EPRI Report TR-113594, Resolution of GL 96-06
ML021440583
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/24/2002
From: Goshen J
NRC/NRR/DLPM
To: Scarola J
Carolina Power & Light Co
Goshen, JM, NRR/DLPM, 415-1437
Shared Package
ML021440595 List:
References
GL-96-006, TAC M96818
Download: ML021440583 (5)


Text

May 24, 2002 Mr. James Scarola, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - EPRI REPORT TR-113594, RESOLUTION OF GENERIC LETTER 96-06 WATERHAMMER ISSUES, VOLUMES 1 AND 2 (TAC NO. M96818)

Dear Mr. Scarola:

Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, requested that licensees evaluate waterhammer and two-phase flow concerns associated with containment air cooler cooling water systems. Your remaining actions to fully address these concerns were deferred pending Nuclear Regulatory Commission (NRC) review and approval of Electric Power Research Institute (EPRI) Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2. The purpose of this letter is to inform you that we have completed our review, and we have determined that use of EPRI Report TR-113594 for evaluating the GL 96-06 waterhammer issues is acceptable to the extent specified and within the limitations delineated in the report and NRC evaluation. We request that you complete your actions to address GL 96-06 and submit the information referred to in Section 3.3 of the NRC evaluation by October 31, 2002. The NRCs letter of acceptance with enclosed evaluation (ADAMS Accession No. ML020940132) are enclosed for your information.

Please contact me at (301) 415-1437 if you are unable to meet this schedule, or if you have any other questions on these issues.

Sincerely,

/RA/

John M. Goshen, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

NRC letter to Mr. Vaughn Wagoner dated April 3, 2002 cc w/encl: See next page

ML020940132) are enclosed for your information.

Please contact me at (301) 415-1437 if you are unable to meet this schedule, or if you have any other questions on these issues.

Sincerely,

/RA/

John M. Goshen, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

NRC letter to Mr. Vaughn Wagoner dated April 3, 2002 cc w/encl: See next page DISTRIBUTION PUBLIC PDII-2 Reading JGoshen EDunnington (Hard copy)

TKoshy JTatum OGC File Name : C:\\ORPCheckout\\FileNET\\ML021440583.wpd ADAMS ACCESSION NO:

OFFICE PDII-2/PM PDII-2/LA PDII-2/SC(A)

NAME JGoshen BClayton for EDunnington KJabbour for TKoshy DATE 5/15/02 5/16/02 5/16/02

Mr. James Scarola Shearon Harris Nuclear Power Plant Carolina Power & Light Company Unit 1 cc:

Mr. William D. Johnson Mr. Chris L. Burton Vice President and Corporate Secretary Director of Site Operations Carolina Power & Light Company Carolina Power & Light Company Post Office Box 1551 Shearon Harris Nuclear Power Plant Raleigh, North Carolina 27602 Post Office Box 165, MC: Zone 1 New Hill, North Carolina 27562-0165 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Mr. Robert P. Gruber 5421 Shearon Harris Road Executive Director New Hill, North Carolina 27562-9998 Public Staff NCUC Post Office Box 29520 Ms. Karen E. Long Raleigh, North Carolina 27626 Assistant Attorney General State of North Carolina Chairman of the North Carolina Post Office Box 629 Utilities Commission Raleigh, North Carolina 27602 Post Office Box 29510 Raleigh, North Carolina 27626-0510 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Linda Coleman, Chairperson Board of County Commissioners of Wake County P. O. Box 550 Mr. Mel Fry, Director Raleigh, North Carolina 27602 Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Dr.

Mr. Gary Phillips, Chairman Raleigh, North Carolina 27609-7721 Board of County Commissioners of Chatham County P. O. Box 87 Mr. Terry C. Morton Pittsboro, North Carolina 27312 Manager Performance Evaluation and Mr. Richard J. Field, Manager Regulatory Affairs CPB 7 Regulatory Affairs Carolina Power & Light Company Carolina Power & Light Company Post Office Box 1551 Shearon Harris Nuclear Power Plant Raleigh, North Carolina 27602-1551 P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. Robert J. Duncan II Plant General Manager Mr. John R. Caves, Supervisor Carolina Power & Light Company Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company P.O. Box 165, Mail Zone 3 Shearon Harris Nuclear Power Plant New Hill, North Carolina 27562-0165 P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.

Washington, DC 20037-1128