ML021330036
| ML021330036 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/23/2002 |
| From: | Abney T Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML021330036 (36) | |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 April 23, 2002 10 CFR 50.55a(a) (3)
U.S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C.
20555-0001 Gentlemen:
In the Matter of
)
Docket No.
50-260 Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
SECTION XI, INSERVICE INSPECTION (ISI) PROGRAM -
REQUESTS FOR RELIEF 2-ISI-16 AND 2-ISI-17 In accordance with 10 CFR 50.55a(a) (3) (i) and (ii),
TVA is requesting relief from certain inservice inspection requirements in Section XI of the ASME Boiler and Pressure Vessel Code.
The enclosure to this letter contains BFN Unit 2 requests for relief 2-ISI-16 and 2-ISI-17 for NRC review and approval.
TVA is seeking relief from inservice inspection requirements of the 1995 Edition with the 1996 Addenda,Section XI of the ASME Code for the volumetric examination of Class 1, Reactor Pressure Vessel (RPV) nozzle inner radius sections for the RPV and RPV head.
As an alternative, TVA proposes to use an enhanced remote visual (VT-l) examination, capable of a i-mil resolution, for the RPV nozzles inner radius section.
For the RPV head nozzles inner radius section, TVA proposes to use an enhanced direct visual (VT-I) examination capable of a 1-mil resolution.
These requests for relief are consistent with ones submitted by Detroit Edison Company for Fermi Unit 2 by letters dated June 11, and August 16, 2001.
The NRC approved the requests for relief by letter dated October 5, 2001.
Additionally, Printed on recycled paper 0
4 q
U.S. Nuclear Regulatory Commission Page 2 April 23, 2002 request for relief 2-ISI-16 is consistent with one for BFN Unit 3 RPV head nozzles (3-ISI-11) submitted by TVA letters dated August 13,
- 2001, January 9, and February 5, 2002.
NRC approved this request for relief by letter dated March 13, 2002.
TVA requests approval of this request for relief by June 28, 2002, to support resource planning for the Unit 2 Cycle 12 (Spring 2003) refueling outage.
There are no new commitments contained in this letter.
If you have any questions, please contact me at (256) 729-2636.
U.S. Nuclear Regulatory Commission Page 3 April 23, 2002 Enclosure (Via NRC Electronic Distribution) cc (Enclosure):
Mr.
Paul E.
Fredrickson, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant P.O. Box 149 Athens, Alabama 35611 Mr.
Kahtan N.
Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9) 11555 Rockville Pike Rockville, Maryland 20852-2739
ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
SECTION XI INSERVICE INSPECTION (ISI) PROGRAM (THIRD TEN-YEAR INSPECTION INTERVAL)
REQUEST FOR RELIEF 2-ISI-16 (See Attached)
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 2 ASME SECTION XI INSERVICE INSPECTION PROGRAM (THIRD TEN-YEAR INSPECTION INTERVAL)
REQUEST FOR RELIEF 2-ISI-16 Executive Summary:
In accordance with 10 CFR 50.55a(a) (3)
(i),
TVA is requesting relief from inservice inspection requirements of the 1995 Edition with the 1996 Addenda,Section XI of the ASME Boiler and Pressure Vessel Code for the volumetric examination of Class 1, reactor pressure vessel (RPV) and RPV head nozzles inner radius sections.
The examination requirement is for a volumetric examination of ASME Section XI, Examination Category B-D, "Full Penetration Welded Nozzles in Vessels," Item No.
B3.100, "Reactor Vessel Nozzle Inner Radius Section."
This request for relief applies to the BFN Unit 2 Reactor Pressure Vessel and RPV Head nozzles, with the exception of the six (N4)
Feedwater nozzles.
The six Feedwater nozzle radius sections will continue to be examined with ultrasonic testing (UT) techniques developed and qualified using GE-NE-523-A71 0594-A, Revision 01, "Alternate BWR Feedwater Nozzle Inspection Requirements,"
(the NRC has approved this report in an SER transmitted by letter dated March 10, 2000),
and ASME Section XI Code requirements.
TVA will take both ASME Section XI Code credit and credit in accordance with GE-NE-523-A71 0594-A, Revision 01, for all six Feedwater nozzles.
TVA proposes to implement alternate visual (VT-l) requirements consistent with ASME Code Case N-648-1, "Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles."
TVA recognizes that the original publication of Code Case N-648 references a subsurface flaw acceptance criteria table that does not exist (i.e.,
Table IWB-3513-3, which is a
El-2
typographical error).
Code Case N-648 was revised to correct the error and references Table IWB-3510-3, the correct applicable acceptance criteria.
In addition, an editorial clarification was added to N-648 to provide guidance for determining component thickness to use with this table.
A copy of Code Case N-648-I, that passed ASME Code Subcommittee is included in Attachment A of this request.
In summary TVA's proposed alternative examinations are as follows:
(1) For the Reactor pressure vessel nozzle inner radius
- sections, TVA will perform an enhanced remote visual (VT-i) examination, capable of a 1-mil wire resolution, in accordance with ASME Section XI, VT-i requirements, (2)
For the RPV head nozzles, TVA will perform an enhanced direct visual (VT-i) examination of the nozzle inner radius sections, capable of a 1-mil wire resolution, in accordance with ASME Section XI VT-I requirements.
TVA considers the above proposed alternative examinations will provide an acceptable level of quality and safety.
The proposed alternatives will also provide a significant savings in examination resources and radiation exposure.
This request for relief is consistent with one submitted by Detroit Edison for Fermi Unit 2 by letters dated June 11, 2001, and August 16, 2001.
NRC approved this request for relief by letter dated October 5, 2001.
This request for relief is also consistent with one for the BFN Unit 3 RPV head nozzles (3-ISI-li) submitted by TVA letters dated August 13, 2001, January 9, and February 5, 2002.
NRC approved this request for relief by letter dated March 13, 2002.
Unit:
Two (2)
ISI Interval:
ASME Section XI, Third Ten-Year ISI Interval (May 25, 2001 to May 24, 2011)
System(s):
E1-3
Components:
ASME Code Class:
ASME Section XI Code Edition:
Code Table:
Examination Category:
Examination Item Number:
Code Requirement:
RPV and RPV Head Nozzles, Inner Radius Sections:
Reactor Recirculation Suction Loop, NIA and NIB (Total of 2 nozzles)
Main Steam Nozzles,
- N3A, N3B,
- N3C, and N3D (Total of 4 nozzles)
Reactor Pressure Vessel Head Nozzles,
- N6A, N6B, and N7 (Total of 3 nozzles)
Control Rod Drive Return Line Nozzle, (capped) N9 (Total of 1 nozzle)
ASME Code Class 1 1995 Edition with 1996 Addenda IWB-2500-1 B-D, "Full Penetration Welded Nozzles Vessels" In B3.100, "Nozzle Inner Radius Sections,"
(Nozzles NIA, NIB,
- N3A, N3B,
- N3C, N3D,
- N6A, N6B, N7, and N9)
The 1995 Edition with 1996 Addenda, ASME Section XI, Table IWB-2500-1, Examination Category B-D, Item B3.100, requires a volumetric examination of the reactor pressure vessel (RPV) and RPV head nozzles inner radius section.
Relief is requested from the requirement to perform the volumetric examination of the reactor pressure vessel and RPV head nozzle inner radius sections (Nozzles NIA,
- NIB, N3A,
- N3B, N3C,
- N3D, N6A,
- N6B, N7, and N9)
E1-4 Code Requirements From Which Relief Is Requested:
List Of Items Associated With The Relief Request:
Basis For Relief Request:
Reactor Pressure Vessel and RPV Head Nozzles, NIA, NIB, N3A, N3B,
- N3C, N3D,
- N6A, N6B, N7, and N9 (Total of 10 nozzles)
Note:
TVA's proposed alternative examination is consistent with Code Case N-648-1 for the nozzle inner radius section of the RPV and RPV head nozzles.
The six Feedwater nozzle inner radius sections will continue to be examined with ultrasonic examination (UT) techniques developed and qualified with GE-NE-523-A71-0594-A, Revision 01 (NRC has approved this report by letter dated March 10, 2000),
and ASME Section XI Code requirements.
TVA will take both ASME Section XI Code credit for the nozzle to vessel weld for Code Category B-D, Item No. B3.90 and the inner radius sections Code Category B-D, Item No.
B3.100, and credit in accordance with GE-NE-523-A71 0594-A, Revision 01, simultaneously for all six Feedwater nozzles.
Pursuant to 10 CFR 50.
55a(a) (3) (i)
TVA is requesting relief from ASME Section XI requirements to perform the volumetric examination described above.
TVA is proposing to implement a visual examination alternative.
This examination is consistent with the alternative proposed in ASME Code Case N-648-l.
The visual examination will cover the same inspection surface as specified for the volumetric examination.
The volumetric examinations (ultrasonic) conducted from the outside surfaces are difficult and time consuming due to the asymmetrical configuration of both the nozzle outside surface (where the transducers are manipulated) and the inner radius section of the nozzle being interrogated.
Examination of the asymmetrical surfaces may require several different transducer/wedge angle combinations and these are applied at certain azimuths around the nozzle weld blend area of the vessel surface.
El-5
Different size nozzles usually require a separate set of transducer/wedge angle combinations and calibrations.
Several hours may be required for the calibrations and examination of one typical 6-inch diameter nozzle inner radius section.
An enhanced visual (VT-I) examination of the nozzle inner radius sections would provide assurance of the required coverage and indicate the presence of surface flaws.
The option to perform an enhanced visual (VT-I) examination will provide an acceptable examination without compromising the level of quality and safety.
The proposed alternative will also provide a significant savings in examination resources and radiation exposure to examination and support personnel.
Alternate Examination:
In accordance with 10 CFR 50.55a(a) (3) (i)
TVA will perform the following alternate examinations:
TVA will perform an enhanced direct visual (VT-l) examination, capable of a 1-mil wire resolution, of the reactor pressure vessel (RPV) head nozzles (Nozzles N6A, N6B, and N7) inner radius sections, in accordance with ASME Section XI, VT-I requirements.
Essentially 100 percent Code coverage will be attained.
For the Reactor pressure vessel nozzles inner radius sections, (NIA, NlB, N3A, N3B,
- N3C, N3D, and N9),
TVA will perform an enhanced remote visual examination (VT-l),
capable of a 1-mil wire resolution, in accordance with ASME Section XI, VT-l requirements.
This examination will be a remote visual exam utilizing cameras.
Essentially 100 percent Code coverage will be attained.
Crack-like surface flaws exceeding the acceptance criteria of Table IWB-3512-1 are unacceptable for continued service unless the reactor vessel meets the requirements of IWB-3142.2, IWB-3142.3 or IWB-3142.4.
El-6
Justification For The Granting Of Relief:
Implementation Schedule:
The RPV nozzles were nondestructively examined during fabrication and have previously been examined using inservice ultrasonic techniques specific to the nozzle configuration.
No indication of fabrication defects or service related cracking has been detected by these examinations.
The RPV and RPV head nozzles inner radius sections are the only non-welded areas (excluding the RPV head bolts) requiring examination on the reactor vessel.
This requirement was deterministically made early in the development of ASME Section XI.
For all nozzles, other than Feedwater, there is no significant thermal cycling during operation.
From a risk perspective, there is no need to perform a volumetric examination on any nozzle other than the Feedwater and CRD return nozzles.
No service related cracking has ever been discovered in any of the BWR fleet nozzles other than on Feedwater or CRD return lines.
Development of Code Case N-648 was coordinated with the Westinghouse Owners Group (WOG),
- ASME, and the NRC.
On May 9, 2000, the WOG met with NRC to discuss issues related to the proposed inspection elimination for reactor pressure vessel inner radius regions.
Although justification was presented to eliminate any examination of RPV nozzle inner radius sections (excluding BWR Feedwater and CRD nozzles),
a consensus was reached between the WOG and the NRC, to replace the volumetric examination of the other RPV nozzles (non Feedwater or CRD) with a visual (VT-I) examination.
This request for relief is applicable to the BFN Unit 2, Third Ten-Year ASME Section XI Inservice Inspection Interval (May 25, 2001 to May 24, 2011).
El-7
Attachments:
Attachment A ASME Code Case N-648-1, "Alternative Requirements for Inner Radius Examinations of Class 1 Reactor Vessel Nozzles,Section XI, Division 1" Attachment B -
(7 sketches)
Sketch SK-B2001, Reactor Pressure Vessel Assembly Sketch SK-B2017, Ni Recirculation Nozzles Sketch SK-B2018, N3,Main Steam Nozzles Sketch SK-B2020, N9, Control Rod Drive Return Line Nozzle Sketch SK-B2011, Attachments Map Top Head Assembly Sketch SK-B2015, Weld Detail Vent Nozzle N7 Sketch SK-B2016, Weld Detail Head Spray/Instrumentation Nozzles N6 El-8
Attachment A
2-ISI-16 ASME Code Case N-648-1 El-9
CASE N-648-1 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: September 7, 2001 Expiration Date: September 7, 2004 Case N-648-1 Alternative Requirements for Inner Radius Examinations of Class I Reactor Vessel NozzlesSection XI, Division I Inquiry: What alternative to the inservice examina tion requirements of Table IWB-2500-1, Examination Category B-D may be used for reactor vessels?
Reply: It is the opinion of the Committee that a VT-I examination of the surface M-N shown in Figs.
IWB-2500-7(a) through (d) in the 1998 Edition may be performed in lieu of the volumetric examination required by Table IWB-2500-I, Examination Category B-D, Item No. B3.20 or Item No. B3.100, for inservice examination of reactor vessel nozzles other than BWR feedwarer nozzles and operational control rod drive return line nozzles.
Crack-like surface flaws exceeding the acceptance criteria of Table IWB-3510-3 in the 1998 Edition are unacceptable for continued service unless the reactor vessel meets the requirements of IWB-3142.2, IWB 3142.3, or IWB-3142.4. The component thickness, t, to be applied in calculating the allowable surface flaw length, e, in Table IWB-3510-3 shall be selected as specified in Table IWB-3512-2.
El-10
Attachment B 2-ISI-16 Seven (7)
Sketches SK-B2001, SK-B2017, SK-B2018, SK-B2020, SK-B2011, SK-B2015, SK-B2016, RPV Assembly Recirc. Nozzles Main Steam Nozzles
- CRD, Return Line Nozzle RPV Top Head Assembly RPV Head, Weld Detail Vent Nozzle RPV Head, Weld Detail Head Spray/Inst.
Nozzle EI-1l
Attachment B DRAIN IJCZZLE BROýIJS F=-RR'1 2
PEFERENCE 681W OPPAWNG NO:24le5F-11 SKEtCH AELEASE RECORD RE-Y WAE PRlErAREO REVIEWJED INIT APPAOVEC4 IT PURPOSE 0 9-2-32R ML~/ET~
.TROTER R.
HOOPER Sketch SK-B2001 El-12 (N
7c, 2
O rnl
'S"T 1
-D F-I
-3 3/6'LADIS NUINI cn
-L lie, NIN (DD NO1586E-NOTE. THIS SýETCHi 1S FOR IS] PROGRAH USE 0ONLl AND L~"
N rfl I
I I I I
I I
COLRSE TABLE A NOZZLE B&W NOZZLE ID.
SHELL NO.
OZZLE DESCFIPTION NE-
. (NON?
COURSE N2 RECIRCULATION INLET MK-067 11.56' SCI N3 STEAM OUTLET NK-814 23.75' SC5 N4 FEEOWANER INLET NK-010 tI.76" 5C3 CLADDING REHOVED BY PLANT MOOIFICATWION N5 CORE SPRAY MK-011 8.78" SC3 REFERENCE BSS DRAWING NO. 122860E-8 I DETAIL B)
AND NO. 12285LE-B I DETAIL B)
AND NO. 1Z2862E-B (DETAIL B)
NOTE: THIS SKETCH IS FOR ISI PROGRAM USE NLY AND t.I1 (D
Pý It N) 0O rt rt (D
rt 0i1:
I I
I I
I I
I I
m (
0 6 1/8-MIN
/
FINISHEO
- ':m=
/
--~3 3/8" M4EASURED A*TI S/
CENTER OF HI.E
- 0
~3/16'
/
(Dp r--o
(:I rt t
(NO")
I D
(D
-ý
ý 3/jOi' CLADDING (NOR )
S1/
9,
OI N
G NOZZLE FORGING o
HK-eI3 SASI A568 CL2 REFERENCE BRW DRAWING NO 122861E-8 (DETAIL CI AND NO. 122868E-5 NOTE. THIS 5KFTC1I IS FOR 151 PROGRAM USE ONLY AND VELD DETAIL C-D HYDRAULIC CONTROL A OO-5306 BROWNS FERRY 2 NOZZLE NO
$HALL NOT BE USED FOR FABRICATION/1NOTALL1 AION.
I K822 I. I I I I I I
rt rt (D
ýj rt uj
Z FINISHED 2 2 THICKNESS
-~ 0
-NOZZLE FORGING MK(-206 ASIM A508 CL2 (D
r rt rt 02' Crl 3/1 TOP HEAD PLATE I MK-2021 NOTE: THIS SKETCH IS FOR IS[ PROGRKAM USE 0 LY AND WCL DEAI KID0 SPA SHI OTB UEDFR ARIAIO/iNTAIATO A"O-53106 Z RO'WNS FERRY 2...
INSTRUM&RTATION 4OZZLE N6 77-B2 016
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
SECTION XI INSERVICE INSPECTION (ISI) PROGRAM (THIRD TEN-YEAR INSPECTION INTERVAL)
REQUEST FOR RELIEF 2-ISI-17 (See Attached)
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 2 ASME SECTION XI INSERVICE INSPECTION PROGRAM (THIRD TEN-YEAR INSPECTION INTERVAL)
REQUEST FOR RELIEF 2-ISI-17 Executive Summary:
In accordance with 10 CFR 50.55a(a) (3) (ii),
TVA is requesting relief from inservice inspection requirements of the 1995 Edition with the 1996 Addenda,Section XI of the ASME Boiler and Pressure Vessel Code for the volumetric examination of Class 1, reactor pressure vessel (RPV) nozzle inner radius sections for the Recirculation Inlet loop, Jet Pump Instrumentation, and Core Spray nozzles.
The examination requirement is for a volumetric examination of ASME Section XI, Examination Category B-D; Full Penetration Welded Nozzles in Vessels, Item No.
B3.100, "Reactor Vessel Nozzle Inner Radius Section."
TVA is proposing to perform a remote visual examination of the accessible surface (reactor internal piping configuration prevents placement of camera to obtain essentially 100 percent coverage) of the nozzle inner radius region for the specified nozzles.
TVA's proposal is consistent with the alternative visual (VT-I),
requirements of ASME Code Case N-648-1, "Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles."
TVA recognizes that the original publication of Code Case N-648 references a subsurface flaw acceptance criteria table that does not exist (i.e., Table IWB-3513-3, which is a
typographical error).
Code Case N-648 was revised to correct the error and references Table IWB-3510-3, the correct applicable acceptance criteria.
In addition, an editorial clarification was added to provide guidance for determining component thickness to use with this table.
A copy of Code E2-2
Case N-648-1, that passed ASME Section XI Subcommittee is included in Attachment A of this request.
TVA considers that the proposed enhanced visual (VT-l) examination, capable of a 1-mil resolution, of the accessible portions of the nozzle inner radius region for the specified nozzles will provide an acceptable level of quality and safety.
- Further, compliance with the existing ASME Section XI requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Performance of the volumetric examination requires the examiner to enter and remain inside the biological shield penetration area around the nozzle for the duration of the ultrasonic examination, which takes approximately one hour.
Dose rates for the specified RPV nozzles are in the range of 500 to 1200 millirem per hour, with shielding in place.
Performance of these examinations results in an estimated personnel exposure of about 4.5 Rem per inspection interval.
Performance of a visual examination using remote cameras essentially eliminates any personnel exposure.
This request for relief is consistent with one submitted by Detroit Edison for Fermi Unit 2 by letters dated June 11, 2001, and August 16, 2001.
NRC approved this request for relief by letter dated October 5, 2001.
Unit:
Two (2)
ISI Interval:
ASME Section XI, Third Ten-Year ISI Interval (May 25, 2001 to May 24, 2011)
System(s):
Components:
RPV Nozzles Inner Radius Sections:
Reactor Recirculation Inlet Loop Nozzles,
- N2A, N2B,
- N2C, N2D,
- N2E, N2F,
- N2G, N2H,
- N2J, and N2K (Total of 10 nozzles)
E2-3
ASME Code Class:
ASME Section XI Code Edition:
Code Table:
Examination Category:
Examination Item Number:
Code Requirement:
Code Requirements From Which Relief Is Requested:
List Of Items Associated With The Relief Request:
Basis For Relief Request:
Core Spray Nozzles, N5A and NSB (Total of 2 nozzles)
Jet Pump Instrumentation Nozzles, NeA and N8B (Total of 2 nozzles)
ASME Code Class 1 1995 Edition with 1996 Addenda IWB-2500-1 B-D, "Full Penetration Welded Nozzles in Vessels" B3.100, "Nozzle Inner Radius Sections,"
(Nozzles N2A,
- N2B, N2C,
- N2D, N2E,
- N2F, N2G,
- N2H, N2J,
- N2K, N5A,
- N5B, N8A, and N8B)
The 1995 Edition with 1996 Addenda, ASME Section XI, Table IWB-2500-1, Examination Category B-D, Item B3.100, requires a volumetric examination of all reactor pressure vessel nozzles inner radius section welded with full penetration welds as shown in Figures IWB-2500-7(a) through (d).
Relief is requested from the requirement to perform the volumetric examination of the reactor pressure vessel nozzles inner radius section (Nozzles N2A,
- N2B, N2C,
- N2D, N2E,
- N2F, N2G,
- N2H, N2J, N2K,
- N5A, N5B,
- N8A, and N8B)
Reactor Pressure Vessel Nozzles,
- N2A, N2B,
- N2C, N2D,
- N2E, N2F,
- N2G, N2H,
- N2J, N2K,
- N5A, N5B,
- N8A, and N8B (Total of 14 nozzles)
Pursuant to 10 CFR 50.55a(a) (3) (ii)
TVA is requesting relief from ASME Section XI requirements to perform the volumetric examination described above.
Performance E2-4
of the volumetric examination results in significant personnel radiation exposure without a compensating increase in the level of plant quality or safety.
TVA is proposing to perform a remote enhanced visual (VT-i) examination, capable of a 1-mil resolution, of the accessible portions of the nozzle inner radius region for the specified RPV nozzles.
The volumetric examinations (ultrasonic) conducted from the outside surfaces are difficult and time consuming due to the asymmetrical configuration of both the nozzle outside surface (where the transducers are manipulated) and the inner radius section of the nozzle being interrogated.
Examination of the asymmetrical surfaces may require several different transducer/wedge angle combinations and these are applied at certain azimuths around the nozzle weld blend area of the vessel surface.
Different size nozzles usually require a separate set of transducer/wedge angle combinations and calibrations.
Several hours may be required for the calibrations and examination of one typical 6-inch diameter nozzle inner radius section.
TVA's proposed examination is consistent with the visual (VT-I),
requirements of ASME Code Case N-648-1, "Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles."
Development of Code Case N-648 was coordinated with the Westinghouse Owners Group (WOG),
- ASME, and the NRC.
On May 9, 2000, the WOG met with NRC to discuss issues related to the proposed inspection elimination for reactor pressure vessel inner radius regions.
Although justification was presented to eliminate any examination of RPV nozzle inner radius sections (excluding BWR Feedwater and CRD nozzles),
a consensus was reached between the WOG and the NRC, to replace the volumetric RPV nozzle inner radius section examination with a visual examination (VT-I).
E2-5
An enhanced remote visual (VT-I) examination of the accessible regions of the nozzle inner radius sections would provide assurance of the required coverage and indicate the presence of surface flaws.
The performance of an enhanced remote visual (VT-i) examination would provide an acceptable examination without compromising the level of quality or safety.
The proposed examination will also provide a significant savings in examination resources and radiation exposure to examination and support personnel.
Alternate Examination:
TVA will perform the following examination on the specified nozzles:
For the reactor pressure vessel nozzles inner radius sections, (N2A,
- N2B, N2C,
- N2D, N2E,
- N2F, N2G, N2H, N2J, N2K,
- NSA, N5B,
- N8A, and N8B),
TVA will perform an enhanced remote visual examination (VT-i),
capable of a 1-mil wire resolution, in accordance with ASME Section XI, VT-I requirements.
This examination will be a remote visual examination utilizing cameras.
Visual examination of the inner radius section for the above nozzles is limited because the reactor internal piping configuration prevents placement of the camera in all positions necessary to examine the surface M-N [See Figures IWB-2500-7(a) through (d)]
over the full circumference.
Crack-like surface flaws exceeding the acceptance criteria of Table IWB-3512-1 are unacceptable for continued service unless the reactor vessel meets the requirements of IWB-3142.2, IWB-3142.3 or IWB-3142.4.
The specific limitations and estimated examination coverage for each nozzle are provided below.
E2-6
NOZZLE TYPE/NO.
Recirculation Inlet, N2 (10 nozzles)
Core Spray, N5 (2 Nozzles)
Jet-Pump Instrumentation, N8 (2 Nozzles)
Justification For The Granting Of Relief:
LIMITATION ESTIMATED COVERAGE Thermal Sleeve/
Jet-Pump Riser Thermal Sleeve and Sparger Instrumentation Lines 50%
40%
60%
The limited remote visual examination of the RPV nozzles inner radius section does not significantly reduce the level of plant quality and safety for the following reasons:
There are no mechanisms of damage other than fatigue for the nozzle inner radius, and for other than Feedwater nozzles, there is no cause for significant thermal cycling.
Therefore, the primary flaw of concern would be a flaw that was not detected during the manufacturing process.
The BFN Unit 2 RPV nozzles were examined during and after manufacturing by surface and volumetric techniques.
Additionally preservice and inservice ultrasonic examinations have detected no flaws.
It is unlikely that flaws would be initiated by the fatigue mechanism.
" After approximately 20 years of operation (Unit 2 was shut down from September 1984 to May 1991),
no cracking in the subject BFN Unit 2 RPV nozzles inner radius region has been found.
" Fracture toughness tests performed at Oakridge National Laboratories' indicate there is a large flaw tolerance for BWR Nozzle inner radius regions.
Even if flaw propagation was assumed, test results indicate a leak before break E2-7
scenario would occur, which would not result in a significant increase in core damage frequency 2.
In addition, system pressure testing continues to be performed each refueling outage, and during plant operation the containment is monitored for changes in unidentified leakage.
" More than 50 percent of the total RPV nozzle population receives a complete (i.e., essentially 100 percent) nozzle inner radius examination.
" Visual examination of the accessible nozzle inner radius surface (zone M-N) provides reasonable assurance that deep flaws are not present.
Additionally, when flaws are initiated by the fatigue mechanism, they typically are encountered over a significant portion of the circumference as was the case for cracking of Feedwater nozzles addressed in NUREG-0619.
In summary, fatigue cracking is the only applicable degradation mechanism for the RPV nozzle inner radius region, and for all nozzles other than Feedwater there is no significant thermal cycling during operation.
Therefore, from a risk perspective, there is no need to perform volumetric examination on any nozzles other than Feedwater and CRD return lines.
This is supported by the fact that no service related cracking has ever been discovered in any of the BWR fleet RPV nozzles other than on Feedwater and CRD return lines.
The BFN Unit 2 Feedwater nozzles inner radius sections will continue to be examined with ultrasonic techniques developed and qualified in accordance with GE-NE-523-A71 0594-A, Revision 1. The NRC accepted this E2-8 1 & 2:
Conclusions made in ASME NDE subcommittee report ISI-99-26, "Technical Basis for Elimination of Reactor Vessel Nozzle Inner Radius Inspections"
methodology by letter to the Boiling Water Reactor Owners Group (BWROG) dated March 10, 2000.
TVA notified the NRC by letter dated October 23, 2000 (TAC Nos.
M08436 and M08437) that it was adopting the BWROG methodology.
The Feedwater nozzles alone represent 20 percent of all RPV nozzles currently requiring volumetric inner radius examination, which is more than industry accepted risk sampling requirements for similar items.
Additionally, BFN request for relief 2-ISI-16 provides for a full (i.e.,
essentially 100 percent) visual examination of 10 other RPV nozzles, resulting in a complete examination of more than 50 percent of the total BFN Unit 2 RPV nozzle population.
Therefore, TVA believes that the remote visual examination of the accessible regions of the 14 specified RPV nozzle inner radius sections will ensure an acceptable level of quality and safety while providing a significant reduction in personnel dose.
Implementation Schedule:
This request for relief is applicable to the BFN Unit 2, Third Ten-Year ASME Section XI Inservice Inspection Interval (May 25, 2001 to May 24, 2011).
Attachments:
Attachment A ASME Code Case N-648-1, "Alternative Requirements for Inner Radius Examinations of Class 1 Reactor Vessel Nozzles,Section XI, Division 1" Attachment B -
(3 sketches)
Sketch SK-B2001, Reactor Pressure Vessel Assembly Sketch SK-B2018, Recirculation N2 and Core Spray Nozzles N5 Sketch SK-B2019, Jet-Pump Nozzles N8 E2-9
Attachment 2-ISI-17 ASME Code Case N-648-1 E2-10 A
CASE N-648-1 CASES OF ASME BOILER AND PRESSURE VESSEL CODE Approval Date: September 7, 2001 Expiration Date: September 7, 2004 Case N-648-1 Alternative Requirements for Inner Radius Examinations of Class I Reactor Vessel NozzlesSection XI, Division 1 Inquiry.- What alternative to the inservier examina tion requirements of Table IWB-2500-1, Examination Category B-D may be used for reactor vessels?
Reply: It is the opinion of the Committee that a VT-! examination of the surface M-N shown in Figs.
IWB-2500-7(a) through (d) in the 1998 Edition may be performed in lieu of the volumetric examination required by Table IWB-2500-1, Examination Category B-D, Item No. B3.20 or Item No. B3.100, for inservice examination of reactor vessel nozzles other than BWR feedwater nozzles and operational control rod drive return line nozzles.
Crack-like surface flaws exceeding the acceptance criteria of Table IWB-3510-3 in the 1998 Edition are unacceptable for continued service unless the reactor vessel meets the requirements of IWB-3142.2, IWB 3142.3, or IWB-3142.4. The component thickness, t, to be applied in calculating the allowable surface flaw length, e, in Table IWB-3510-3 shall be selected as specified in Table IWB-3512-2.
E2-11
Attachment B 2-ISI-17 Three (3)
SK-B2001, SK-B2018, SK-B2019, Sketches RPV Assembly Recirculation N2 and Core Spray N5 Nozzles Jet-Pump Nozzles N8 E2-12
U-za TOOZS-HS T43 4 Gý[ S tj3dOOH t1l 3soand Jj+j-r33AMJddV j1INrjO3A3lA3tj 300 A3b 5tJO33ti 3SV313b HOONG ll-JGSTýZ!ON I)NIATUO ARS DN30.43d z
ýdtj:azl SI'MOUS 3,1=Zoll filvda OH-1 07 3H O's stjno:. iBHS ZOS I
- Dstjrlo:l
-InBHS 3ýcos tjnoý 1-13HS I t-os )
3sldnoc) 173-S SOS )
.Sýroz
ý BHS k Owl CV:3H Ciol E quouiqopqqv
(D rt Cf) 00
ýDl rt ct (D
ýl ct w
Attachment B REFERENCE HAW DRAWING NO.122860E-B AND NO.151855E-4 SKETCH RELEASE RECORD jE V DATE PREPARED REVIEIIED)INIT APPROVED IN;C PURPOSE 0 11-1-92 M MCLAVERTY K.TROTTER RHmOOPER -
Sketch SK-B2019 E2-15
- 201, cm, w-.