Ltr, Extension Request for Special Nuclear Material Balance Reports
ML020530466
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/01/2002
From: Donohew J
NRC/NRR/DLPM/LPD4
To: Overbeck G
Arizona Public Service Co
Donohew J N, NRR/DLPM,415-1307
References
Download: ML020530466 (4)


Text

March 1, 2002 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

EXTENSION REQUEST FOR SPECIAL NUCLEAR MATERIAL BALANCE REPORTS

Dear Mr. Overbeck:

By letter dated January 17, 2002, you requested approval to delay submitting the special nuclear material (SNM) balance reports for 2002 that are required by 10 CFR 70.53(a)(1) and 10 CFR 74.13(a)(1) for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. These regulations require licensees to compile such reports as of March 31 and September 30, of each year, and to submit these reports within 30 days of these dates. However, the regulation in 10 CFR 74.13(a)(1) contains the provision that [t]he Commission may permit a licensee to submit the reports at other times when good cause is shown.

In your letter, you stated that the SNM balance reports for the Palo Verde units are required to be submitted during the period when the refueling outages for the Palo Verde units usually occurs. You requested that the delay in submitting the reports for March 31 and September of this year be delayed by 30 days (i.e., submit the reports 60 days after the March 31 and September 30 dates in the regulations) because there are refueling outages in the March-April and September-October periods of each year, and the Nuclear Fuel Management personnel who compile these reports are usually also involved in the refueling outages.

The Nuclear Regulatory Commission (NRC) staff has reviewed your generic request for the year 2002 and concludes that good cause has been shown for delaying, by an additional 30 days, the submittal of the SNM balance reports for March 31 and September 30, 2002, which are due on April 30 and October 30, 2002, respectively. Therefore, the NRC staff finds acceptable the request to delay until (1) May 30, 2002, the submittal of the report due April 30, 2002, and (2) November 29, 2002, the submittal of the report due October 30, 2002. Previously the NRC has approved similar requests from you for a 30-day delay in the submittal of these reports in our letters of October 27, 2000, and March 14, 2001. As stated in your letter, there is an effort to revise the reporting requirements in 10 CFR 70.53(a)(1) and 10 CFR 74.13(a)(1) to annually, and the SNM balance reporting requirement in the regulations may be changed for 2003 and beyond.

G. Overbeck If you have any questions concerning this letter, please contact me at 301-415-1307, or through the internet at jnd@nrc.gov.

Sincerely,

/RA/

Jack N. Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: STN 50-528, STN 50-529, and STN 50-530 cc: See next page

G. Overbeck If you have any questions concerning this letter, please contact me at 301-415-1307, or through the internet at jnd@nrc.gov.

Sincerely,

/RA/

Jack N. Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: STN 50-528, STN 50-529, and STN 50-530 cc: See next page DISTRIBUTION PUBLIC PDIV-2 r/f RidsNrrDlpmLpdiv(SRichards)

RidsNrrDlpmLpdiv-2(SDembek)

RidsNrrPMJDonohew RidsNrrLAMMcAllister RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn4MailCenter (L. Smith, L. Hurley, D. Bujol)

SMorris RNelson ACCESSION NO: ML020530466 OFFICE PDIV-2/PM PDIV-D/LA NMSS/FCSS/SSSB PDIV-2/SC NAME JDonohew:as MMcAllister RNelson SDembek DATE 2/26/2002 2/25/02 2/27/02 3/1/2002 OFFICIAL RECORD COPY

August 2001 Palo Verde Generating Station, Units 1, 2, and 3 cc:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Mr. Craig K. Seaman, Director Regulatory Affairs Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, AZ 85004 Mr. David Summers Public Service Company of New Mexico 414 Silver SW, #1206 Albuquerque, NM 87102 Mr. Jarlath Curran Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Terry Bassham, Esq.

General Counsel El Paso Electric Company 123 W. Mills El Paso, TX 79901 Mr. John Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100