MONTHYEARML0210902482002-05-0202 May 2002 Memo, Conference Call on April 10, 2002, Txu Generation Company LP Post-Inspection Results of Comanche Peak Electric Station (CPSES) Unit 2 Reactor Pressure Vessel Head (Tac No. MB4538) Project stage: Other ML0212102202002-05-15015 May 2002 Memorandum, Summary of April 4, 2002, Telephone Call Regarding Txu Generation Co, LP Proposed Inspection of the Comanche Peak Unit 2 Reactor Pressure Vessel Head Project stage: Other ML0224601202002-09-10010 September 2002 Letter, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 15 Day Response Project stage: Other ML0232902152002-11-22022 November 2002 RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-day Response (TAC MB4537 & TAC MB4538) Project stage: RAI 2002-05-15
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML24019A0342024-01-30030 January 2024 Public Meeting Summary - 01-04-2024 - Comanche Peak LRA - Structures Monitoring Program ML23279A1052023-10-0606 October 2023 Memorandum from the Secretary to the Board and Parties ML22304A1912022-11-23023 November 2022 Aging Management Audit Plan Regarding the License Renewal Application Review ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21259A1492021-10-26026 October 2021 CPNPP, Unit Nos. 1 and 2 - Meeting Summary for Environmental Pre Submittal Meeting for Initial License Renewal Application on September 21, 2021 ML21259A1402021-10-0505 October 2021 Meeting Summary for Safety Pre Submittal Meeting for Initial License Renewal Application on September 21, 2021 ML21176A1292021-06-25025 June 2021 CPNPP FFD Inspection Doc Request 2021 ML21174A0942021-06-23023 June 2021 Reactor Trip on June 7, 2021 - Management Directive 8.3 Screening ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21124A0052021-05-10010 May 2021 Memo for Environmental Pre-Submittal Meeting for Initial License Renewal Application ML19120A3382019-04-26026 April 2019 Memo to File Environmental Assessment and Finding of No Significant Impact for Luminant Generation Company, Llc'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and 10 CFR 72.30(c) for Comanche Peak ISFSI ML18346A1832019-01-0606 January 2019 FO Closure Audit Summary ML18221A6322018-08-15015 August 2018 Eicb Safety Evaluation - Comanche Peak Nuclear Power Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.2 Engineered Safety Feature Actuation System Instrumentation Docket/Epid 000976/05000446/L-2018-LLA-0 ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12299A4102012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company, LLC, to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12306A3242012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12286A2792012-10-18018 October 2012 Notice of Meeting with Luminant Generating Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12216A2992012-08-27027 August 2012 9/13/12 Notice of Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12191A1472012-07-11011 July 2012 8/6/12 Notice of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8615-ME8616) ML12171A1842012-06-11011 June 2012 6/26/12 Revised Notice of Meeting with Luminant Generation Company, LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML1117302232011-06-29029 June 2011 Staff Review of the Comanche Peak Independent Spent Fuel Storage Installation Physical Security Plan and Verification of Additional Security Measures Incorporation ML1107401282011-03-15015 March 2011 3/17/11 Notice of Forthcoming Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML1009105332010-04-0505 April 2010 U.S. Nuclear Regulatory Commission Staff Review of the Department of Homeland Security Consultation Reports ML1006010322010-03-0101 March 2010 Cy 2009 Baseline Inspection Completion ML0925404602009-09-10010 September 2009 Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ ML0919705782009-07-31031 July 2009 Summary of Category 1 Meeting with Luminant Generation Company LLC, Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0921000502009-07-31031 July 2009 Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0724904812007-09-11011 September 2007 Notice of Meeting with Strategic Teaming and Resource Sharing (Stars) for Licensees of Comanche Peak, Diablo Canyon, Palo Verde, South Texas, and Wolf Creek Plants ML0720800042007-07-31031 July 2007 Memo to File Request for Additional Information Application for Order Approving Indirect Transfer of Control of Licenses & License Amendments to Reflect Proposed Licensee'S Name Change ML0713003582007-05-11011 May 2007 Notice of Meeting with Txu Generation Company LP, Regarding Proposed Transition to Westinghouse Methodology and Other Methodologies Specific to Comanche Peak Steam Electric Station (CPSES) and Power Uprate Application ML0630400142006-10-31031 October 2006 Notice of Forthcoming Meeting with Txu Generation Company, LP Re Radiological Consequences of Design-Basis Accidents for Comanche Peak Steam Electric Station ML0627202212006-10-13013 October 2006 Staff'S Review of the Revision to Technical Specification Surveillance Requirements 3.3.1.2 & 3.3.1.3, Reactor Trip System Instrumentation (RTS) ML0612805802006-06-30030 June 2006 Memo with Enclosures 1 and 2, - Trip Report Regarding Staff Observations Regarding Flume Testing of a Prototype Portion of the Proposed Replacement Suction Screen Design for the Comanche Peak Steam Electric Station ML0607302642006-03-0707 March 2006 Closure Memorandum: Issue for Resolution 2005-083: Evaluation: Part 21 - Engine Systems - Governor Drive Coupling Element ML0527802152005-10-0505 October 2005 Forthcoming Meeting with Txu Analytical Methodologies Supporting the Comanche Peak, Unit 1, Steam Generators Replacement Project ML0525803232005-09-15015 September 2005 Meeting with Strategic Teaming and Resource Sharing (Stars) for Licensees of Comanche Peak, Diablo Canyon, Palo Verde, South Texas, and Wolf Creek Plants ML0519301632005-07-14014 July 2005 Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0516003452005-06-14014 June 2005 Draft Information Memo - May 6 - May 27, 2005 ML0506104872005-03-23023 March 2005 Draft Information Memo - May 1, 2005 Thru May 27, 2005 ML0435701632005-01-24024 January 2005 Draft Information Memo - Inputs from March 2, 2004 Through March 31, 2004 ML0429402412004-10-25025 October 2004 Draft Information for June 1, 2004 to June 30, 2004 ML0426400682004-09-21021 September 2004 Draft Information Report from January 14 Thru February 26, 2004 ML0421103022004-08-19019 August 2004 Draft Information Memo for April, 2004 - Shirley ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback 2024-01-30
[Table view] |
Text
May 2, 2002 MEMORANDUM TO: Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV /RA/
Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE APRIL 10, 2002, TELEPHONE CONFERENCE CALL REGARDING TXU GENERATION COMPANY LP POST-INSPECTION RESULTS OF THE COMANCHE PEAK STEAM ELECTRIC STATION (CPSES), UNIT 2, REACTOR PRESSURE VESSEL HEAD (TAC NO. MB4538)
On April 10, 2002, a conference call was held with members of the U.S. Nuclear Regulatory Commission (NRC) staff and representatives from TXU Generation Company LP, the licensee for CPSES, Unit 2. The purpose of this call was to discuss the licensees preliminary results of their inspection of the reactor pressure vessel head.
The licensee performed a 100% effective visual inspection of the reactor pressure vessel head.
No evidence of leakage from the vessel head penetration nozzles was observed. The licensee noted that the head outer surface was coated with a thin layer of gray, easily dislodged, powder that did not obstruct the view of the metal. No boric acid material was found and there was no wastage of the vessel head. Some of the peripheral tubes showed a brown discoloration which was attributed to wetting of the surfaces during a previous incident. No other anomalous conditions were noted. The NRC staff expressed some concern that the gray power might be boric acid residue and requested that the licensee determine the composition of this material; the licensees initial impression was that the material was dust.
Following the conference call, the licensee e-mailed to the NRC staff, the following analysis of the gray powder:
Calcium as Calcium Carbonate = 55.6%
Magnesium as Magnesium Carbonate = 42.4%
Aluminum as Aluminum Oxide = 2.03%
Boron as Boric Acid < 0.00196%
The above analysis, especially the low boric acid content and easily dislodged form, seems to indicate that whatever the source, the material is benign.
Based on the preliminary findings from the Davis-Besse Nuclear Power Station, the inspections performed by the licensee and the CPSES, Unit 2, low susceptibility to nozzle cracking, the
R. A. Gramm NRC staff did not identify any issues that needed additional follow-up prior to plant restart. The NRC staff will document its formal review after receiving the licensees Bulletin 2002-01 response.
Docket No. 50-446
R. A. Gramm NRC staff did not identify any issues that needed additional follow-up prior to plant restart. The NRC staff will document its formal review after receiving the licensees Bulletin 2002-01 response.
Docket No. 50-446 DISTRIBUTION:
PUBLIC PDIV-1 R/F RidsNrrOd (SCollins/JJohnson)
RidsNrrAdpt (BSheron/KODonoghue)
RidsNrrDlpm (JZwolinski/TMarsh)
RidsNrrDlpmLpdiv (LBarnett, Acting)
RidsNrrDlpmLpidv1 (RGramm)
RidsNrrPmas (MCase)
RidsNrrPMDJaffe RidsNrrLADJohnson RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrPMSBloom RidsNrrPMBWetzel KKarwoski DMcCain IJung AHiser RidsRgn4MailCenter (KBrockman/WJohnson/DAllen)
BBorchardt BKane SCoffin Accession No. ML021090248 OFFICE PDI-IV/PM PDI-IV/LA EMCB/PM PD1-IV/SC NAME DJaffe:as DJohnson SBloom RGramm DATE 4/26/02 4/25/02 4/26/02 4/29/02 OFFICIAL RECORD COPY