TAC:M96818
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
| |
| From | |
MONTHYEARML18016A4611998-06-24024 June 1998
[table view]Refers to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions, & CP&L Reponse .Forwards RAI Re Resolution of GL 96-06 Issues for Harris NPP Unit 1 HNP-98-097, Forwards Response to NRC 971215 RAI Re Plant Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. with Twelve Oversize Design Configuration Drawings1998-09-28028 September 1998 Forwards Response to NRC 971215 RAI Re Plant Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. with Twelve Oversize Design Configuration Drawings ML0214405832002-05-24024 May 2002 EPRI Report TR-113594, Resolution of GL 96-06 HNP-07-004, Supplemental Information Regarding GL-96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions.2007-03-0808 March 2007 Supplemental Information Regarding GL-96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. ML0715100562007-06-0101 June 2007 Note to File - Verification of Licensee Assumption for GL 96-06 ML0718301802007-08-10010 August 2007 Receipt of Shearon Harris Nuclear Power Plant, Unit 1, Response to GL 96-06 Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions TAC No. M96818 2002-05-24 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:M96818&oldid=5043499"