L-02-074, June 2002 Monthly Operating Report for Beaver Valley Units 1 & 2
| ML021980495 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 07/08/2002 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-02-074 | |
| Download: ML021980495 (5) | |
Text
FENOC cler.0 *na A P aI FirsEnerpqy Beaver Valley Power Station P. 0. Box 4 Shippingport,PA 15077 L-02-074 July 8, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
of the Monthly In accordance with NRC Generic Letter 97-02, "Revised Contents the "Monthly Operating Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, Report" is submitted for Unit 1 and Unit 2 for the month of June 2002.
Respectfully, Vice-President DTJ/caj Enclosures cc: NRC Regional Office King of Prussia, PA
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE July 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: June 2002 Reason Met+,o^no Cause / Co, ,et, ve c No. Date Type Duration Reason Method Shutting of (Y/M/D) (Hours)
F: Forced Down (2)
S: Scheduled Comments NONE I ______ - I ________I _______I .1 I_______ I___________________________
(1) Reason (2) Method 1 - Manual A - Equipment Failure (Explain) 2 - Manual Trip / Scram B - Maintenance or Test 3 - Automatic Trip / Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training / License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
report period.
The Unit operated at a nominal value of 100% output for the entire
OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 07/02/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962
"* Note: Rated thermal power at
- la. REPORTING PERIOD: JUNE 2002 "* BVPS-1 was uprated from 2652 MWt*
"* to 2689 MWt on 10/20/01. Net
- I. DESIGN ELECTRICAL RATING (Net MWe):
835 "* MDC was also uprated from
- 821
"* 810 MWe to 821 MWe. *
- 2. MAX. DEPENDABLE CAPACITY (Net MWe):
YEAR TO DATE CUMULATIVE THIS MONTH 720.0 4343.0 229367.0 3a. HOURS IN REPORTING PERIOD:
720.0 4343.0 156424.5 "3. NO. OF HRS. REACTOR WAS CRITICAL:
153964.9 720.0 4343.0
- 4. SERVICE HOURS GENERATOR ON LINE:
0.0 0.0 0.0
- 5. UNIT RESERVE SHUTDOWN HOURS:
3578870.0 115245013.0 592060.0
- 6. NET ELECTRICAL ENERGY GEN. (MWH):
3787520.0 123054306.0 626940.0
- 7. GROSS ELECT. ENERGY GEN. (MWH):
11550379.0 379185184.5 1932939.0
- 8. GROSS THERMAL ENERGY GEN. (MWH):
100.0 68.6 100.0
- 9. UNIT AVAILABILITY FACTOR (%):
100.4 63.9 100.2
- 10. UNIT CAPACITY FACTOR (MDC) (M):
0.0 0.0 16.0
- 11. UNIT FORCED OUTAGE RATE (M):
UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE July 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: June 2002 I.
j.
I Metnou UT I Cause / Corrective Actions No. I Date Type Duration Reason Method ot (Hours) (1) Shutting (Y/M/D) F: Forced Comments S: Scheduled Down (2)
NONE I_____ I______ I _____ I I- I_________________________
(1) Reason (2) Method 1 - Manual A - Equipment Failure (Explain) 2 - Manual Trip / Scram B - Maintenance or Test 3 - Automatic Trip / Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training / License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 07/02/02 COMPLETED BY: DAVID T. JONES TELEPHONE.: (724) 682-4962 la. REPORTING PERIOD: JUNE 2002 Notes: Rated thermal power at *
- BVPS-2 was uprated from 2652 MWt*
- to 2689 Mwt on 10/30/01. Net *
- 1. DESIGN ELECTRICAL RATING (Net MWe): 836 MDC was also uprated from *
- 820 MWe to 831 MWe. *
- 2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 4343.0 128150.0
- 3. NO. OF HRS. REACTOR WAS CRITICAL: 720.0 3783.6 105138.1
- 4. SERVICE HOURS GENERATOR ON LINE: 720.0 3716.9 104409.5
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWH): 600212.0 2955881.0 81533973.0
- 7. GROSS ELECT. ENERGY GEN. (MWH): 631777.0 3121387.0 86196130.0
- 8. GROSS THERMAL ENERGY GEN. (MWH): 1932910.0 9476955.0 262884536.0
- 9. UNIT AVAILABILITY FACTOR (%): 100.0 85.6 81.5
- 10. UNIT CAPACITY FACTOR (MDC) (9): 100.3 81.9 77.0 II. UNIT FORCED OUTAGE RATE (M): 0.0 0.5 10.1
Text
FENOC cler.0 *na A P aI FirsEnerpqy Beaver Valley Power Station P. 0. Box 4 Shippingport,PA 15077 L-02-074 July 8, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
of the Monthly In accordance with NRC Generic Letter 97-02, "Revised Contents the "Monthly Operating Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, Report" is submitted for Unit 1 and Unit 2 for the month of June 2002.
Respectfully, Vice-President DTJ/caj Enclosures cc: NRC Regional Office King of Prussia, PA
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE July 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: June 2002 Reason Met+,o^no Cause / Co, ,et, ve c No. Date Type Duration Reason Method Shutting of (Y/M/D) (Hours)
F: Forced Down (2)
S: Scheduled Comments NONE I ______ - I ________I _______I .1 I_______ I___________________________
(1) Reason (2) Method 1 - Manual A - Equipment Failure (Explain) 2 - Manual Trip / Scram B - Maintenance or Test 3 - Automatic Trip / Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training / License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
report period.
The Unit operated at a nominal value of 100% output for the entire
OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 07/02/02 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962
"* Note: Rated thermal power at
- la. REPORTING PERIOD: JUNE 2002 "* BVPS-1 was uprated from 2652 MWt*
"* to 2689 MWt on 10/20/01. Net
- I. DESIGN ELECTRICAL RATING (Net MWe):
835 "* MDC was also uprated from
- 821
"* 810 MWe to 821 MWe. *
- 2. MAX. DEPENDABLE CAPACITY (Net MWe):
YEAR TO DATE CUMULATIVE THIS MONTH 720.0 4343.0 229367.0 3a. HOURS IN REPORTING PERIOD:
720.0 4343.0 156424.5 "3. NO. OF HRS. REACTOR WAS CRITICAL:
153964.9 720.0 4343.0
- 4. SERVICE HOURS GENERATOR ON LINE:
0.0 0.0 0.0
- 5. UNIT RESERVE SHUTDOWN HOURS:
3578870.0 115245013.0 592060.0
- 6. NET ELECTRICAL ENERGY GEN. (MWH):
3787520.0 123054306.0 626940.0
- 7. GROSS ELECT. ENERGY GEN. (MWH):
11550379.0 379185184.5 1932939.0
- 8. GROSS THERMAL ENERGY GEN. (MWH):
100.0 68.6 100.0
- 9. UNIT AVAILABILITY FACTOR (%):
100.4 63.9 100.2
- 10. UNIT CAPACITY FACTOR (MDC) (M):
0.0 0.0 16.0
- 11. UNIT FORCED OUTAGE RATE (M):
UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE July 2, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: June 2002 I.
j.
I Metnou UT I Cause / Corrective Actions No. I Date Type Duration Reason Method ot (Hours) (1) Shutting (Y/M/D) F: Forced Comments S: Scheduled Down (2)
NONE I_____ I______ I _____ I I- I_________________________
(1) Reason (2) Method 1 - Manual A - Equipment Failure (Explain) 2 - Manual Trip / Scram B - Maintenance or Test 3 - Automatic Trip / Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training / License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 07/02/02 COMPLETED BY: DAVID T. JONES TELEPHONE.: (724) 682-4962 la. REPORTING PERIOD: JUNE 2002 Notes: Rated thermal power at *
- BVPS-2 was uprated from 2652 MWt*
- to 2689 Mwt on 10/30/01. Net *
- 1. DESIGN ELECTRICAL RATING (Net MWe): 836 MDC was also uprated from *
- 820 MWe to 831 MWe. *
- 2. MAX. DEPENDABLE CAPACITY (Net MWe): 831 THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 4343.0 128150.0
- 3. NO. OF HRS. REACTOR WAS CRITICAL: 720.0 3783.6 105138.1
- 4. SERVICE HOURS GENERATOR ON LINE: 720.0 3716.9 104409.5
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (MWH): 600212.0 2955881.0 81533973.0
- 7. GROSS ELECT. ENERGY GEN. (MWH): 631777.0 3121387.0 86196130.0
- 8. GROSS THERMAL ENERGY GEN. (MWH): 1932910.0 9476955.0 262884536.0
- 9. UNIT AVAILABILITY FACTOR (%): 100.0 85.6 81.5
- 10. UNIT CAPACITY FACTOR (MDC) (9): 100.3 81.9 77.0 II. UNIT FORCED OUTAGE RATE (M): 0.0 0.5 10.1