MONTHYEARML0214200592002-02-0404 February 2002 Part a - Susquehanna Steam Electric Station, Supplement to Proposed Amendment No. 239 to License NPF-14 & Proposed Amendment No. 204 to License NPF-22, HPCI Automatic Transfer to Suppression Pool Logic Elimination Project stage: Supplement ML0209803402002-04-0808 April 2002 Request for Additional Information High-Pressure Coolant Injection Pump Automatic Suction Transfer Project stage: RAI ML0209400902002-04-0808 April 2002 Memo to File - Request for Additional Information Faxed to the Licensee Elimination of High Pressure Coolant Injection (HPCI) Automatic Suction Transfer (Tac Nos. MB2190 and MB2191) Project stage: RAI ML0210702902002-04-22022 April 2002 Request for Additional Information High-Pressure Coolant Injection (HPCI) Pump Automatic Suction Transfer Project stage: RAI ML0212905232002-05-17017 May 2002 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0215101602002-05-21021 May 2002 Request for Additional Information Faxed to the Licensee Susquehanna Steam Electric Station, Units 1 and 2, Elimination of Automatic High Pressure Coolant Injection Pump Suction Transfer to the Suppression Pool Project stage: RAI ML0214803492002-05-28028 May 2002 RAI Faxed to the Licensee Susquehanna Steam Electric Station, Units 1 and 2, Elimination of Automatic High Pressure Coolant Injection Pump Suction Transfer to the Suppression Pool (TAC Nos. MB2190 & MB2191) Project stage: RAI PLA-5488, Supplement 4 to Proposed Amendment No. 239 and Proposed Amendment No. 204 HPCI Automatic Transfer Suppression Pool Logic Elimination2002-06-0606 June 2002 Supplement 4 to Proposed Amendment No. 239 and Proposed Amendment No. 204 HPCI Automatic Transfer Suppression Pool Logic Elimination Project stage: Supplement ML0221801862002-08-0505 August 2002 Technical Specifications, Issuance of Amendment High Pressure Coolant Injection Pump Automatic Transfer to Suppression Pool Logic Elimination (TAC Nos. MB2190 & MB2191) Project stage: Approval ML0220000642002-08-0505 August 2002 Issuance of Amendment High Pressure Coolant Injection Pump Automatic Transfer to Suppression Pool Logic Elimination (TAC Nos. MB2190 & MB2191) Project stage: Approval 2002-05-17
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information ML23013A2082023-01-13013 January 2023 Request for Additional Information ML22146A1022022-05-26026 May 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000387/2022404 and 05000388/2022404 ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22041A1562022-02-10010 February 2022 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000387/2022013 and 05000388/2022013 ML21316A1242021-11-18018 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Emergency Core Cooling Technical Specifications ML20056E4392020-02-21021 February 2020 Ti 2515/194 Inspection Documentation Request ML20010D2012020-01-0909 January 2020 Request for Additional Information Related to Request to Allow Application of Framatome Analysis Methodologies Necessary to Support a Planned Transition to Atrium 11 Fuel Under Maximum ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19128A0232019-05-0707 May 2019 Request for Additional Information: Susquehanna Steam Electric Station, Units 1 and 2 License Amendment Request for ESW Piping Replacement ML18352B1832018-12-13013 December 2018 Enclosurequest for Additional Information (Letter to K. Cimorelli Request for Additional Information Regarding Susquehanna Nuclear, Llc'S Decommissioning Funding Plan Update for Susquehanna Steam Electric Station Independent Spent Fuel Stor ML17180A2002017-07-0707 July 2017 Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits ML17059D2142017-03-0606 March 2017 Susquehanna Steam Electric Station - Supplemental Information Needed for Acceptance of Requested Licensing Action Re: License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage Frequency Limits ML16251A0652016-09-0909 September 2016 Susquehanna Steam Electric Station, Unit 2 - RAI Regarding Temporary Change of Unit 2, Technical Specifications 3.7.1 & 3.8.7 to Allow Replacement of Unit 1, 480 Volt Engineered Safeguard System Load Center Transformers(CAC No. MF7298) ML16245A2052016-09-0101 September 2016 Draft Request for Additional Information Replacement of Load Center Transformers ML16243A0952016-08-30030 August 2016 Draft Request for Additional Information Application for Approval of Indirect Transfer of Control of Licenses ML16060A2302016-03-24024 March 2016 Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.71 and 3.87 to Allow Replacement of Unit 1 480V Ess Load Center Transformers ML15316A5632015-11-13013 November 2015 Request for Additional Information Regarding Proposed Relief Requests for the Third 10-Year Inservice Inspection Interval(Cac Nos. MF6302 Through MF6307) ML15292A1782015-10-15015 October 2015 TSTF-425 LAR Draft 3rd RAIs ML15230A0802015-08-26026 August 2015 Request for Additional Information Regarding License Amendment Request to Adopt NEI 99-01, Revision 6, EAL Scheme Change ML15209A9742015-08-24024 August 2015 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425 ML15229A2002015-08-17017 August 2015 E-mail from J. Whited to J. Jennings SSES Draft TSTF-425 RAIs ML15229A2092015-08-17017 August 2015 SSES Draft Request for Additional Information Licensee Request to Adopt TSTF-425 ML15230A0462015-08-17017 August 2015 Draft RAIs SSES EAL Scheme Change LAR in Accordance with NEI 99-01 Rev 6 ML15183A3502015-07-0202 July 2015 SSES Relief Requests 3RR-19, 3RR-20, and 3RR-21 Draft Identified Information Insufficiencies (TAC Nos. MF6302 Through MF6307) ML15103A3962015-05-22022 May 2015 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425 (TAC Nos. MF5151 and MF5152) ML15128A5162015-05-0808 May 2015 SSES Draft Request for Additional Information LAR for Implementation of TSTF-425 ML15128A5092015-05-0808 May 2015 E-mail from J. Whited to D. Filchner SSES Draft Request for Additional Information LAR for Implementation of TSTF-425 ML15008A4702015-01-30030 January 2015 Request for Additional Information Request to Revise Technical Specification 3.4.10, RCS Pressure and Temperature (P/T) Limits. ML15016A2742015-01-16016 January 2015 Draft RAIs License Amendment Request for Change to TS 3.4.10 P/T Limits (TAC Nos. MF4597 and MF45980) ML15016A2722015-01-16016 January 2015 E-mail from J. Whited to D. Filchner Draft RAIs License Amendment Request for Change to TS 3.4.10 P/T Limits (TAC Nos. MF4597 and MF45980) ML14343A9842015-01-0808 January 2015 Request for Additional Information Relief Request 4RR-01 ML14345A2412014-12-16016 December 2014 Request for Additional Information Request for Order Approving Indirect Transfer of Control and Conforming License Amendments ML14346A1022014-12-12012 December 2014 Draft License Transfer Revised 2nd RAIs ML14346A4022014-12-12012 December 2014 Draft RAIs Relief Request 4RR-01 ML14346A4012014-12-12012 December 2014 E-mail from J. Whited to D. Filchner Susquehanna Steam Electric Station Draft RAIs Relief Request 4RR-01 ML14346A1002014-12-12012 December 2014 E-mail from J. Whited to R. Sgarro Susquehanna Steam Electric Station Draft License Transfer Revised 2nd RAIs ML14342A8082014-12-0808 December 2014 E-mail from J. Whited to R. Sgarro (PPL) SSES Units 1 and 2 Draft RAIs Application for Approval of Indirect Transfer of Control of Licenses ML14342A8132014-12-0808 December 2014 SSES Units 1 and 2 Draft RAIs Application for Approval of Indirect Transfer of Control of Licenses ML14233A2772014-08-27027 August 2014 Request for Additional Information License Amendment Request to Change the Low Pressure Safety Limit ML14233A3392014-08-21021 August 2014 Draft RAIs for Susquehanna Steam Electric Station Units 1 and 2 License Amendment Request for Changes to the Low Pressure Safety Limits ML13298A7582014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage (TAC ME9607 and ME960) ML13298A7812014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirement 3.8.1.19 to Increase Diesel Generator Minimum Steady State Frequency (TACs ME9609. ML14013A1502014-01-31031 January 2014 Request for Additional Information Regarding Relief Requests for the Fourth 10-Year Inservice Testing Interval ML14024A4752014-01-24024 January 2014 Draft 4th IST RRs 1RR05 RAIs ML13338A4422013-12-19019 December 2013 Request for Additional Information Regarding Relief Requests for the Fourth Ten-Year Inservice Inspection Interval ML13312A9142013-12-18018 December 2013 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements 3.5.1.12 2023-11-30
[Table view] |
Text
May 21, 2002 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Eric M. Thomas, Project Manager, Section 1 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FAXED TO THE LICENSEE RE: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, ELIMINATION OF AUTOMATIC HIGH PRESSURE COOLANT INJECTION PUMP SUCTION TRANSFER TO THE SUPPRESSION POOL (TAC NOS. MB2190 & MB2191)
Attached is a list of questions received by e-mail from the technical review staff regarding the Nuclear Regulatory Commission (NRC) staffs review of the licensees application dated June 8, 2001. The attached questions were faxed to the licensee on May 16, 2002, as a follow-up to the licensees May 7, 2002, response to the staffs request for additional information (RAI) dated December 18, 2001. The questions were discussed during conference calls between the licensee and NRC staff on May 14, 15 and 17, 2002. The licensees answers to these questions will clarify its May 7, 2002, response and will allow the technical staff to complete its review in a timely manner. This memo documents the NRC staffs clarifying questions in lieu of issuing another formal RAI.
Docket Nos. 50-387 and 50-388
Attachment:
As stated CONTACT: Eric M. Thomas, NRR (301) 415-3780
May 21, 2002 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Eric M. Thomas, Project Manager, Section 1 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FAXED TO THE LICENSEE RE: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, ELIMINATION OF AUTOMATIC HIGH PRESSURE COOLANT INJECTION PUMP SUCTION TRANSFER TO THE SUPPRESSION POOL (TAC NOS. MB2190 & MB2191)
Attached is a list of questions received by e-mail from the technical review staff regarding the Nuclear Regulatory Commission (NRC) staffs review of the licensees application dated June 8, 2001. The attached questions were faxed to the licensee on May 16, 2002, as a follow-up to the licensees May 7, 2002, response to the staffs request for additional information (RAI) dated December 18, 2001. The questions were discussed during conference calls between the licensee and NRC staff on May 14, 15 and 17, 2002. The licensees answers to these questions will clarify its May 7, 2002, response and will allow the technical staff to complete its review in a timely manner. This memo documents the NRC staffs clarifying questions in lieu of issuing another formal RAI.
Docket Nos. 50-387 and 50-388
Attachment:
As stated CONTACT: Eric M. Thomas, NRR (301) 415-3780 DISTRIBUTION:
PUBLIC SRichards EThomas T. Colburn PDI-1 R/F RLaufer MOBrien Accession No.: ML021510160 OFFICE PDI-1/LA PDI-1/PM PDI-1/SC NAME MOBrien EThomas RLaufer DATE 5/21/02 5/21/02 5/21/02 OFFICIAL RECORD COPY
Additional Questions Regarding The Susquehanna HPCI Source Auto-Swap Elimination resulting from conference calls between PPL Susquehanna (PPL, the licensee), and the Nuclear Regulatory Commission (NRC) on May 14-15, 2002.
Background
During NRC technical staffs review of the licensees May 7, 2002, response to its December 18, 2001 request for additional information, the staff identified that PPLs SABRE code does not model the recirculation line fluid and metal mass. PPL indicated that the SABRE code was originally developed to model ATWS and a simple modeling assumption was made not to consider it. For a LOCA, particularly a LOCA mass and energy calculation, the staff believes that it is necessary to model the recirculation line fluid volume and metal mass. Therefore, following a telephone conversation with licensee on May 15, 2002, the staff submits the following questions regarding PPLs calculations based on the SABRE code.
Questions:
- 1. Mr. Mark Chaiko (PPL) has verbally provided the recirculation line volume and metal mass data during our telephone call. That helps to speed up our review process.
Please document these data, the supporting references and calculations.
- 2. The sensitivity cases documented in EC-052-1025 indicated that the maximum suppression pool temperature was 135 oF, when the vessel pressure reaches LPCI set point. This was calculated without considering the recirculation line fluid volume and metal mass. What will be the resulting suppression pool temperature if the recirculation line fluid volume and metal mass are considered? Furthermore, what will be the impact to the proposed EOP changes if it is higher than 140 oF ?
- 3. The licensee indicated in EC-052-1025 that a 0.0375 ft**2 break is the most limiting case in terms of the operator reaction time (21 minutes). The licensee pointed out that during a LOCA with a break size larger than 0.0375 ft**3, the downcomer water level would drop below the feedwater sparger and a fast depressurization would bring the vessel pressure down to the LPCI set point due to the condensation. What will be the calculated transient downcomer water level if the recirculation line fluid mass and metal mass are considered? Will the 0.0375 ft**2 break still be the limiting break size? Will 21 minutes still be the earliest time for the operator to take action?
If PPL chooses to modify the SABRE code or input deck to answer these questions, please provide the revised code, input deck and supporting documents for further review.