June 2002 Monthly Operating Report for Beaver Valley Units 1 & 2
ML021980495
Person / Time
Site: Beaver Valley
Issue date: 07/08/2002
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-02-074
Download: ML021980495 (5)


Text

FENOC FirsEnerpqy cler.

  • na 0

A P

aI Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-02-074 July 8, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of June 2002.

Respectfully, Vice-President DTJ/caj Enclosures cc:

NRC Regional Office King of Prussia, PA

UNIT SHUTDOWNS DOCKET NO.

50-334 UNIT NAME BVPS Unit #1 DATE July 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD:

June 2002 No.

Date (Y/M/D)

Type F: Forced S: Scheduled Duration (Hours)

Reason Met+,o^no Reason Method of Shutting Down (2)

Comments NONE I ______

I ________I

_______I I_______

.1 I___________________________

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training / License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip / Scram 3 - Automatic Trip / Scram 4 - Continuation 5 - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Cause / Co,, et, ve c

OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

REPORT DATE:

COMPLETED BY:

TELEPHONE:

REPORTING PERIOD:

JUNE 2002 DESIGN ELECTRICAL RATING (Net MWe):

MAX.

DEPENDABLE CAPACITY (Net MWe):

50-334 BVPS UNIT #1 07/02/02 DAVID T.

JONES (724) 682-4962

"* Note: Rated thermal power at

"* BVPS-1 was uprated from 2652 MWt*

"* to 2689 MWt on 10/20/01.

Net

"* MDC was also uprated from

"* 810 MWe to 821 MWe.

835 821 HOURS IN REPORTING PERIOD:

NO.

OF HRS.

REACTOR WAS CRITICAL:

SERVICE HOURS GENERATOR ON LINE:

UNIT RESERVE SHUTDOWN HOURS:

NET ELECTRICAL ENERGY GEN.

(MWH):

GROSS ELECT.

ENERGY GEN.

(MWH):

GROSS THERMAL ENERGY GEN.

(MWH):

UNIT AVAILABILITY FACTOR (%):

UNIT CAPACITY FACTOR (MDC)

(M):

UNIT FORCED OUTAGE RATE (M):

THIS MONTH 720.0 720.0 720.0 0.0 592060.0 626940.0 1932939.0 100.0 100.2 0.0 YEAR TO DATE 4343.0 4343.0 4343.0 0.0 3578870.0 3787520.0 11550379.0 100.0 100.4 0.0 CUMULATIVE 229367.0 156424.5 153964.9 0.0 115245013.0 123054306.0 379185184.5 68.6 63.9 16.0 la.

I.

2.

3a.

"3.

4.
5.
6.
7.
8.
9.
10.

11.

UNIT SHUTDOWNS DOCKET NO.

50-412 UNIT NAME BVPS Unit #2 DATE July 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD:

June 2002

j.

I. Metnou UT No. I Cause / Corrective Actions Comments NONE I_____

I______

I I

I-I_________________________

Date (Y/M/D)

Type F: Forced S: Scheduled Duration (Hours)

Reason (1)

Method ot Shutting Down (2)

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training / License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip / Scram 3 - Automatic Trip / Scram 4 - Continuation 5 - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

I I

OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

REPORT DATE:

COMPLETED BY:

TELEPHONE.:

REPORTING PERIOD:

JUNE 2002 DESIGN ELECTRICAL RATING (Net MWe):

MAX.

DEPENDABLE CAPACITY (Net MWe):

836 831 50-412 BVPS UNIT #2 07/02/02 DAVID T.

JONES (724) 682-4962 Notes: Rated thermal power at BVPS-2 was uprated from 2652 MWt*

to 2689 Mwt on 10/30/01.

Net MDC was also uprated from 820 MWe to 831 MWe.

HOURS IN REPORTING PERIOD:

NO.

OF HRS.

REACTOR WAS CRITICAL:

SERVICE HOURS GENERATOR ON LINE:

UNIT RESERVE SHUTDOWN HOURS:

NET ELECTRICAL ENERGY GEN.

(MWH):

GROSS ELECT.

ENERGY GEN.

(MWH):

GROSS THERMAL ENERGY GEN.

(MWH):

UNIT AVAILABILITY FACTOR (%):

UNIT CAPACITY FACTOR (MDC)

(9):

UNIT FORCED OUTAGE RATE (M):

THIS MONTH 720.0 720.0 720.0 0.0 600212.0 631777.0 1932910.0 100.0 100.3 0.0 YEAR TO DATE 4343.0 3783.6 3716.9 0.0 2955881.0 3121387.0 9476955.0 85.6 81.9 0.5 CUMULATIVE 128150.0 105138.1 104409.5 0.0 81533973.0 86196130.0 262884536.0 81.5 77.0 10.1 la.

1.

2.

3a.

3.
4.
5.
6.
7.
8.
9.
10.

II.