FINAL AS-ADMINISTERED WALKTHROUGH JPMS FOR THE POINT BEACH INITIAL EXAMINATION - JAN/FEB 2002

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS K/A

REFERENCE:

APE 005.AA2.03 (3.5/4.4)

(NUREG-1122) APE 024.AK3.01 (4.1/4.4)

APE 024.AK3.02 (4.2/4.4)

ALTERNATE PATH JPYW X YES NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

X Procedure adequately addresses task elements.

Enter identifier here: EOP 0.1 Unit 1 Other document adequately describes necessary task elements.

Enter identifier here:

X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM IN-PLANT CONTROL ROOM X VALIDATED TIME FOR COMPLETION: 15 MINUTES Page 1 of 9

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS EXAMINEE EVALUATOR START TIME FINISH TIME PERFORMANCE [:]SAT [:1 UNSAT JOB TITLE: 1] AOT [:1 COT [-] SRO Ml STA TOOLS/EQUIPMENT/

REFERENCES:

EOP 0.1 Unit 1 "Reactor Trip Response" Rev. 26 TASK STANDARDS:

Emergency boration established per EOP 0.1 due to 2 control rods not fully inserted.

SIMULATOR INFORMATION:

Initialize to JPM specific IC (Exam IC #68).

RAMP RAMP DELAY SEVERITY TIME TAGNAME VALUE VALUE TIME TIME VALUE TRIGGER NOTE: If this JPM is performedon the simulator,the JPM administratorshould only give cues that are not indicatedon the simulator. If simulatorindicationis sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the traineeto continue the evolution.

NOTE: Only this page needs to be retained in examinee's recordif completed satisfactorily. If unsatisfactory performanceis demonstrated,the entire JPM should be retained.

Page 2 of 9

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

You are the Unit 1 CO. Unit 1 has experienced a reactor/turbine trip due to a main generator lockout. The crew has transitioned from EOP-0 to EOP-0.1 "Reactor Trip Response" and EOP-0. I actions are in progress.

INITIATING CUES (IF APPLICABLE):

The Shift Manager directs you to continue with EOP-0.1 actions beginning at step 9.

Page 3 of 9

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITICAL SAT 1 1 N UNSAT ELEMENT: Check VCT level > 17%.

STANDARD: VCT level determined to be greater than 17% from indication on 1C04.

CUE: VCT level is 55% (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 2 N UNSAT ELEMENT: Ensure VCT Outlet to Charging Pump Suction MOV ICV-l 12C is open.

STANDARD: 1CV-1 12C is ensured open using indication on 1C04.

CUE: Green light is off, red light is lit for 1CV-1 12C (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 3 3 N UNSAT ELEMENT: Ensure RWST to Charging Pump Suction MOV ICV-1 12B is shut.

STANDARD: ICV- I12B is ensured shut using indication on 1C04.

CUE: Green light is lit, red light is off for 1CV-1 12B (or as indicated on simulator).

COMMENTS:

Page 4 of 9

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 4 4 N UNSAT ELEMENT: Ensure RCS Loop A Cold Leg Normal Charging Isolation Valve 1CV-1298 is open.

STANDARD: 1CV-1298 checked open on 1C04.

CUE: Red light is lit, green light is off for 1CV-1298 (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 4 N UNSAT ELEMENT: Check at least one charging pump running.

STANDARD: Two charging pumps determined to be running.

CUE: Red light is lit above control switch for two charging pumps (or as indicated on simulator).

COMMENTS:

Page 5 of 9

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 6 4 N UNSAT ELEMENT: Start additional charging pumps as necessary and adjust speed to establish desired charging flow.

STANDARD: Examinee should determine that the current charging pump alignment is satisfactory. A third pump could be started at this time, but is not necessary based on current information known by the examinee.

CUE: Pressurizer level is stable (or as indicated on simulator).

NOTE: Minor adjustments in pump speed may be made to balance the Auto and Manual chargingpumps.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 7 4 N UNSAT ELEMENT: Adjust charging line flow controller 1HC-142 to maintain labyrinth seal delta-P > 20 inches.

STANDARD: IHC-142 adjusted as necessary to maintain RCP labyrinth seal delta-P > 20 inches as indicated on 1C04.

CUE: Labyrinth seal delta-P is 30 inches for both RCPs (or as indicated on simulator).

NOTE: Minor adjustments in chargingpump speed may be made when 1HC-142 is adjusted.

COMMENTS:

Page 6 of 9

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 8 5 Y UNSAT ELEMENT: Check all control rods fully inserted.

STANDARD: Two control rods (E9 and G11) are determined to NOT be fully inserted, a transition to the RNO column for additional actions must be made.

CUE: Control rod E9 indicates 225 steps, control rod GIl indicates 220 steps, the rod bottom lights for E9 and G11 are not lit (or as indicated on simulator).

NOTE: This begins the Alternate Path of this JPM.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 9 6 N UNSAT ELEMENT: Level for in-service BAST recorded.

STANDARD: Level for T6A BAST read from indicator on panel CO1.

CUE: T6A BAST level is 65% (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 10 6 Y UNSAT ELEMENT: Start one boric acid transfer pump.

STANDARD: Either 1P-4A or 1P-4B is manually started using its control switch on 1C04.

CUE: Red light is lit for the pump chosen to start (or as indicated on simulator).

COMMENTS:

Page 7 of 9

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 11 7 Y UNSAT ELEMENT: Fully open charging flow control valve IHC-142.

STANDARD: IHC-142 is fully opened.

CUE: Red light is lit, green light is off, for 1HC-142 (or as indicated on simulator).

NOTE: The valve hand controllerhas a designatorof IHC-142, the actual valve is 1CV-142.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 12 7 Y UNSAT ELEMENT: Start additional charging pumps.

STANDARD: All three charging pumps are running.

CUE: Red light is lit for any additional charging pump started (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 13 7 Y UNSAT ELEMENT: Adjust charging pump speed as necessary to maintain charging pump flow <140 gpm.

STANDARD: Charging pump speed adjusted to obtain charging flow as high as possible but on-scale on flow indicator

(<140 gpm). Charging pump flow must be >120 gpm but <140 gpm.

CUE: Charging pump flow is increasing as pump speed is increased (or as indicated on simulator).

Charging pump flow is approximately 130 gpm (or as indicated on simulator).

COMMENTS:

Page 8 of 9

POINT BEACH NUCLEAR PLANT JPM P704OaCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO MULTIPLE STUCK RODS PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 14 8 Y UNSAT ELEMENT: Open emergency borate valve ICV-350.

STANDARD: 1CV-350 is opened using its control switch on lC04.

CUE: Red light is lit, green light is off above 1CV-350 (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 15 9 N UNSAT ELEMENT: Borate 1200 gallons for each control rod not fully inserted.

STANDARD: 2400 gallon boration determined to be required based on 2 control rods not fully inserted.

CUE: The BOP Operator ( 3 rd license) will determine the BAST level change.

COMMENTS:

TERMINATION CUE: THIS COMPLETES THE JPM. COMPLETION TIME:

Page 9 of 9

POINT BEACH NUCLEAR PLANT JPM P006.003COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 DRAIN THE ACCUMULATORS TOTAL REWRITE K/A

REFERENCE:

)06.K 1.15 (2.2/2.2)

(NUREG-1122) )06.K5.02 (2.8/2.9)

)06.A 1.13 (3.5/3.7)

)06.A4.01 (4.1/3.9)

)06.A4.02 (4.0/3.8)

ALTERNATE PATH JPM YES X NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed and/or out of sequence (if applicable)

X Procedure adequately addresses task elements.

Enter identifier here: 01-100 "Adjusting SI Accumulator Level and Pressure" Other document adequately describes necessary task elements.

Enter identifier here:

X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM X IN-PLANT CONTROL ROOM X VALIDATED TIME FOR COMPLETION: 15 MINUTES Page I of 7

POINT BEACH NUCLEAR PLANT JPM P006.003COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 DRAIN THE ACCUMULATORS TOTAL REWRITE EXAMINEE EVALUATOR JOB TITLE: F1 AOT 0 COT FI SRO FD STA TOOLS/EQUIPMENT/

REFERENCES:

01-100 "Adjusting SI Accumulator Level and Pressure" Rev 16 TASK STANDARDS:

Accumulator drained to desired level (30%).

SIMULATOR INFORMATION:

TIME I FAIL ICOMPONENT I OPTION I VALUE I RAMP DELAY ACT COND Initialize to JPM specific saved IC (Exam IC #62).

Page 2 of 7

POINT BEACH NUCLEAR PLANT JPM P006.003COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 DRAIN THE ACCUMULATORS TOTAL REWRITE READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Unit 1 is at 100% power. IT-34A, SI accumulator is at 35%.

INITIATING CUES (IF APPLICABLE):

The Shift Manager directs you to drain the accumulator to 30%, in accordance with 01-100, "Adjusting SI Accumulators Level and Pressure."

Page 3 of 7

POINT BEACH NUCLEAR PLANT JPM P006.003COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 DRAIN THE ACCUMULATORS TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITICAL SAT 1 1 N UNSAT ELEMENT: Reviews "Caution" and "Note" prior to Section 5.3, completes Sections 1.0 and 2.0 of Attachment A.

STANDARD: Sections 1.0 and 2.0 completed using proper accumulator ID and parameter values. Inquiry as to reason for level rise (from CAUTION) should be made by examinee.

CUE: Inform examinee that Chemistry will perform SR 3.5.1.4 to sample the accumulator if examinee inquires about level rise.

Pressure is 750 psi, level is 35%. (Or as shown on simulator.)

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 1 N UNSAT ELEMENT: Pump down the RCDT for affected unit to 30%.

STANDARD: PAB AO contacted to check Unit I RCDT at 30% and pump down if necessary.

CUE: The PAB AO reports the Unit 1 RCDT is at 30%.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 3 1 N UNSAT ELEMENT: Establish communications with PAB AO to monitor the RCDT pressure and level during accumulator draining to RCDT.

STANDARD: PAB AO contacted and informed to monitor RCDT pressure and level, informs AO of CAUTION regarding not exceeding 8 psig in RCDT.

CUE: The PAB AO acknowledges the report and is standing by at C-59.

COMMENTS:

Page 4 of 7

POINT BEACH NUCLEAR PLANT JPM P006.003COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 DRAIN THE ACCUMULATORS TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 4 2 N UNSAT ELEMENT: Record RCDT initial level in Attachment A, Section 4.0 STANDARD: 30% recorded as initial RCDT level.

CUE:

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 3 y UNSAT ELEMENT: Open accumulator drain valve ISI-844A ("A" accumulator) to drain the accumulator to desired level.

STANDARD: 1SI-844A is opened using its control switch on rear of CO.

CUE: Red light is lit, green light is off above valve ISI-844A, level is decreasing (or as shown on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 6 4 y UNSAT ELEMENT: Drain the accumulator to the desired level as indicated on LI-939 or LI-938.

STANDARD: Desired level reached (28-32%).

CUE: LI-939 or LI-938 indicates 30% (or as shown on simulator).

COMMENTS:

Page 5 of 7

POINT BEACH NUCLEAR PLANT JPM P006.003COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 DRAIN THE ACCUMULATORS TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 7 5 Y UNSAT ELEMENT: Shut ISI-844A.

STANDARD: 1SI-844A shut using its control switch on rear of CO.

CUE: Green light is lit, red light is off above valve 1SI-844A, level is stable (or as shown on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 8 6 N UNSAT ELEMENT: Complete Sections 4.0, 5.0, and 7.0 of Attachment A.

STANDARD: Sections 4.0 and 5.0 filled out correctly, log entries made per 7.0. AO contacted for final RCDT level.

CUE: Inform examinee that RCDT level is now 39%.

Accumulator pressure is -745 psig, accumulator level is 30% (or as shown in simulator).

Inform examinee that log entries will be made by shift supervision.

COMMENTS:

Page 6 of 7

POINT BEACH NUCLEAR PLANT JPM P006.003COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 DRAIN THE ACCUMULATORS TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 9 6 N UNSAT ELEMENT: Ensure Accumulator pressure between 720 to 760 psig as indicated on PI-940 or PI-941.

STANDARD: Accumulator pressure between 720 to 760 psig.

CUE: PI-940 reads 745 psig (or as shown on the simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 10 6 N UNSAT ELEMENT: Inform the Shift Manager on the status of the accumulator.

STANDARD: Shift Manager informed of accumulator status.

CUE: The Shift Manager acknowledges the report.

COMMENTS:

TERMINATION CUE: This completes the JPM. COMPLETION TIME:

Page 7 of 7

POINT BEACH NUCLEAR PLANT JPM PXXX.XXXCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT January 14, 2002 PERFORM PRESSURIZER HEATER ENERGY INPUT TEST H(.C_

K/A

REFERENCE:

)10.K2.01 (3.0/3.4)

(NUREG-1122) ()10.A4.02 (3.6/3.4)

ALTERNATE PATH JPM YES X NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

"X Procedure adequately addresses task elements.

Enter identifier here: TS-43 Other document adequately describes necessary task elements.

Enter identifier here:

"X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM X IN-PLANT CONTROL ROOM X VALIDATED TIME FOR COMPLETION: 12 MINUTES Page 1 of 7

POINT BEACH NUCLEAR PLANT JPM PXXX.XXXCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT January 14, 2002 PERFORM PRESSURIZER HEATER ENERGY INPUT TEST EXAMINEE EVALUATOR START TIME FINISH TIME PERFORMANCE F-1 SAT R] UNSAT JOB TITLE: El AOT El COT FI SRO FD STA TOOLS/EQUIPMENT/

REFERENCES:

TS 43 "Pressurizer Heater Group Energy Input Test" Rev 2 TASK STANDARDS:

T-ID Pressurizer Heater Group D energy input calculated within the given band (see JPM step) and determined to be SAT.

SIMULATOR INFORMATION:

TIME I FAIL COMPONENT OPTION IVALUE I RAMP DELAY ACT COND Use JPM specific Exam IC.

NOTE: If this JPM is performed on the simulator,the JPM administratorshould only give cues that are not indicatedon the simulator. If simulatorindication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated,the entire JPM should be retained.

Page 2 of 7

POINT BEACH NUCLEAR PLANT JPM PXXX.XXXCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT January 14, 2002 PERFORM PRESSURIZER BEATER ENERGY INPUT TEST READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

You are the Unit I Control Operator.

Major maintenance has just been completed on the breaker for the 'D' pressurizer heater group.

A partial performance of TS-43 "Pressurizer Heater Group Energy Input Test" is required for post maintenance testing.

The DOS has marked up a copy of TS-43 for performance ONLY on the 'D' pressurizer heater group.

INITIATING CUES (IF APPLICABLE):

Complete TS-43 for the 'D' pressurizer heater group and report the results to the DOS.

Page 3 of 7

POINT BEACH NUCLEAR PLANT JPM PXXX.XXXCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT January 14, 2002 PERFORM PRESSURIZER HEATER ENERGY INPUT TEST PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 1 1 y UNSAT ELEMENT: Record "AS FOUND" position of components AND position to the REQUIRED POSITION.

STANDARD: T-IE Pzr Heater Group E "AS FOUND" switch position recorded and placed in PULLOUT.

T- ID Pzr Heater Group D "AS FOUND" switch position recorded.

CUE: None.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 2 N UNSAT ELEMENT: T-ID Pzr Heater Group D turned off.

STANDARD: Control switch for T- ID Pzr Heater Group D placed in the OFF position.

CUE: None COMMENTS:

Page 4 of 7

POINT BEACH NUCLEAR PLANT JPM PXXX.XXXCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT January 14, 2002 PERFORM PRESSURIZER HEATER ENERGY INPUT TEST PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 3 3 Y UNSAT ELEMENT: X-14 current reading obtained and recorded.

STANDARD: Current reading for X-14 (panel C02) obtained and recorded in Step 5.3.1 CUE: None COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 4 4 Y UNSAT ELEMENT: T- ID Pzr Heater Group D energized and X-14 current recorded.

STANDARD: Control switch for T- ID Pzr Heater Group D placed in the ON position and X-14 current obtained and recorded in Step 5.3.1.

CUE: None COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 5 Y UNSAT ELEMENT: Bus IA06 voltage recorded.

STANDARD: Bus voltage for Bus 1A06 is recorded from panel C02.

CUE: None.

COMMENTS:

Page 5 of 7

POINT BEACH NUCLEAR PLANT JPM PXXX.XXXCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT January 14, 2002 PERFORM PRESSURIZER HEATER ENERGY INPUT TEST PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 6 6 N UNSAT ELEMENT: Return T- ID Pzr Heater Group D to "AS FOUND" condition.

STANDARD: The control switch for T- ID Pzr Heater Group D is placed in AUTO.

CUE: None.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 7 6 y UNSAT ELEMENT: Return T- IE Pzr Heater Group E to "AS FOUND" condition.

STANDARD: The control switch for T-lE Pzr Heater Group E is placed in AUTO (red flagged - ON).

CUE: None COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 8 7 Y UNSAT ELEMENT: Determine Pzr Heater Group D current draw.

STANDARD: The first X-14 current reading is correctly subtracted from the second X- 14 current reading to obtain the current draw for the D heater group.

CUE: None.

COMMENTS:

Page 6 of 7

POINT BEACH NUCLEAR PLANT JPM PXXX.XXXCOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT January 14, 2002 PERFORM PRESSURIZER HEATER ENERGY INPUT TEST PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 9 8 Y UNSAT ELEMENT: Calculate the energy input of Pzr Heater Group D (kW).

STANDARD: Using the given formula, Pzr heater Group D energy input determined and falls within the band of 111.9 142.2 kW.

CUE: None NOTE: The kW band is based on an actual correct performance of the JPM with an allowance of a span of one half of a division on the final current value and the voltage value.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 10 9 Y UNSAT ELEMENT: Energy input verified to be within limits of Technical Specifications.

STANDARD: Energy input determined to be greater than TS limit of 100 kW and marked as SAT.

CUE: None COMMENTS:

TERMINATION CUE: THIS COMPLETES THIS JPM. COMPLETION TIME:

Page 7 of 7

POINT BEACH NUCLEAR PLANT JPM P003.OO1 COT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 27, 2001 START A REACTOR COOLANT PUMP TOTAL REWRITE B~ IA K/A

REFERENCE:

003.K1.13 (2.5/2.5)

(NUREG-1122) 003.K4.03 (2.5/2.8)

)03.K5.05 (2.8/3.0)

)03.A4.01 (3.3/3.2)

)03.A4.02 (2.9/2.9)

)03.A4.03 (2.8/2.5)

)03.A4.04 (3.1/3.0)

)03.A4.05 (3.1/3.0)

)03.A4.06 (2.9/2.9)

)03.A4.08 (3.2/2.9)

ALTERNATE PATH JPM YES X NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

X Procedure adequately addresses task elements.

Enter identifier here: OP 4B "Reactor Coolant Pump Operation" Other document adequately describes necessary task elements.

Enter identifier here:

X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATEIWALKTHROUGH X DISCUSSION PERFORM X IN-PLANT CONTROL ROOM X VALIDATED TIME FOR COMPLETION: 14 MINUTES Page 1 of 8

POINT BEACH NUCLEAR PLANT JPM P003.001COT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 27, 2001 START A REACTOR COOLANT PUMP TOTAL REWRITE EXAMINEE EVALUATOR START TIME FINISH TIME PERFORMANCE D] SAT El UNSAT JOB TITLE: El AOT DCOT 7 SRO FI STA TOOLS/EQUIPMENT/

REFERENCES:

OP 4B, "Reactor Coolant Pump Operation", Rev. 43 TASK STANDARDS:

Start RCP IA in accordance with OP 4B, "Reactor Coolant Pump Operation".

SIMULATOR INFORMATION:

TIME IFAIL ICOMPONENT IOPTION IVALUE IRAMP DELAY ACT COND Initialize to JPM specific IC (Exam IC #63).

NOTE: If this JPM is performed on the simulator, the JPM administratorshould only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated,the entire JPM should be retained.

Page 2 of 8

POINT BEACH NUCLEAR PLANT JPM P003.001COT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 27, 2001 START A REACTOR COOLANT PUMP TOTAL REWRITE READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

"* You are the Unit I Control Operator.

"* Unit 1 is in Mode 3 (Hot Standby).

"* IP-IA RCP had been secured for breaker inspection.

"* Inspection has been completed and permission granted to restart IP-IA.

"* OP 4B has been completed UP TO Step 5.0.

"* All appropriate precautions, limitations, and prerequisites have been met.

"* The BOP operator is available to respond to any alarms unrelated to the task.

INITIATING CUES (IF APPLICABLE):

The Shift Manager directs you to start IP- IA per OP 4B, Section 5. 1.

Page 3 of 8

POINT BEACH NUCLEAR PLANT JPM P003.001 COT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 27, 2001 START A REACTOR COOLANT PUMP TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITI CAL SAT 1 1 N UNSAT ELEMENT: CHECK that starting duty limits will not be exceeded.

STANDARD: Starting limits checked per P&L 3.5.

CUE: Starting limits will not be exceeded (or as indicated on simulator).

NOTE: If asked, IP-JA RCP was last run 3 days ago.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 1 Y UNSAT ELEMENT: Start the IP-IA reactor coolant pump oil lift pump (1P-74A).

STANDARD: Lift pump started using control switch on 1C04.

CUE: Red light is lit for IP-74A oil lift pump (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITI CAL SAT 3 1 N UNSAT ELEMENT: Verify amber IP-IA RCP lift pressure light illuminates.

STANDARD: Lift pressure light verified ON (amber).

CUE: Lift pressure light is on (or as shown on simulator).

NOTE: Evaluatorshould make note of the time the lift pump was startedto ensure a minimum of two minutes occurred.

COMMENTS:

Page 4 of 8

POINT BEACH NUCLEAR PLANT JPM P003.OO1 COT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 27, 2001 START A REACTOR COOLANT PUMP TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 4 1 N UNSAT ELEMENT: CHECK No. I seal leakoff flow within the normal operating range of Figure 1.

STANDARD: Seal leakage checked per Figure 1. Determines leakage is within normal operating range.

CUE: Seal leakage is 1.5 gpm (or as indicated on simulator). Inform examinee that RCP seal injection flow and charging/letdown flow have been balanced (steps associated with balancing these flows are N/A).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 1 N UNSAT ELEMENT: Adjust charging pump speed and letdown as necessary to maintain letdown flow at 35-40 gpm.

STANDARD: Charging pump speed adjusted as necessary. Letdown flow adjusted to 35-40 gpm.

CUE: Letdown flow is approximately 37 gpm. Charging pump speed is adjusted to maintain stable pressurizer level (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 6 1 N UNSAT ELEMENT: If necessary to preclude excessive flow through demineralizers, then bypass the affected demineralizers.

STANDARD: Demineralizers bypassed, if necessary.

CUE: The Shift Manager states it is NOT necessary to bypass demineralizers.

COMMENTS:

Page 5 of 8

POINT BEACH NUCLEAR PLANT JPM P003.001COT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 27, 2001 START A REACTOR COOLANT PUMP TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 7 2 Y UNSAT ELEMENT: After RCP oil lift pump has run a minimum of two minutes, then start IP-1A.

STANDARD: RCP oil lift pump verified running for two minutes. IP-lA control switch taken to START, red breaker indicating light verified ON.

CUE: If two minutes have not elapsed and this is recognized by the examinee, the examinee may be informed that two minutes have elapsed.

1P-IA red light is lit (or as indicated on simulator).

COMMENTS:

Page 6 of 8

POINT BEACH NUCLEAR PLANT JPM P003.001 COT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 27, 2001 START A REACTOR COOLANT PUMP TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 8 3 N UNSAT ELEMENT: Check the following:

"* RCP running current normal (<620 amps, RCS at normal operating temp)

"* Labyrinth sea] DP >15 inches

"* No. 1 seal DP >200 psid

"* Seal water inlet/bearing temp <150'F

"* Seal water outlet temperature <170'F

"* RCP motor bearing temperatures (upper and lower) <90'C

"* VCT pressure >15 psig

"* RCS pressure stabilized

"* CC return temperatures <120'F

"* DMIMS - No alarms STANDARD: RCP conditions are verified within the normal limits above.

CUE: 0 RCP current 595 amps (or as indicated on simulator) 0 Lab seal DP is 35 inches (or as indicated on simulator) 0 No. I seal DP >400 (or as indicated on simulator)

S Seal water inlet/bearing temp 115'F (or as indicated on simulator)

S Seal water outlet temperature 151'F (or as indicated on simulator)

S RCP motor bearing temperatures (upper and lower) are 55°C (or as indicated on simulator) 0 VCT pressure is 28 psig (or as indicated on simulator) 0 RCS pressure is stable (or as indicated on simulator) 0 CC Return temperatures are 95°F (or as indicated on simulator) 0 No DMIMS alarms (or as indicated on simulator)

When examinee begins to go behind 1C04 to check RCP motor bearingtemperatures on TR-2001, inform examinee that all temperaturesare approximately 55 C.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 9 3 y UNSAT ELEMENT: Stop oil lift pump after one minute of RCP operation.

STANDARD: Lift pump (lP-74A) taken to STOP and green light verified lit.

CUE: Green light lit above IP-1A Oil Lift pump (or as indicated on simulator).

COMMENTS:

Page 7 of 8

POINT BEACH NUCLEAR PLANT JPM P003.001 COT TRAINING JOB PERFORMANCE MEASURES Revision I DRAFT August 2 7, 2001 START A REACTOR COOLANT PUMP TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 10 3 N UNSAT ELEMENT: Check RCP IA loss of power bistable is OFF.

STANDARD: Observes RCP 1A loss of power bistable is OFF on the reactor protection/safeguard status panel.

CUE: Light is OFF (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 11 3 N UNSAT ELEMENT: Steps 5.1.12 and 5.1.13 are N/A'd.

STANDARD: As above.

CUE: RCS pressure is within band, demineralizers were not bypassed.

COMMENTS:

TERMINATION CUE: THIS COMPLETES THE JPM. COMPLETION TIME:

Page 8 of 8

POINT BEACH NUCLEAR PLANT JPM P026.002COT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO FAILURE OF CONTAINMENT SPRAY K/A

REFERENCE:

)26.A2.03 (4.1/4.4)

(NUREG-1122)

ALTERNATE PATH JPM X YES NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

"X Procedure adequately addresses task elements.

Enter identifier here: EOP-0 Unit 1 Attachment A Other document adequately describes necessary task elements.

Enter identifier here:

"X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM IN-PLANT CONTROL ROOM X VALIDATED TIME FOR COMPLETION: 10 MINUTES Page 1 of 8

POINT BEACH NUCLEAR PLANT JPM P026.002COT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO FAILURE OF CONTAINMENT SPRAY EXAMINEE EVALUATOR START TIME FINISH TIME PERFORMANCE II SAT F-1 UNSAT JOB TITLE: El AOT El COT rI SRO F-1 STA TOOLS/EQUIPMENT/

REFERENCES:

Attachment A of EOP-0 Unit I "Reactor Trip or Safety Injection" Rev 37.

TASK STANDARDS:

One train of Containment Spray is actuated, the other train is shutdown per Attachment A of EOP-0.

SIMULATOR INFORMATION:

TIME FAIL COMPONENT I OPTION VALUE RAMP DELAY ACT COND Initialize to JPM specific saved IC (Exam IC #66).

NOTE: If this JPM is performed on the simulator, the JPM administratorshould only give cues that are not indicated on the simulator. If simulatorindication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the traineeto continue the evolution.

NOTE: Only this page needs to be retained in examinee's recordif completed satisfactorily. If unsatisfactoiy performance is demonstrated,the entire JPM should be retained.

Page 2 of 8

POINT BEACH NUCLEAR PLANT JPM P026.002COT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO FAILURE OF CONTAINMENT SPRAY READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

You are the BOP operator ( 3rd license). Unit 1 has experienced a loss of reactor coolant inside containment. The control room crew is currently performing actions of EOP-0. The DOS has tasked you with performing actions of EOP-0, Attachment A "Automatic Action Verification". This attachment is currently in progress and complete through step A9.

INITIATING CUES (IF APPLICABLE):

The DOS directs you to continue with the actions of EOP-0 Attachment A, beginning at step AI0.

Page 3 of 8

POINT BEACH NUCLEAR PLANT JPM P026.002COT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO FAILURE OF CONTAINMENT SPRAY PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITICAL SAT 1 1 N UNSAT ELEMENT: Check Control Room Ventilation in Accident Mode STANDARD:

  • At least one Control Room recirc fan is running, W-13B 1 or W-13B2.

a Control Room damper solenoid valve purple light is lit CUE: W-13B I is running (or as indicated on simulator).

Control Room damper solenoid valve purple light is lit (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 1 N UNSAT ELEMENT: Check if Main Steam Lines can remain open.

STANDARD: MSIVs determined to be closed, transition made via RNO to next procedural step.

CUE: Green light is lit for both MSIVs (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITI CAL SAT 3 1 N UNSAT ELEMENT: Verify proper SI valve alignment.

STANDARD:

  • All lights checked lit on "Unit I SI Active" status panel.
  • No lights checked lit on "Unit 1 SI-Spray Ready" status panel.

CUE: All lights are lit on "Unit 1 SI Active" status panel (or as indicated on simulator).

No lights are lit on "Unit 1IS pray Ready" status panel (or as indicated on simulator).

COMMENTS:

Page 4 of 8

POINT BEACH NUCLEAR PLANT JPM P026.002COT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO FAILURE OF CONTAINMENT SPRAY PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THIE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 4 2 N UNSAT ELEMENT: Check containment pressure has remained less than 25 psig.

STANDARD: Recorders 1PR-968 and 1PR-969 checked to see if containment has exceeded 25 psig.

CUE: Containment pressure is 27 psig (or as indicated on simulator).

NOTE: This begins the Alternate Path portion of this JPM.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 2 N UNSAT ELEMENT: Check containment spray actuated.

STANDARD: Annunciator CO 1 B 2-6 checked to see if lit.

CUE: Annunciator CO1 B 2-6 is not lit (or as indicated on simulator).

NOTE: Examinee may inform DOS of the failure of containmentspray to automaticallyactuate and the need to manually actuate spray. Examinershould acknowledge report.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 6 3 N UNSAT ELEMENT: Manual actuation of both trains of containment spray is required.

STANDARD: BOTH containment spray manual initiation pushbuttons are depressed simultaneously.

CUE: BOTH pushbuttons are depressed, the containment spray system does not actuate (or as indicated in simulator).

NOTE: Examinee may informn DOS of the failure of containment spray to automatically and manually actuate and the need to manually align spray. Examiner should acknowledge report.

COMMENTS:

Page 5 of 8

POINT BEACH NUCLEAR PLANT JPM P026.002COT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO FAILURE OF CONTAINMENT SPRAY PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 7 4 Y UNSAT ELEMENT: Ensure ALL containment spray pump discharge MOVs open.

STANDARD: Discharge valves ISI-860A, ISI-860B, ISI-860C, and ISI-860D are all manually opened using the control switches.

CUE: Red light is lit above all 4 containment spray discharge MOVs (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 8 5 y UNSAT ELEMENT: Ensure at least one containment spray pump is running.

STANDARD: One or both containment spray pumps are manually started using the control switch(es).

CUE: Red light is lit above each containment spray pump that was manually started (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 9 6 Y UNSAT ELEMENT: Shut down one train of containment spray.

STANDARD: If BOTH containment spray pumps are running, one pump is stopped and its control switch is placed in pull-out. If only one pump is currently running, the control switch for the idle pump is placed in pull-out.

CUE: Red light is lit for one spray pump, the other has no lights lit and its control switch is in pull-out (or as indicated on simulator).

COMMENTS:

Page 6 of 8

POINT BEACH NUCLEAR PLANT JPM P026.002COT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO FAILURE OF CONTAINMENT SPRAY PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 10 7 Y UNSAT ELEMENT: Ensure suction on idle spray pump is shut.

STANDARD: The suction valve for the idle pump is shut (ISI-870A for IP-14A, ISI-870B for 1P-14B).

CUE: The green light is lit on the suction valve of the idle pump (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 11 8 y UNSAT ELEMENT: Ensures at least one spray additive eductor suction valve open (1SI-836A or ISI-836B) when containment spray has been actuated for >2 minutes.

STANDARD: One or both spray additive eductor suction valves opened (ISI-836A , ISI-836B) when two minutes has elapsed since containment spray actuation.

CUE: One or both eductor valve controllers indicate open after placing in manual and opening (or as indicated on simulator).

COMMENTS:

Page 7 of 8

POINT BEACH NUCLEAR PLANT JPM P026.002COT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 RESPOND TO FAILURE OF CONTAINMENT SPRAY PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 12 9 N UNSAT ELEMENT: Verify SI Flow STANDARD: 0 RCS pressure checked < 1400 psig

"* SI Pump flow verified for each train (IFI-925 and 924)

"* RCS wide range pressure checked < (425 psig) 200 psig

"* RHR Pump flow verified for each train (IFI-626 and 928)

CUE: All above conditions are met (or as indicated on simulator).

When the last step of the attachment is finished, the JPM is complete.

COMMENTS:

TERMINATION CUE: THIS COMPLETES THE JPM. COMPLETION TIME:

Page 8 of 8

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID K/A

REFERENCE:

)62.K4.05 (2.7/3.2)

(NUREG-1122) ()62.K5.03 (2.4/2.6)

)62.AI.05 (2.3/2.4)

)62.A3.02 (2.4/2.2)

)62.A4.01 (3.3/3.1)

)62.A4.03 (2.8/2.9)

)62.A4.07 (3.1/3. 1)

ALTERNATE PATH JPM YES X NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

X Procedure adequately addresses task elements.

Enter identifier here: OP-1C "Startup To Power Operation" Other document adequately describes necessary task elements.

Enter identifier here:

X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM X IN-PLANT CONTROL ROOM X VALIDATED TIME FOR COMPLETION: 15 MINUTES Page 1 of 9

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID EXAMINEE EVALUATOR START TIME FINISH TIME PERFORMANCE Ei SAT F-l UNSAT JOB TITLE: El AOT El COT F-1 SRO Fl STA TOOLS/EQUIPMENT/

REFERENCES:

OP- C "Startup To Power Operation" Rev 79 TASK STANDARDS:

Main generator phased onto the grid at minimum load in accordance with OP-IC.

SIMULATOR INFORMATION:

TIME FAIL COMPONENT OPTION VALUE RAMP DELAY ACT COND Initialize to JPM specific saved IC (Exam IC #67).

NOTE: This JPM is written to be performed on either unit.

NOTE: If this JPM is performed on the simulator,the JPM administratorshould only give cues that are not indicatedon the simulator. If simulatorindication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated,the entire JPM should be retained.

Page 2 of 9

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

You are the BOP operator. Unit I is at low power with OP-IC complete through Step 5.79. The secondary is started up and the turbine generator is ready to be placed on the grid. The CO is available to respond to alarms not related to this task. All applicable precautions, limitations, and prerequisites have been met.

INITIATING CUES (IF APPLICABLE):

The Shift Manager directs you to place the turbine generator on the grid per OP-1C, starting at Step 5.80.

Page 3 of 9

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITICAL SAT 1 1 y UNSAT ELEMENT: Ensure turbine speed between 1750 and 1800 rpm, AND CLOSE the Unit 1 generator exciter field breaker.

STANDARD: Turbine speed checked on 1C03 to be between 1750 and 1800 rpm, exciter field breaker closed using its control switch on CO.

CUE: Turbine speed is 1800 rpm and red light is lit above exciter field breaker (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 2 N UNSAT ELEMENT: Slowly adjust the Unit 1 generator voltage regulator DC adjuster to obtain Unit I generator voltmeter indication of approximately 19 kV at 1800 rpm.

STANDARD: Voltage adjusted to 19 kV on C01 using DC adjuster.

CUE: The voltage is adjusted to 19 kV at 1800 rpm (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 3 3 N UNSAT ELEMENT: Ensure all three phases approximately 19 kV, using Unit 1 generator voltmeter switch.

STANDARD: Phase voltages verified at 19 kV on CO1.

CUE: The phase voltage is verified to be at 19 kV (or as indicated on simulator).

COMMENTS:

Page 4 of 9

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 4 4 y UNSAT ELEMENT: For automatic voltage regulation:

1. PLACE Unit 1 generator voltage regulator to TEST, AND ensure yellow light is lit.
2. Ensure the generator voltage regulator balance meter is approximately zero using the Unit 1 generator voltage regulator AC adjuster.
3. PLACE Unit 1 generator voltage regulator to AUTO AND ensure red light is lit.

STANDARD: Automatic voltage regulation set up as above.

CUE: 1. The regulator switch is in TEST, the yellow light is lit (or as indicated on simulator).

2. The balance meter now reads zero (or as indicated on simulator).
3. The voltage regulator switch is in AUTO, red light is lit (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 5 y UNSAT ELEMENT: PLACE the Unit I generator breaker 122 synchroscope switch to ON.

STANDARD: Synchroscope placed to ON.

CUE: The synchroscope is on (or as indicated on simulator).

NOTE: Incoming voltmeter reading is generator voltage. Running voltmeter reading representsline voltage.

COMMENTS:

Page 5 of 9

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 6 6 y UNSAT ELEMENT: ADJUST incoming voltmeter reading to match running voltmeter reading, using the Unit 1 generator voltage regulator AC adjuster.

STANDARD: Voltages matched as above.

CUE: Incoming and running voltages matched (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 7 7 N UNSAT ELEMENT: Ensure Unit 1 generator exciter field ammeter at LESS THAN 23 amps.

STANDARD: Exciter field current verified as above.

CUE: Exciter field current is 20 amps (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 8 8 y UNSAT ELEMENT: ADJUST turbine speed (using reference control raise and lower pushbuttons) as necessary to rotate the synchroscope 2 to 5 rpm in the "FAST" direction.

STANDARD: Synchroscope rotating slowly in "FAST" direction as above. Adjustment made using Reference/Setter turbine controls on 1C03 to raise or lower turbine speed as necessary.

CUE: The synchroscope is rotating slowly in the "FAST" direction at 2-5 rpm (or as indicated on simulator).

COMMENTS:

Page 6 of 9

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 9 9 y UNSAT ELEMENT: REMOVE 1F52-122 from PULLOUT.

STANDARD: 1F52-122 out of PULLOUT on COa.

CUE: 1F52-122 removed from PULLOUT, green light is lit (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 10 10 y UNSAT ELEMENT: WHEN the synchroscope is just before 12:00 AND within the green band, THEN CLOSE 1F52-122 Unit 1 generator main breaker.

STANDARD: Unit 1 generator main breaker CLOSED on C01 and time recorded in OP-IC.

CUE: The red light is lit for the Unit 1 generator main breaker (or as indicated on simulator).

The synchroscope has stopped at the 12 o'clock position (or as indicated on simulator).

NOTE: It is"not criticalto record times.

COMMENTS:

Page 7 of 9

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 11 11 N UNSAT ELEMENT: Ensure the following:

1. 20-30 MWe Unit I generator wattmeter.
2. Unit 1 generator varmeter indicates a positive number (MVARS in out direction).
3. "LOAD CONTROL" status light is lit.

STANDARD: Status of generator toad VERIFIED as above.

CUE: 1. 24 MWe indicated on Unit I generator wattmeter (or as indicated on simulator).

2. Unit 1 generator varmeter indicates a positive number (or as indicated on simulator).
3. "LOAD CONTROL" status light is lit (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 12 11 N UNSAT ELEMENT: PLACE the Unit I generator breaker 122 synchroscope switch to OFF.

STANDARD: Synchroscope OFF.

CUE: The synchroscope switch is OFF (or as indicated on simulator).

COMMENTS:

Page 8 of 9

POINT BEACH NUCLEAR PLANT JPM P045.005COT TRAINING JOB PERFORMANCE MEASURES Revision 2 DRAFT August 27, 2001 SYNCHRONIZE TURBINE GENERATOR AND PLACE TOTAL REWRITE ONTO THE GRID PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 13 11 N UNSAT ELEMENT: Make notification that the unit is online.

STANDARD: WEPOG notified per NP 2.1.5.

CUE: WEPOG acknowledges the report.

NOTE: Examinee may inform the Shift Manager that unit is on line and that WEPOG needs to notified.

COMMENTS:

TERMINATION CUE: THIS COMPLETES THE JPM. COMPLETION TIME:

Page 9 of 9

POINT BEACH NUCLEAR PLANT JPM P000.015COT TRAINING JOB PERFORMANCE MEASURES Revision 3 DRAFT August 27, 2001 RESPOND TO A LOSS OF COMPONENT COOLING TOTAL REWRITE WATER K/A

REFERENCE:

008.K4.02 (2.9/2.7)

(NUREG-1122) 008.A1.04 (3.1/3.2) 008.A2.02 (3.2/3.5) 008.A4.07 (2.9/2.9) 026.AA 1.05 (3.1/3.1) 026.AA2.02 (2.9/3.6)

ALTERNATE PATH JPM X YES NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

X Procedure adequately addresses task elements.

Enter identifier here: AOP-9B "Component Cooling System Malfunction" Other document adequately describes necessary task elements.

Enter identifier here:

X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM X IN-PLANT CONTROL ROOM X VALIDATED TIME FOR COMPLETION: 15 MINUTES Page 1 of 7

POINT BEACH NUCLEAR PLANT JPM P000.015 COT TRAINING JOB PERFORMANCE MEASURES Revision 3 DRAFT August 27, 2001 RESPOND TO A LOSS OF COMPONENT COOLING TOTAL REWRITE WATER EXAMINEE EVALIJATOR START TIME FINISH TIME PERFORMANCE [] SAT El UNSAT JOB TITLE: El AOT D COT El SRO [] STA TOOLS/EQUIPMENT/

REFERENCES:

AOP-9B Unit 1 "Component Cooling System Malfunction" Rev 16 TASK STANDARDS:

Respond to a loss of component cooling water in excess of make-up capacity in accordance with AOP-9B, "Component Cooling System Malfunction".

SIMULATOR INFORMATION:

TIME FAIL COMPONENT OPTION VALUE RAMP DELAY ACT COND Initialize to JPM specific IC (Exam IC#65)

NOTE: The JPM administratorshould insertthe malfunction and bring in the CCW Surge Tank low level alarm, then FREEZE the simulator and administerthe JPM (unless set up ahead of time). DO NOT TAKE SIMULATOR TO RUN UNTIL EXAMINEE IS READY TO BEGIN THE JPM.ENSURE RX MAKE-UP WATER SIGN IS PROPERLY POSITIONED ON BACK OF COL TREND CCW LEVEL FOR NRC RECORD PURPOSES.

NOTE: If this JPM is performed on the simulator, the JPM administratorshould only give cues that are not indicated on the simulator. If simulatorindicationis sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

NOTE: Only this page needs to be retainedin examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated,the entire JPM should be retained.

Page 2 of 7

POINT BEACH NUCLEAR PLANT JPM P000.015COT TRAINING JOB PERFORMANCE MEASURES Revision 3 DRAFT August 27, 2001 RESPOND TO A LOSS OF COMPONENT COOLING TOTAL REWRITE WATER READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

"* You are the Unit 1 Control Operator.

"* Both Units are at 100% power.

"* The following indications/alarms occur:

(1) CCW surge tank low level alarm.

(2) CCW surge tank level lowering.

(3) Auxiliary Building -19 ft sump high level alarm.

"* The PAB AO has been dispatched to investigate the Auxiliary Building Sump alarm.

INITIATING CUE(S) / TASK TO BE PERFORMED (SIMULATED):

The Shift Manager directs you to respond to the indications/alarms, taking any corrective actions required in accordance with AOP-9B, "Component Cooling System Malfunction."

Page 3 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.015COT TRAINING JOB PERFORMANCE MEASURES Revision 3 DRAFT August 27, 2001 RESPOND TO A LOSS OF COMPONENT COOLING TOTAL REWRITE WATER PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITICAL SAT 1 1 N UNSAT ELEMENT: Check at least one component cooling pump running (1P-1 1A or 1P-1 1B).

STANDARD: Checked that one CCW pump is running on 1C03.

CUE: One CCW pump red light on, green light off (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 1 N UNSAT ELEMENT: Check Component Cooling surge tank level lowering.

"* 1LI-618B

"* PPCS Point YYLT 618

" f{New PPCS point L-6181 STANDARD: CCW surge tank level stability checked by at least one of the above noted indications.

CUE: CCW surge tank level is lowering (or as indicated on simulator).

NOTE: At any time, should CCW surge level lower to less than 10% or examinee determines that surge tank level cannot be maintainedabove 10%/c, examinee may take the actions of Step 3 RNO of AOP-9B.

Examiner shouldproceed to Step 9/Sequence 5 of this JPM.

COMMENTS:

Page 4 of 7

POINT BEACH NUCLEAR PLANT JPM P000.015COT TRAINING JOB PERFORMANCE MEASURES Revision 3 DRAFT August 27, 2001 RESPOND TO A LOSS OF COMPONENT COOLING TOTAL REWRITE WATER PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 3 2 Y UNSAT ELEMENT: Start reactor makeup water pump aligned for services.

"* P-23A

"* P-23B STANDARD: Start either P-23A or P-23B, whichever is aligned for services, behind CO.

CUE: P-23A or B red light is lit, green light is off (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 4 2 N UNSAT ELEMENT: Ensure component cooling surge tank vent (1CC-17) open.

STANDARD: 1CC-17 is opened or verified open on 1C03.

CUE: 1CC-17 red indicating light is on, green light is off (or as indicated on simulator).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 3 Y UNSAT ELEMENT: Cycle emergency make-up valve 1CC-815 as necessary to maintain level between 20% and 60%

STANDARD: 1CC-815 is opened and component cooling surge tank level trend is monitored. Recognizes that CCW surge tank level is still lowering.

CUE: If examinee contacts PAB AO and requests that local fill valve 1CC-773 be opened, then acknowledge the request. The examiner can report back that 1CC-773 is full open approximately 2 3 minutes after the request (i.e. there will be no change in the level trend).

Red light is lit, green light is off for 1CC-815. Component cooling surge tank level is still lowering. (or as indicated on simulator).

COMMENTS:

Page 5 of 7

POINT BEACH NUCLEAR PLANT JPM P000.015COT TRAINING JOB PERFORMANCE MEASURES Revision 3 DRAFT August 27, 2001 RESPOND TO A LOSS OF COMPONENT COOLING TOTAL REWRITE WATER PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 6 3 N UNSAT ELEMENT: Isolate leak per Attachment A, "Leak Isolation For Lowering Surge Tank Level", while continuing with this procedure.

STANDARD: Using Attachment A, control room alarms/indications, and reports, identify that system leakage is to Atmosphere (A3 applies).

CUE: The PAB AO reports that water is spraying from the common discharge pipe in the area below C 59 by the shortline and that no isolation valves exist to stop the leakage.

NOTE: The examinee, upon recognizing that the leak cannot be isolatedand thatfull CCW make-up is insufficient to maintain Surge Tank level, should recommend a plantshutdown or a plant trip.

Examinee may raise concerns about chromate spill, however, should not be distractedfrom this AOP by concurrently entering into the hazardousspill AOP.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 7 4 N UNSAT ELEMENT: Check component cooling surge tank level stable STANDARD: Recognize that component cooling surge tank level is NOT STABLE and continue with the procedure.

CUE: Surge tank level is lowering (or as indicated on simulator).

COMMENTS:

Page 6 of 7

POINT BEACH NUCLEAR PLANT JPM POO.0O15COT TRAINING JOB PERFORMANCE MEASURES Revision 3 DRAFT August 27, 2001 RESPOND TO A LOSS OF COMPONENT COOLING TOTAL REWRITE WATER PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 8 4 N UNSAT ELEMENT: Check surge tank level greater than 10%

"* 1LI-618B

"* PPCS Point YYLT618

"* (New PPCS point L-618)

STANDARD: Check surge tank level using one of the above indicators.

CUE: Surge tank level is 10% (or as indicated on simulator).

NOTE: If actual surge tank level is > 10%, examinee should continue with procedure.Level will continue to lower. Examinee MUST recognize when level drops below 10% andperform step 3 RNO actions of the AOP (this is a continuous action step).

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 9 5 Y UNSAT ELEMENT: Perform the following:

"* Place IP- IIA and IP-11B, component cooling water pumps in PULL-OUT.

"* Trip reactor, stabilize plant with EOPs while continuing with AOP-9B.

"* Stop RCPs STANDARD: 0 Place Component Coolant Water pumps to PULL-OUT on 1C03.

"* Trip the reactor from 1C04 or CO1.

"* Stop any running RCPs.

CUE:

After the examinee trips the reactor and performs the immediate actions of EOP-0, inform the examinee that the immediate actions have been verified and to continue with actions of AOP-9B.

When the RCPs are tripped, this completes this JPM.

COMMENTS:

TERMINATION CUE: THIS COMPLETES THE JPM. COMPLETION TIME:

Page 7 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.036aAOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 MAKEUP TO RWST DURING LOSS OF CONTAINMENT SUMP RECIRCULATION 1_/

K/A

REFERENCE:

tE11.EK1.2 (3.6/4.1)

(NUREG-1122) t 1 1.EK3.2 (3.5/4.0)

A-11.EK3.3 (3.8/3.8)

ALTERNATE PATH JPM YES X NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

"X Procedure adequately addresses task elements.

Enter identifier here: Unit 1 ECA-1.1 Attachment A Other document adequately describes necessary task elements.

Enter identifier here:

"X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM X IN-PLANT X CONTROL ROOM VALIDATED TIME FOR COMPLETION: 15 MINUTES Page 1 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.036aAOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 MAKEUP TO RWST DURING LOSS OF CONTAINMENT SUMP RECIRCULATION EXAMINEE EVALUATOR START TIME ____________________FINISH TIME PERFORMANCE [] SAT Ej UNSAT JOB TITLE: El AOT [] COT [] SRO [] STA TOOLS/EQUIPMENT/

REFERENCES:

ECA- 1.1 "Loss of Containment Sump Recirculation, RWST REFILL" Attachment A, Rev 26 TASK STANDARDS:

RWST refill initiated per Section A2 of ECA-1.1, Attachment A.

SIMULATOR INFORMATION:

TIME I FAIL I COMPONENT I OPTION I VALUE I RAMP I DELAY ACT COND None NOTE: If this JPM is performed on the simulator,the JPM administratorshould only give cues thatare not indicatedon the simulator. If simulatorindication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the traineeto continue the evolution.

NOTE: Only this page needs to be retainedin examinee's recordif completed satisfactorily. If unsatisfactory performance is demonstrated,the entire JPM should be retained.

Page 2 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.036aAOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 MAKEUP TO RWST DURING LOSS OF CONTAINMENT SUMP RECIRCULATION READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

"* Unit 1 is shutdown due to a large RCS leak inside containment.

"* Neither RHR/SI train has been able to be placed on containment sump recirculation.

"* The Unit 1 RWST is empty.

INITIATING CUES (IF APPLICABLE):

The Shift Manager directs you to line-up and refill the Unit 1 RWST from the Fuel Transfer Canal using P-9, Holdup Tank Recirculating Pump per ECA- 1.1, Attachment A, step A2. The fuel transfer canal is filled and the canal doors are shut.

Page 3 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.036aAOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 MAKEUP TO RWST DURING LOSS OF CONTAINMENT SUMP RECIRCULATION PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y'. FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITICAL SAT 1 1 N UNSAT ELEMENT: At MCC B-33, ensure P-9 CVCS HUT recirc pump breaker on (B52-334F).

STANDARD: B52-334F is verified closed (ON) at B-33.

CUE: When located, breaker B52-334F is ON.

NOTE: Examinee may indicate that he/she will depress the thermal overload RESET pushbutton. This is not requiredfor successful completion of this JPM COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 2 N UNSAT ELEMENT: IF holdup tank recirculation pump is running, THEN locally stop the pump (P-9).

STANDARD: Ensures P-9 is NOT running by checking red light off and/or locally identifying pump is not running.

CUE: P-9 red light is off, pump is not running.

COMMENTS:

Page 4 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.036aAOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 MAKEUP TO RWST DURING LOSS OF CONTAINMENT SUMP RECIRCULATION PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y'". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 3 3 N UNSAT ELEMENT: Locally ensure the following valves are shut:

1) P-9 recirculation pump suction (BS- 1112).
2) P-9 recirculation pump discharge (13 S- 1109).
3) Spent fuel pool drain to T-8B CVCS holdup tank inlet (BS- 1119).
4) P-9 HUT recirc pump return to spent fuel pool (SF-785A).
5) P-9 HUT recirc pump return to transfer canal (SF-785C).

STANDARD: Near P-9, ensures above valves are shut by checking position of each.

CUE: 1) BS- 1112 valve operating handle is perpendicular to piping.

2) B S- 1109 valve operating handle is perpendicular to piping.
3) B S- 1119 valve operating handle is perpendicular to piping.
4) SF-785A stem is inserted.
5) SF-785C stem is inserted.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 4 4 Y UNSAT ELEMENT: Locally open P-9 HUT recirc pump suction from transfer canal (SF-785B).

STANDARD: SF-785B is located and opened by turning handwheel in counter-clockwise direction.

CUE: SF-785B stem is extended.

COMMENTS:

Page 5 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.036aAOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 MAKEUP TO RWST DURING LOSS OF CONTAINMENT SUMP RECIRCULATION PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 5 5 Y UNSAT ELEMENT: Locally open RWST boric acid inlet, 1SI-828 (PAB 26' elevation, east of boric acid evaporator condensate demineralizer).

STANDARD: 1SI-828 is located and OPENED by turning handwheel in counter-clockwise direction.

CUE: 1SI-828 stem is extended.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 6 6 Y UNSAT ELEMENT: Locally start holdup tank recirculation pump, P-9.

STANDARD: P-9 started by depressing START pushbutton above P-9.

CUE: P-9 red light is on, pump is observed to be running.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 7 7 Y UNSAT ELEMENT: Establish holdup tank recirculation pump discharge pressure between 45 psig and 50 psig by throttling 1T-4 volume control tank outlet valve (1CV-361A).

STANDARD: 1CV-361A throttled with 45-50 psig indicated on P1-192.

CUE: 1CV-361A throttled with pressure indicating 47 psig.

COMMENTS:

Page 6 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.036aAOT TRAINING JOB PERFORMANCE MEASURES Revision 0 DRAFT August 27, 2001 MAKEUP TO RWST DURING LOSS OF CONTAINMENT SUMP RECIRCULATION PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 8 8 N UNSAT ELEMENT: Inform Shift Manager that makeup to the RWST has commenced.

STANDARD: Shift Manager informed.

CUE: The Shift Manager acknowledges the report.

COMMENTS:

TERMINATION CUE: THIS COMPLETES THE JPM. COMPLETION TIME:

Page 7 of 7

POINT BEACH NUCLEAR PLANT JPM P000.017AOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 23, 2001 PERFORM LOCAL ACTIONS FOR ISOLATING A S/G TOTAL REWRITE K/A

REFERENCE:

040.AK3.01 (4.2/4.5)

(NUREG-1122) 040.AK3.03 (4.5/4.7)

Gen 2.4.35 (3.3/3.5)

ALTERNATE PATH JPM YES X NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

X Procedure adequately addresses task elements.

Enter identifier here: EOP-2 Unit 2 "Faulted Steam Generator Isolation" Other document adequately describes necessary task elements.

Enter identifier here:

X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM X IN-PLANT X CONTROL ROOM VALIDATED TIME FOR COMPLETION: 10 MINUTES Page 1 of 5

POINT BEACH NUCLEAR PLANT JPM P000.017AOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 23, 2001 PERFORM LOCAL ACTIONS FOR ISOLATING A S/G TOTAL REWRITE EXAMINEE ____________________EVALUATOR START TIME FINISH TIME PERFORMANCE El SAT M] UNSAT JOB TITLE: [] AOT E] COT El SRO El STA TOOLS/EQUIPMENT/

REFERENCES:

EOP-2 Unit 2 "Faulted Steam Generator Isolation", Rev 15 TASK STANDARDS:

Locally operated valves for isolating the "A" steam generator are shut.

SIMULATOR INFORMATION:

TIME FA I COMPONENTI OPTION VALUE RAMP DELAY ACT COND None NOTE: If this JPM is performed on the simulator,the JPM administratorshould only give cues that are not indicatedon the simulator. If simulatorindication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the traineeto continue the evolution.

NOTE: Only this page needs to be retained in examinee's recordif completed satisfactorily. If unsatisfactory performance is demonstrated,the entire JPM should be retained.

Page 2 of 5

POINT BEACH NUCLEAR PLANT JPM P000.017AOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 23, 2001 PERFORM LOCAL ACTIONS FOR ISOLATING A S/G TOTAL REWRITE READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

"* You are the PAB auxiliary operator.

"* Unit 2 has tripped due to a steam leak (faulted steam generator) in containment.

"* The crew has identified the steam leak as being from the Unit 2 "A" steam generator.

"* The crew is in the process of isolating the Unit 2 "A" steam generator per EOP-2, "Faulted Steam Generator Isolation".

INITIATING CUES (IF APPLICABLE):

The Unit 2 control operator has directed you to ensure shut the "A" steam generator MSIV Bypass Valve, 2MS-234, per step 2.b of EOP-2.

A second auxiliary operator has already been directed to ensure shut the "B" steam generator MSIV Bypass Valve, 2MS-236.

Page 3 of 5

POINT BEACH NUCLEAR PLANT JPM P000.017AOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 23, 2001 PERFORM LOCAL ACTIONS FOR ISOLATING A S/G TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITICAL SAT 1 1 N UNSAT ELEMENT: Locally check shut MSIV Bypass Valve, 2MS-234 (85' elevation of the faqade).

STANDARD: 2MS-234 handwheel rotated in clockwise direction or red lock verified in place and notifies control room that 2MS-234 is shut.

CUE: 2MS-234 MSIV Bypass Valve handwheel cannotbe rotated in the clockwise direction (if manipulated)

OR the red lock is in place. After reportingto control, the reportis acknowledged.

NOTE: If examinee inquiresabout 2MS-236, the second auxiliary operatorhas checked this valve shut.

If examinee inquiresabout red locks, the DSS has authorized breaking of all red locks associatedwith this evolution.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 2 N UNSAT ELEMENT: N/A STANDARD: N/A CUE: After acknowledging report, inform examinee that steps 7.d and 7.e of EOP-2 also need to be performedfor the Unit 2 "A" steam generator.(2MS-235 2P-29 AFP/Radwaste Steam Isolation and 2MS-228 Main Steam Trap Isolationare to be SHUT)

COMMENTS: This step is provided to ensure the evaluator provides the above cue.

STEP/SEQUENCE/CRITICAL SAT 3 3 Y UNSAT ELEMENT: Locally shut 2P-29 AFP/Radwaste Steam Isolation valve, 2MS-235 (85' elevation of the faqade).

STANDARD: Red lock is removed and 2MS-235 rotated in clockwise direction.

CUE: 2MS-235, 2P-29 AFP/Radwaste Steam Isolation valve stem is inserted.

COMMENTS:

Page 4 of 5

POINT BEACH NUCLEAR PLANT JPM P000.017AOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 23, 2001 PERFORM LOCAL ACTIONS FOR ISOLATING A S/G TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 4 3 Y UNSAT ELEMENT: Locally shut Main Steam Trap Isolation valve, 2MS-228 (85' elevation of the faqade).

STANDARD: 2MS-228 rotated in clockwise direction.

CUE: 2MS-228, Main Steam Trap Isolation valve stem is inserted.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 4 N UNSAT ELEMENT: Control room informed that 2MS-235 and 2MS-228 are shut.

STANDARD: Control room contacted and informed that 2MS-235 and 2MS-228 are shut.

CUE: Control room acknowledges report that the valves are shut.

COMMENTS:

TERMINATION CUE: THIS COMPLETES THE JPM. COMPLETION TIME:

Page 5 of 5

POINT BEACH NUCLEAR PLANT JPM POOO.039aAOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 24, 2001 FAST START AN EMERGENCY DIESEL GENERATOR TOTAL REWRITE K/A

REFERENCE:

055.EA1.02 (4.3/4.4)

(NUREG-1122) 055.EA1.06 (4.1/4.5) 055.EA2.03 (3.9/4.7)

ALTERNATE PATH JPN X YES NO PERFORMANCE CHECKLIST:

SATISFACTORY - Properly performed critical step(s) and/or in sequence (if applicable)

UNSATISFACTORY - Improperly performed critical step(s) and/or out of sequence (if applicable)

X Procedure adequately addresses task elements.

Enter identifier here: ECA-0.0 Unit I "Loss of All AC Power" Other document adequately describes necessary task elements.

Enter identifier here:

X Task elements described as attached.

DESIRED MODE OF EVALUATION: APPLICABLE EVALUATION SETTING:

SIMULATE/WALKTHROUGH X DISCUSSION PERFORM X IN-PLANT X CONTROL ROOM VALIDATED TIME FOR COMPLETION: 15 MINUTES Page 1 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.039aAOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 24, 2001 FAST START AN EMERGENCY DIESEL GENERATOR TOTAL REWRITE EXAMINEE EVALUATOR START TIME ____________________FINISH TIME PERFORMANCE L] SAT El UNSAT JOB TITLE: El AOT Ej COT [: SRO El STA TOOLS/EQUIPMENT/

REFERENCES:

ECA-0.0 Unit 1 "Loss of All AC Power", Attachment A, Rev 29 TASK STANDARDS:

Emergency Diesel Generator G-01 started, bus 1A-05 energized.

SIMULATOR INFORMATION:

TIME FAIL I COMPONENTI OPTION VALUE I RAMP I DELAY ACT COND None NOTE: Only this page needs to be retained in examinee's record if completed satisfactorily. If unsatisfactory performance is demonstrated,the entire JPM should be retained.

NOTE: If this JPM is performed on the simulator,the JPM administratorshould only give cues that are not indicatedon the simulator. If simulatorindicationis sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the traineeto continue the evolution.

Page 2 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.039aAOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 24, 2001 FAST START AN EMERGENCY DIESEL GENERATOR TOTAL REWRITE READ AND PROVIDE TO THE EXAMINEE THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMs. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, "acknowledge." All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

A loss of all AC power has occurred on Unit 1.

Emergency Diesel Generator G-01 failed to auto start and cannot be started from the control room.

INITIATING CUES (IF APPLICABLE):

The Shift Manager directs you to perform ECA-0.0 Unit 1, Attachment A "G-01 Local Manual Start" steps Al through A7.

Page 3 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.039aAOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 24, 2001 FAST START AN EMERGENCY DIESEL GENERATOR TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y'" FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

START TIME STEP/SEQUENCE/CRITICAL SAT 1 1 N UNSAT ELEMENT: Check green "Power On" light energized (Panel C-64A and Panel C-34).

STANDARD: Checks green "Power On" light energized at C-64A and C-34.

CUE: The green "Power On" light is illuminated at both panels.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 2 1 N UNSAT ELEMENT: Check no overspeed trip alarms (Panel C-64A and Panel C-34).

STANDARD: Overspeed trip alarms verified clear at panel C-64A and C-34.

CUE: The overspeed trip alarm is clear at both panels.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 3 2 Y UNSAT ELEMENT: Place local/remote transfer switches to local at C-34A (transfer switch No. 1 and No. 2).

STANDARD: Transfer switch No. 1 and No. 2 placed to local position at C-34A.

CUE: The local/remote transfer switches are in local.

COMMENTS:

Page 4 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.039aAOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 24, 2001 FAST START AN EMERGENCY DIESEL GENERATOR TOTAL REWRITE "PERFORMANCEINFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 4 3 Y UNSAT ELEMENT: Start G-01 by depressing "EMERGENCY START" push-button at C-34A.

STANDARD: EMERGENCY START push button is depressed at C-34A.

CUE: After the EMERGENCY START push-button is depressed, there are no indications that the diesel started..

NOTE: This begins the Alternate Pathportion of this JPM.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 5 4 Y UNSAT ELEMENT: Place mode selector switch in "LOCAL START" at C-64.

STANDARD: Selector switch in "LOCAL START" at C-64.

CUE: The selector switch is in "LOCAL START" at C-64.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT ________________

STEP/SEQUENCE!CRITICAL SAT 6 5 y UNSAT ELEMENT: Depress and hold "ENGINE START" push-button at C-64 until engine speed rises to idle.

STANDARD: ENGINE START push-button depressed and held, till engine is at idle speed.

CUE: After the ENGINE START push-button is depressed, you hear the engine start and note approximately 400 rpm on G-01 engine tachometer.

COMMENTS:

Page 5 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.039aAOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 24, 2001 FAST START AN EMERGENCY DIESEL GENERATOR TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y'. FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 7 6 Y UNSAT ELEMENT: Depress the idle release push-button at C-64 to raise engine speed to 900 rpm.

STANDARD: Idle release push-button depressed, engine speed checked rising to 900 rpm.

CUE: After the idle release push-button has been depressed, the engine tachometer is rising toward 900 rpm.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 8 7 N UNSAT ELEMENT: Check diesel speed Ž900 rpm at C-64.

STANDARD: Diesel speed checked.

CUE: Diesel speed is slightly >900 rpm.

COMMENTS:

STEP/SEQUENCE/CRITICAL SAT 9 8 N UNSAT ELEMENT: Contact control room to check G-01 frequency between 59.5 Hz and 60.5 Hz.

STANDARD: Control room contacted to check G-01 frequency between 59.5 Hz and 60.0 Hz.

CUE: The control room reports that G-01 frequency is 60 Hz.

COMMENTS:

Page 6 of 7

POINT BEACH NUCLEAR PLANT JPM POOO.039aAOT TRAINING JOB PERFORMANCE MEASURES Revision 1 DRAFT August 24, 2001 FAST START AN EMERGENCY DIESEL GENERATOR TOTAL REWRITE PERFORMANCE INFORMATION NOTE: CRITICAL STEPS ARE DENOTED WITH A "Y". FAILURE TO MEET THE STANDARDS FOR THIS ITEM CONSTITUTES FAILURE.

STEP/SEQUENCE/CRITICAL SAT 10 9 N UNSAT ELEMENT: Contact control room to check G-01 voltage between 4050 Vac and 4300 Vac.

STANDARD: Control room is contacted to check G-01 voltage.

CUE: The control room reports diesel voltage is 4160 Vac.

COMMENTS:

TERMINATION CUE: THIS COMPLETES THE 1PM. COMPLETION TIME: