Revision 2 to RA-EP-02010, Emergency Management.
ML021330514
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/29/2002
From:
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML021330514 (55)


Text

Davis Besse Power Station Control Copy Number: 1665 Transmittal / Receipt Acknowledgement Transmittal Number: 0204-05688 Transmittal Date: 04-29-2002 To: DOC. CONTROL DESK Mail Stop / Address: USNRC DIVISION OF EMERGENCY PREPARDNESS WASHINGTON, D.C. 20555 Document holders are responsible for control and maintenance of documents in accordance with the actions specified by this transmittal. Outdated material shall either be removed and destroyed or marked to reflect that it is superseded or voided and is no longer considered controlled.

Note: Destroy Safeguard information by shredding.

File documents in tab order as identified on the Table of Contents Contact Document Control with any questions at (419)-321-7483 C05e ýS-

Davis Besse Power Station Control Copy Number: 1665 Transmittal / Receipt Acknowledgement Transmittal Number: 0204-05688 Transmittal Date: 04-29-2002 Document TOC 1 TOC 2 Type Number Sht/Sec Changes Rev Status r-old EPIB EC PROC RA-EP-02010 E01-3144 0002 APPROVED new PROC RA-EP-02010 E01-3144, E02-0946 0002 APPROVED EPIB C old EPON PROC RA-EP-02864 0000 APPROVED new EPON PROC RA-EP-02864 E02-0078 0000 APPROVED

PROCEDURE ACTIVITY TRACKING NO.

PROCEDURE DEVELOPMENT FORM ED 7635-18 SHEET 1 OF 1 1 ~ ~02-q1t "SECTION1 - IDENTITY PROCEDURE NO. / CURRENT REVISION PROPOSED PROPOSED [: NEW (N) C CANCELLATION (CX)

ElRETRI RA-EP-0200REVISION NO. C or E NO. REVISION (R) [- INACTIVATION (IN)

SUPERSEDES C CHANGE (C) E] REACTIVATION (RA) ESTIMATED EXPIRATION E-2 E TEMPORARY APPROVAL (TA)

EDITORIAL CORRECTION (E) (DATE / EVENT)

PROCEDURE TITLE Emergency Management PROCEDURE CLASSIFICATION PAT / PCR NOS. CLOSED OUT ED SR C-OR D N-OR CHANGE TO'? r- YES M NO PCR 020326 CONTINUED ACTIVITY

SUMMARY

/ PURPOSE Correct organizational and facility titles.

Cl CONTINUED SECTION 2 - CONCURRENT EFFECTIVE DOCUMENTS []CONTINUED DOCUMENT NO. / REVISION DOCUMENT TITLE PAT NO. / CHANGE REQUEST SECTION 3 - REVIEW ORGANIZATIONS REQUIRED REQUESTED C CONTINUED C CONTINUED PROCEDURE PREPARER DATE/ QUALIFIED REVIEWER DATE

-(:4W 2 N/A SCTION 4- ATTACHMENTS COMPLETED AND ATTACHED YES N/A YES N/A YES N/A Q [] VALIDATION CHECKLIST El C) 10CFR50.59 SCREEN NO. El E REVISED CROSS REFERENCES LIST El El COMMITMENT VERIFICATION

SUMMARY

[3 El 10CFR50.59 EVALUATION NO. _ E PCRs El Dl REGULATORY APPLICABILITY DETERMINATION [I El DOCUMENT REVIEW SHEETS El El OTHER NO.

FINAL QUALIFIED REVIEWER CONCURRENCE DATE N/A SECTION 5 - TEMPORARY APPROVAL MANAGEMENT SRO DATE APPROVAL AUTHORITY DATE N/A N/A SECTION 6 - CONCURRENCE / FINAL APPROVAL PROCEDURE SPONSOR DATE ElSRB DATE N/A N/A

[3 MANAGER - NUCLEAR QUALITY ASSESSMENT (CA) DATE [] PLANT MANAGER DATE N/A N/A APPROVAL AUTHORITY DATE SECTION 7 - TRAINING / PROCEDURE EFFECTIVITY TRAINING COMPLETE ALTER ION E FFECTIVE DATE PROCEDUFSPONS9O DATE ECYES []N/A 1/ -,ýý* -- A(,- I1 .

SHEET PROCEDURE ACTNPfY TRACK 'JO.

PROCEDURE ACTIVITY TRACK INVG O PROCEDURE DEVELOPMENT FORM 101- :3)'ydi/

ED 7635-17 ISHEET 1 OF 1 SECTION 1 - IDENTITY PROCEDURE NO. / CURRENT REVISION PROPOSED PROPOSED 0l NEW (N) El CANCELLATION (CX)

REVISION NO. C or E NO. El REVISION (R) [I INACTIVATION (IN) RESTRICTED SUPERSEDES El CHANGE (C) El REACTIVATION (RA) ESTIMATED EXPIRATION SEEE-1 El TEMPORARY APPROVAL (TA)

Z EDITORIAL CORRECTION (E) (DATE/EVENT)

PROCEDURE TITLE Emergency Management PROCEDURE CLASSIFICATION HAS PROCEDURE BEEN EXEMPTED PAT / PCR NOS. CLOSED OUT ED SR [I QR El N-OR FROM REGULATORY APPLICABILITY?

CHANGE TO? El YES M NO El YES [9 NO El CONTINUED ACTIVITY

SUMMARY

/ PURPOSE Corrrect Titles, Correct Spelling, remove an obsolete reference, El CONTINUED SECTION 2 - CONCURRENT EFFECTIVE DOCUMENTS ECONTINUED DOCUMENT NO. / REVISION DOCUMENT TITLE PAT NO. I CHANGE REQUEST SECTION 3 - REVIEW ORGANIZATIONS REQUIRED REQUESTED El CONTINUED CONTINUED PROCEDURE P E ER DATE QUALIFIED REVIEWER DATE USECT ON 4 ATTACHMENTS COMPLETED AND ATTACHED YES N/A YES N/A YES N/A

[] [I VALIDATION CHECKLIST El Dl 10CFR50.59 SCREEN NO - 0 [1 REVISED CROSS REFERENCES LIST

[1l COMMITMENT VERIFICATION

SUMMARY

[ Il 10CFR50.59 EVALUATION NO. -- 0 El PCRs El El REGULATORY APPLICABILITY DETERMINATION El 0l DOCUMENT REVIEW SHEETS 05 OTHER NO.

FINAL QUALIFIED REVIEWER CONCURREN~

DT SECTION 5 - TEMPORARY APPROVAL MANAGEMENT SRO DATE APPROVAL AUTHORITY DATE N/A N/A SECTION 6 - CONCURRENCE / FINAL APPROVAL PROCEDURE SPONSOR DATE ElSRB DATE El MANAGER - NUCLEAR OUALITY ASSESSMENT (QA) DATE El PLANT MANAGER DATE APPROVAL AUTHORITY DATE SECTION 7 -TRAINING / PROCEDURE EFFECTIVITY TRAINING COMPLETE ALTERATION EFFECTIVE DATE PROCED ONSOR DATE El YES *N/A jIhroJc-V -': I V

I

Page 1 of 36 Davis-Besse Nuclear Power Station EMERGENCY PLAN IMPLEMENTING PROCEDURE RA-EP-02010 (Supersedes RA-EP-02010, Ri)

Emergency Management REVISION 02 Prepared by: /6t-2e 6 Date Sponsor:

Manager - Regulatory Affairs Date Approved by:

Director - Engineering & Services Date Approved by:

P1 tINlanager Date' Effective Date: /-

(P  % ,,aIla Procedure Classification:

X Safety Related LEVEL OF USE:

- Quality Related IN-FIELD REFERENCE

___ Non-Quality Related

2 RA-EP-02010 Revision 02 E-2 LIST OF EFFECTIVE PAGES Page Change No. Page Change No. Page Change No.

1 23 2 E-2 24 E-I 3 E-I 25 4 E-1 26 5 27 E-1 6 28 E-1 7 E-2 29 E-I 8 30 E-1 9 E-2 31 10 E-2 32 E-2 11 E-1 33 12 E-1 34 E-2 13 E-1 35 E-1 14 E-1 36 15 E-2 16 E-1

+

17 E-2 18 E-2 19 E-2 20 E-1 21 E-1 22 E-2

EMERGENCY MANAGEMENT 3 RA-EP-02010 Revision 02 Change E-I TABLE OF CONTENTS Page 1.0 PU RPO SE ............................................................................................................................................. 4 2.0 RE FER EN C ES ...................................................................................................................................... 4 3.0 DEFINITIONS ........................ ....................................................................... 5 4.0 RE SPON SIB IL IT IE S ............................................................................................................................ 5 5.0 INITIATING CONDITIONS ....................................................................................................... 5 6 .0 PR O CE DU R E ....................................................................................................................................... 6 6.1 A ctiv ation ................................................................................................................................. 6 7.0 FIN A L C O ND IT ION S .......................................................................................................................... 6 8 .0 RE C O R DS ........................................................................................................................................... 6 ATTACHMENT 1. Emergency Management Guidelines for Emergency Director .............................. 7 ATTACHMENT 2. Emergency Management Guidelines for Emergency Plant Manager ................... 12 ATTACHMENT 3. Emergency Management Guidelines for Emergency Offsite Manager ............... 17 ATTACHMENT 4. Emergency Management Guidelines for Company Spokesperson ...................... 23 ATTACHMENT 5. Emergency Management Guidelines for Emergency Assistant Plant Manager ..... 27 ATTACHMENT 6. Overview of Assembly/Evacuation/Accountability ............................................ 31 ATTACHMENT 7. AEOF Activation and Operation .......................................................................... 32 ATTACHMENT 8. Guidelines for Shift Turnover .............................................................................. 34 C OM M ITM E N T S ...................................................................................................................................... 36

1:

EMERGEUt1NCY MANAGEIMEINT 4 RA-EP-02010 Revision 02 Change E-1 1.0 PURPOSE This procedure establishes a reference aid for key Emergency Response Organization personnel that consolidates the action steps of each individual during the first phase of any emergency response. It is intended to supplement the individual's familiarity and compliance with the plan and implementing procedures by providing a memory key and guideline for the manager's initial responses.

2.0 REFERENCES

2.1 Developmental 2.1.1 Davis-Besse Nuclear Power Station Emergency Plan 2.1.2 Corporate Emergency Response Plan 2.2 Implementation 2.2.1 NG-IS-00004, Fitness for Duty Program 2.2.2 RA-EP-00600, Emergency Facility and Equipment Maintenance Program 2.2.3 RA-EP-01500, Emergency Classification 2.2.4 RA-EP-01600, Unusual Event 2.2.5 RA-EP-01700, Alert 2.2.6 RA-EP-0 1800, Site Area Emergency 2.2.7 RA-EP-01900, General Emergency 2.2.8 RA-EP-02000, Medical Emergencies 2.2.9 RA-EP-021 10, Emergency Notification 2.2.10 HS-EP-02230, Dose Assessment Center Activation and Response 2.2.11 RA-EP-02245, Protective Action Guidelines 2.2.12 RA-EP-02520, Assembly and Accountability 2.2.13 RA-EP-02530, Evacuation 2.2.14 RA-EP-02620, Emergency Exposure Controls and Potassium Iodide Distribution 2.2.15 RA-EP-027 10, Reentry 2.2.16 RA-EP-02720, Recovery Organization 2.2.17 RA-EP-02800, Preparation and Transport of Contaminated Injured Personnel 2.2.18 RA-EP-02950, JPIC Activation and Response 2.2.19 DB-OP-00002, Operations Section Event/Incident Notifications and Actions 2.2.20 Davis-Besse Emergency Plan Telephone Directory

5 RA-EP-02010 Revision 02 3.0 DEFINITIONS 3.1 ALTERNATE EMERGENCY OPERATIONS FACILITY (AEOF) - A conference area outside the 10-mile EPZ, which is available to hold meetings between Davis-Besse emergency management personnel and offsite agency management personnel.

3.2 ESSENTIAL PERSONNEL - Personnel assigned specific Emergency Response Duties as identified in the DBNPS Emergency Plan (i.e., operations, fire brigade (FB), first aid team (FAT), radiation monitoring team (RMT), Team Leaders and members, etc.)

3.3 NONESSENTIAL PERSONNEL - Personnel who are not preassigned specific Emergency Response duties.

3.4 PAR - Protective Action Recommendation.

4.0 RESPONSIBILITIES 4.1 Emergency Director (Outside of the Control Room), Attachment 1, Emergency Management Guidelines for Emergency Director.

4.2 Emergency Plant Manager, Attachment 2, Emergency Management Guidelines for Emergency Plant Manager.

4.3 Emergency Offsite Manager, Attachment 3, Emergency Management Guidelines for Emergency Offsite Manager.

4.4 Company Spokesperson, Attachment 4, Emergency Management Guidelines for Company Spokesperson.

4.5 Emergency Assistant Plant Manager, Attachment 5, Emergency Management Guidelines for Emergency Assistant Plant Manager.

5.0 INITIATING CONDITIONS This procedure is initiated upon notification of a classified emergency event at Davis-Besse Nuclear Power Station.


LLL-6 RA-EP-02010 Revision 02 6.0 PROCEDURE 6.1 Activation Upon notification of a classified event at Davis-Besse Nuclear Power Station, each member of the Emergency Response Organization identified below may refer to the appropriate attachment for their responsibilities.

6.1.1 Emergency Director (Outside of the Control Room), Attachment 1, Emergency Management Guidelines for Emergency Director.

6.1.2 Emergency Plant Manager, Attachment 2, Emergency Management Guidelines for Emergency Plant Manager.

6.1.3 Emergency Offsite Manager, Attachment 3, Emergency Management Guide lines for Emergency Offsite Manager.

6.1.4 Company Spokesperson, Attachment 4, Emergency Management Guidelines for Company Spokesperson.

6.1.5 Emergency Assistant Plant Manager, Attachment 5, Emergency Management Guidelines for Emergency Assistant Plant Manager.

7.0 FINAL CONDITIONS Use of this procedure by emergency management personnel is no longer required when the emergency has been terminated.

8.0 RECORDS 8.1 The following quality assurance records are completed by this procedure and shall be listed on the Nuclear Records List, captured, and submitted to Nuclear Records Management in accordance with NG-NA-00106:

8.1.1 Emergency Director Turnover Sheet, ED-8122 8.2 The following non-quality assurance records are completed by this procedure and may be captured and submitted to Nuclear Records Management, in accordance with NG-NA-00106:

8.2.1 None

7 RA-EP-02010 Revision 02 E-2 Emergency Management Guidelines For Emergency Director (Outside Of The Control Room)

ALTERNATES: Emergency Plant Manager until the designated Emergency Director arrives.

As listed in Emergency Plan Telephone Directory, Section 3 DUTY LOCATION: Technical Support Center, or Emergency Control Center/Emergency Operations Facility I PRIMARY DUTY: Overall coordination of Davis-Besse's response to any classifiable event.

NON-DELEGABLE RESPONSIBILITIES:

1. Emergency Classification.
2. Offsite Protective Action Recommendations.
3. Compliance with station procedures.
4. Safety and well being of station personnel.
5. Ordering a General Evacuation.

DELEGABLE RESPONSIBILITIES:

1. Emergency Dose Authorizations.*
2. Onsite use of Potassium Iodide by Company personnel.*
  • Delegable ONLY to Emergency Plant Manager DIRECT REPORTS:
1. Emergency Offsite Manager
2. Emergency Plant Manager
3. Company Spokesperson
4. Emergency Director Advisor Attachment 1 Page 1 of 5

8 RA-EP-0201 0 Revision 02 Resnonse To Classified Events This guideline is provided to assist in performing the various activities associated with an Emergency Response in the event of an incident at the Davis-Besse Nuclear Power Station. Refer to the appropriate emergency classification heading and carry out the actions identified under it.

Unusual Event RA-EP-01600 A. IF a meaningless "Group" pager display appears on your pager, THEN call the Computerized Automated Notification System to verify that an emergency does not exist at the station.

B. When notified of an Unusual Event (1111 on your pager), call the Computerized Automated Notification System to indicate you have been notified.

NOTE C.

The on-call Plant Manager will contact the Control Room, determine the status of the situation and will then contact you with the essential information.

C. When contacted by the Plant Manager, if practical, use the Emergency Director Turnover Data Sheet, ED 8122, to review each of the listed areas.

D. Review the actions being taken to resolve the situation and the projected course of the event.

NOTE E.

The Plant Manager's home, office and individual pager phone numbers are listed in the Emergency Plan Telephone Directory.

E. Exchange telephone numbers, pager numbers, and points of contact with the Plant Manager for further discussions as the situation develops. I F. No further action is required in response to an incident at this classification level.

Attachment I Page 2 of 5

9 RA-EP-02010 Revision 02 E-2 Alert RA-EP-01700. Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 A. Upon being notified by pager of an Alert (2222 on your pager), Site Area Emergency (3333 on your pager), General Emergency (4444 on your pager) call the Computerized Automated Notification System to indicate you have been notified and provide the system with your estimated travel time (in minutes) to the Emergency Control Center/Emergency Operations Facility.

B. Report to the Emergency Control Center/Emergency Operations Facility (ECC!EOF).

C. Upon arrival at the ECC/EOF contact the Emergency Director for a briefing on the nature of the incident.

D. Discuss the situation with the Emergency Plant Manager and the Emergency Offsite Manager; verify the appropriate classification was made. In the event an improper classification was made, properly classify the event and carry out the correct procedures.

E. When you have been sufficiently briefed and the Emergency Control Center/Emergency Operations Facility (ECC/EOF) and Technical Support Center (TSC) are activated, complete an Emergency Director Turnover Data Sheet, ED 8122, and inform the Emergency Director that you are assuming the position of Emergency Director. Announce to the following individuals that you have assumed the Emergency Director position (also direct a general announcement be made):

1. Emergency Plant Manager
2. Emergency Offsite Manager
3. Company Spokesperson F. Direct the Emergency Offsite Manager to activate the Corporate Support group at the Perry Plant.

G. Notify the President - First Energy Nuclear Operating Company (FENOC) of the incident and its potential at the earliest opportunity.

H. With the Emergency Offsite Manager, review the status of any Protective Action Recommendations made to offsite organizations. REFER TO RA-EP-02245, Protective Action Guidelines.

Consider delegating authority for emergency radiation dose and onsite use of Potassium Iodide to the Emergency Plant Manager. REFER TO RA-EP-02620, Emergency Exposure Controls and Potassium Iodide Distribution.

Attachment 1 Page 3 of 5

10 RA-EP-02010 Revision 02 E-2 Alert RA-EP-01700, Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 (CONT.)

S.............................................................................................

NOTE J.

Announcements that are intended for the emergency organization in the DBAB are to be made using the ERF Public Address system. Only the north end of the DBAB 1I"floor is covered by this system. No information can be sent to the station using this system.

J. Focus your attention to the area of major concern by seating yourself in the facility (TSC or ECC/EOF) which is playing the pivotal role in response to the situation.

Ensure that both the Emergency Plant Manager and Emergency Offsite Manager are aware of your location at all times.

K. Review the status of the Joint Public Information Center (JPIC) with the Company Spokesperson.

L. Review the status of assembly within the Protected Area with the Emergency Plant Manager. REFER TO RA-EP-02520, Assembly and Accountability. REFER TO Attachment 6, Overview of Assembly/Evacuation/Accountability, for overview.

M. Perform evacuation duties, as necessary, in accordance with RA-EP-02530, Evacuation.

N. IF it becomes desirable or necessary to meet with offsite agency officials at a location outside the Plume Exposure Emergency Planning Zone (10-mile EPZ),

THEN direct that the EOM activate the Alternate Emergency Operations Facility.

0 As the Emergency Classification requires upgrading or downgrading (as indicated to you by either the Emergency Plant Manager or Emergency Offsite Manager) conduct a meeting with both the Emergency Plant Manager and Emergency Offsite Manager to review the appropriate classification and its impact on onsite and offsite activities underway. Direct the Emergency Offsite Manager to initiate the completion of the Initial Notification Form for your signature.

REFER TO RA-EP-021 10, Emergency Notification.

P. Periodically meet with the Emergency Plant Manager and Emergency Offsite Manager to review the situation and prognosis for the event.

Q. Evaluate the duration of the event, and arrange for relief staff as deemed appropriate.

REFER TO Attachment 8, Guidelines for Shift Turnover. Assign an individual to coordinate this activity.

R. Periodically update the Senior Vice President - Nuclear.

S. IF evacuation of non-essential personnel was performed, THEN, inform the Corporate Emergency Response Organization (CERO) of the offsite location that was selected. Coordinate use of company facilities with the CERO. As support is required, obtain assistance from the Corporate Planning Center.

Attachment 1 Page 4 of 5

EMERGENCY MANAGEMENT 11 RA-EP-02010 Revision 02 Change E- 1 Alert RA-EP-01700, Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 (Cont.)

T. Confer with offsite agency liaisons during the emergency and prior to entering recovery.

U. When the Emergency Plant Manager determines that the plant has been stabilized, consider reentry and recovery requirements. REFER TO RA-EP-02710, Reentry and RA-EP-02720, Recovery Organization V. Direct that a Condition Report be generated.

I Attachment 1 Page 5 of 5

12 RA-EP-02010 EMERGENCY MANAGEMENT Revision 02 Change E-1 Emergency Management Guidelines For Emergency Plant Manager ALTERNATES: As listed in Emergency Plan Telephone Directory, Section 3 DUTY LOCATION: Technical Support Center PRIMARY DUTY: Coordination and conduct of:

1. Plant Operations
2. Plant Assessment
3. Emergency classification associated with plant parameters.
4. Onsite actions to mitigate and terminate the emergency event.
5. Provide input to protective action recommendations based upon plant parameters.

NON-DELEGABLE RESPONSIBILITIES:

1. IF delegated by the Emergency Director, Potassium Iodide THEN the responsibility of authorizing emergency dose and distribution of (KI) cannot be re-delegated.

Plant Manager.

2. Reentry operations into evacuated areas shall be approved by the Emergency DIRECT REPORTS:
1. Emergency Assistant Plant Manager
2. Emergency Radiation Protection Manager
3. TSC Engineering Manager
4. OSC Manager
5. Emergency Security Manager
6. Recovery Advisor.

Attachment 2 Page 1 of 5

13 RA-EP-02010 EMERGENCY MANAGEMENT Revision 02 Change E-1 RESPONSE TO CLASSIFIED EVENTS with an This procedure is provided as a guide to assist in performing the various activities associated the Davis-Besse Nuclear Power Station. Refer to Emergency Response in the event of an incident at and carry out the actions identified under it.

the appropriate emergency classification heading Unusual Event RA-EP-01600 A. IF a meaningless "Group" pager display appears on your pager, THEN call the Computerized Automated Notification System to verify that an emergency does not exist at the station.

B. Upon being notified of an Unusual Event (1111 on your pager), call the Computerized Automated Notification System to indicate you have been notified.

C. Contact the Control Room and discuss the nature of the incident with the Emergency Director (Shift Manager).

1. Review the existing plant conditions and verify that the appropriate Emergency Classification has been made.

aid the

2. Determine any need for additional manpower or logistical support that may Emergency Director (Shift Manager) in correcting the situation.
3. Through discussion attempt to determine the length of time anticipated until downgrading is possible.
4. Using the Emergency Director Turnover Data Sheet, ED 8122, review each of the areas listed on the sheet with the Emergency Director (Shift Manager) and complete I

the form.

NOTE D.

The Davis-Besse Public Affairs Duty Officer (PADO) telephone number is found on the ED/EPM/EOM pocket call card and in the Emergency Plan Telephone Directory.

I brief D. Call the Davis-Besse Public Affairs Duty Officer voice mail box and provide a summary of the event, and a point of contact for requesting additional information.

Attachment 2 Page 2 of 5

14 RA-EP-02010 EMERGENCY MANAGEMENT Revision 02 Change E-1 RESPONSE TO CLASSIFIED EVENTS Unusual Event RA-EP-01600 (Cont.)

outlined on E. Contact the on-call Emergency Director and review the information the Emergency Director Turnover Data Sheet, ED 8122.

an

1. Review the actions being taken to resolve the situation and provide estimate of how long the station will be in this emergency classification prior to downgrading.

discussions

2. Exchange telephone numbers and points of contact for future as the situation develops.

with the F. Continue to monitor the progress of the situation through follow-up discussions Emergency Director (Shift Manager).

level.

G. No further action is required in response to an incident at this classification Alert RA-EP-01700, Site Area Emer2encv RA-EP-01800 &

General Emergency RA-EP-01900 Emergency A. Upon being notified of an Alert (2222 on your pager), Site Area General Emergency (4444 on your pager), call the (3333 on your pager),

Notification System to indicate you have been notified Computerized Automated to the and provide the system with your estimated travel time (in minutes)

Technical Support Center.

NOTE B.

The Davis-Besse Public Affairs Duty Officer (PADO) telephone number is found on the ED/EPMIEOM pocket call card and in the Emergency Plan Telephone Directory.

box and provide a B. Call the Davis-Besse Public Affairs Duty Officer voice mail and a point of contact for requesting additional brief summary of the event, information.

C. Report to the Technical Support Center (TSC).

the nature of the D. Upon arrival at the TSC, contact the Control Room and discuss Director Turnover incident with the Emergency Director using the Emergency Data Sheet, ED 8122, as a guide.

of the

1. Determine the immediacy of the need to shift the responsibilities or the Emergency Assistant Plant Emergency Director to either yourself the on-call Emergency Director or one of his Manager in the absence of alternates.
a. IF it is necessary to relieve the Shift Manager of the Emergency Director responsibilities and the Emergency Assistant Plant Manager has not arrived, as THEN proceed to the Control Room and relieve the Shift Manager Emergency Director.

Attachment 2 Page 3 of 5

15 RA-EP-02010 Revision 02 E-2 RESPONSE TO CLASSIFIED EVENTS Alert RA-EP-01700, Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 (Cont.)

b. IF the Emergency Assistant Plant Manager (EAPM) has arrived, THEN you may remain in the TSC, and the EAPM may relieve the Shift Manager as Emergency Director as needed.
c. IF the on-call Emergency Director has been delayed, but adequate staffing has arrived to activate the TSC and ECC/EOF, THEN activate the TSC and ECC/EOF and relieve the Control Room of Emergency Director responsibilities.
d. The Emergency Director shall remain in the Control Room until the TSC and ECC/EOF have been activated.
2. IF you are not required to proceed to the Control Room, THEN review the existing plant conditions and verify that the appropriate Emergency Classification has been made.

E. Upon the arrival of the Emergency Director and Emergency Offsite Manager, review the current status of the situation. Assist the Emergency Director in preparation for shifting the responsibilities from the Control Room.

F. Activation and management of the TSC is the responsibility of the TSC Engi neering Manager. Upon being notified of the activation of the TSC by the TSC Engineering Manager, ensure that the following individuals are informed:

1. Emergency Director
2. Emergency Offsite Manager
3. Emergency Assistant Plant Manager
4. Emergency RP Manager
5. OSC Manager NOTE F.6 Announcements that are intended for the emergency organization in the DBAB are to be made using the ERF Public Address system. Only the north end of the DBAB 1 St floor is covered by this system. The Protected Area cannot be contacted using this system.
6. Make a general plant announcement.

Attachment 2 Page 4 of 5

16 RA-EP-02010 EMERGENCY MANAGEMENT Revision 02 Change E-1 RESPONSE TO CLASSIFIED EVENTS Alert RA-EP-01700. Site Area Emergency RA.EP-01800 &

General Emergency RA-EP-01900 (Cont.)

and G. With the activation of the TSC you are responsible for the coordination These responsibilities conduct of all activities associated with plant operations.

include:

and

1. Continuously monitoring plant conditions/radiological conditions Director remains apprised of specific plant ensuring that the Emergency the Emergency Classification and Protective conditions which impact Measures (onsite and offsite).

Director, for

2. Assuming the responsibility, if delegated by the Emergency in excess of 10 CFR 20 limits and authorizing emergency radiological dose to onsite personnel. These also the distribution of Potassium Iodide responsibilities may not be delegated to any other individual.

Emergency H. When directed by the Emergency Director, coordinate with the accomplish assembly and accountability of all personnel Security Manager to of within the protected area. REFER TO Attachment 6, Overview for overview of these activities.

Assembly/Evacuation/Accountability an Alert, Site

1. Notification of American Nuclear Insurers (ANI) is required at Area Emergency and General Emergency classification.

for contact REFER TO Section 2 of the Emergency Plan Telephone Directory ANI, contact the Corporate Risk names and telephone numbers. After notifying Department.

advise Nuclear J. For events which involve damage to Davis-Besse property, Plan Telephone Electric Insurance. Refer to Section 2 of the Emergency Directory for telephone numbers.

Offsite Manager K. Periodically meet with the Emergency Director and Emergency to review the status of the situation and progress toward resolution.

actions being L. Periodically conference with the following individuals to review response by each group:

implemented and to ensure a coordinated

1. Emergency Assistant Plant Manager
2. Emergency RP Manager
3. TSC Engineering Manager
4. OSC Manager
5. Emergency Security Manager M. Ensure that periodic updates are given to the onsite organization as appropriate, using the ERF PA system.

of all actions and N. Ensure that the TSC Administrative Assistant maintains a log decisions made during the course of the response.

conditions has

0. You are responsible for determining when stabilization of plant guidance in this area. You occurred. REFER TO RA-EP-027 10, Reentry, for Director of conditions that are also responsible for informing the Emergency support recovery.

Attachment 2 Page 5 of 5

17 RA-EP-02010 Revision 02 E-2 Emergency Management Guidelines For Emergency Offsite Manager ALTERNATES: As listed in Emergency Plan Telephone Directory, Section 3 DUTY LOCATION: Emergency Control Center/Emergency Operations Facility PRIMARY DUTIES:

1. Communications and information flow with corporate, offsite and regulatory agencies.
2. Overview of EALs associated with radiological releases.
3. Making recommendations to the Emergency Director concerning PARs.
4. Inputs to the Emergency Director concerning EALs and classification of the event.

DIRECT REPORTS:

1. NRC Liaison
2. ECC Operations Advisor
3. Dose Assessment Coordinator
4. Emergency Planning Advisor
5. Emergency Facilities Services Manager Attachment 3 Page 1 of 6

18 RA-EP-02010 Revision 02 E-2 Response To Classified Events This guideline is provided to assist in performing the various activities associated with an emergency response in the event of an incident at the Davis-Besse Nuclear Power Station. Refer to the appropriate emergency classification heading and carry out the actions identified under it.

Unusual Event RA-EP-01600 A. IF a meaningless "Group" pager display appears on your pager, THEN call the Computerized Automated Notification System to verify that an emergency does not exist at the station.

B. Upon begin notified of an Unusual Event (1111 on your pager), call the Computerized Automated Notification System (CANS) to indicate you have been notified.

C. If you suspect that CANS is not functioning properly, direct an individual to go to the TSC Library and check CANS.

D. Contact the Emergency Plant Manager, review the items listed on the Emergency Director Turnover Data Sheet, ED 8122. If the Emergency Plant Manager cannot be contacted, then contact the Emergency Director in the Control Room.

E. Contact the on-call Emergency Planning Advisor:

1. Provide an update on the cause and status of the Unusual Event.
2. Request the on-call Emergency Planning Advisor contact Ottawa and Lucas County EMA officials and verify that initial notifications were received and any questions were answered.

F. Contact the Ohio Emergency Management Agency Duty Officer listed in Section 2 of the Davis-Besse Emergency Plan Telephone Directory and verify that the initial notifications were received and any questions answered.

G. Verify that the President - FENOC has received follow-up information on the Unusual Event.

H. Continue to monitor the progress of the situation through follow-up discussions with the Emergency Director as the situation warrants.

I. Upon downgrading, contact the personnel that were called in Steps F and G and ensure any questions are answered and the situation is understood.

J. Send personnel to the station, as appropriate, to collect the various logs, records, reports, etc., for review.

Attachment 3 Page 2 of 6

19 RA-EP-02010 Revision 02 E-2 Alert RA-EP-01700. Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 A. Upon being notified of an Alert (2222 on your pager), Site Area Emergency (3333 on your pager), General Emergency (4444 on your pager), call the Computerized Automated Notification System to indicate you have been notified and provide the system with your estimated travel time (in minutes) to the Emergency Control Center/Emergency Operations Facility.

B. Report to the Emergency Control Center/Emergency Operations Facility (ECC/EOF).

C. Contact the Emergency Plant Manager, review the items listed on the Emergency Director Turnover Data Sheet, ED 8122. If the Emergency Plant Manager cannot be contacted, contact the Emergency Director in the Control Room.

D. Verify the minimum required ECC/EOF staffing in the following functional areas:

1. Emergency Offsite Manager
2. Emergency Planning Advisor
3. Dose Assessment Coordinator and Dose Assessment Staff
4. NRC Liaison
5. State and County Communicator E. Declare the ECC/EOF activated when minimum staffing has arrived, the offsite communication links are functioning, and the current plant situation is understood.

F. Make the following or similar announcement on the Emergency Response Facility Public Address (ERF PA) System:

"THE EMERGENCY CONTROL CENTER IS ACTIVATED AT (TIME).

(NAME) IS THE EMERGENCY OFFSITE MANAGER."

G. Notify the Emergency Assistant Plant Manager of ECC/EOF activation.

H. Monitor the status of key ECC/EOF tasks by using the Problem Analysis Board, as needed.

I. As appropriate, direct the Emergency Facility Services Manager or assigned individual to communicate with the supplementary JPIC personnel which assemble in the Energy Education Center (EEC) during normal working hours. Consider having the EEC/EOF establish a communicator on the Public Information Loop Telephone System.

J. Periodically conduct briefings with personnel in the ECC/EOF and Dose Assessment Center on emergency status. Use the Emergency Director Turnover Data Sheet, ED 8122, for information, as applicable.

Attachment 3 Page 3 of 6

- LLI EMERGENCY MANAGEMENT 20 RA-EP-02010 Revision 02 Change E-1 Alert RA-EP-01700, Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 (Cont.)

K. Contact the Perry Plant Control Room and advise them that Davis-Besse is in a classifiable emergency and request that they activate their corporate support group.

Provide them an ECC phone number to be used as a contact phone number when they have established their organization. Typically, this will be the Policy Loop Communicator's phone number.

L. When advised by the Dose Assessment Coordinator that a release is in progress or imminent, coordinate isolation of the DBAB ventilation and water supply with the Emergency Facility Services Manager.

1. Announce "THERE WILL BE NO EATING, DRINKING, SMOKING OR CHEWING UNTIL FURTHER NOTICE" over the ERF PA system, and ensure the JPIC is notified.
2. Make an ERF PA announcement to use water sparingly while the potable water is isolated.
3. Advise the Emergency Director to relocate the JPIC, if it is onsite.

M. Assist in determining an evacuation route to the offsite assembly area in accordance with RA-EP-02520, Assembly and Accountability.

N. Ensure a Davis-Besse Technical Liaison arrives at the state and both county EOCs.

0. Review protective actions with the Dose Assessment Coordinator and make recommendations to the Emergency Director, as necessary, in accordance with RA-EP-02245, Protective Action Guidelines.

P. Ensure the NRC Liaison uses the NRC Event Notification Worksheet, ED 7843, to inform the NRC of any change in emergency classification in accordance with DB-OP-00002, Operations Section Event/Incident Notifications and Actions.

Q. When directed by the Emergency Director to establish the Alternate Emergency Operations Facility (AEOF), perform the following:

1. Notify the Bay Shore management that the Alternate Emergency Operations Facility (AEOF) is being activated by contacting Bay Shore Security. Notify the Emergency Security Manager in the TSC that the AEOF is being activated and direct him/her to make appropriate arrangements to address AEOF security needs.
2. Inform the offsite authorities that the AEOF is being established at the Bay Shore Power Station Training Center.

Attachment 3 Page 4 of 6

EMERGENCY MANAGEMENT 21 RA-EP-02010 Revision 02 Change E-1 Alert RA-EP-01700, Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 (Cont.)

3. Determine which functional areas from the ERO should attend this conference. As a minimum, it is suggested that the following functional areas be included:

"* Emergency Director

"* Emergency Offsite Manager

"* Radiation Protection Management

"* Operations Management

  • Technical Communicator
4. Use the Emergency Plan Telephone Directory to call out the desired additional personnel and direct them to report to the Alternate EOF to consult with offsite officials. REFER TO Attachment 7, AEOF Activation and Operation to set up the facility.
5. Notify the Company Spokesperson and the JPIC Manager that the Alternate EOF is being established.
6. Begin collecting information and data to fax to the AEOF once it is activated.

R. When notified that an NRC Incident Response Team (IRT) will be dispatched.

1. Advise the following individuals:

"* Emergency Director

"* Emergency Plant Manager

"* Company Spokesperson

"* Emergency Security Manager

2. Direct the Emergency Facilities Services Manager to set up NRC work areas.

NOTE R 3.

Personnel who are being called-in shall comply with NG-IS-00004, Fitness for Duty Program guidelines.

L -- - -- - -- -- -- - -- - -- -- - -- -- - -- -- -- - -- -- -- -- - -- - -- -- -- - -- -- - -- - -- - -- -- - -- -- - -- -- - --- - -- - -.

3. Call-in additional personnel as needed to prepare a technical briefing for the NRC and to perform support and liaison activities for the IRT.

S. Ensure a release pathway diagram and plume exposure footprint are faxed to the State and both county EOCs, as appropriate.

T. Assist the Emergency Director in assessing the need for and implementing a shift turnover, if needed.

Attachment 3 Page 5 of 6

22 RA-EP-02010 Revision 02 E-2 Alert RA-EP-01700. Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 (Cont.)

U. If radiation monitoring assistance is needed, then request the corporate support group:

1. Contact appropriate utilities.

REFER TO the Emergency Plan Telephone Directory, Section 2.

2. Contact the Department of Energy Radiological Assistance Program.

REFER TO the Emergency Plan Telephone Directory, Section 2.

V. If assistance is requested for bringing personnel or vehicles to the site:

1. Plan an entry route considering wind direction, release condition, and road blocks.
2. Arrange for vehicles, if needed, through the corporate support group.

W. Request that the Dose Assessment Coordinator assess radiological conditions in preparation for Recovery activities.

X. Direct deactivation of the ECC/EOF when conditions warrant, including:

1. The Emergency Director and Emergency Plant Manager agree that continued offsite dose assessment and Protective Action functions are no longer necessary for responding to the existing plant conditions.
2. Prior to announcing the deactivation, the Company Spokesperson shall be fully briefed on plant status and planned recovery actions.

Y. Instruct ECC/EOF staff to collect all pertinent material for documentation, and return their areas to pre-emergency status.

1. All equipment and supplies have been replaced in accordance with RA-EP-00600, Emergency Facility and Equipment Maintenance Program.
2. Electrical equipment has been de-energized, as appropriate.

Z. Review ECC/EOF records for completeness.

AA. Perform assigned recovery duties in accordance with RA-EP-02720, Recovery.

Attachment 3 Page 6 of 6

23 RA-EP-020 10 Revision 02 Emergency Management Guidelines For Company Spokesperson ALTERNATES: As listed in Emergency Plan Telephone Directory, Section 3 DUTY LOCATION: Joint Public Information Center (JPIC)

PRIMARY DUTIES:

1. Senior management of Emergency Public Information.
2. Coordinate company-related news information with official offsite agencies.
3. Confer with Emergency Director - plant status.
4. Confer with JPIC Manager - media interests.
5. Review DBNPS information gathered by the JPIC Manager and the JPIC Communicator
6. Provide information concerning Davis-Besse status to the public and media representatives.
7. Approve company-related news release information.

DIRECT REPORT: JPIC Manager Attachment 4 Page 1 of 4

EMERGENCY MANAGEMENT 24 RA-EP-02010 Revision 02 Change E-1 Response To Classified Events This guideline is provided to assist in performing the various activities associated with an Emergency Response in the event of an incident at the Davis-Besse Nuclear Power Station. Refer to the appropriate emergency classification heading and carry out the actions identified under it.

Unusual Event RA-EP-01600 A. IF a meaningless "Group" pager display appears on your pager, THEN call the Computerized Automated Notification System to verify that an emergency does not exist at the station.

B. Upon being notified of an Unusual Event (1111 on your pager), call the Computerized Automated Notification System to indicate you have been notified.

NOTE C.

The Davis-Besse Public Affairs Duty Officer (PADO) voice mail box telephone number is found on the Company Spokesperson pocket call card and in the Emergency Plan Telephone Directory.

C. Call the Davis-Besse Public Affairs Duty Officer voice mail box and provide a brief summary of the event, and a point of contact for requesting additional information.

Alert RA-EP-01700, Site Area Emergency RA-EP-01800, &

General Emergency RA-EP-01900 A. IF a meaningless "Group" pager display appears on your pager, THEN call the Computerized Automated Notification System to verify that an emergency does not exist at the station.

B. Upon notification of an Alert (2222 on your pager), Site Area Emergency (3333 on your pager), or General Emergency (4444 on your pager), call the Computerized Automated Notification System to indicate you have been notified and provide the system with your estimated travel time (in minutes).

C. Proceed to the offsite Joint Public Information Center and upon arrival:

1. Sign in on staffing board.
2. Initiate a personal log beginning with arrival time.

D. Activation:

1. Discuss the current emergency classification and overall plant status with the Emergency Director.
2. Discuss with the JPIC Manager the emergency status based on information from the Emergency Director Turnover Data Sheet, ED 8122 Attachment 4 Page 2 of 4

25 RA-EP-0201 0 Revision 02

3. Review with the JPIC Manager and/or Public Affairs Duty Officer news releases and media notifications made thus far.

NOTE D.4 Prior to the arrival of governmental Public Information Officers (PIOs), the JPIC may serve as a company news center.

4. Ensure that information (e.g. News Releases, notification logs) regarding Emergency Public Information activities prior to JPIC activation have been transmitted to the appropriate facilities. Responding news agencies should be notified that the JPIC is being activated.
5. Receive notification from the JPIC Manager that the facility is ready to activate. Verify that governmental PIOs are aware that the JPIC is ready to activate.
6. Declare the JPIC activated.
7. Notify the Emergency Director of the time the JPIC was declared activated.
8. Announce that the JPIC is activated. This means the JPIC has assumed primary responsibility for emergency public information activities.

E. Emergency Actions I. Coordinate with other PIOs and the JPIC Manager to establish a schedule for news briefings. Ensure changes to the schedule are announced whenever the pace of emer gency developments changes significantly.

2. Review each news release prepared by the JPIC Writer for overall accuracy, clarity and style, and approve releases prior to distribution to the media.
3. Confer with the PlOs prior to each news briefing to exchange and compare information and to determine the most appropriate sequence of presentation.
4. Provide public information on behalf of the Company to the news media at the JPIC.
a. Public statements may be based on news release content.
b. Respond to inquiries on facts, events, and actions involving the Company, its personnel, and its property.
c. DO NOT speculate on the causes or possible consequences of the emergency; focus on the presentation of current, factual information.
d. DO NOT discuss public protective actions or activities of responding governmental agencies; refer inquiries on these subjects to the appropriate governmental PIOs.

Attachment 4 Page 3 of 4

26 RA-EP-02010 Revision 02

5. Provide interviews, as arranged by the JPIC Manager. The Audio/Visual Coordinator should video tape one-on-one interviews.
6. Respond to inquiries from Nuclear Energy Institute.
7. Provide information copies of news releases to the Emergency Director after approval.

F. Termination of Emergency Conditions I. IF the Company Spokesperson is considering deactivation of the JPIC, THEN, confer with the JPIC Manager to determine whether news media interest is within normal public relations capabilities.

a. The JPIC shall NOT be deactivated unless all PIOs agree that they NO longer need the JPIC to carry out emergency public information activities.
b. Inform the Emergency Director of the deactivation discussion with the PIOs.
c. When the Emergency Director approves deactivation of the JPIC, commence deactivation.
2. During recovery activities, the JPIC may be designated to support media center activities.

G. Perform recovery duties in accordance with RA-EP-02720, Recovery.

Attachment 4 Page 4 of 4

EMERGENCY MANAGEMENT 27 RA-EP-02010 Revision 02 Change E- I Emergency Management Guidelines For Emergency Assistant Plant Manager ALTERNATES: As listed in Emergency Plan Telephone Directory, Section 3 DUTY LOCATION: Control Room Shift Manager's Office PRIMARY DUTIES:

1. Coordination of Control Room response to the emergency situation.
2. Liaison between Control Room and TSC personnel.
3. Advisor to the Emergency Plant Manager on plant status and trends.
4. Provide input for protective action recommendations and emergency classification changes DIRECT REPORTS:
1. Shift Manager
2. Shift Engineer (Shift Technical Advisor)
3. Control Room Communicator Attachment 5 Page 1 of 4

EMERGENCY MANAGEMENT 28 RA-EP-02010 Revision 02 Change E-1 Response To Classified Events This procedure is provided as a guide to assist in performing the various activities associated with an Emergency Response in the event of an incident at the Davis-Besse Nuclear Power Station. Refer to the appropriate emergency classification heading and carry out the actions identified under it.

Unusual Event RA-EP-01600 A. IF a meaningless "Group" pager display appears on your pager, THEN call the Computerized Automated Notification System to verify that an emergency does not exist at the station.

B. Upon being notified of an Unusual Event (1111 on your pager), call the Computerized Automated Notification System to indicate you have been notified.

C. Contact the Control Room and discuss the nature of the incident with the Emergency Director (Shift Manager).

1. Review the existing plant conditions and verify that the appropriate Emergency Classification has been made.
2. Determine any need for additional manpower or logistical support that may aid the Emergency Director (Shift Manager) in correcting the situation.
3. Through discussion attempt to determine the length of time anticipated until downgrading is possible.
4. Using the Emergency Director Turnover Data Sheet, ED 8122, review each of the areas listed on the sheet with the Emergency Director (Shift Manager) and complete the form.

Alert RA-EP-01700, Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 A. Upon being notified of an Alert (2222 on your pager), Site Area Emergency (3333 on your pager), General Emergency (4444 on your pager), call the Computerized Automated Notification System to indicate you have been notified and provide the system with your estimated travel time (in minutes) to the Shift Supervisor's Office.

B. Report to the Control Room (CTRM) and obtain a briefing from the onshift staff.

Attachment 5 Page 2 of 4

29 RA-EP-02010 EMERGENCY MANAGEMENT Revision 02 Change E- I Response To Classified Events Alert RA-EP-01700, Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 (Cont.)

NOTE C.

The NRC telephone, CTRM Communicator telephone, headsets, and emergency forms are stored in sealed boxes underneath the Shift Manager's Desk. I S-----------------------------------------------------------------------------

C. Upon arrival at the CTRM, establish communications with the Technical Support Center (TSC) and discuss the nature of the incident with the Emergency Plant Manager.

1. Determine the immediacy of the need to shift the responsibilities of the Emergency Director to either yourself or the Emergency Plant Manager in the absence of the on-call Emergency Director or one of his alternates.
a. When you arrive in the Control Room area, offer to assume the responsibilities of Emergency Director from the Shift Manager. I
b. When the TSC and ECC have been activated, shift the Emergency Directory responsibilities to the Emergency Director or in his absence the Emergency Plant Manager.
c. The Emergency Director shall remain in the Control Room until TSC and ECC have been activated.
2. Review the existing plant conditions and verify that the appropriate Emergency Classification has been made. REFER TO RA-EP-01500, Emergency Classification.

NOTE C.3 Personnel who are being called in shall comply with NG-IS-00004, Fitness for Duty Program guidelines.

3. Call in an additional shift of operators to assume the fire brigade and first aid team duties, and to perform other duties as directed by the OSC Manager. Extra operators do not have to be present to consider the OSC activated.
4. Keep the Emergency Plant Manager advised of plant operations, actions performed by Operations personnel, changes in plant parameters, and potential changes in classification and problems.
5. Ensure that the members of the normal plant organization assume duties in the onsite Emergency Organization.

Attachment 5 Page 3 of 4

EMERGENCY MANAGEMENT 30 RA-EP-02010 Revision 02 Change E-1 Response To Classified Events Alert RA-EP-01700, Site Area Emergency RA-EP-01800 &

General Emergency RA-EP-01900 (Cont.)

6. Review staffing levels with the Emergency Plant Manager and, if necessary, call in additional individuals.
7. Ensure that first aid and medical treatment is given to injured personnel:
a. Station personnel, trained in first aid, shall assist in accordance with RA-EP-02000, Medical Emergencies.
b. RA-EP-02800, Transport of Contaminated Injured Personnel, shall govern the handling of contaminated injured personnel needing offsite medical care.

D. Periodically conduct tele-conferencing with the Emergency Plant Manager and the OSC Manager to review actions being implemented and to ensure a coordinated response.

E. Ensure that periodic updates are given as appropriate, using the GaiTronics system.

F. Ensure that the Shift Manager or his designee maintains a log of all actions and I decisions made during the course of the response.

G. Once the emergency classification has been reclassified to an Unusual Event or terminated, the presence of the Emergency Assistant Plant Manager in the Control Room is no longer required.

H. Participate in recovery activities in accordance with RA-EP-02720, Recovery Organization, as necessary.

Attachment 5 Page 4 of 4

Required Actions 4 Non-Essential Personnel within the:

Y 4 1 Owner Controlled Event Essential Personnel Protected Area Optional Actions Area Unusual Event Na:1 .....

..... ~n.to

. tkn ........... 1 tafn

........... ... ............. f h S

3. Assembly of the Protected Area Alert Respond to assigned Assembly N*tifii t iO i 1 Assembled personnel options:

emergency response a. Keep personnel assembled facility b Evacuate the Protected Area c.Return personnel to work Site Area Respond to assigned Evacuate and perform Assembly 1. Assembled personnel options:

Emergency ehiergency response accountability of the a. Keep personnel assembled facility Protected Area b. Site evacuate General Respond to assigned Site Evacuation, Site Evacuation to 1. Assembled personnel options:

Emergency emergency response perform Protected offsite assembly area a. Keep personnel assembled facility Area Accountability if b. Send personnel home not performed earlier CD n

32 RA-EP-02010 Revision 02 E-2 AEOF ACTIVATION AND OPERATION Alternate Emergency Operations Facility (AEOF) Setup and Activation A. Locate 5 company telephone lines, record their individual telephone numbers and designate them as follows:

  • 1 - Technical Loop Communicator
  • 1 - Senior Management Phone
  • 3 - General usage telephone B. Locate the Fax machine and record the telephone number.

C. Refer to the Emergency Plan Telephone Directory, Emergency Facility Tab, and fax the AEOF telephone numbers to the Emergency Control Center/Emergency Operations Facility, Public Relations fax machine.

D. AEOF Technical Loop Communicator shall:

  • Utilize the Emergency Plan Telephone Directory to access the Technical Data Loop and establish communications with the Davis-Besse Emergency Response Facilities.
  • Once the Technical Data Loop Telephone is established maintain the circuit open.
  • Request that the Emergency Control Center/Emergency Operations Facility fax current data on the following issues:

o Offsite release values, effected sub-areas and projected duration o Plant status ol Plant safety system status Q Recent Joint Public Information Center (JPIC) news releases.

E. Establish a parking area for arriving agencies.

F. Setup the senior manager's speaker phone and obtain a briefing from the Emergency Director (ED) or his/her representative.

G. Setup the large classroom in a "roundtable" arrangement H. Setup the overhead projector and verify operations I. Setup signs to direct individuals to Alternate EOF J. Advise Emergency Director (ED) that the AEOF is activated Attachment 7 Page 1 of 2

33 RA-EP-02010 Revision 02 AEOF ACTIVATION AND OPERATION (Cont.)

Briefing Guidelines A. Use tent cards to identify each individual by name and organization.

B. Respond only to utility actions and responses to the event. Direct non-utility questions to the appropriate individual/organization C. Designate an individual to serve as a scribe.

"* Record key issues, questions and request for additional information.

"* Maintain a log of attendees.

D. Periodically brief the Emergency Director of AEOF activities.

E. Call in additional personnel as required to maintain facility operations.

Deactivation A. Review all AEOF records for completeness and accuracy.

B. Remove all AEOF signs and return equipment to the AEOF storage locker. REFER TO RA-EP 00600, Emergency Facilities and Equipment Maintenance Program, for AEOF cabinet inventory.

C. Complete the RA-EP-02720, Recovery, Attachment 1, Deactivation Report.

D. Collect and forward all AEOF records to the Emergency Preparedness Unit.

Attachment 7 Page 2 of 2

34 RA-EP-02010 Revision 02 E-2 GUIDELINES FOR SHIFT TURNOVER The activities of this checklist are to be coordinated by an individual assigned by the Emergency Director. Evaluate the event duration. For events that have an expected duration of greater than four hours a relief shift of ERO staff should be assembled.

A. Considerations for the following issues should be made:

1. Establishment of an ERO shift rotation schedule.
2. Selection of a shift turnover time.
3. Determine if special instructions are required to be communicated to the personnel being called out, e.g. duration of shift and if they are going to be required to stay at their assigned facility, access route/requirements, radiological controls, assembly points, etc.
4. As appropriate, establish an offsite assembly point for relief personnel and make provisions for a caravan or a bus to bring personnel to the station. If an offsite assembly point is selected, ensure the ECC/EOF has made offsite agencies aware of the assembly point location and the access route to the station.
5. Determine how or if individual dosimeter will be retrieved from off going personnel and make provisions for issuing dosimeters to relieving personnel.

NOTE A.6 Personnel who are being called in shall comply with NG-IS-00004, Fitness for Duty Program guidelines.

6. Assign an individual to coordinate the call-out. Normally, this is assigned to the Emergency Facility Services Manager.
7. Establish a phone number(s) that ERO personnel can call for offsite information.

B. The facility should prepare for shift turnover by:

1. Directing each member of your staff to review their records/logs and ensure completeness.
2. Review facility status boards for accuracy and update as appropriate.
3. Assemble a list of agencies which you are in communications with, and identify any outstanding or follow-up issues.

Attachment 8 Page 1 of 2

EMERGENCY MANAGEMENT 35 RA-EP-02010 Revision 02 Change E- I GUIDELINES FOR SHIFT TURNOVER (Cont.)

4. Evaluate the need to assemble your staff following turnover to debrief or discuss special instructions.
5. Brief staff as to turnover expectations. Ensure that they understand which route to take when leaving the station, and when they are expected to return.

Provide personnel with a Company telephone number to obtain information or to contact the ERO.

C. Coordinate turnover such that key facility activities are not disrupted, and important evolutions such as emergency classification or protective action changes are completed prior to beginning turnover. Each member of your staff should turnover their responsibilities to the oncoming individual by:

1. As applicable, reviewing any logs or records maintained by their position.
2. Review the information on the status boards.
3. Discuss evolutions that have occurred during the past shift.
4. Discuss classification level, special evolutions, and any onsite protective actions.
5. As appropriate, discuss pending evolutions.
6. Ask if there are questions.
7. Advise ERO supervisor that they have been relieved.

D. Personnel who have completed turnover should ensure that they have:

1. Signed into the facility organization status board.
2. Been issued a TLD and appropriate dosimeter, if necessary. I
3. As appropriate, make an entry into the logbook indicating that they are now responsible for the position. The entry should include name, ERO title, time and date that the turnover took place, and any other pertinent details regarding the turnover.

Attachment 8 Page 2 of 2

36 RA-EP-02010 Revision 02 COMMITMENTS Section Reference Comments TERMS 0 05685 Station management presence in the Control Room during TSC activation.

TERMS 0 13454 Who, by title, has authority ,

to authorize emergency exposures in excess of regulatory limits.

TERMS 0 13612 List of delegable and non delegable responsibilities of the Emergency Director.

TERMS Q 02855, Orderly transfer of authority , , TERMS Q 02856 Attachment 5 TERMS Q 02857 Relieving the Emergency Attachment 2, TERMS Q 02858 Director in the Control Room Section C, and Attachment 5, Section C TERMS Q 03111 Emergency Organization and Entire Procedure individual authority TERMS 0 18661 Alternate EOF Attachment 7 END

SHEET PROCEDURE ACTIVITY TRACKING PROCEDURE DEVELOPMENT FORM ED 7635-17 1 OF I 672? -- 7q SECTION 1 - IDENTITY PROCEDURE NO. / CURRENT REVISION PROPOSED PROPOSED El NEW (N) El CANCELLATION (CX)

REVISION NO. C or E NO. El REVISION (R) Dl INACTIVATION (IN) RESTRICTEDcR RA-EP-02864 46 SUPERSEDES 0l CHANGE (C) [E REACTIVATION (RA) ESTIMATED EXPIRATION N/A E-1 El TEMPORARY APPROVAL (TA) 0 EDITORIAL CORRECTION (E) (DATE / EVENT)

PROCEDURE TITLE Containment Evacuation PROCEDURE CLASSIFICATION HAS PROCEDURE BEEN EXEMPTED PAT / PCR NOS. CLOSED OUT ED SR El OR El N-OR FROM REGULATORY APPLICABILITY?

CHANGE TO? R YES [ NO El YES Z NO None El CONTINUED ACTIVITY

SUMMARY

/ PURPOSE

1. Change 'Shift Supervisor' to 'Shift Manager'
2. Change 'Radiological Control' to 'Radiation Protection'
3. Change 'MG' to 'dosimetry' in step 6.4.9 and 6.5.1.c
4. Make reference title complete 'Personnel Contamination Evaluation and Decontamination' J
5. Correct 'MPR I' to 'MPR 2' on Attachment I.
6. Add "Refer to Attachment I for egress locations." to step 4.4 1%"

SECTION 2 - CONCURRENT EFFECTIVE DOCUMENTS ElCONTINUED DOCUMENT NO. I REVISION DOCUMENT TITLE PAT NO. I CHANGE REQUEST None None SECTION 3 - REVIEW ORGANIZATIONS REQUIRED REQUESTED None None

[E CONTINUED El CONTINUED PROCEDURE PREPARER ) 7 S"A/C1 DATE QUALIFIED REVIEWER DATE Paul F. Timmerma 1,,

1/14/01 N/A N/A SECTION 4 - ATTACHMENTS COMPLETED AND ATTACHED YES N/A YES N/A YES N/A 0 Z VALIDATION CHECKLIST El [ 10CFR50.59 SCREEN NO - C REVISED CROSS REFERENCES LIST o C9 COMMITMENT VERIFICATION

SUMMARY

C [ 10CFR50.59 EVALUATION NO. - [ PCRs o [ REGULATORY APPLICABILITY DETERMINATION El [ DOCUMENT REVIEW SHEETS [] Z OTHER NO.

FINAL QUALIFIED REVIEWER CONCURRENCE DATE N/A SECTION 5 - TEMPORARY APPROVAL MANAGEMENT SRO DATE APPROVAL AUTHORITY DATE N/A N/A SECTION 6 - CONCURRENCE / FINAL APPROVAL PROCEDURE SPONSOR DATE T SRB DATE N/A N/A El MANAGER - NUCLEAR QUALITY ASSESSMENT (QA) DATE [I PLANT MANAGER DATE N/A N/A APPROVAL AUTHORITY DATE IN/A SECTION 7 - TRAINING / PROCEDURE EFFECTIVITY TRAINING COMPLETE ALTER6TION EfFECTIVE DATE PiOCEM SPONS*)F fl!, DATE ElYES 0N/A z w 2. 14.

Page 1 of 14 Davis-Besse Nuclear Power Station EMERGENCY PLAN OFF NORMAL OCCURRENCE PROCEDURE RA-EP-02864 (Supersedes HS-EP-02864 RO Cl)

CONTAINMENT EVACUATION REVISION 0 Prepared by:-

Date Sponsor: * , D. 7Regulatory

'C *-

Affairs Date Manager -

Approved by: A Director - Nuclear Services Approved by:

Plant Manager Dat Effective Date: JAN 10 1995 Procedure Classification:

LEVEL OF USE:

X Safety Related Quality Related IN-FIELD REFERENCE

.R' Non-Quality Related

CONTAINMENT EVACUATION 2 RA-EP-02864 Revision 00 E-1 LIST OF EFFECTIVE PAGES Page Change No. Page Change No. Page Change No.

1 -

2 E-1 3 E-1 4 E-1 5

6 7

E-I E-1 B-i

_ I___

i 8 -

9 E-1 10 E-1 i

11 E-1

-4 12 -

13 i

14 --

i i

i

+

CONTAINMENT EVACUATION 3 RA-EP-02864 Revision 00 E-1 TABLE OF CONTENTS Section Page 1.0 PURPO SE ...................................................................................................................... 4

2.0 REFERENCES

......................................................................................................... 4 3.0 DEFINITIONS ......................................................................................................... 4 4.0 RESPONSIBILITIES .................................................................................................... 4 5.0 INITIATIN G CONDITIONS ....................................................................................... 5 6.0 PROCEDURE ................................................................................................................ 6 6.1 Shift M anager Actions ..................................................................................... 6 6.2 Fuel Handling D irector Actions ..................................................................... 6 6.3 Control Room Operator Actions ...................................................................... 6 6.4 Radiation Protection Personnel Actions ........................................................... 8 6.5 Station Personnel Actions ................................................................................. 9 7.0 FINAL CONDITION S ................................................................................................... 10 8.0 RE CORDS ..................................................................................................................... 10 ATTACHMENT 1. CONTAINMENT AND AUXILIARY BUILDING ................................ 11 FLOOR PLANS COMM ITMENTS ....................................................................................................................... 14

CONTAINMENT EVACUATION 4 RA-EP-02864 Revision 00 E-1 1.0 PURPOSE The purpose of this procedure is to define actions or tasks performed to ensure containment is safely evacuated in cae of an emergency, when containment radiation levels exceed allowable levels, or during fuel handling accidents.

2.0 REFERENCES

2.1 RA-EP-01500, Emergency Classification 2.2 RA-EP-02520, Assembly and Accountability 2.3 DB-HP-01701, Personnel Contamination Evaluation and Decontamination 2.4 DB-OP-02530, Fuel Handling Accident 2.0 DEFINITIONS None.

4.0 RESPONSIBILITIES 4.1 The Shift Manager is responsible for ordering and directing containment evacuations.

4.2 The Control Room Operators are responsible for directing the sounding of the Containment Evacuation Alarm and initiating containment evacuation upon receipt of containment high radiation alarms in the Control Room.

4.3 The Fuel Handling Director is responsible for directing the sounding of the Containment Evacuation Alarm, informing the Shift Manager of fuel handling accidents, and initiating containment evacuation..

4.4 All personnel in containment are responsible for prompt evacuation when the Containment Evacuation Alarm is activated, local area radiation monitors alarm, or at the direction of the Shift Manager, Fuel Handling Director, or Radiation Protection personnel (Refer to Attachment 1 for egress location).

CONTAINMENT EVACUATION 5 RA-EP-02864 Revision 00 E-1 5.0 INITIATING CONDITIONS 5.1 Upon receipt of any of the following containment alarms in the Control Room:

"* Gamma radiation high level

"* Out of core high neutron levels

"* High count rate in the source range instrumentation

"* Increasing count rate greater than three decades per minute in the criticality monitoring system

"* Containment ventilation monitoring system high level alarm 5.2 At the direction of the Fuel Handling Director during fuel movements 5.3 At the direction of the Shift Manager 5.4 At the direction of Radiation Protection personnel

CONTAINMENT EVACUATION 6 RA-EP-02864 Revision 00 E-1 6.0 PROCEDURE 6.1 Shift Manager Actions 6.1.1 Verify alarms or other criteria presented by the Reactor Operator as the basis for initiating containment evacuation.

6.1.2 Ensure containment evacuation is evacuation is announced over the Gai-Tronics System.

6.1.3 Ensure the Containment Evacuation is activated.

6.1.4 Determine emergency classification in accordance with RA-EP-01500, Emergency Classification.

6.1.5 Determine areas which may need to be evacuated in accordance with RA-EP-02520, Assembly and Accountability.

6.1.6 Notify the Supervisor - Radiation Protection to ensure personnel are denied access to containment until it has been determined safe by Radiation Protection.

6.1.7 Inform and update the Plant Manager of emergency conditions.

6.2 Fuel Handling Director Actions 6.2.1 During fuel handling operations, in accordance with DB-OP-02530, Fuel Handling Accident, the Fuel Handling Director shall:

a. Initiate containment evacuation when evidence of fuel damage is found.
b. Request the Control Room sound the Containment Evacuation Alarm..
c. Contact the Control Room and advise the Shift Manager of the evacuation status.

6.3 Control Room Operator Actions 6.3.1 Notify the Shift Manager of alarms and instrument readings indicating a need to initiate containment evacuation.

CONTAINMENT EVACUATION 7 RA-EP-02864 Revision 00 E-1 WARNING 6.3.2 Control Room Operators shall not delay initiating containment evacuation if verification of containment radiation alarms or abnormal instrument readings cannot be immediately verified.

NOTE 6.3.2 Radiation Monitoring System Alarms The affected radiation monitor will automatically sound an alarm outside the entrance to the personnel hatch or outside the entrance to the equipment hatch. The Control Room Operator will receive an alarm at the RMS Console CRT Printer. The monitors also provide a readout in the Control Room at the personnel/equipment hatch entrance for verifying conditions.

6.3.2 Verify the validity of the following:

a. Alarms for containment high radiation alarms.
b. High count rate in the source range instrumentation.
c. Increasing count rate in the criticality monitoring system during refueling.
d. High radiation levels in the containment gaseous/air-borne monitoring instruments.

6.3.3 Initiate containment evacuation by sounding the Containment Evacuation Alarm, and make the following announcement over the Gai-Tronics:

"ATTENTION ALL PERSONNEL IN CONTAINMENT.

ATTENTION ALL PERSONNEL IN CONTAINMENT.

EVACUATE CONTAINMENT AND REPORT TO YOUR SUPERVISOR.

EVACUATE CONTAINMENT AND REPORT TO YOUR SUPERVISOR."

6.3.4 Inform the Shift Manager of required actions performed to accomplish containment evacuation.

CONTAINMENT EVACUATION 8 RA-EP-02864 R0 6.3.5 The Control Room Operator, after the Containment Evacuation Alarm sounds, shall take immediate action to correct the situation, reduce the radiation levels and restore the station to normal conditions.

6.3.6 Contact Security after evacuation to verify no personnel are still logged into Containment.

6.3.7 Log all data pertaining to the evacuation including the reports verifying evacuation of affected personnel and con ditions inside containment.

6.4 Radiation Protection Personnel Actions 6.4.1 Report to the Supervisor - Radiation Operations for instruc tions.

6.4.2 Suspend all Radiation Work Permits (RWP) which are affected by the potential radiological hazard.

6.4.3 Send an individual to the Control Room and obtain current update of Radiation Monitoring System (RMS) data.

6.4.4 Perform radiological surveys outside the following contain ment and annulus emergency egress locations as appropriate based on Supervisor - Radiation Operations direction:

a. Containment personnel lock, 603' elevation
b. Containment equipment hatch, 603' elevation
c. Containment emergency hatch, 585' elevation (outside)
d. Mechanical penetration room #3 annulus penetration, 585' elevation
e. Mechanical penetration room #4 annulus penetration, 585' elevation
f. Mechanical penetration room #1 annulus penetration, 565' elevation
g. Mechanical penetration room #2 annulus penetration, 565' elevation 6.4.5 Monitor outside Containment areas for changes in radiation, contamination, and airborne radiological conditions.

6.4.6 Depending on existing radiological conditions, establish additional controls to prevent the spread of contamination at containment exits as evacuees remove protective clothing.

I I

CONTAINMENT EVACUATION 9 RA-EP-02864 Revision 00 E-1 6.4.7 Observe or assist in the performance of personnel contamination surveys of containment evacuees using PC-18's or portable survey equipment. Perform personnel decontamination as needed, in accordance with DB-HP-01701, Personnel Contamination Evaluation and Decontamination.

6.4.8 If local radiological conditions deteriorate rapidly, evacuate personnel to another area (RRA exit ramp) for controlled removal of protective clothing and personnel contamination monitoring.

6.4.9 The RRA entrance Radiation Protection personnel shall read the containment evacuee's dosimetry. Abnormal exposures shall be reported to the Supervisor - Radiation Operations.

6.4.10 Report results of radiological surveys and personnel monitoring and decontamination to the Radiation Protection Supervisor.

6.5 Station Personnel Actions 6.5.1 Upon hearing the Containment Evacuation Alarm, personnel in containment shall:

a Stop work, leaving tools and equipment shut off, and in a safe condition.

b Evacuate containment, proceeding to the equipment hatch or personnel lock on the 603' elevation.

c After leaving containment, personnel shall read their dosimetry and report abnormal readings to the control point, monitor for contamination, or be surveyed by Radiation Protection personnel.

d Report missing personnel to Radiation Protection and work group leaders.

e If routes to the 603' elevation personnel lock or equipment hatch are cut-off or impassable, proceed to the 585' elevation emergency lock and exit containment. Personnel using the emergency lock should remain outside the lock until released by Radiation Protection.

6.5.2 Upon hearing the Containment Evacuation Alarm, personnel in the annulus shall:

a Stop work, leaving tools and equipment shut off, and in a safe condition.

b Evacuate the annulus proceeding to the nearest exit.

CONTAINMENT EVACUATION 10 RA-EP-02864 Revision 00 E-1 6.5.3 Work group leaders shall assist Radiation Protection personnel in verifying all members of their work groups have evacuated containment and/or the annulus, and are accounted for.

6.5.4 Notify the Shift Manager of conditions inside containment affecting plant safety.

6.5.5 Proceed to assembly areas in accordance with RA-EP-02502, Assembly and Accountability, if so instructed by Gai-Tronics announcements or Radiation Protection personnel.

7.0 FINAL CONDITIONS 7.1 All personnel are evacuated from containment.

7.2 Containment access is prohibited until Radiation Protection has determined it is safe for reentry.

8.0 RECORDS 8.1 The following quality assurance records are completed by this procedure and shall be listed on the Nuclear Records List, captured, and submitted to Nuclear Records Management in accordance with NG-NA-00106:

8.1.1 None 8.2 The following non-quality assurance records are completed by this procedure and may be captured and submitted to Nuclear Records Management, in accordance with NG-NA-00106:

8.2.1 None

RA-EP-02864 CONTAINMENT EVACUATION II Revision 00 E-1 ATTACHMENT I CONTAINMENT AND AUXILIARY BUILDING FLOOR PLANS ELEVATION 665' N t Annulus Penetration Annulus Penetration No exit from Containment on this MPR - Mechanical Penetration Room Attachment 1 Page 1 of 3

CONTAINMENT EVACUATION 12 RA-EP-02864 RO CONTAINMENT AND AUXILIARY BUILDING FLOOR PLANS (Cont.)

ELEVATION 585' j

PRIMARY EVACUATION ROUTE:

Use stairs up to Personnel Hatch at 603' elevation.

ATTACHMENT 1 Page 2 of 3

CONTAINMENT EVACUATION 13 RA-EP-02864 RO CONTAINMENT AND AUXILIARY BUILDING FLOOR PLANS (Cont.)

j ELEVATION 603' NOTE: The Equipment Hatch shall be used only when opened for maintenance during shutdown.

ATTACHMENT 1 Page 3 of 3

CONTAINMENT EVACUATION 14 RA-EP-02864 R0 COMMITMENTS Section Reference Comments None None None END