level 2 SR 3.3.5.1.4 SR 3.3.5.1.5
- b. Drywell Pressure 1, 4 B SR 3.3.5.1.2
- c. Reactor Vessel 1, 2 C SR 3.3.5.1.2
- d. Condensate 1, 2 D SR 3.3.5.1.2 _ 36.0 inches above Storage Tank 2(e), 3(e) SR 3.3.5.1.3 tank bottom Level-Low SR 3.3.5.1.5 (a) When the associated subsystem(s) are required to be OPERABLE.
(e) With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 1 3.3-44 Amendment No. -- 8, 204
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE FUNCTION
- 3. HPCI System (continued) 1, 1 C SR 3.3.5.1.5 NA
- e. Manual Initiation 2(e), 3(e)
- 4. Automatic Depressurization System (ADS) Trip System A 2 E SR 3.3.5.1.1 > -136 inches
- a. Reactor Vessel 1, SR 3.3.5.1.2 Water Level--Low 2(e), 3(e)
SR 3.3.5.1.4 Low Low, Level 1 SR 3.3.5.1.5 E SR 3.3.5.1.2
- b. Drywell Pressure 1, 2 SR 3.3.5.1.3 High 2(e), 3(e)
SR 3.3.5.1.5 F SR 3.3.5.1.2 < 114 seconds
- c. Automatic 1, 1 SR 3.3.5.1.3 Depressurization 2(e), 3(e)
SR 3.3.5.1.5 System Initiation Timer 1, E SR 3.3.5.1.1 > 11.5 inches
- d. Reactor Vessel SR 3.3.5.1.2 Water Level-Low, 2(e), 3(e)
SR 3.3.5.1.4 Level 3 SR 3.3.5.1.5 (Confirmatory)
F SR 3.3.5.1.2 > 125 psig 1, 2
- e. Core Spray Pump SR 3.3.5.1.3 and Discharge 2(e), 3(e)
SR 3.3.5.1.5 !5 165 psig Pressure-High (continued)
(e) With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 1 3.3-45 Amendment 204 No. 174,
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 4. ADS Trip System A (continued)
- f. Low Pressure 1, 2 F SR 3.3.5.1.2 > 115 psig Coolant 2(e), 3(e) SR 3.3.5.1.3 and SR 3.3.5.1.5 <135 psig Injection Pump Discharge Pressure-High
- g. Automatic 1, 2 F SR 3.3.5.1.2 <450 sec Depressurization 2(e), 3(e) SR 3.3.5.1.3 System Drywell SR 3.3.5.1.5 Pressure Bypass Actuation Timer
- h. Manual Initiation 1, 2 F SR 3.3.5.1.5 NA 2(e), 3(e)
- 5. ADS Trip System B
- a. Reactor Vessel 1, 2 E SR 3.3.5.1.1 > -136 inches Water Level 2(e), 3(e) SR 3.3.5.1.2 Low Low Low, SR 3.3.5.1.4 Level 1 SR 3.3.5.1.5
- b. Drywell 1, 2 E SR 3.3.5.1.2 < 1.88 psig Pressure-High 2(e), 3(e) SR 3.3.5.1.3 SR 3.3.5.1.5
- c. Automatic 1, F SR 3.3.5.1.2 _ 114 sec Depressurization 2(e), 3(e) SR 3.3.5.1.3 System Initiation SR 3.3.5.1.5 Timer
- d. Reactor Vessel 1, E SR 3.3.5.1.1 >11.5 inches Water Level- 2(e), 3(e) SR 3.3.5.1.2 Low, Level 3 SR 3.3.5.1.4 (Confirmatory) SR 3.3.5.1.5
- e. Core Spray Pump 1, 2 F SR 3.3.5.1.2 > 125 psig 2(e), 3(e) SR 3.3.5.1.3 and Discharge Pressure-High SR 3.3.5.1.5 f: 165 psig (continued)
(e) With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 1 3.3-46 Amendment No. 1-78 204
ECCS Instrumentation 3.3.5.1 Table 3.3.5. 1-1 (page 3 of 5)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 3. High Pressure Coolant Injection (HPCI)
System
- a. Reactor Vessel 1, 4 B SR 3.3.5.1.1 >-45inches Water Level--Low 2(e), 3(e) SR 3.3.5.1.2 Low, Level 2 SR 3.3.5.1.4 SR 3.3.5.1.5
- b. Drywell Pressure- 1,4 B SR 3.3.5.1.2 < 1.88 psig High 2(e),3(e) SR 3.3.5.1.3 SR 3.3.5.1.5
- c. Reactor Vessel 1 2 C SR 3.3.5.1.2 <55.5 inches Water Level-- 2(e), 3(e) SR 3.3.5.1.3 High, Level 8 SR 3.3.5.1.5
- d. Condensate 1, 2 D SR 3.3.5.1.2 >36.0 inches Storage Tank 2(e), 3(e) SR 3.3.5.1.3 above tank bottom Level--Low SR 3.3.5.1.5
- e. Manual Initiation 1, 1 D SR 3.3.5.1.5 NA 2(e), 3(e)
(continued)
(a) When the associated subsystem(s) are required to be OPERABLE.
(e) With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 2 TS / 3.3-45 Amendment No.
178