MONTHYEARML0208702262002-03-20020 March 2002
[Table View]Email Re Amendment Request of September 11, 2001 Project stage: Other ML0210904512002-04-0808 April 2002 Additional Information - Technical Specification Change Request No. 294 Cycle-Specific Safety Limit MCPR Project stage: Other ML0215503542002-05-0707 May 2002 Tech Spec Change Request No. 294, Transmittal of Camera - Ready Tech Spec Pages Project stage: Request ML0215102642002-05-0707 May 2002 Technical Specification Change Request 294, Transmittal of Camera - Ready Technical Specification Pages Project stage: Request ML0215401332002-05-31031 May 2002 TS Pages to Amendment 289 Cycle-Specific Safety Limit Minimum Critical Power Ratio Project stage: Other ML0212803392002-05-31031 May 2002 License Amendment, Cycle-Specific Safety Limit Minimum Critical Power Ratio Project stage: Other 2002-04-08 |
ML021550354 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 05/07/2002 |
From: | Gallagher M AmerGen Energy Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2130-02-20130, TAC MB2891 | |
Download: ML021550354 (5) | |
Similar Documents at Oyster Creek | |
---|---|
Category:Letter
MONTHYEARIR 07200015/20244012024-10-30030 October 2024
[Table view]NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200015/2024401 ML24303A2822024-10-29029 October 2024 License Termination Plan Supplemental Submittal for Technical Bases Documents ML24284A1972024-10-10010 October 2024 Cover Letter Oyster Creek, License Termination Plan Acceptance Review ML24269A0462024-10-0404 October 2024 Cover Letter for Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Acceptance Review Request for Additional Information ML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 – NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report – January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 – NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 – NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 – NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages 2024-09-05 Category:Technical Specification MONTHYEARML24214A0692024-08-0101 August 2024
[Table view]Enclosure 18: Technical Basis Document No. 24-01-12-2888 Revision 1, Dose Contribution from Insignificant Radionuclides in the Oyster Creek Site-Specific Suite of Radiological Nuclides, February 14, 2024 RA-19-019, Submittal of Changes to Technical Specifications Bases2019-04-12012 April 2019 Submittal of Changes to Technical Specifications Bases RA-18-018, Submittal of Changes to Technical Specifications Bases2018-04-13013 April 2018 Submittal of Changes to Technical Specifications Bases RA-14-035, Submittal of Changes to Technical Specifications Bases2014-04-10010 April 2014 Submittal of Changes to Technical Specifications Bases RA-13-039, Submittal of Changes to Technical Specifications Bases2013-04-10010 April 2013 Submittal of Changes to Technical Specifications Bases RA-12-046, Submittal of Changes to Technical Specifications Bases2012-04-12012 April 2012 Submittal of Changes to Technical Specifications Bases RA-11-021, Submittal of Changes to Technical Specifications Bases2011-04-15015 April 2011 Submittal of Changes to Technical Specifications Bases RA-10-027, Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable2010-06-25025 June 2010 Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable RA-10-037, Submittal of Changes to Technical Specifications Bases2010-04-22022 April 2010 Submittal of Changes to Technical Specifications Bases ML1006200112010-02-25025 February 2010 Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary RA-10-009, Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary2010-02-25025 February 2010 Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary RA-09-065, Application for Technical Specifications Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (Adoption of TSTF-425, Rev 3)2009-10-30030 October 2009 Application for Technical Specifications Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (Adoption of TSTF-425, Rev 3) RA-09-036, Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 20092009-04-17017 April 2009 Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 2009 RA-08-091, Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)2008-09-29029 September 2008 Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses RA-08-060, Transmittal of Supplemental Response - Amergen Application to Revise Technical Specifications Secondary Containment Operability Requirements During Refueling2008-07-0303 July 2008 Transmittal of Supplemental Response - Amergen Application to Revise Technical Specifications Secondary Containment Operability Requirements During Refueling RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im ML0810505452008-04-30030 April 2008 Technical Specification Pages for License Amendment No. 265 the Incorporation of TSTF-448, Revision 3, Control Room Habitability. (Tac MD5281) RA-08-041, Submittal of Changes to Technical Specifications Bases2008-04-28028 April 2008 Submittal of Changes to Technical Specifications Bases ML0731804012007-11-0202 November 2007 Technical Specification Change Request No. 338 - Secondary Containment Operability Requirements During Refueling RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0712401382007-04-27027 April 2007 Submittal of Changes to Technical Specifications Bases RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0627200562006-09-28028 September 2006 Technical Specification Change Request No. 339 - License Amendment Request to Revise Technical Specification Definitions of Channel Calibration, Channel Check and Channel Test ML0615103502006-05-25025 May 2006 Technical Specification Change Request No. 328 - Response to Request for Additional Information Concerning a Revision to Surveillance Requirements for Testing of Main Steam Line Electromatic Relief Valve ML0612902192006-04-24024 April 2006 Submittal of Changes to Technical Specifications Bases ML0534302552005-12-0202 December 2005 License Amendment Request Increase Safety Valve As-Found Setpoint Tolerance from 1% to 3% ML0513704932005-05-10010 May 2005 Oyster Creek Generating Station, Submittal of Changes to Technical Specifications Bases ML0508705402005-03-25025 March 2005 Technical Specification Change Request No. 332 - Upgrade of 69 Kv Offsite Power Transmission Line ML0506002452005-02-25025 February 2005 Technical Specification Pages Re Control Rod Operability Requirements RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program ML0432200942004-11-16016 November 2004 Tech Spec Page for Amendment No. 252, Safety Limit Minimum Critical Power Ratio ML0432201012004-11-0808 November 2004 Unit 1 Amendment to Technical Specification ML0429505442004-10-15015 October 2004 Correction of Amendment No. 245 to Technical Specification Pages Electrical Power Sources ML0409003432004-03-23023 March 2004 Technical Specification Change Request No. 304/320 (Tscr) - Relocation of Independent Onsite Safety Review Group Function to the Quality Assurance Topical Report ML0409003312004-03-19019 March 2004 Technical Specification Change Request No. 322 Regarding Implementation of Option B Scram Time Testing ML0404002262004-02-0505 February 2004 Tech Spec Pages for License Amendment 240, Extension of Delay Period as Result of Missed Surveillance ML0326510472003-09-11011 September 2003 Supplement to License Amendment Request No. 306 for Revision to Technical Specifications Regarding DC Electrical Power Sources Based on TSTF-360 ML0316110292003-06-0202 June 2003 Technical Specification Change Request No. 314 - Startup Transformer and Emergency Diesel Generator Unavailability Periods ML0312006612003-04-21021 April 2003 License Amendment Request No. 306 - DC Electrical Power Sources Based on TSTF-360 ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process ML0215401332002-05-31031 May 2002 TS Pages to Amendment 289 Cycle-Specific Safety Limit Minimum Critical Power Ratio ML0215503542002-05-0707 May 2002 Tech Spec Change Request No. 294, Transmittal of Camera - Ready Tech Spec Pages ML0212900522002-04-26026 April 2002 Technical Specification Change Request No. 308 - General Electric Stability Analysis Methodology ML0208705752002-03-27027 March 2002 Technical Specifications, Amendment 227 - Allowing 24-month Capacity Test for DG Starting Batteries ML0208000102002-03-18018 March 2002 Technical Specification - Amendment, Correction of Pages Issued by Amendment No. 219 (Tac Nos. MA7804 and MB1748) ML0205801792002-02-11011 February 2002 Transmittal of Revised Oyster Creek Technical Specification Page 3 (Revision 224), Lep 1 (Revision 224), Lep 4 (Revision 224), Xxiv (Revision 224), TS Appendix a Pages 6-4 & 6-6 (Revision 224) ML0204300932002-02-0707 February 2002 Amendment 225, Tech Spec Pages ML0203005342002-01-23023 January 2002 Amendment 223, Technical Specification 5.3 Re Auxiliary Equipment ML0204501572002-01-17017 January 2002 Technical Specification Change Request 287, Transmittal of Camera-Ready Technical Specification Pages 2024-08-01 Category:Bases Change MONTHYEARML24214A0692024-08-0101 August 2024
[Table view]Enclosure 18: Technical Basis Document No. 24-01-12-2888 Revision 1, Dose Contribution from Insignificant Radionuclides in the Oyster Creek Site-Specific Suite of Radiological Nuclides, February 14, 2024 RA-19-019, Submittal of Changes to Technical Specifications Bases2019-04-12012 April 2019 Submittal of Changes to Technical Specifications Bases RA-18-018, Submittal of Changes to Technical Specifications Bases2018-04-13013 April 2018 Submittal of Changes to Technical Specifications Bases RA-14-035, Submittal of Changes to Technical Specifications Bases2014-04-10010 April 2014 Submittal of Changes to Technical Specifications Bases RA-13-039, Submittal of Changes to Technical Specifications Bases2013-04-10010 April 2013 Submittal of Changes to Technical Specifications Bases RA-12-046, Submittal of Changes to Technical Specifications Bases2012-04-12012 April 2012 Submittal of Changes to Technical Specifications Bases RA-11-021, Submittal of Changes to Technical Specifications Bases2011-04-15015 April 2011 Submittal of Changes to Technical Specifications Bases RA-10-027, Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable2010-06-25025 June 2010 Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable RA-10-037, Submittal of Changes to Technical Specifications Bases2010-04-22022 April 2010 Submittal of Changes to Technical Specifications Bases RA-09-036, Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 20092009-04-17017 April 2009 Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 2009 RA-08-091, Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)2008-09-29029 September 2008 Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) RA-08-041, Submittal of Changes to Technical Specifications Bases2008-04-28028 April 2008 Submittal of Changes to Technical Specifications Bases ML0731804012007-11-0202 November 2007 Technical Specification Change Request No. 338 - Secondary Containment Operability Requirements During Refueling RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0712401382007-04-27027 April 2007 Submittal of Changes to Technical Specifications Bases RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0615103502006-05-25025 May 2006 Technical Specification Change Request No. 328 - Response to Request for Additional Information Concerning a Revision to Surveillance Requirements for Testing of Main Steam Line Electromatic Relief Valve ML0612902192006-04-24024 April 2006 Submittal of Changes to Technical Specifications Bases ML0513704932005-05-10010 May 2005 Oyster Creek Generating Station, Submittal of Changes to Technical Specifications Bases ML0508705402005-03-25025 March 2005 Technical Specification Change Request No. 332 - Upgrade of 69 Kv Offsite Power Transmission Line ML0316110292003-06-0202 June 2003 Technical Specification Change Request No. 314 - Startup Transformer and Emergency Diesel Generator Unavailability Periods ML0215503542002-05-0707 May 2002 Tech Spec Change Request No. 294, Transmittal of Camera - Ready Tech Spec Pages ML0212900522002-04-26026 April 2002 Technical Specification Change Request No. 308 - General Electric Stability Analysis Methodology ML0204501572002-01-17017 January 2002 Technical Specification Change Request 287, Transmittal of Camera-Ready Technical Specification Pages 2024-08-01 |