ML020600110
ML020600110 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 02/20/2002 |
From: | Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
OP-1903.065 Rev 015-05-0 | |
Download: ML020600110 (73) | |
Text
Arkansas Nuclear One - Administrative Services Document Control Wednesday, February 20, 2002 Document Update Notification COPYHOLDER NO: 103 TO: NRC - WASHINGTON ADDRESS: OS-DOC CNTRL DESK MAIL STOP OP1 17 WASHINGTON DC 20555-DC DOCUMENTNO: OP-1903.065 TITLE: EMERGENCY RESPONSE FACILITY TECHNICAL SUPPORT CENTER (TSC)
REVISION NO: 015-05-0 CHANGE NO: PC-05 SUBJECT.- PERMANENT CHANGE (PC)
F7 If this box is checked, please sign, date, and returnwithin 5 days.
Ej ANO-1 Docket 50-313 fThis ANO-2 Docket 50-368 Signature Date SIGNATURE CONFIRMS UPDATE HAS BEEN MADE RETURN TO:
ATTN: DOCUMENT CONTROL ARKANSAS NUCLEAR ONE 7404.5 1448 SR 333 RUSSELLVILLE, AR 72801
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE DOCUMENT NO. CHANGE NO.
TITLE: Emergency Response Facility Technical Support 015-05-0 Cetr(S)1903.065 WORK PLAN EXP. DATE TC EXP. DATE N/A N/A C)'
IPTE SET # I D-0 l-SAFETY-RELATED
-YES r]NO EYES 0N0 TEMP ALT E-YES [ONO TRAPS Get these TOOLS When you see these Effective Communication Time Pressure Questioning Attitude Distraction/interruption Placekeeping Multiple Tasks Self Check Overconfidence Peer Check Vague or Interpretive Guidance Knowledge First Shift/Last Shift Procedures Peer Pressure Job Briefing Change/Off Normal Coaching Physical Environment Turnover Mental Stress (Home or Work)
DATE TIME VERIFIED BY E NO FORM NO. CHANGE NO.
FORM TITLE: 1000.006A 050-00-0 VERIFICATION COVER SHEET
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE Pa e 1 C MT DOCUMENT NO. CHNGE NO.
RESPONSE
- E FACILITY TECHNICAL SUPPORTFIR-U TITLE:EMERGENCY ENT ER 1903.065 015-05-0 C] EDDEETO
[]~ NEW UNIT 2rE WRK PLAN, EXP. DATE N/A L YES L NO AFUNITT1 U P TIO TYPE OF CHANGE: CDLTO El NEW P El EZ EXP. DATE: N/A El REVISION DOES THIS DOCUMENT: [. YES NO procedure?
- 1. Supersede or replace another (If YES, complete 1000.006B for deleted procedure.) (0CAN058107) NO 0 YES
- 2. Alter or delete an existing regulatory commitment? (0CNA128509)(OCAN049803)
(IfYES, coordinate with Licensing before implementing.) 0 YES 0 NO also 1000.006, Attachment 15)
- 3. Require a 50.59 review per LI-101? (See (If 50.59 evaluation, OSRC review required.)
8.5 for details.)
El YES 0NO
- 4. Cause the MTCL to be untrue? (See Step OCAN099001, 0CNA128509, OCAN049803)
(If YES, complete 1000.009A) (1CAN108904, 0NO ElYES
- 5. Create an Intent Change?
(If YES, Standard Approval Process required.) E- YES 0NO
- 6. Implement or change IPTE requirements? required.)
(IfYES, complete 1000.143A. OSRC review El YES 0NO
- 7. Implement or change a Temporary Alteration?
(If YES, then OSRC review required.)
0 YES 0 NO document?
Was the Master Electronic File used as the source STANDARD APPROVAL PROCESS INTERIM APPROVAL PROCESS 0INATOR SIGNARE (Includes review of Att.
- 13) DATE: 0 _
- 13) DATE:
ORIGINATOR SIGNATURE: (Includes review of Att.
PHONE #:4997 PHONE #: Priand Sion name: Duane White int and Si n name:(( DATE: INDEPENDENT REVIEWE . DATE:
ERVISOR APPROVAL: =AAT DATE: ENGINEERING:
SRO UNIT ONEE'*
DATE:
SRO UNIT TWO:**
DATE: QUALITY: MDATE DATE:
changes requiring no UNIT SURVEILLANCE COORDINATOR (0CNA049803):
Interim approval allowed for non-intent DT 50.59 evaluation that are stopping work in progress. SE N LEADER:
intent changes or changes Standard Approval required for /1-- 57 02, requiring a 50.59iUtevaluation. notASUANE:DATE:
in progress, QUALI ASSURANCE
- Ifchange not required to support work DAE Department Head must sign. DATE:
signatures OTHER SECTION LEADERS:
OTHER SECTION LEADERS:
procedures only.)
DATE:
OTHER SECTION LEADERS:
DATE:
OTHER SECTION LEADERS:
DATE:
OTHER SECTION LEADERS:
HAIRMA ECHNIC L REVIEWER: (0CNA0493 2) DATE:
DATE:
b:~ate:. OTHER SECTION LEADERS:
F1 APPRO DATE:
OTHER SECTION LEADERS:
EQUIRED EFFECTIVE DATE:
FORMITLE:FORM 10.0B NO. 010- NO. 1 CHANGE FORM TITLE: PLAN APPROVAL P A1 REQUEST PROCEDURE/ORK
n ENTERGY OPERA I IUNZ, II4LNuIrJrXxr I ARKANSAS NUCLEAR ONE DOCUMENT NO. CHANGE NO.
TITLE:Emergency Response Facility Technical 1903.065 015-05-0 Support Center (TSC) n/a PAGE 1 OF 5 ZPROCEDURE []WORK PLAN, EXP. DATE
[] ELECTRONIC DOCUMENT "TYPEOF CHANGE: PC TC n DELETION
[] NEW Li EZ EXP. DATE: n/a__9a_
L1 REVISION made, include sufficient detail to describe AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change (Include step # if reason for the change.)
applicable)
Renumber pages appropriately.
Table of Contents Deleted "Task Al - Plant Assessment Support".
F.
Changed "Supt" to "Superintendent" in Position Guide Added "7.2.5 Form 1903.065 - TSC Critical Tasks".
of the note "ED&C is normally Step 6.4 Deleted note previous to step 6.4.1 and made the contents Director. The TSC Director will assume ED&C if transferred from the Shift Manager to the EOF is not ready to assume ED&C" the new step the EOF will not be activated or if the EOF Director 6.4.1 and renumbered the following steps as appropriate.
Step 6.7 Changeed "will" to "should" in last sentence of paragraph.
Step 7.1 of Deleted "Task Al - Plant Assessment Support".
Attachments and Forms Position Guide A Deleted "Plant Assessment" from step C.
TSC Activations Checklist (Form Changed "Verify TSC setup in accordance with the THEN perform TSC setup in accordance 1903.065A" to " IF TSC setup is not being performed, with the TSC Activation Checklist (Form 1903.065A).
D.1 .f.
Added Note prior to step D.1 .f and rearranged step A-I) - Contact personnel from IHEA or Plant Deleted "(1) Plant Assessment Support (Task Director, Section V) from step D.1 .g and renumbered as Analysis (see Emergency Telephone appropriate.
in step D.1.h Changed "Report current manpower" to "Report manpower" evacuation or exclusion area evacuation Deleted "or exclusion area evacuation" from "If a plant has occurred" in step D.2.b.
and added "to perform continuous Change "Maintain continuous accountability of" to "Remind" accountability" to end of step D.2.b.1.
Changed "Assure" to "Ensure" in step D.2.c.
have been removed from the IHEA group Position Guide A, Task Deleted complete task. The tasks of this Task Guide which not longer exist and given to other site groups.
A-i, Plant Assessment Support FORM NO. CHANGE NO.
FORM TITLE: I 1000.006C 050-00-0 DESCRIPTION OF CHANGE I
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE DOCUMENT NO. CHANGE NO.
-ITLE:Emergency Response Facility Technical Support Center (TSC) 1903.065 015-05-0 PAGE 2 OF 5
[]WORK PLAN, EXP. DATE n/a ZPROCEDURE nl ELECTRONIC DOCUMENT TYPE OF CHANGE: Z PC E] TC DELETION
[n NEW F1 EZ EXP. DATE:_n/a Fl REVISION made, include sufficient detail to describe AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change (Include step # if reason for the change.)
applicable) into the TSC Switchboard Room" from step Position Guide B, Deleted "located on the front of the door leading D.1.d.
Maintenance Manager step. Incorporated step D.1 .f and the 3 Moved note following step D.1 .f and moved before items listed below the step into one step.
4, etc.) for Damage and Control Team missions.
Made "Establish priorities (example: 1, 2, 3, number" step D.2.f.
Assign each mission its own unique priority responsea. Priority code 1 mission Made" Brief the OSC periodically (1)Status of in-plant conditions c.Nuclear Chemistry status as status and prognosis b.Actual in-plant radiological to the OSC Director regarding rescue/repair and appropriate (2) Provide direction and oversight status" step D.2.g and renumbered following damage control operations (3) OSC manpower steps appropriately.
to "when providing current" in step D.2.h.
Changed "Using" to "Use" and changed "provide" Position Guide B, Task from step 7 Deleted "located in the TSC Emergency Kit file" Guide B-1 priorities (example: 1, 2, 3, 4, etc.) from the Deleted "Ensure that you obtain periodic mission the OSC via the OSC Team Tracking Board TSC Diretor. Communicate these priorities to in Team Tracking Board Communicator not to" Communicator" and added "Remind the OSC step 9 Position Guide D, Director to inform plant personnel via plant Radiation Protection Added "If an offsite release occurs, notify the TSC page" to step D.2.k and Radwaste Manager Position Guide F, Task area by pressing the [rollover ON] button on Guide F-2 Added " During briefs, roll all TSC calls to the booth the completion of the brief by pressing the the booth telephone. Roll the telephones back at step 8 and renumbered appropriately.
[rollover OFF] button on the booth telephone" to I I flRMN0 ICHANGE NO.
FIIo.oeNU 050-O0-O FORM TITLE:
I rerOIDTIAM U E5* AF
-. (I-IANGE I fpip-nnii nP r-14ANGE 1 1000.006,C i
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE i
DOC3UMENTNO. C 0HAN ..05-,,0.
TITLE:Emergency Response Facility Technical 015-05 Support Center (TSC) n/a PAGE 3 OF 5 EPROCEDURE E-WORK PLAN, EXP. DATE E-l ELECTRONIC DOCUMENT TYPE OF CHANGE: TC DELETION Z PC Rl NEW E] EZ EXP. DATE: n/a_____
Fl REVISION made, include sufficient detail to describe AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change (Include step # if reason for the change.)
apolicable) step 4 Position Guide F, Task Deleted "Upon arrival, report to the TSC Director and" from 4 "A. IF Emergency Direction and Control will be transferred Guide F-5 Combined step 5-10 into step THEN go to step 6. B. Obtain all previous directly from the Shift Manager to the-EOF Director, in the TSC. C. Contact the Control notification from the DEFNS or commercal fax located from the unaffected Unit typically fills this Room Notifications Communicator (the Shift Engineer when you have completed your brief and are position) and obtain a brief. D. Notify TSC Director responsibilities from the ready to take notifications. E. [(P-9459) Assume notification Perform notifications in accordance with Control Room as directed by the TSC Director. (1) Radiological/Meteorological Procedure 1903.011, "Emergency ResponselNotifications."] to TSC RDACS. b. The from: a. The Nuclear Chemist assigned information should be obtained not been transferred to the Assessment has Initial Dose Assessor in the Control Room if Dose been transferred to the EOF.
has EOF. c. The REAM located at the EOF if Dose Assessment from: a. The Initial Dose data should be obtained (2) Protective Action Recommendation (PAR) EOF. b. The not been transferred to the Assessor in the Control Room if Dose Assessment has c. The TSC been transferred to the EOF.
REAM located at the EOF, if Dose Assessment has based on plant conditions. F. Obtain the information necessary Director will determine PAR's to the NRC immediately after to adequately describe the plant status then make notifications with, at a minimum, the same the NRC notifying the ADH using the ENS telephone. (1)Provide was supplied on the notification form telefaxed to the ADH. Step 5 Turn over information that instructions.
per TSC Director notifications to the EOF Notificaition Communicatior Critical Tasks." Update the Added "Maintain a log of critical times using Form 1903.065F,"TSC TSC Director and staff as necessary." to new step 6.
located in Procedure 1903.011.
Deleted instructions from this position guide that are from the TSC Emergency Kit" to Changed "Obtain a party-line headset and earasable markers headset Erasable markers and eraser (extras Position Guide F, Task "Tools required: Party-line headset or cordless located in the TSC Emergency Kit)" in step 5.
Guide F-6 setup and operation. Plug prongs into Added the following to step 6 "6.1 Party line headset to "Talk". 6.2 Cordless headset status line jack located below wallboard. Move headswitch status line jack located below wallboard setup and operation 1. Place phone line in appropriate from base unit and securely place if not already done. 2. Remove headset and control unit
- 3. Press "talk" on the controller to controller on your person and place headset on head.
- 5. Place control unit on base unit as transmit and receive. 4. Move headswitch to "Talk".
Room, OSC and EOF Status Board Communicators necessary to recharge. 6.3 The Control will join the party line as they report to their facilities.
FORM TITLE: NFORM NO. CHANGE NO.
1000.006C 050-00-0 DESCRIPTION OF CHANGE
0 ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE DOCUMENT NO. CHANGE NO.
TITLE: Emergency Response Facility Technical 1903.065 015-05-0 Support Center (TSC) n/a PAGE 4 OF 5 IPROCEDURE [I-]WORK PLAN, EXP. DATE E] ELECTRONIC DOCUMENT TYPE OF CHANGE: E] TC DELETION Z PC El NEW E] EZ EXP. DATE: n/a_
El REVISION include sufficient detail to describe AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change made, (Include step # if reason for the change.)
applicable)
Position Guide F, Task Deleted Note pror to step 6 and replaced with "Note: The IC ENS telephoune, t l Room ENS telephone and the Unit 2 Control Room ENS telephone are extensions of Guide F-7 Control NRC, the TSC ENS Communicator will the same line. If the Control Room is on-line with the telephone."
hear this communcation when picking up TSC ENS
- 30. Operatons Support" to the Technical Form 1903.065A Added "3. EAL Reviewer, 7. Problems Solutions Board, Support Center Legend.
(+) to a square (U) throughout form.
Changed symbol for NRC telephone from a diamond Updated drawing of TSC.
Manager Update Items.
Form 1903.065D Added "EAL's" and "EAL Upgrades" to section 4 Operations if an offsite release has occurred" to Added "J. Ensure announcement is made via plant page section 5 RP&RW Manager Update Items.
Form 1903.065 F Added complete form.
FORM TITLE:
F DESCRIPTION OF CHANGE FORM NO.
1000.006C CHANGENO.
050-00-0 I
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE DOCUMENT NO. CHAN(51G.E NO0.
TITLE:Emergency Response Facility Technical 1903.065 015-05-0 Support Center (TSC) n/a PAGE 5 OF 5 EPROCEDURE I--WORK PLAN, EXP. DATE El ELECTRONIC DOCUMENT TYPE OF CHANGE: El TC El DELETION z PC E- NEW n/a El EZ EXP. DATE:
L- REVISION made, include sufficient detail to describe AFFECTED SECTION: DESCRIPTION OF CHANGE: (For each change (Include step # if reason for the change.)
applicable)
F~osition Guide E, TSC Added Critical Task
)irector transferred from the Control E] rEmergency Direction and Control (P-I107661] (Must be Go to ED&C section Room within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of an Alert or higher Emergency Classification).
below.
El TSC Operability (Must be operable within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of an Alert or higher Emergency classification). Go to TSC Operability - page 3 of 7 of this position guide.
El Site Area Emerqencv Declared - Go to Site Area Emergency Declared - page 4 of 7 of this position guide.
Declared - page 4 of 7 of
[I General Emergency Declared - Go to General Emergency this position guide.
No items deleted just moved into Rearranged position guide to match the new critical tasks.
new location.
I FFORM NO. CHANGE NO.
FORM TITLE: 11000.006C 00-00-0J 0 DESCRIPTION OF CHANGE
PROC./WORK PLAN NO. PROCEDURE/JWORK PLAN TITLE: PAGE: 1 of 65 1903.065 EMERGENCY RESPONSE FACILITY TECHNICAL SUPPORT CENTER (TSC) CHANGE: 015-050 TABLE OF CONTENTS PAGE NO.
SECTION
. .. . . . . .. . .. . . . . . . . . . .. . . 3 1 .0 PUR PO SE . . . . . . . . . . . . . . . ..
. . . . .. . . . . . . .. . .. . . . . . . .. . 3 2 .0 S CO PE . . . .. . ..
3 3 .0 REFEREN CES ..........................................................
4 4 .0 DEFINITIONS .........................................................
5 Z.0 RESPONSIBILITY AND AUTHORITY ........................................
6.0 INSTRUCTIONS ....................................................... 6 6
6.1 TSC Description ... ..........................................
6 6 .2 TSC Activation .............................................
7 6 .3 TSC Staffing ...............................................
TSC Director ..... 7]
[6.4 (P-10766) Emergency Direction & Control -
T SC Sta ff .. .. .... ... ... ... ... .... ... .. ... ..... ... .. ........ 8 6 .5 9
6 .6 Secondary TSC ..............................................
....................... 9]
[6.7 (P-16243) Severe Accident Management 10
- 7. ATTACHMENTS AND FORMS ...............................................
7 ATTACHMENTS for Attachment 1 Position Guides and Task Assignments
.................................... 11 the TSC Staff
..................... 12 Position Guide A - Engineering Manager 16 Reactor Engineering Support ...................
Task A2 -
17 Task A3 - TSC Engineering Support ........................
18 Position Guide B - Maintenance Manager ..................... 22 (TSC) .........
Task B1 - Team Tracking Board Communicator 23 Position Guide C - Operations Manager ...................... 27 Task Cl - Operations Support ............................. 28 Task C2 - OSC Operations Support .........................
Radwaste Manager .29 Position Guide D - Radiation Protection & 33 Task Dl - Dosimetry ..... 34 Task D2 - Radwaste Support ...............................
............................ 35 Position Guide E - TSC Director
=AGE 5 PROC.JWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
............... 43 Position Guide F - TSC Support Superintendent 48 Task F1 - Security .... .....................................
49 Task F2 - Administrative Services ....................... 50 Support .........
Task F3 - Computer Maintenance/Software 51 Task F4 - TSC EAL Reviewer .............................. 52 Task FS - TSC Notifications Communicator 54 Board Communicator ..................
Task F6 - TSC Status 55 Task F7 TSC ENS Communicator ..........................
7.2 FORMS 56 7.2.1 Form 1903.065A - "TSC Activation Checklist" .......
Form 1903.065C - 'Secondary TSC Activation 7.2.2 59 Checklist " .. ......................................
7.2.3 Form 1903.065D "TSC Director Status Update 61 Guide" .......... .................................
64 7.2.4 Form 1903.065E - "TSC Position Staffing Form" ....
Form 1903.065F "TSC Critical Tasks" ............. 65 7.2.5
PAGE:
PAGE 3f5 3 of 65 PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 TECHNICAL SUPPORT CENTER (TSC) 1.0 PURPOSE The purpose of this procedure is to describe the Technical Support Center at ANO.
when activated during an emergency (TSC) and the role of this facility 2.0 SCOPE the description of the TSC along with This procedure includes the physical the facility. In addition, the operating instructions for activating and assigned to this facility are described responsibilities of each ERO position tasks.
in the form of position guides and/or
3.0 REFERENCES
3.1 REFERENCES
USED IN PROCEDURE PREPARATION:
3.1.1 Emergency Plan Supp. I Requirements for Emergency Response 3.1.2 NUREG-0737, Capability Inc. letter ESC-96-566 dated 3.1.3 Framatome Technologies, October 21, 1996.
Revision 1 - Severe Accident Issue Closure 3.1.4 NEI 91-04, Guidelines THE PROCEDURE:
3.2 REFERENCES
USED IN CONJUNCTION WITH Emergency Telephone Directory RELATED ANO PROCEDURES:
Procedure 1903.030, "Evacuation" NRC COMMITMENTS WHICH ARE REGULATORY CORRESPONDENCE CONTAINING IMPLEMENTED IN THE PROCEDURE:
NOTE Throughout procedure commitments are denoted by [BOLD]
P-4193 (0CAN038313) - Response to IR 313/8211; 368/8209:
3.4.1 All TSC personnel to have TLDs. Position Guide D, Step D.2.u 3.4.2 P-16243 (0CAN129803) - Severe Accident Management Implementation Completion: Sections 4.8, 4.9, 6.7; Position Task A-3, step 7; Guide A, step D.3.d; Task A-2, step 7; D.3.e; Position Guide E, section D; Position Guide C, step Task Guide F-4, step 10.
P-1457 (0CAN079009) - Response to IR 313/9008; 368/9008 3.4.3 Weakness 06 - Status Board Communicators: Qualifications and Training. Position Guide E, Task F-6 3.4.4 P-1460 (0CAN079009) - Response to IR 313/9008; 368/9008 Radwaste Manager Weakness 04 - Radiation Protection and relocated to TSC. Position Guide D
- Response to IR 313/9008; 368/9008 3.4.5 P-1462 (0CAN079009)
Engineering Manager has assigned Weakness 04 -
responsibilitY to assist the TSC Director.
Position Guide A
- Response to IR 313/9008; 368/9008 3.4.6 P-1464 (0CAN079009) ED&C functlon in ERO.
Weakness 01 - EAL Reviewer to support F-4 Step 6 & 7.
Position Guide F, Task Guide 3.4.7 P-4978 (0CAN068104) - Response to IR 313/81-13; 368/81-11 to TSC.
Status Board Communicator will be assigned Position Guide F, Task Guide F-6 P-7899 (0CAN058701) Response to Deficiency 313;368/8710 3.4.8 Upon 01 Turnover of Emergency Direction and Control.
t*urnover of ED&C, the responsibilities for Notifications shall not be split and Protective Action Recommendations Step 4.2.
facilities. Section 4 between two 1 data exchange from 3.4.9 P-9459 (0CAN0584 !) - Offsite monitoring Position Guide F, TSC to ADH prior to ECC (STSC) Staffing.
Task F-5 Step 8.
P-9475 (0CAN048312) - Staff of the TSC will include 3.4.10 keeper. Position communications operator and status board Guide F, Task Guide F-5, F-6 and F-7.
3.4.11 P-10766 (0CAN068320) - One individual shall be responsible to recommend PARs and that this individual shall be the highest level of authority. This is the individual with 4 Step 4.2, Step Emergency Direction and Control. Section Direction Guide E Section D Emergency 6.4.3 and Position and Control DEFINITIONS Room Either of two facilities (Unit One or Unit Two) which 4-Control as necessary, following the directs and controls emergency actions, The Control Room(s) are staffed initial declaration of an emergency. Plan.
ANO Emergency in accordance with Table B-1 of the Control - Overall direction
[4.2 (P-7899, P-10766) Emergency Direction and non-delegable response which must include the of facility responsibilities for the decision to notify and to recommend of Health personnel and protective actions to Arkansas Department With for offsite emergency measures.
other authorities responsible assumes the typically activation of the EOF, the EOF Director The management of and Control.
responsibility for Emergency Direction consequences remains on-site facility activities to mitigate accident Technical Support Center. The Shift with the TSC Director in the Room and plant systems Manager retains responsibility for the Control operations.]
near-site emergency response 4.3 Emergency Operations Facility (EOF) - The northeast of the reactor facility located approximately 0.65 miles ANO buildings. This facility serves dually as the training center for personnel.
PAGE: 5 of 65 PROC.IWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
Initial Response Staff (IRS] The emergency organization primarily 4.4 which must be able to augment the composed of plant staff personnel with Table B-i of the Emergency onsite plant personnel in accordance Plan.
- The emergency response facility 4.5 Technical Support Center (TSC) This ANO Administration Building.
located on the 3rd floor of the instrumentation and facility is equipped with the necessary the course of an accident and communication systems for monitoring Additional action plans.
formulating corrective and recovery included within this is information concerning this facility procedure.
- The emergency response facility 4.6 Ooerational Support Center (OSC) provides the This facility located in the ANO Maintenance Facility.
functions:
support for coordinating the following Nuclear Chemistry, Onsite Radiological Monitoring, Maintenance, Support.
Fire Fighting Emergency Medical Support and point and briefing area for the The OSC also serves as the assembly rescue/repair and damage control teams.
- The organization which is 4.7 Emergency Response Organization (ERO) the OSC staff, and the TSC staff, composed of the IRS, the EOF staff, to provide manpower the Emergency Team members. It has the capability and long-term response to and other resources necessary for immediate an emergency situation.
event that can be categorized in
[4.8 (P-16243) Severe Accident - A plant that one of two ways: 1) An event where it is known with certainty goals and assumptions has core damage beyond design basis analysis amount of is a significant occurred, or 2) An event where there which the core has been damaged.]
uncertainty concerning the degree to Guidelines (SAMG) - ANO-specific
[4.9 (P-16243) Severe Accident Management guidance developed to assist the plant operating and technical staff in implementing strategies for the best use of the existing plant and recover from a severe capabilities to diagnose, respond to, accident.]
5.0 RESPONSIBILITY AND AUTHORITY detailing the responsibilities of 5.1 Position Guides and Task Assignments Center are Support those ERO positions assigned to the Technical for the Emergency Teams/
provided in Attachment 1. Responsibilities are listed in the appropriate procedures Groups and the Fire Brigade These of this procedure.
and are not included within the scope procedures include:
5.1.1 Procedure 1015.007, "Fire Brigade Organization and Responsibilities" Guidelines for 5.1.2 Procedure 1903.033, "Protective Action Rescue/Repair and Damage Control Teams"
PAGE: 6 of65 PROC.AVORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE 6 of 65 1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 (TSC)
TECHNICAL SUPPORT CENTER 5.1.3 Procedure 1904.002, "Offsite Dose Projections RDACS Computer Method" Team" Procedure 1903.042, "Duties of the Emergency Medical 5.1.4 "Duties of the Emergency Radiation 5.1.5 Procedure 1903.043, Team" setup in for ensuring that the TSC is 5.2 The TSC Director is responsible "TSC Activation Checklist".
accordance with form 1903.065A, 6.0 :NSTRUCTIONS 6.1 TSC DESCRIPTION One Floor of the Arkansas Nuclear The TSC is located on the 3rd facility is equipped Administration Building. This emergency response to monitor the course of an with the necessary instrumentation for coordinating the accident. It also serves as the primary location A floor in response to an incident.
technical support activities of Form 1903.065A.
a part diagram of the TSC is included as 6.2 TSC ACTIVATION (ERO) will begin 6.2.1 The Emergency Response Organization of an Alert, initial announcement activating following the Manager.
the Shift Site Area or General Emergency by within one (1) 6.2.2 The goal is for the TSC to be operational an Alert, Site Area or hour following the declaration of General Emergency.
ensuring that the TSC 6.2.3 The TSC Director is responsible for the guidance established on is set up in accordance with "TSC Activation Checklist".
Form 1903.065A, when the following 6.2.4 The TSC is considered operational positions are staffed:
A. TSC Director B. Operations Manager C. Maintenance Manager D. Engineering Manager E. Radiation Protection and Radwaste Manager F. Notification Communicator in the TSC. The 6.2.5 Dose Assessment will not be performed the Control dose assessment will be in responsibility for transferred to the EOF. Dose Assessment will Room until evacuation of the EOF is remain in the EOF unless an the be returned to the Control Room until declared and may evacuation is complete.
PAGE: 7 of 65 PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE 015-05-0 TECHNICAL SUPPORT CENTER (TSC) 6.3 TSC STAFFING for the TSC staff are 6.3.1 Position guides and task assignments included in Attachment 1.
in sequential 6.3.2 Items on a position guide are not necessarily and prioritize The user should scan the entire list order. than activities as appropriate to the situation, rather perform the items in the order listed.
necessarily these position Members of the ERO should not rely upon alone to determine the items for which they are guides These position guides should always be used resoonsible- Procedures with Emergency Plan Implementing in con3unction or other appropriate station procedures.
6.3.3. Each position guide details the following:
Reporting location for the listed position A.
B. Position to which the listed position reports supervises C. Those positions/tasks which the position and coordinates D. Duties for the listed position (ED&C) - TSC DIRECTOR EMERGENCY DIRECTION A.ND CONTROL Shift Manager to the 6.4.. ED&C is normaiyv transferred from the The TSC Director will assume ED&C if the EOF EOF Director. is not ready will not be activated or if the EOF Director to assume ED&C.
Manager of the 6.4.2 The TSC Director shall relieve the Shift and Control if not responsibility for Emergency Direction EOF Director. ED&C must be transferred already done by the Shift Manager within one hour of an Alert or from the higher emergency classification.
6.4.3 To assume ED&C, the TSC Director must have the following:
A notifications communicator in the TSC.
A.
May use the Initial Dose B. Dose Assessment capability.
Assessor or the Dose Assessment Team.
The TSC is not required to be operable.
SHALL NOT delegate the
[6.4.4 (P-10766) The TSC Director responsibility for making offsite Protective Action (PARs) or for making decisions to notify Recommendations offsite authorities.]
following actions when 6.4.5 The TSC Director will perform the for Emergency Direction required to assume responsibility and Control:
Manager and/or A. Acquire a briefing from the Shift on the incident and the response tasks being designees performed.
to assume the B. Notify the Shift Manager when prepared Direction for Emergency responsibility and authority and Control of the incident.
an announcement to C. Notify the OSC Director and make that the transfer of responsibility has the TSC staff occurred.
Director to ensure that 6.4.6 It is the responsibility of the TSC Board in the TSC is updated the Command and Control Status as turnover occurs.
for 6.4.7 The TSC Director, once assuming responsibility maintain this Direction and Control (ED&C) , shall Emergency If the responsibility until relieved by the EOF Director.
to the EOF Director's ability to TSC is evacuated prior to the Shift Manager.
assume ED&C, ED&C may be returned Director when they are 6.4.8 The EOF Director will notify the TSC for Emergency prepared to assume the responsibility Direction and Control of the incident.
over A. The TSC Director shall promptly turn and authority for the overall response responsibility as requested by the EOF Director.
to the TSC B. The TSC Director shall make an announcement of the turnover of ED&C to the EOF.
staff Shift Manager C. The TSC Director shall ensure that the informed of the turnover from and the OSC Director are the TSC Director to the EOF Director.
6.5 TSC STAFF to make 6.5.1 The TSC Director must be available immediately (PARs) and make decisions Protective Action Recommendations to notification of offsite authorities.
relating over responsibility Therefore, the TSC Director must turn individual before leaving the TSC for ED&C to a qualified for Emergency when the TSC Director has responsibility Direction and Control.
their assigned 6.5.2 Emergency Response personnel who must leave inform their immediate superior location temporarily must time of of their location, destination, and estimated TSC Director as outlined return with the exception of the in the above step.
PAGE: 9 of 65 PROCEDUREIWORK PLAN TITLE: PAGE 65 PROC.IWORK PLAN NO.
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC) position 6.5 . Whenever a shift turnover is completed for any ERO shall report this in the TSC, the oncoming ERO member located in the turnover to the TSC Support Superintendent TSC.
6.6 SECONDARY TSC The Secondary TSC is located in the Emergency Operations 6.6.1 Facility (EOF) room 260.
same radiological 6.6.2 The Secondary TSC is designed to the as the onsite Control Rooms.
habitability with the facilities for 6.6.3 The Secondary TSC is also equipped monitoring the course of an accident.
for the Secondary 6.6.4 A floor diagram and activation checklist TSC.
TSC is included on Form 1903.065C, "Secondary Activation Checklist".
[6.7 (P-16243) SEVERE ACCIDENT MANAGEMENT is acknowledged, the TSC will take In the event that a Severe Accident The to mitigate the emergency.
the lead for evaluation and strategies ensure review of individual to TSC Director will be the responsible (SAMGs), and for the Severe Accident Management Guidelines Engineers and mitigation strategies. The TSC Support implementing the and propose the SAMGs TSC EAL Reviewer will form a team to review will serve as The Operations Manager strategies to the TSC Director. to carry out the team facilitator and will instruct the Shift Manager is given. The Operations the recommended actions once approval and Engineering Manager will provide support to the team, as Manager with the SAM team reviews.
needed, but should not be directly involved SAMG action(s) will rest The final decision to carry out recommended consultation with the EOF Director and with the TSC Director after with the Implementation of the actions will rest Shift Manager.
affected unit's Shift Manager.]
.1~
PAGE: 10 of 65 PROC..WORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC) 7.0 ATTACHMENTS AND FORMS 7.1 ATTACHMENTS for the TSC Staff Attachment 1 - Position Guides and Task Assignments Position Guide A Engineering Manager Task A2 Reactor Engineering Support Task A3 TSC Engineering Support Position Guide B Maintenance Manager Team Tracking Board Communicator (TSC)
Task B1 Position Guide C - Operations Manager Task Ci Operations Support Manager Position Guide D Radiation Protection and Radwaste Task D1 Dosimetry Task D2 Radwaste Support Position Guide E TSC Director Position Guide F TSC Support Supt.
Task F! Security Task F2 Administrative Services Task F3 - Comouter Maintenance/Software Support Task F4 TSC EAL Reviewer Task F - TSC Notifications Communicator Task F6 TSC Status Board Communicator Task F7 - TSC ENS Communicator 71.2 FORMS 7.2.1 Form 1903.065A - "TSC Activation Checklist' Form 1903.065C ,"Secondary TSC Activation Checklist" 7.2.2 7.2.3 Form 1903.065D - "TSC Director Status Update Guide" 7.2.4 Form 1903.065E - "TSC Position Staffing Form" Form 1903.065F - "TSC Critical Tasks" 7.2.5
PAGE: 11 of 65 PROC.IWORK PLAN NO. PROCEDUREWORK PLAN TITLE:
EMERGENCY RESPONSE FACILITY 1903.065 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
ATTACHMENT 1 POSITION GUIDES AND TASK ASSIGNMENTS FOR THE TSC STAFF
PROC.IWORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 12 of 65 1903.065 EMERGENCY RESPONSE FACILITY CHANGE. 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE A
[ENGINEERING MANAGER (P-1462)]
Page 1 of 4 A. Normal Reporting Location TSC B. Reports To TSC Director C. Supervises/Coordinates Reactor Engineering
- 2. TSC Engineering Support
- 3. Nuclear Chemistry Manager
- 4. Accident Assessment Manager D. Duties immediate Actions report to your
- a. When notified of an Emergency Plan Activation, and, if not already performed, notify CNS (858 assigned facility 3683) that you are staffing your ERO position.
initial
- b. If a plant evacuation is occurring, perform security card reader accountability by logging "0000' in the TSC card reader) and insert your badge.
(or any other security the position that
- c. Write your name on the TSC Staffing Board under you are staffing.
- d. IF TSC setup is not being performed, TSC Activation THEN perform TSC setup in accordance with the Checklist (Form 1903.065A).
you are staffing your
Note Do Not call the Control Room and
- f. Obtain available information on emergency classifications Possible sources include TSC Director, TSC plant conditions.
Status Board and other TSC personnel.
PAGE: 13 of 65 PROC.IWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE A ENGINEERING MANAGER Page 2 of 4
- g. Ensure task responsibilities under your position are assigned:
A-2) - Notified by the (1) Reactor Engineering Support (Task Computerized Notification System (CNS).
- Notified by the (2) TSC Engineering Support (Task A-3)
(CNS).
Computerized Notification System verify the above (3) Request the TSC Support Superintendent CNS notification by checking the positions responding via latest CNS printout.
as individuals arrive to
'4) Distribute appropriate Task Guides staff the task positions.
Report manpower status to the TSC Director.
- i. Obtain all necessary forms for your position:
(1) Procedure Forms - Form 1903.065D (2) ERO Chronological Logs.
2- On Going Actions on the TSC facility
- a. Refer to Procedure 1903.065 for a description criteria, TSC and information relating to TSC activation Secondary TSC.
staffing, TSC staff turnover and the If a plant evacuation has occurred, then:
b.
your position that (1) Remind those individuals working under the evacuated area to are remaining within or returning to perform continuous accountability.
working under your (2) Ensure that the OSC tracks any personnel remaining within or returning to the position that are evacuated area.
may be referenced for Procedure 1903.030, "Evacuation",
definitions and/or instructions.
Ensure adequate technical and clerical personnel are available to c.
support the Engineering group. Support personnel may be obtained by contacting the TSC Support Superintendent.
PAGE: 14 of 65 PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE A ENGINEERING MANAGER Page 3 of 4 supplies and
- d. Ensure adequate office space, equipment, are readily available to the Engineering communications equipment group.
and transmittal of
- e. Provide for the timely collection, retention requested.
engineering information to the ERO as then refer to your
- f. If reactor sump recirc has been established, on the BWST possible filtration handbook guide for establishing and/or RWT located at your desk.
provide Using Form 1903.065D, "TSC Director Status Update Guide",
g.
current uodates to the TSC Director.
to develop emergency work
- h. Coordinate with the Operations Manager systems or equipment plans and procedures regarding abnormal operat ions.
Manager in the OSC (ext.
- i. Coordinate with the Nuclear Chemistry sample results for core damage 6613) to obtain post accident assessment.
Cordinae with the Accident Assessment Manager in the EOF (ext.
projections that 7860) to develop potential long-term accident the ERO wi77 have to contend with.
basis to ensure that job
- k. Review recovery efforts on a continuous priorities are consistent and accurate.
that job priorities
- 1. Coordinate with the TSC Director to ensure are reviewed and revised as necessary.
adequate core
- m. Oversee plant design modifications to ensure and protection is available and all temporary surveillance modifications are documented.
provide for the timely
- n. Coordinate with the Operations Manager to regarding abnormal operation and/or resolution of NRC questions Specifications and SAR's in accordance with changes to Technical ANO procedures.
and ensure that an open
- o. Coordinate with collocated NRC officials throughout the event.
communications dialogue is maintained where outside assistance is being
- p. Monitor consultant activities provided.
maintenance activities is
- q. Ensure that documentation of all maintained using the ERO Chronological Logs.
PAGE: 15 of 65 PROC./WORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE A ENGINEERING MANAGER Page 4 of 4 as Needed
- 3. Special Actions to be Implemented to an individual
- a. Consider a shift change to relieve your position Refer to the Emergency from the affected unit, if applicable. the TSC Support I, or notify Telephone Directory, Section Superintendent for assistance.
of working hours to support
- b. If applicable, establish a schedule Notify the TSC Support around-the-clock operations-Superintendent for assistance by the TSC Director, relocate to if a TSC evacuation is declared 1903.030, "Evacuation".
the EOF in accordance with Procedure Accident is acknowledged,
[d. (P-16243) In the event that a Severe Engineering Support (Task A-2) and TSC ensure that the Reactor Severe Accident review the Engineering Support tasks (Task A-3) and, for mitigation strategies, Management Guidelines (SAMG's) actions Reviewer, formulate recovery along with the TSC EAL Provide support for the team necessary to mitigate the accident.
as necessary.]
- 4. Shift Change replacement, turn over all pertinent
- a. Upon arrival of your shift documents, forms, and supplies.
Emergency Classification,
- b. Brief your replacement on the current plant, information on the Status Boards and ongoing status of the measures that you have been assigned.
of the staffing change.
- d. Update your position status on the S. Actual Event/Drill Termination your position that the
- a. Notify those individuals working under event/drill has been terminated.
all of your
- b. Collect and organize in chronological order procedures, supplies, etc., and help restore the documents, logs, TSC.
to
- c. Provide a list of any forms or supplies needing replenishment Emergency Planning.
- d. Turn over all documentation generated during the drill/emergency to Emergency Planning.
critique to identify
- e. Participate in the post drill/emergency weaknesses and strengths.
PAGE: 16 of 65 PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE A TASK A-2 REACTOR ENGINEERING SUPPORT report to the Engineering Manager Notified of Alert or higher classification, in the TSC
- 2. Review this task guide perform initial accountability by logging
- 3. If plant evacuation is occurring, then insert your badge.
and "0000" into the nearest card reader
- 4. Monitor the Safety Parameter Display System.
damage as and perform assessments of core Monitor reactor core parameters Chemistry Manager (ext. 6613).
Nuclear necessary by coordinating with the actions.
and review of proposed recovery e- Provide input for the development is acknowledged, work with the In the event that a Severe Accident
[7. (P-16243) and Accident Management Guidelines (SAMG's)
EAL Reviewer to review the Severe accident.
actions necessary to mitigate the formulate and recommend recovery to the Operations Manager.]
Make the recovery action recommendations your your location and any change in
- 8. :nform -he Engineering Manager of purposes.
Iocation for tracking and accountability collect and organize in h no:ified of the drill/event termination, supplies, etc.,
chronological order all of your documents, logs, procedures, ore-drill/event status. Turn over all and her. restore the TSC to its to Emergency Planning.
drill/event documentation generated during the
POSITION GUIDE A TASK A-3 TSC ENGINEERING SUPPORT report to the Engineering Manager I. Notified of Alert or higher classification, in the TSC
- 2. Review this task guide.
perform initial accountability by logging
- 3. If plant evacuation is occurring, insert your badge.
and then "0000" into the nearest card reader required to support Technical Develop and document temporary modifications efforts.
Support Center emergency response Engineering, Drafting and Z. Coordinate Electrical Engineering, Mechanical during an emergency.
Drawing Control activities and review of proposed recovery action.
- 6. Provide input for the development the Accident is acknowledged, work with
[7. (P-16243) In the event that a Severe Guidelines (SAMG's) and Management EAL Reviewer to review the Severe Accident the accident.
necessary to mitigate formulate and recommend recovery actions recommendations to the Operations Manager.]
Make the recovery action and any change in your
. informl the Engineering Manager of your location purposes.
locazion for tracking and accountability collect and organize in
- 9. When notified of the drill/event termination, supplies, etc.,
c-ronological order all of your documents, logs, procedures, ore-drill/event status. Turn over all and hIlo restore the TSC to its Planning.
drill/event to Emergency documenr ation generated during the t
PAGE: 18 of 65 PROC.1WORK FPLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.0465 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE B MAINTENANCE MANAGER Page 1 of 4 A. Normal Reporting Location TSC B. Reports To TSC Director C. Coordinates With
-. Operations Manager
- 2. Engineering Manager
- 3. OSC Director
- 4. Maintenance Superintendent D. Duties Immediate Actions Activation, report to
- a. When notified of an Emergency Plan already performed, your assigned facility and, if not staffing your ERO notify CNS ( 8 58-3683) that you are nosit ion.
initial
- b. If a plant evacuation is occurring, perform by logging "0000" in the TSC security card accountability and insert your reader (or any other security card reader) badge.
under the Write your name on the TSC Staffing Board position that you are staffing.
TSC Activation Verify TSC setup in accordance with the Checklist (Form 1903.065A).
you are staffing e . Notify the TSC Support Superintendent that your ERO position.
NOTE
- f. Obtain available information on emergency classifications and plant conditions. Possible sources include TSC TSC Director (staff briefing), TSC Status Board and other staff personnel.
PAGE: 19 of 65 PROC.IWORK PLAN NO. PROCEDURE.WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY TECHNICAL SUPPORT CENTER (TSC) CHANGE: 015050 POSITION GUIDE B MAINTENANCE MANAGER Page 2 of 4
- g. Ensure task responsibilities under your position are assigned:
- (Task B-1)
(1) Team Tracking Board Communicator (TSC)
L6615) has Ensure that the Maintenance Superintendent Tracking Board Communicator.
dispatched your TSC Team as (2) Distribute appropriate Task Guides (attached) to staff the task positions.
individuals arrive
- h. Report current manpower status to the TSC Director.
- i. Obtain all necessary forms for your position:
(i) Procedure Forms - Form 1903.065D (2) ERO Chronological Logs.
- 2. On Going Actions of the TSC facility
- a. Refer to Procedure 1903.065 for a description TSC TSC activation criteria, and information relating to staff turnover and the Secondary TSC.
staffing, TSC If a Q'anL evacuation has occurred, then:
b.
your position that (1) Remind those individuals working under or returning to the evacuated area to are remaining wit-hin perform continuous accountability.
working under your (2) Ensure that the OSC tracks any personnel or returning to the position that are remaining within evacuated area.
may be referenced for Procedure 1903.030, "Evacuation",
definitions and/or instructions.
guidelines concerning
- c. Refer to Procedure 1903.033 for established from the OSC.
damage control teams being dispatched repair and damage control plans
- d. Coordinate the development of repair and under the direction of the TSC Director.
of Repair and
- f. Establish priorities (example: 1, 2, 3, 4, etc.) for Damage and Assign each mission its own unique Control Team missions.
priority number.
PAGE: 20 of 65 PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE B MAINTENANCE MANAGER Page 3 of 4
- g. Brief the OSC periodically (1) Status of in-plant response prognosis
- a. Priority code 1 mission status and
- b. Actual in-plant radiological conditions C. Nuclear Chemistry status as appropriate the OSC Director (2) Provide direction and oversight to rescue/repair and damage control operations regarding (3) OSC manpower status Update Guide", when
Oversee the investiqation of all maintenance related problems and i.
review problem-solving alternatives developed as to their adequacy and workability.
of monitoring and I. Develop and propose alternative means Operations Manager.
controlling plant parameters to the and provide technical
- k. Monitor in-plant maintenance activities in support of these advice to the Maintenance Superintendent maintenance activities.
is cognizant of the Ensure that the Maintenance Superintendent Form", may serve as fact that Form 1903.033B, "OSC Team Briefing to expedite the the emergency RWP and Work Order in order dispatch of repair and damage control teams.
area for
- m. Provide the technical expertise in the maintenance and inquiries from various regulatory response to questions agencies.
to help track the progress
- n. Coordinate with the TSC RDACS Operator of maintenance activities as it relates to reducing or the terminating offsite radiological releases being monitored by SPINGS.
resolve maintenance
- o. Coordinate with the Engineering Manager to involving necessary engineering support.
related problems and ensure that an open
- p. Coordinate with collocated NRC officials the event.
communications dialogue is maintained throughout where outside assistance is being
- q. Monitor consultant activities provided.
0 PAGE: 21 of 65 PROC.JNORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE B MAINTENANCE MANAGER Page 4 of 4 maintenance activities is
- r. Ensure that documentation of all Logs.
maintained using the ERO Chronological as Needed
- 3. Special Actions to be Implemented an individual
- a. Consider a shift change to relieve your position to Refer to the Emergency from the affected unit, if applicable. TSC Support Section I, or notify the Telephone Directory, Superintendent for assistance.
of working hours to support
- b. if aoolicable, establish a schedule around-the-clock operations- Notify the TSC Support Superintendent for assistance.
the TSC Director, relocate to C. If a TSC evacuation is declared by 'Evacuation".
1903.030, the EOF in accordance with Procedure
- 4. Shift Change turn over all pertinent
- a. Upon arrival of your shift replacement, documents, forms, and supplies.
Emergency Classification, b Brief your replacement on the current on the Status Boards and ongoing status of the plant, information measures that you have been assigned.
of the staffing change.
C. Notify the TSC Support Superintendent Staffing Board.
- d. Update your position status on the TSC
- 5. Actual Event/Drill Termination your position that the
- a. Notify those individuals working under event/drill has been terminated.
all of your
- b. Collect and organize in chronological order etc., and help restore the documents, logs, procedures, supplies, TSC.
to
- c. Provide a list of any forms or supplies needing replenishment Emergency Planning.
- d. Turn over all documentation generated during the drill/emergency to Emergency Planning.
critique to identify
- e. Participate in the post drill/emergency weaknesses and strengths.
PAGE: 22 of 65 PROC.JWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY TECHNICAL SUPPORT CENTER (TSC) CHANGE: 015-05-0 POSITION GUIDE B TASK B-1 TEAM TRACKING BOARD COMMUNICATOR (TSC) or higher classification, report to the Maintenance Manager
- 1. Notified of Alert in the TSC.
- 2. Review this task guide.
perform initial accountability by logging
- 3. If plant evacuation is occurring, insert your badge.
and then "0000" into the nearest card reader Team Tracking Board Communicator located Establish communications with the OSC (OSC) using the headset as follows:
in the Operational Support Center
- a. Don the cordless headse-.
from cradle and place near
- b. Remove handset of associated telephone telephone.
NOTE to auto-dial the TSC or OSC. When you The Team Tracker telephone is set uo until the person at will hear ringing remove the handset from the cradle you already performed these If the other facility has
-he other end picks up. the handset.
as you pick up steps, you will be on-line as soon the cordless headset stand, to the C_ Turn the "on/off" switch, located on When the OSC Team Tracker completes these same "or" oosition.
able to communicate with them.
instructions in the OSC, you will be the OSC Team Tracking Board Ob-ain 0SC -eam tracking information from on the Team Tracking Board.
Communicator and record this information information.
G Main:ain the Team Tracking Board with up-to-date on the Team Tracking Board by
- 7. Maintain a hard copy of information recorded completing Form 1903.033F.
information is recorded on the Team
- 8. Keep the Maintenance Manager informed as Tracking Board.
not to duplicate priorities
- 9. Remind the OSC Team Tracking Board Communicator Each mission must have a unique priority.
on missions.
change in your
- 10. Inform the Maintenance Manager of your location and any purposes.
location for tracking and accountability When notified of the drill/event termination, collect and organize in
- 11. etc.,
chronological order all of your documents, logs, procedures, supplies, pre-drill/event status. Turn over all and help restore the TSC to its Planning.
to Emergency documentation generated during the drill/event
PAGE: 23 of 65 PROC.JWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE C OPERATIONS MANAGER Page 1 of 4 A. Normal Reporting Location TSC B. Reports To TSC Director C. Supervises/Coordinates
- 7. Operations staff
- 2. Assistant Operations Manager
- 3. Operations Support D. Duties
- 1. immediate Actions report to your a When notified of an Emergency Plan Activation, and, if not already performed, notify CNS (858 assigned facility 3683) that you are staffing your ERO position.
initial
- b. If a plant evacuation is occurring, perform by logging '0000" in the TSC security card reader accountability insert your badge.
(or any other security card reader) and under the position that C. Write your name on the TSC Staffing Board you are staffing.
that you are staffing your
classifications and
- e. Obtain available information on emergency plant conditions. Possible sources include:
(1) Shift Manager (Affected Unit)
(2) TSC Director (staff briefing)
(3) TSC Status Board (4) Other TSC staff personnel
PAGE: 24 of 65 PROC./WORK PLAN NO. PROCEDUREtWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE C OPERATIONS MANAGER Page 2 of 4 your position are assigned.
- f. Ensure task responsibilities under (These personnel normally report to the OSC Assembly Area prior to dispatch.):
contacting the OSC Obtain the following personnel by either use of the Emergency Assembly Area coordinator (ext. 6625),
TSC Support Superintendent.
Telephone Directory or via the
- Assign operations person to (I) Operations Support (Task C-I) This person staff the Operations Support task in the TSC.
used to free the Operations Manager of busy work.
should be individual upon arrival Distribute appropriate Task Guide to to the TSC.
Assign a Senior Reactor (2) OSC Operations Support (Task C-2) -
Reactor Operator to report to the OSC to Operator or a Technical and assist the OSC Director and provide The Task Guide for this position Operational expertise.
resides with the OSC Director.
to the affected (3) Dispatch an Assistant Operations Manager the information flow units Control Room to help coordinate to the TSC. There is no task guide from tihe Control Room for this oosition.
qualified as a (4) If necessary, obtain a Technical Assistant in the TSC.
SRO to monitor and operate the SPDS
- q. Report current manpower status to the TSC Director.
Obtain all necessary forms for your position:
(1) Procedure Forms - Form 1903.065D (2) ERO Chronological Logs.
- 2. On Going Actions on the TSC facility
- a. Refer to Procedure 1903.065 for a description TSC relating to TSC activation criteria, and information turnover and the Secondary TSC.
staffing, TSC staff has occurred,
- b. If a plant evacuation or exclusion area evacuation then:
those individuals (1) Maintain continuous accountability of position that are remaining within or working under your returning to the evacuated area.
POSITION GUIDE C OPERATIONS MANAGER Page 3 of 4 working under your (2) Ensure that the OSC tracks any personnel or returning to the position that are remaining within evacuated area.
Procedure 1903.030, 'Evacuation", may be referenced for definitions and/or inszructions.
solicit oversight and
- c. Interface with the TSC Director to in recovery efforts.
direction/decision input with the EAL Reviewer,
- d. Review the Emerqency Class declared and the Operations staff.
located in the TSC, and emergency procedures
- e. Oversee the implementation of normal plant to a safe shutdown.
needed to bring the procedures and
- f. Determine the need for out-of-normal and emergency of these procedures.
supervise the development and implementation to the TSC Director
- g. Provide information and recommendations could affect the plant or the concerning future operations that environment.
provide
- h. Using For !903.065D, "TSC Director Status Update Guide",
current uodates to the TSC Director.
and ensure that an open iý Coordinate with col7ocated NRC officials the event.
is maintained throughout communications dialogue to request Coordinate with the TSC Support Superintendent sources.
services that may be needed from offsite of
- k. Advise the TSC Director regarding relaxation/curtailment Emergency Organization duties.
and Maintenance Manager
- 1. Coordinate with the Engineering Manager NRC questions regarding to provide for the timely resolution of to Technical Specifications and abnormal operation and/or changes SARs in accordance with procedures.
and Maintenance Manager
- m. Coordinate with the Engineering Manager work plans and procedures regarding abnormal to develop emergency systems or equipment operations.
to obtain
- n. Coordinate with the TSC Support Superintendent Technical Assistants, as necessary.
where outside assistance is being
- o. Monitor consultant activities provided.
operations activities is
- p. Ensure that documentation of all Logs.
maintained using the ERO Chronological
0 PAGE: 26 of 65 PROC./WORK PLAN NO. PROCEDURE[WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE C OPERATIONS MANAGER Page 4 of 4 Needed
- 3. Special Actions to be Implemented as your position to an individual
- a. Consider a shift change to relieve Refer to the Emergency from the affected unit, if applicable.
Section I, or notify the TSC Support Telephone Directory, Superintendent for assistance.
of working hours to support
- b. If applicable, establish a schedule the TSC Support around-the-clock operations. Notify Superintendent for assistance.
the TSC Director, relocate to
- c. If a TSC evacuation is declared by 1903.030, 'Evacuation".
the EOF in accordance with Procedure coolant pumps, refer to "TSC
- d. Prior to restarting Unit 1 reactor of RCP Restart" (contained Guidance for Determining Acceptability ESC-96-566 dated in Framatome Technologies, Inc. letter in your position guide book in October 21, 1996) which is located the TSC.
Accident is acknowledged,
[e. (P-16243) In the event that a Severe of the TSC EAL for the team composed act as the facilitator task. The team should Reviewer and the Engineering Support Management Guidelines (SAMG's), and review the Severe Accident necessary to mitigate the formulate and recommend actions and the emergency. Recommend these actions to the TSC Director Direction and Control. Once approval is person with Emergency carry out these actions.]
given, instruct the Shift Manager to
- 4. Shift Change replacement, turn over all pertinent
- a. Upon arrival of your shift documents, forms, and supplies.
Emergency Classification,
- b. Brief your replacement on the current information on the Status Boards and ongoing status of the plant, measures that you have been assigned.
of the staffing change.
- c. Notify the TSC Support Superintendent Staffing Board.
- d. Update your position status on the TSC
- 5. Actual Event/Drill Termination your position that the
- a. Notify those individuals working under event/drill has been terminated.
all of your
- b. Collect and organize in chronological order logs, procedures, supplies, etc., and help restore the documents, TSC.
to
- c. Provide a list of any forms or supplies needing replenishment Emergency Planning.
- d. Turn over all documentation generated during the drill/emergency to Emergency Planning.
critique to identify
- e. Participate in the post drill/emergency weaknesses and strengths.
POSITION GUIDE C TASK C-1 OPERATIONS SUPPORT report to the Administration
- 1. Notified of Alert or higher classification, otherwise by the TSC Operations directed Building Library (3rd floor) unless Manager.
- 2. Review this task guide.
perform initial accountability by logging
- 3. If plant evacuation is occurring, and then insert your badge.
"c00C" into the nearest card reader Room with maintenance and with the Control
- 4. Establish a working level interface of the affected unit.
alternatives emergency conditions and provide
- 5. Perform problem analyses of the operations to the Operations recovery for corrective action and long term Manager.
- 6. Research the feasibility of proposed recovery actions.
as necessary, to implement proposed
- 7. Develop procedures and work plans, recovery actions.
- 8. 'Consult available resource material (technical manuals, drawings, procedures, on equipment and systems to operations.
e:c.ý :o provide specific information your location your location and any change in
- 9. Inform the Operations Manager of
-for tracking and accountability purposes.
collect and organize in 2.0. When notified of the drill/event termination, supplies, etc.,
chronological order all of your documents, logs, procedures, pre-drill/event status. Turn over all and help restore the TSC to its to Emergency Planning.
the drill/event documentation generated during
POSITION GUIDE C TASK C-2 OSC OPERATIONS SUPPORT report to the OSC Director in the
- 1. Notified of Alert or higher classification, OSC.
Task Book (Task C-2) from the OSC Director
- 2. Ob-ain your OSC Operations Support and review this task guide.
initial accountability by logging
- 3. If plant evacuation is occurring, perform insert your badge.
card reader and then
"'10000" into the nearest
- 4. Assist the OSC Director.
briefings, debriefings, etc.
S. Provide input for OSC planning,
- 6. Stay updated on plant status.
When notified of the drill/event termination, collect and organize in logs, procedures, supplies, etc.,
chronological order all of your documents, Turn over all and help restore the OSC to its pre-drill/event status.
drill/event to Emergency Planning.
documentation generated during the
POSITION GUIDE D
[RADIATION PROTECTION AND RADWASTE MANAGER (P-1460)] Page 1 of 4 A. Normal Reporting Location TSC B. Reports To TSC Director C. Supervises/Coordinates
- 1. Dosimetry Support
- 2. Radwaste Support
- 3. TSC RDACS Operator NOTE during an emergency response, ensure If contractor H4P personnel are utilized by a qualified ERO member.
that they are accompanied and supervised D. Duties
- 1. immediate Actions (858-3683) that you
perform initial
- b. :f a olant evacuation is occurring,
'0000" in the TSC security card accountability by logging reader) and insert your reader (or any other security card badge.
under the
- c. Write your name on the TSC Staffing Board position that you are staffing.
the TSC Activation
- d. Verify TSC setup in accordance with located on the front of the door Checklist (Form 1903.065A) leading into the TSC Switchboard Room.
classifications
- e. Obtain available information on emergency conditions. Possible sources include:
and plant NOTE Do not call the Control Room.
(1) TSC Director (staff briefing)
(2) TSC Status Board (3) Other TSC staff personnel 6614)
(4) Health Physics Supervisor (OSC - Ext.
PAGE: 30 of 65 PROC.JWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE D RADIATION PROTECTION AND RADWASTE MANAGER Page 2 of 4 Ensure task responsibilities under your position are f.
assigned:
from (1) Dosimetry (Task D-1) - Contact personnel as 7641 or 7642) . Obtain assistance Dosimetry (Ext. staff to necessary from the TSC Support Superintendent as stated this task if unable to obtain personnel above.
(2) Radwaste Sunport (Task D-2) Contact personnel from Radwaste (Ext. 3540) . Obtain assistance as necessary staff this task from the TSC Support Superintendent to obtain personnel as stated above.
if unable to
- 5) - The Dose (3) TSC RDACS Operator (1904.011 Attachment Supervisor (DAS) located in the EOF is Assessment Operator.
responsible for providing a TSC RDACS as (4) Distribute appropriate Task Guides (attached) individuals arrive to staff the task positions.
- g. If not already available, request via the TSC Support member be Superintendent that a Dose Assessment Team to the TSC to monitor the RDACS Computer.
dispatched Reoort current marnower status to the TSC Director.
- 2. On Going Actions on the TSC
- a. Refer to Procedure 1903.065 for a description and information relating to TSC activation facility criteria, TSC staffing, TSC staff turnover and the Secondary TSC.
has
- b. If a plant evacuation or exclusion area evacuation occurred, then:
those (1) Maintain continuous accountability of individuals working under your position that are area.
remaining within or returning to the evacuated under (2) Ensure that the OSC tracks any personnel working your position that are remaining within or returning to the evacuated area.
Procedure 1903.030, "Evacuation", may be referenced for definitions and/or instructions.
(Ext. 6614)
- c. Coordinate with the Health Physics Supervisor provide oversight for all Health located in the OSC to Physics activities.
POSITION GUIDE D RADIATION PROTECTION AND RADWASTE MANAGER Page 3 of 4 1903.033,
- d. Using the guidelines established in Procedure and Damage provide an oversight of all entries by Repair exposure is held to Control Teams to ensure that radiation a minimum.
the use of reactor sump
- e. If the emergency event has dictated in the OSC to begin recirc, then inform the H.P. Supervisor RWT outlet and return lines for monitoring the BWST and/or radioactivity.
and, using the
- f. Monitor radiation levels in the TSC/OSC 1903.030, recommend guidelines on Attachment i of Procedure any protective actions to the TSC Director.
Update Guide",
Using Form 1903.065D, "TSC Director Status orovide current updates to the TSC Director.
need for the
- h. Using Procedure 1903.035, assess the Iodide for on-site personnel administration of Potassium the TSC Director of any such recommendations.
and advise for keeping
- i. Develop plans, procedures, and methods as low as radiation exposure of recovery personnel reasonably achievable (ALARA).
TLDs are read Coordinate with Dosimetry to ensure personnel and updated computer listings are provided.
the TSC RDACS Operator monitors the status of
- k. Ensure that any offsite radiological release.
IF an offsite release occurs, via THEN notify the TSC Director to inform plant personnel plant page.
to develop
- 1. Coordinate with the Health Physics staff effort.
the recovery decontamination plans to support to the TSC Director
- m. Provide information and recommendations that could affect the plant or concerning future operations the environment.
and ensure that an
- n. Coordinate with collocated NRC officials dialogue is maintained throughout the open communications event.
accomplishing
- o. Recommend equipment needed for use in radwaste processing and monitoring activities.
necessary
- p. Advise the Plant Modifications group as additions and modifications.
concerning radwaste system
PAGE: 32 of 65 PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-050 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE D MANAGER RADIATION PROTECTION AND RADWASTE Page 4 of 4 to request
- q. Coordinate with the TSC Support Superintendent be needed from offsite sources.
services that may Superintendent to obtain
- r. Coordinate with the TSC Support Technical Assistants, as necessary.
where outside assistance is
- s. Monitor consultant activities being provided Ensure that documentation of all Radiation Protection
- t. Logs.
activities is maintained using the ERO Chronological
[u. (P-4193) Ensure all TSC personnel have a TLD.]
- 3. Special Actions to be implemented as Needed of working hours to
- a. If applicable, establish a schedule operations. Notify the TSC support around-the-clock Support Superintendent for assistance.
- b. If a TSC evacuation is declared by the TSC Director, relocate to the EOF in accordance with Procedure 1903.030, "Evacuation".
-Shift Change Upon arrival of your shift replacement, turn over all a.
pertinent documents, forms, and supplies.
Emergency
- b. Brief your replacement on the current on the of the plant, information Classification, status and ongoing measures that you have been Status Boards assigned.
Staffing Board.
- c. Update your position status on the TSC
- 5. Actual Event/Drill Termination your position that
- a. Notify those individuals working under the event/drill has been terminated.
order all of your
- b. Collect and organize in chronological help etc., and documents, logs, procedures, supplies, restore the TSC.
- c. Provide a list of any forms or supplies needing replenishment to Emergency Planning.
- d. Turn over all documentation generated during the drill/emergency to Emergency Planning.
to
- e. Participate in the post drill/emergency critique identify weaknesses and strengths.
PAGE: 33 of 65 PROC.IWORK PLAN NO. PROCEDURE!WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE D TASK D-1 DOSIMETRY report to your assigned location.
- 1. Notified of Alert or higher classification,
- 2. Review this task guide.
perform initial accountability by logging
- 3. If plant evacuation is occurring, and then insert your badge "0000" into the nearest card reader
- 4. SupporZ the ERO by issuing personnel dosimetry.
are updated in a exposure history files
- 5. Ensure personnel TLDs are read and timely manner.
and accurately logged and this information
as necessary
- 7. Provide whole body counts for personnel, any Radwaste Manager of your location and
- 8. Inform the Radiation Protection and purposes.
and accountability change in your location for tracking collect and organize in
- 9. When no:ified of the drill/event termination, supplies, etc.,
chrronological order all of your documents, logs, procedures, pre-drill/event status. Turn over all and help restore the TSC to its Planning.
drill/event to Emergency documentation generated during the
POSITION GUIDE D TASK D-2 RADWASTE SUPPORT report to your assigned location.
- 1. Notified of Alert or higher classification,
- 2. Review this task guide.
initial accountability by logging
- 3. If plant evacuation is occurring, perform then insert your badge.
"0000" into the nearest card reader and
-. Direct the packaging of radioactive wastes.
wastes.
Arrange for transport and disposal of radioactive Ensure all waste shipments are fully authorized and documented.
6.
activities to the Radiation Protection
- 7. Report the status of radwaste handling TSC.
and Radwaste Manager, located in the and any and Radwaste Manager of your location
.nform the Radiation Protection and accountability purposes.
change in your location for tracking collect and organize in when no.ified of the drill/event termination, of your documents, logs, procedures, supplies, etc.,
-hronoloqical order all Turn over all ore-drill/event status.
and he-o restore the TSC to its Planning.
the drill/event to Emergency documentation generated during
POSITION GUIDE E TSC DIRECTOR Page 1 of 8 A. Normal Reporting Location TSC B. Reports To Management / EQE Director Entergy Operations Corporate C. Supervises/Coordinates
- 1. Operations Manager
- 2. Maintenance Manager
- 3. Engineering Manager OSC D Director
- 5. Radiation Protection and Radwaste Manager
- 6. TSC Support Superintendent D. Duties IMMED IATE ACTIONS position.
that you are staffing your ERO El Notify CNS (858-3683) perform initial accountability by E] -- a plant evacuation is occurring, card reader (or any other security If logging '0000" in the TSC security card reader) and insert your badge.
Board under the position TSC El Write your name on the TSC Staffing Director.
classifications and plant 0 Obtain available information on emergency conditions. Possible sources include:
(May use ringdown circuit to the Control Room)
(1) Shift Manager (2) TSC Status Board (3) Other TSC staff personnel IF affected Unit is in an outage update/turnover for outage THEN contact the Outage desk for an and plant/equipment status. Consider requesting the Outage activities in mitigating Manager and outage staff to report to the TSC to assist the emergency.
PAGE: 36 of 65 PROC.IWORK PLAN NO. PROCEDUREJWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE E TSC DIRECTOR Page 2 of 8 Critical Tasks (Must be transferred from
[Emergency Direction and Control (P-10766)]
Alert or higher Emergency the Control Room within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of an Classification) . Go to ED&C section below.
higher within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of an Alert or El TSC Operability (Must be operable TSC Operability - page 3 of 8 of Emergency Classification). Go to this position guide.
Emergency Declared - page 4 of LI ALERT Emergency Declared - Go to Alert 8 of this position quide.
Site Area Emergency Declared LI Site Area Emergency Declared - Go to page 4 of 8 of this position quide.
- page 4 Go to General Emergency Declared El General Emergency Declared -
of 8 of this position guide.
CONTROL ACTIONS (P-10766)]
[EMERGENCY DIRECTION AND Personnel Required for ED&C LI TSC Director
[] Notificatiions Communicator Dose Assessor in the Control Room LI Dose Assessment May be Initial or Dose Assessment Team in the EOF.
and the TSC Support FI If required personnel are not availablethe TSC Support Superintendent is available, instruct personnel. (The EOF Support Superintendent to contact additional if the TSC Superintendent may also be used Manager or Support Support With no Support Superintendent is not available. may ERO personnel, any ERO member personnel available to contact be used for this task.)
Manager.
El Perform turnover with the Shift to perform turnover with the LI Instruct the Notifications Communicator in the Control Room.
Notification Communicator LI Assume Emergency Direction and Control.
if available.
LI Notify the EOF Director of the transfer LI Change the ED&C status board in the TSC.
TSC Director has ED&C.
F7 Announce to the TSC and OSC Staff that the
POSITION GUIDE E TSC DIRECTOR Page 3 of 8 NOTE 15 minutes of EACH emergency class The Arkansas Department of Health must be notified within declaration.
each notification to the must be notified immediately after The Nuclear Regulatory Commission class declaration.
AH bun within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of each emergency 30 minutes of the and NRC should be performed within Fo.llw-ur, notifications to the ADH significant events occur.
hourlv thereafter or as initial notification and at least in D Iinstruct the Notifications Communicator to perform notifications "Emergency Response/Notifications."
accordance with procedure 1903.011, Protective Action Recommendations Notify offsite authorities concerning (PARs) conditions is under the (i) Formulation of PARs based on radiological responsibility of the REAM located in toe Eur.
are developed by the (24 Formulation of PARs based on plant conditions Operations/TSC Staff and the EAL Reviewers Organization (ERO) effort until the
[ Direct and control the Emergency Response EOQ Director assurmes this resp.onsibility.
for event classification. The EAL ihe 7SC Director has the responsibility for informing you of EOF are responsible Reviewers in the Control Room, TSC and conditions.
even- classification caused by changing TSC OPERABILITY D] Personnel Required for TSC Operability D] TSC Director
[] Notifications Communicator
[] Operations Manager
[] Engineering Manager E] Maintenance Manager
[] RP&RW Manager and the TSC Support If any of the above personnel are not available EOF Support Manager or EOF Support Superintendent is superintendent, additional qualified available, instruct one of the above to contact above, any ERO In the absence of the support personnel listed personnel.
personnel.
personnel may be used to contact additional declare the TSC operable.
E] Once all required personnel are available, is in progress or complete.
[] Ensure that the "TSC Activation Checklist"
Ob PAGE: 38 of 65 PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE E TSC DIRECTOR 8 Page 4 of ALERT EMERGENCY DECLARED Who has Emergency Direction and Control?
and Control, D] IF the Control Room has Emergency Direction Control section and take ED&C.
THEN go to Emergency Direction and Direction and Control, 7 IF the EOF Director has Emergency TSC is staffed and operational.
THEN ensure Direction and Control, D IF the TSC Director has Emergency Control "Alert Emergency Direction and THEN complete Form 1903.011M, Checklist SITE AREA EMERGENCY DECLARED Who has Emergency Direction and Control?
and Control, D] IF the Control Room has Emergency Direction Control section and take ED&C.
THEN go to Emergency Direction and Direction and Control, IF the EOF Director has Emergency the EOF Director.
THEN wait for the instruction from and Control, D] IF the TSC Director has Emergency Direction Emergency Direction and Control THEN complete Form 1903.01iQ, "SAE Checklist TSC Director Critical SAE Checklist Items:
Plant Evacuation Announcement must be made within 15 minutes of SAE declaration 30 minutes of the SAE Initial Accountability must be complete within declaration.
Consider an Exclusion Area Evacuation.
GENERAL EMERGENCY DECLARED Who has Emergency Direction and Control?
Direction and Control, 0] IF the Control Room has Emergency and Control section and take ED&C.
THEN go to Emergency Direction and Control,
[] IF the EOF Director has Emergency Direction from the EOF Director.
THEN wait for the instruction and Control, LI IF the TSC Director has Emergency Direction Emergency Direction and Control THEN complete Form 1903.011T, "GE Checklist TSC Director
a PAGE: 39 of 65 PROC.IWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE E TSC DIRECTOR Page 5 of 8 Critical GE Checklist Items:
be made within 15 minutes of SAE Plant Evacuation Announcement must declaration 30 minutes of the SAE Initial Accountability must be complete within declaration.
Perform an Exclusion Area Evacuation.
PLANT EVACUATION / INITIAL ACCOUNTABILITY D] IF a SAE or GE is declared, SAE or accordance with Form 1903.011Q -for THEN perform a Plant Evacuation in 1903.011T for GE.
other than SAE or GE, D] IF Plant Evacuation is required for reasons in accordance with Procedure 1903.030, THEN nerform a Plant Evacuation "Evacuation."
NOTE accountability is to ascertain the names of missing individuals no The goal of iniial of an SAE or higher emergency classification.
later than 30 minutes after the declaration Critical Plant Evacuation Items the Accountability within 30 minutes of Notify Security to perform Initial SAE or GE declaration.
Superintendent.
Review initial accountability with the TSC Support necessary to account for missing Initiate search and rescue efforts as individuals following a plant evacuation.
those individuals working under your maintain continuous accountability of returning to the evacuated area.
position that are remaining within or working under your position that are Ensure that the OSC tracks any personnel evacuated area.
remaining within or returning to the Localized Evacuation exclusion area evacuation Li If necessary, declare localized, plant and 1903.030, "Evacuation."
in accordance with Procedure TSC/OSC Evacuation Li Perform a TSC/OSC Evacuation in accordance with procedure 1903.030, "Evacuation."
PAGE: 40 of 65 PROCJWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE E TSC DIRECTOR Page 6 of 8 TSC/OSC Evacuation Tasks:
Secondary TSC due to adverse conditions, If the TSC is to be relocated to the TSC Activation Checklist".
refer to Form 1903.065C, "Secondary advised of any relocation of the TSC/OSC Ensure that NRC/ADH officials are OSC/TSC.
and the operational status of the Secondary approve/disapprove requests by Following an Exclusion Area Evacuation, through established roadblocks.
Security to grant access to personnel NOTE Guidelines (SAMG) and data gathering Review of the Severe Accient Manaqement to the implementation of Severe by the SAM team may be started prior Accident Management.
[SEVERE ACCIDENT MANAGEMENT (SAM)
(P-16243) point where the Control Room has If the incident has progressed to a effective, implement Severe Accident determined that the EOP's are no longer Utilize the SAM checklist located in your position box.]
Management.
On Going Actions on the status of the Dl Interface with NRC/ADH/locai officials emergency.
on dose assessment and 0 interface with NRC/ADH/local officials recommended offsite protective actions.
overall emergency effort.
Continuously review the status of the of the status of the jj] Keep Entergy Operations Management informed emergency.
Evaluate and approve/disapprove requests for additional personnel staffing from offsite entities.
on the TSC facility
[] Refer to Procedure 1903.065 for a description TSC staffing, criteria, and information relating to TSC activation TSC staff turnover and the Secondary TSC.
Establish communications with the OSC. Either communicate fl delegate as appropriate.
directly with the OSC Director or (Can be performed Conduct periodic updates with the OSC Director.
by the TSC Maintenance Manager.)
on:
[] Conduct periodic updates to the EOF Director
PAGE: 41 of 65 PROC.VORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE E TSC DIRECTOR Page 7 of 8 10CFR20 exposure D] Approve emergency exposure limits exceeding emergency teams if required.
limits, for in-plant (KI) for onsite personnel D] Approve the usage of Potassium Iodide of the RP & RW Manager.
upon recommendation the Control Room, OSC, TSC and Admin.
D Review the habitability of Bldg.
Manager to ensure D] Review recovery efforts with the Engineering that they have bee'n adequately prioritized.
plans and corrective actions with Coordinate and promulgate mitigation the TSC staff consider using Reactor Building If a radiological release is involved, radioactivity levels and containment Spray to reduce containment the release rate to the offsite environment.
pressure, thus lowering Request staff members to Perform periodic briefs with the TSC staff.
Guide", for briefings.
use Form 1903.065D, "TSC Director Status Update and ensure that an open ED Coord.inae wi:h collocated NRC officials the event.
commu-nicat:ions dialocue is maintained throughout to obtain Technical D] Coordinate with the TSC Support Superintendent Assistan5s, as necessary monitored when outside Ensure that- consultant activities are being assistance is being provided.
and decisions are D] Ensure that documentation of all TSC activities using the ERO Chronological Logs.
recorded and maintained around-the-clock D] Establish a schedule of working hours to support for Use the TSC Support Superintendent operations if required.
assistance.
Shift Change Upon arrival of your shift replacement, turn over all pertinent
[]
documents, forms, and supplies.
Classification, status Brief your replacement on the current Emergency Status Boards and ongoing measures of the plant, information on the that you have been assigned.
change.
LI Notify the TSC Support Superintendent of the staffing
[] Update your position status on the TSC Staffing Board.
PAGE: 42 of 65 PROC.IWORK PLAN NO. PROCEDUREJWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE E TSC DIRECTOR Page 8 of 8 Actual Event/Drill Termination your position that the Notify those individuals working under event/drill has been terminated.
all of your documents, LI Collect and organize in chronological order help restore the TSC.
logs, procedures, supplies, etc., and replenishment to El Provide a list of any forms or supplies needing Emergency Planning.
the drill/emergency to LI Turn over all documentation generated during Emergency Planning.
to identify LI Participate in the post drill/emergency critique weaknesses and strengths.
PAGE: 43 of 65 PROC.JWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE F TSC SUPPORT SUPERINTENDENT Page I of 5 A. Normal Reporting Location TSC B. Reports To TSC Director C. Supervises/Coordinates I. ANO Security
- 2. Administrative Services
- 3. Computer Support function following a plant
- 4. Coordinate continuous accountability evacuation
- 5. Support Manager
- 6. TSC Emergency Action Level Reviewers
- 7. TSC Notifications Communicator
- 8. TSC Status Board Communicator
- a. When notified of an Emergency Plan Activation, notify CNS (858 and, if not already performed, assigned facility your ERO position.
3683) that you are staffing initial
- b. If a plant evacuation is occurring, perform by logging '0000' in the TSC security card reader accountability Refer insert your badge.
(or any other security card reader) and as your responsibilities to Step 3.a below for instructions on they relate to accountability.
under the position that
- c. Write your name on the TSC Staffing Board you are staffing.
TSC Activation Checklist
- d. Verify TSC setup in accordance with the the front of the door leading into (Form 1903.06SA) located on the TSC Switchboard Room. Setup should be completed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of TSC operability.
classifications and
- e. Obtain available information on emergency plant conditions. Possible sources include:
(1) TSC Director (staff briefing)
(2) TSC Status Board (3) Other TSC staff personnel
PAGE: 44 of 65 PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE F TSC SUPPORT SUPERINTENDENT Page 2 of 5 position are assigned:
- f. Ensure task responsibilities under your from Security using (1) Security (Task F-l) - contact personnel Telephone Directory.
Section V of the Emergency Services (Task F-2) - Contact personnel from (2) Administrative Services using Section V of the Emergency Administrative Telephone Directory. Additionally, Administrative Services will be called by CNS during off-hours.
(Task F-3) - Contact (3) Computer Maintenance/Software Support Support using personnel from Computer Maintenance/Software the Emergency Telephone Directory.
Section V of (Task F-4) - Contacted via CNS. Refer to (4) TSC EAL Reviewer CNS printout.
Communicator (Task F-5) - Contacted via (5) TSC Notifications CNS. Refer to CNS report.
(Task F-6) Contacted via (6) TSC Status Board Communicator CNS. Refer to CNS report.
(Task F-7) - Contacted via CNS. Refer (7) TSC ENS Communicator to CNS report.
as individuals (8) Distribute appropriate Task Guides (attached) arrive to staff the task positions.
Refer to the Computerized
- g. Complete the TSC Staffing Board.
Notification System (CNS) printout to ascertain those ERO positions that are enroute.
Director.
- h. Report current manpower status to the TSC Form", complete the
- i. Obtain Form 1903.065E "TSC Position Staffing form to the EOF required information and FAX the completed Number 6957.
Support Superintendent at FAX the Emergency
- j. Obtain all necessary forms for your position from Kit:
(1) Procedure Forms - Form 1903.065D (2) Form 1903.065E (3) ERO Chronological Logs NOTE: If Emergency Direction and Control is transferred the TSC directly from the SS to the EOF Director, you report to you to assist Notifications Communicator will with your responsibilities.
PAGE: 45 of 65 PROC.IWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY 015-05-0 CHANGE:
TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE F TSC SUPPORT SUPERINTENDENT Page 3 of S
- 2. On Going Actions on the TSC facility
- a. Refer to Procedure 1903.065 for a description criteria, TSC and information relating to TSC activation TSC.
turnover and the Secondary staffing, TSC staff evacuation has occurred,
- b. If a plant evacuation or exclusion area then:
of those individuals (1) Maintain continuous accountability position that are remaining within or working under your returning to the evacuated area.
working under your (2) Ensure that the OSC tracks any personnel to. the remaining within or returning position that are evacuated area.
Procedure 1903.030, "Evacuation", may be referenced for definitions and/or instructions.
occur. Coordinate
- c. Maintain the TSC Staffing Board as changes to staffing boards with the Support Manager in the EOF.
changes update Guide", provide
- e. Coordinate Security activities:
roadblocks to minimize (1) Coordinate the deployment of security radiation exposures. Obtain radiological release the placement of information and information concerning Radwaste roadblocks from the Radiation Protection and Manager.
duties
- f. Coordinate office services and other administrative requested by ERO personnel.
Support
- g. Coordinate requests for Computer Maintenance/Software assistance during ERO operations.
ERO.
- h. Coordinate Communicator needs within the Refer to Section V
- i. Coordinate requests for Technical Assistants. these requests.
of the Emergency Telephone Directory when filling and ensure that an open
- j. Coordinate with collocated NRC officials throughout the event.
communications dialogue is maintained at ext. 7854 to
- k. Coordinate with the Support Manager in the EOF sources.
request services that may be needed from onsite/offsite is being
- 1. Monitor consultant activities where outside assistance provided.
a POSITION GUIDE F Page 4 of 5 TSC SUPPORT SUPERINTENDENT
involved are maintained using
- 3. Special Actions to be Implemented as Needed
- a. Accountability (1) Initial Accountability - Following a plant evacuation, those individuals obtain a Security printout to determine 1903.030, In accordance with Procedure that are missing. no later than list must be available Section 6.3.1.D, this or higher the declaration of a SAE 30 minutes after emergency class.
determined to (a) Inform the TSC Director of any personnel be missing.
a plant evacuation, (2) Continuous Accountability - Following complete the following actions:
continuous (a) Verify that Security has obtained which contain accountability clipboards and signs, from the TSC Emergency Kit.
Form 1903.030A, Communicator and (b) Contact the Control Room Status Board clipboards instruct him/her to hang the accountability Control Room doors of both units and signs on the Instruct the Communicator to (inside of door).
review and monitor the Control Room periodically their status to accountability logsheets and report you.
assembled (c) Continuous accountability of personnel is the OSC outside the Control Rooms, TSC and the ERO position responsibility of the person staffing Manager to which they report. (Example: Engineering to account for Engineering personnel).
is responsible (d) Direct requests for continuous accountability to the responsible information on specific individuals A printout of all onsite personnel may be ERO member.
as an aid in routing obtained from Security for use the This printout will include these requests. and for each person listed company and/or department responsible for them while onsite.
the individual with the Health Physics
- b. Following an NRC request, coordinate a technically qualified HP Supervisor in the OSC to ensure that the Health Physics Network (HPN) telephone is prepared to staff in the OSC and the EOF.
working hours to support
- c. If applicable, establish a schedule of for your ERO position as well as around-the-clock operations others when requested.
PAGE: 47 of 65 PROCJ.WORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE F TSC SUPPORT SUPERINTENDENT Page 5 of 5 the TSC Director, relocate to
- d. If a TSC evacuation is declared by Procedure 1903.030, "Evacuation".
the EOF in accordance with
- 4. Shift Change replacement, turn over all pertinent
- a. Upon arrival of your shift documents, forms, and supplies.
Emergency Classification,
- b. Brief your replacement on the current on the Status Boards and ongoing status of the plant, information measures that you have been assigned.
replacements on the TSC
- c. Record staffing changes due to shift Staffing Board.
TSC Staffing Board.
- d. Update your position status on the
- 5. Actual Event/Drill Termination you position that the
- a. Notify those individuals working under event/drill has been terminated.
order all of your
- b. Collect and organize in chronological help restore the procedures, supplies, etc., and documents, logs, TSC.
to C. Provide a list of any forms or supplies needing replenishment Emergency Planning.
- d. Turn over all documentation generated during the drill/emergency to Emergency Planning.
critique to identify
- e. Participate in the post drill/emergency weaknesses and strengths.
PAGE: 48 of 65 PROC.IWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE F TASK F-I SECURITY report to your assigned location.
- 1. Notified of Alert or higher classification,
- 2. Review this task guide.
initial accountability by logging
- 3. If plant evacuation is occurring, perform your badge.
then insert "0000" into the nearest card reader and location.
- 4. Organize staff and have them report to their assigned to support around the clock operation.
- 5. Establish a schedule of working hours Support Superintendent.
- 6. Report manpower status to the TSC accordance with Procedure 1903.011
- 7. Coordinate plant evacuation as needed in and/or 1903.030.
ensure that Security personnel obtain
- 8. Upon declaration of a Plant Evacuation, and signs, which contain Form the continuous accountability clipboards Kit and post them at the following 1903.030A, from the TSC Emergency Administration Building locations:
First Floor - Door leading to Turbine Building
- East and West exits House
- Entry and exit points to Main Guard to Turbine Building Second Floor - Door leading report initial accountability results to the TSC
- 9. Following a plant evacuation, Support Superintendent.
NOTE and Radwaste Manager in the TSC to Coordinate with the Radiation Protection doses are tracked and monitored.
help ensure Security Personnel radiation personnel, maintain continuous i0. Following a plant evacuation of non-essential personnel remaining onsite.
accountability of Security activities as appropriate.
- 12. Set up roadblocks and control points to activated). Consider radiological release information the alternate EOF (if in determining locations of (obtained from TSC Support Superintendent) roadblocks and control points.
alternate EOF (if activated) to
- 13. Establish working area in the EOF and the issue plant access identification.
emergency.
- 14. Reduce security precautions at termination of i5. Notify staff upon termination of the ANO emergency response.
0 PAGE: 49 of 65 PROC IWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY TECHNICAL SUPPORT CENTER (TSC) CHANGE: 015-05-0 POSITION GUIDE F "TASK F-2 ADMINISTRATIVE SERVICES report to the TSC library.
- 1. Notified of Alert or higher classification,
- 2. Review this task guide.
initial accountability by logging
- 3. If plant evacuation is occurring, perform and then insert your badge.
"0000" into the nearest card reader location.
- 4. Organize staff and have them report to their assigned to support around-the-clock operation.
- 5. Establish a schedule of working hours Support Superintendent.
- 6. Report manpower status to the TSC Administrative Services' supplies and equipment as~necessary.
- 7. Relocate/procure the [rollover
- 8. During briefs, roll all TSC calls to the booth area by pressing the completion Roll the telephones back at ON] button on the booth telephone.
brief by pressing the [rollover OFF] button on the booth telephone.
of the that you are performing this task and
- 9. Inform the TSC Support Superintendent accordance with procedure 1903.030, perform accountability tasks in "Evacuation".
personnel, maintain continuous t0. Following a plant evacuation of nonessential personnel remaining onsite.
accountability of Administrative Services upon termination of the ANO emergency response.
Notify staff should be generated which include the
- 12. As appropriate, periodic status reports following items:
- a. Current status of the emergency actions (listing).
- b. Chronological summary of the event and response in this response to the event.
- c. Organizations currently involved the event.
of the plan of action to address
- d. Narrative discussion
6 PAGE: 50 of 65 PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY TECHNICAL SUPPORT CENTER (TSC) CHANGE 015-05-0 POSITION GUIDE F TASK F-3 COMPUTER MAINTENANCE/SOFTWARE SUPPORT classification, report to your assigned location.
I. Notified of Alert or higher
- 2. Review this task guide.
perform initial accountability by logging
- 3. If plant evacuation is occurring, insert your badge.
and then "0000" into the nearest card reader with the TSC Support Superintendent.
- 4. Establish line of communication support for the Emergency Response
- 5. Provide computer hardware and software Organization.
of location and of any changes in
- 6. Inform the TSC Support Superintendent location for tracking purposes.
PAGE: 51 of 65 PROC./WORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY TECHNICAL SUPPORT CENTER (TSC) CHANGE: 015-05-0 POSITION GUIDE F TASK F-4 TSC EMERGENCY ACTION LEVEL REVIEWER classification, report to the TSC Support I. Notified of Alert or higher Superintendent in the TSC.
- 2. Review this task guide.
initial accountability by logging
- 3. If plant evacuation is occurring, perform insert your badge.
"0000" into the nearest card reader and then aware of your presence upon arrival.
- 4. Ensure that the TSC Director is or the and 1903.011 from the TSC Bookcase S. Obtain a copy of Procedure 1903.010 Administration Building Library.
"Emergency Action Level Classification",
[6. (P-1464) Review Procedure 1903.010, of the event. Log and adequate classification on a continuous basis to ensure maintain applicable EAL's for TSC tracking.]
"Emergency Response/Notifications",
[7. (P-1464) Review Procedure 1903.011, continuous basis to ensure that appropriate Attachment 6,7 and 8 on a been implemented.]
Protective Action Recommendations have and Protective Action S. Report all information concerning classification and ensure that the individual responsible Recommendations to the TSC Director is informed.
for Emergency Direction and Control to identify all Emergency Action Levels
- 9. As time permits, review conditions that apply to current conditions.
Accident is acknowledged, work with
[10. (P-16243) In the event that a Severe review the Severe Accident Management support engineers in the TSC to and recommend recovery actions necessary to Guidelines (SAMG's) and formulate to the mitigate the accident. Make the recovery action recommendations Operations Manager.]
PAGE: 52 of 65 PROC.JWORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY TECHNICAL SUPPORT CENTER (TSC) CHANGE: 015-05-0 POSITION GUIDE F TASK F-5
[TSC NOTIFICATIONS COMMUNICATOR (P-9475)]
Page I.of 2 report to the TSC Support
- 1. Notified of Alert or higher classification, Superintendent in the TSC.
- 2. Review this task guide.
perform initial accountability by logging
- 3. If plant evacuation is occurring, then insert your badge.
and "0000" into the nearest card reader to the TSC or and Control will be transferred
- 4. Determine if Emergency Direction EOF.
will be transferred directly from A. IF Emergency Direction and Control t-he Shift Manager to the EOF Director, THEN go to step 6.
DEF/VS or commercial fax B. Obtain all previous notification from the located in the TSC.
Communicator (the Shift C. Contact the Control Room Notifications this position) and typically fills Engineer from the unaffected Unit obtain a brief.
completed your brief and are ready D. Notify TSC Director when you have to take notifications.
from the Control Room E. [(P-9459) Assume notification responsibilities in accordance Perform notifications as directed by the TSC Director.
Response/Notifications.-]
with Procedure 1903.011, "Emergency Radiological/Meteorological information should be obtained (1) from:
RDACS.
- a. The Nuclear Chemist assigned to TSC if Dose
- b. The Initial Dose Assessor in the Control Room to the EOF.
Assessment has not been transferred The REAM located at the EOF, if Dose Assessment has c.
been transferred to the EOF.
(PAR) data should be (2) Protective Action Recommendation obtained from:
Dose
- a. The Initial Dose Assessor in the Control Room if to the EOF.
Assessment has not been transferred The REAM located at the EOF, if Dose Assessment has b.
been transferred to the EOF.
based on plant
PAGE: 53 of 65 PROC./WORK PLAN NO. PROCEDUREIWORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE F TASK F-5 TSC NOTIFICATIONS COMMUNICATOR Page 2 of 2 to adequately describe the plant F. Obtain the information necessary notifying to the NRC immediately after status then make notifications the ADH using the ENS telephone.
the same information (1) Provide the NRC with, at a minimum, form telefaxed to the that was supplied on the notification ADH.
per TSC
- 5. Turn over notifications to the EOF Notificaition Communicatior Director instructions.
Tasks."
- 6. Maintain a log of critical times using Form 1 903.065F,"TSC Critical as necessary.
Update the TSC Director and staff as requested.
- 7. Assist the TSC Support Superintendent
PAGE: 54 of 65 PROCJWORK PLAN NO. PROCEDURE/WORK PLAN TITLE:
1903.065 EMERGENCY RESPONSE FACILITY CHANGE: 015-05-0 TECHNICAL SUPPORT CENTER (TSC)
POSITION GUIDE F TASK F-6
[TSC STATUS BOARD COMMUNICATOR (P-1457, P-4978, P-9475)]
report to the TSC Support
- 1. Notified of Alert or higher classification, Superintendent in the TSC.
- 2. Review this task guide.
perform initial accountability by logging
- 3. If plant evacuation is occurring, insert your badge.
and then "0000" into the nearest card reader setup of the TSC using Form 1903.065A,
- 4. Upon arrival, begin helping with the "TSC Activation Checklist".
- 5. Tools required:
Party-line headset or cordless headset in the TSC Emergency Kit).
Erasable markers and eraser (extras located
- 6. Set up at Station 16 in the TSC.
A. Party line headset setup and operation.
below wallboard. Move Plug prongs into status line jack located headsez switch to "Talk".
B. Cordless headset setup and operation line jack located (1) Place phone line in appropriate status below wallboard if not already done.
unit and securely (2) Remove headset and control unit from base and place headset on head.
place controller on your person and receive.
(3) Press "talk" on the controller to transmit (4) Move headset switch to "Talk".
to recharge.
(5) Place control unit on base unit as necessary Communicators will join the C. The Control Room, OSC and EOF Status Board party line as they report to their facilities.
- 7. Complete and maintain the TSC Status Board.
order, starting at A. Status Board entries should be made in chronological the time entry on the left side.
the top, with start again at the top by erasing B. When the Status Board becomes full, with a different color the oldest entry and begin making new entries marker.
of significant information C. Ensure that the TSC Director is made aware party line and being logged onto the Status that is reported across the etc.).
Board (e.g., Release started, equipment failures,
POSITION GUIDE F TASK F-7 SYSTEM (ENS) COMMUNICATOR
[TSC EMERGENCY NOTIFICATION (P-9475)]
report to the TSC Support
- 1. Notified of Alert or higher classification, Superintendent in the TSC.
- 2. Review this task guide.
perform initial accountability by logging
- 3. If plant evacuation is occurring, insert your badge.
and then "0000" into the nearest card reader a
current operational conditions and
- 4. Obtain a briefinq on the status of the Operations briefing on historical events that led up to the event from Manager in the TSC.
Obtain Panel next to the ENS telephone..
Establish your station at the SPDS Kit.
all necessary supplies from the TSC Emergency NOTE Room ENS telephone and the Unit 2 The TSC ENS telephone, the Unit 1 Control If the Control of the same line.
Control Room ENS telephone are extensions will hear this TSC ENS Communicator Room is on-line with the NRC, the telephone.
communcation when picking up TSC ENS If the Control Room/NRC is
- 6. Lift the receiver on the TSC ENS telephone. that you are taking over inform the Control Room/NRC already on the circuit, If you simply hear a dial tone Room.
the ENS responsibility from the Control any one of the numbers the receiver, you must then dial whenever you lift NRC answers, inform them that Whenever the listed on the telephone placard.
you are staffing the ENS telephone from requested otherwise by the NRC
- 7. Maintain an open-line with the NRC unless Communicator.
as requested. The TSC staff,
- 8. Provide information to the NRC Communicator as your source for obtaining will serve especially the Operations Manager, requested information.
- 9. Drill/Event Termination in When notified of the drill/event termination, collect and organize A. help restore chronological order all of your documents, logs, etc., and the TSC.
to B. Provide a list of any forms or supplies needing replenishment Emergency Planning.
drill/event to C. Turn over all documentation generated during the Emergency Planning.
in the post drill/event critique.
D. Participate
Page 56 of 65 Page 1 of 3 Initials as possible. Use attached Steps I and 3 should be performed as soon for location of stations.
floor diagram of the TSC amplifier (located in the TSC
- 1. Turn on the power to the TSC/OSC PA communications room, station 29).
(Station 20). Key is
- 2. Put the RDACS key in the RDACS computer located in the TSC Emergency Kit key box.
level by turning up
- 3. Ensure plant page volume is at an acceptable is located over the Speaker volume on the speaker as necessary.
Unit 2 end of the SPDS console.
the RP technician.
Steps 4 through 8 may be performed by the checklist is
"* The TSC Support Superintendent should ensure that after the TSC is operable.
completed within approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> should be performed as
"* If a release is known to exist, then step 4 soon as possible.
follows: (station 31)
- 4. Activate the Continuous Air Sampler as A. Move the continuous air sampler to a location near the TSC.
sampler, the air Due to the noise produced by the air as close as possible to the TSC sampler should be moved the TSC operation. (Station 32) without disturbing Ensure all switches are in the "OFF" position.
B.
supply (i.e., 110 VAC C. Plug the NMC into the proper power outlet).
on the front panel, D. Place the "Master" power switch (located upper left corner) to the "ON" position.
of CAM housing).
E. Check amber warning light (located on top continue. OTHERWISE, notify Radiation IF illuminated Protection to check CAM.
F. Wait 5 minutes.
lift lid G. Place the "Blower" switch (located inside CAM, to the "ON" position.
switch is on back panel of CAM) the front panel, H. Place the "High Voltage" switch (located on upper left corner) to the "ON" position. Time: _
I. Wait approximately 30 minutes. After approximately 30 minutes the amber light should turn off and the rate meters should begin to respond. IF the CAM does not respond as expected, THEN request RP to provide air monitoring.
east door of the
IFORM TITLE:FOMNWAG 015-05-0 1903.065A TSC ACTIVATION CHECKLIST
Page 57 of 65 Page 2 of 3 at the north end of the west "6. Place the frisking station stanchion hallway. (Station 28)
Obtain the frisker from the kit and place on the frisking station
- 7. and set the stanchion. Perform a battery check of the instrument scale (i.e., Xl scale for RM-14).
monitor on the lowest usable personnel to the west hallway.
- a. Hang the signs provided to direct on the frisking station stanchion (Signs and chains are hanging as to which station they are to be located.)
and are labeled Director.
- 9. Submit this completed form to the TSC TECHNICAL SUPPORT CENTER LEGEND
- 1. TSC Switchboard Operator
- 2. Health Physics Network (HPN) telephone
- 3. EAL Reviewer
- 4. TSC Director
- 5. Radiation Protection and Radwaste Manager
- 6. Maintenance Manager
- 7. problems Solutions Board
- 8. TSC Notifications Communicator
- 9. NRC Management Counterpart Link
- 10. Engineering Manager
- i. Deleted
- 12. TSC Support Superintendent
- 13. Emergency Notification System (ENS)
- 14. Operations Manager
- 15. Deleted
- 16. TSC Status Board
- 17. Card Reader
- 18. TSC Emergency Kit
- 19. SPDS
- 20. RDACS
- 21. NRC Local Area Network - (Wall Jack)
- 22. NRC Reactor Safety Counterpart Link
- 23. NRC Protective Measures Counterpart Link
- 24. Team Tracking Board
- 25. Computerized Notification System (CNS)
- 26. Emergency Key Box
- 27. Staffing Board
- 28. Frisking Station
- 30. Operations Support (CAM)
- 31. Storage location for Continuous Air Monitor the actual location (CAM) - This is a general location,
- 32. Continuous Air Monitor during drills and emergencies may vary.
the location of the The letter designations on the TSC layout represent Each sign has a corresponding locator to ensure proper hanging signs.
placement.
A= ANO TELEPHONE STATION
- = NRC TELEPHONE STATION FORM NO. CHMANGE FORM TITLE: 1903.065A 015-05-0 "TSCACTIVATION CHECKLIST
Page 58 of 65 Page 3 of 3 TSC Layout To TSC)
(NRC Office Space Provided Adjacent Stairwell Stairwell Breakroom ' _ __,
C D E F
A I Bathroom B Bathroom 31 Elevator! _
28 32] Library 17 21 24 7
0 Page 59 of 65 Page 1 of 2 Initials TSC.
- 2. Notify the EOF Maintenance Coordinator is being relocated and that Room 260 should be setup.
TSC staff a floor diagram of the Secondary TSC.
See page 2 of this form for to the Secondary TSC to
- 3. Ensure that a Communicator is dispatched in preparing Room 260.
aid the EOF Maintenance Coordinator for additional details
- 4. Refer to Procedure 1903.030, "Evacuation" relating to evacuation of the TSC.
- 5. Submit this completed form to the TSC Director.
FORM NO. j CHANGE IFORM NO. ICH NNGE "FORMTITLE: 1903.065C0 015-05-0 SECONDARY TSC ACTIVATION CHECKLIST I I
Page 60 of 65 Page 2 of 2 CENTER - ROOM 260 (EOF)
SECONDARY TECHNICAL SUPPORT 9
D 10 11 A
LEGEND
- 1. Secondary TSC Telephone Operator
- 2. TSC Director
- 3. NRC Operations Coordinator/Reactor Safety Coordinator
- 4. Maintenance Manager
- 5. RP&RW Manager
- 6. TSCD Administrative Assistant
- 7. NRC Containment-Specialist
- 8. Engineering Manager
- 9. Command and Control Board
- 10. Plant Status Board
- 11. NRC Reactor Safety Specialist
- 12. Operations Manager
U = TELEPHONE STATION (NRC)
I FORM TITLE: SECONDARY TSC ACTIVATION CHECKLIST 1903.065C FORM NO. 015-05-0 CHANGE
Page 61 of 65 Page I of 3 Date: Time:
"1. Date and Time of Status Update:
(Check as reviewed):
- 2. Engineering Manager Update Items operational status A. Reactor health, core cooling systems prognosis B. _ Containment status, current trends, and objectives, priorities, C. _ Review of accident mitigation -
strategies in progress D. Status of engineering evaluations in response to OSC and Control Room E. Status of support given Requests F. Engineering support available G. Problem areas needi.ng resolution Notes:
(check as reviewed):
- 3. Maintenance Manager Update Items A. Plant equipment problems or malfunctions efforts in progress B. _ Status of repair and damage control repair or delays experienced in equipment C. Problems P
agencies or consultants giving assistance in repair and D. _ Offsite damage control E. Problem areas needing resolution Notes:
Operations Manager Update Items (check as reviewed):
4.
based on plant conditions A. Review of Emergency Class declared of the affected unit B. Significant items from the SS entered or exited abnormal operating procedures C. Emergency and/or plant equipment and status, trends, and forecasts of D. Operational O
systems affect the plant E. Planned future operations that could providing assistance in the F. Offsite agencies or consultants recovery of the plant G. Problem areas needing resolution H. EAL's I. EAL Upgrades Notes:
CHANGE FORM NO.
1903.065D 015-05-0 "TSCDIRECTOR STATUS UPDATE GUIDE
Page 62 of 65 Page 2 of 3 Update Items (check as reviewed)
"Radiation Protection and Radwaste Manager A. Radiological release data available.
-. Is release source secure?
- 2. Is release from plant secure?
secured.
- 3. Update TSCD if one or both have been B. Control Room \OSC\TSC habitability repair \ recovery effort C. On-site radiological conditions affecting etc contamination, D. Personnel exposure status, overexposure, \ recovery radiation exposure of repair E. Plans for keeping achievable.
personnel as low as reasonably support the recovery effort F. Decontamination work necessary to in progress G. Radwaste processing and monitoring the plant environment H. _ Planned evolutions that could affect Problem areas needing resolution.
I. _
page if an offsite release J. _ Ensure announcement is made via plant has occurred.
Notes:
Superintendent Update Items (check as reviewed):
- 6. TSC Support support requested by the A. Status of technical and/or administrative TSC, OSC, or Control Room from the TSC
_. Offsite communications (transmissions in progress)
(if plant evacuation C. Status of initial\continuous accountability has occurred)
D. Security activities in support of emergency response E. Problem areas needing resolution Notes:
- 7. TSC Director Update Items (check as reviewed):
basis A. Current Emergency Class declared and the protective measures in effect (or planned)
B. On-site and their priorities C. Overall accident mitigation objectives Significant items from the EOF Director D. _
E. _ Significant items from the OSC Director F. Problem P areas needing resolution G. Is release source secure?
H. Is release from plant secure?
Notes:
FORM NO. CHANGE FORM TITLE:
1903.065D 015-05-0
"* - TSC DIRECTOR STATUS UPDATE GUIDE
Page 63 of 65 Page 3 of 3 (NRC, etc.) Update Items (list as reviewed):
"8. Other Organizations A.
B.
C.
D.
E.
their subordinates with applicable
- 9. Direct key TSC personnel to update information obtained in the status update.
Update and announce it in the Technical
- 10. Select the time of the next TSC Status Support Center.
Director on:
I!. Conduct periodic updates with the OSC
- 1) Status of in-plant response a) Priority code 1 mission status and prognosis b) Actual in-plant radiological conditions c) Nuclear chemistry status as appropriate OSC Director regarding
- 2) Provide direction and oversight to the rescue/repair and damage control operations S3) OSC manpower status Director on:
- 12. Conduct periodic updates with the EOF
- 1) Status of in-plant response a) Status of in-plant response b) Nuclear chemistry data as appropriate c) Recommendations regarding Emergency Classifications
- 2) TSC manpower status NOTE Items Items on these lists are suggested topics for routine updates.
based on existing or projected actually selected for update should be conditions.
FORM TITLE FORM NO. TCHANGE 1903.065D 015-05-0 "TSCDIRECTOR STATUS UPDATE GUIDE
Page 64 of 65 TSC POSITION STAFFING FORM NAME POSITION TSC DIRECTOR OPERATIONS MANAGER ENGINEERING MANAGER MAINTENANCE MANAGER R.P. & R.W. MANAGER NOTIFICATIONS COMMUNICATOR TSC SUPPORT SUPERINTENDENT AFFECTED CONTROL ROOM Complete the above by listing the names of the ERO personnel staffing the above at FAX positions. FAX this form immediately to the EOF Support Superintendent Number 6957.
Date Time Completed by IFORMTITLE: TSC POSITION STAFFING FORM FORM NO.
1903.065E OHA 015-05-0
Page 65 of 65 Critical Tasks Alert DECLARATION TIME:
Required Site Area Emer2encv DECLARATION TIME:
Required Completion Time Completion Time ED&C transferred from Control Room Must be transferred within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of declaration time.
TSC Operable Must be operable within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of declaration time.
Plant Evacuation Announcement Must be performed within 15 minutes of the SAE declaration time.
Initial Accountabilitx Must be complete within 30 minutes of the SAE declaration.
General Emergency DECLARATION TIME:
Required Completion Time Completion Time ED&C transferred from Control Room Must be transferred within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of declaration time.
TSC Operable Must be operable within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of declaration time.
Plant Evacuation Announcement Must be performed within 15 minutes of the GE declaration time.
Initial Accountability Must be complete within 30 minutes of the GE declaration.
Exclusion Area Evacuation N/A N/A No time clock.
FORM NO. CHANGE I
I FORM TITLE:
TSC CRITICAL TASKS 1903.065F 015-05-0