February 8, 2002 Mr. L. W. Myers Senior Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NO. 2 (BVPS-2) - UPCOMING STEAM GENERATOR TUBE INSERVICE INSPECTION (TAC NO. MB3906)

Dear Mr. Myers:

Inservice inspections of steam generator (SG) tubes play a vital role in assuring that adequate structural integrity of the tubes is maintained. As required by the plant Technical Specifications (TSs), reporting requirements range from submitting a special report, within 15 days following completion of each inservice inspection of SG tubes, that identifies the number of tubes plugged and/or repaired; to submitting a special report, within 12 months following completion of the inspection, that provides complete results of the SG tube inservice inspection. The special report containing the complete results shall include the following:

1. Number and extent of tubes inspected.
2. Location and percent of wall-thickness penetration for each indication of an imperfection.
3. Identification of tubes plugged and/or repaired.

A phone conference has been arranged with members of your staff to discuss the ongoing results of the SG tube inspections to be conducted during the upcoming BVPS-2 refueling outage. It was agreed with your staff that this phone call would occur after the majority of the tubes have been inspected, but before the SG inspection activities have been completed.

Enclosed is a list of discussion points to facilitate this phone conference.

The staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.

L. Myers Please contact me if you have any questions or suggestions regarding this issue. Thank you for your support in this area.

Sincerely,

/RA/

Daniel S. Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-412

Enclosure:

List of Discussion Points cc w/encl: See next page

L. Myers Please contact me if you have any questions or suggestions regarding this issue. Thank you for your support in this area.

Sincerely,

/RA/

Daniel S. Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-412

Enclosure:

List of Discussion Points cc w/encl: See next page DISTRIBUTION:

PUBLIC PDI-1 R/F DKern, R-I JRogge, R-I OGC EAdensam ACRS ALLund BPlatchek, R-I JMunday RHaag DCollins MOBrien KKarwoski Accession No. ML020350103

  • See previous concurrence OFFICE PDI-1/PM PDI-2/LA EMCB/SC PDI-1/(A)SC NAME DCollins MOBrien ALLund*

JMunday DATE 2/7/02 2/7/02 02/07/02 2/7/02 OFFICIAL RECORD COPY

Enclosure STEAM GENERATOR TUBE INSPECTION DISCUSSION POINTS PREPARED BY THE OFFICE OF NUCLEAR REACTOR REGULATION FIRSTENERGY NUCLEAR OPERATING COMPANY, ET AL.,

BEAVER VALLEY POWER STATION, UNIT NO. 2 (BVPS-2)

DOCKET NO. 50-412 A phone call between the NRC and the licensees staff has been scheduled to occur towards the end of the planned BVPS-2 Steam Generator (SG) tube inspection interval, but before BVPS-2 exits its refueling outage. The following discussion points have been prepared to facilitate the phone conference and to discuss the available results of the SG tube inspections.

The NRC staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.

1.

Discuss whether any primary-to-secondary leakage existed in this unit prior to shutdown.

2.

Discuss the results of secondary side hydrostatic tests.

3.

For each SG, provide a general description of areas examined, including the expansion criteria utilized and type of probe used in each area.

4.

For analyzed eddy current results, describe bobbin indications (those not examined with rotating pancake coil (RPC)) and RPC/Plus Point/Cecco indications. Include the following information in the discussion: location, number, degradation mode, disposition, and voltages/depths/lengths of significant indications.

5.

Describe repair/plugging plans for the SG tubes that meet the repair/plugging criteria.

6.

Discuss the previous history of SG tube inspection results, including any "look backs" performed.

7.

Discuss, in general, the new inspection findings.

8.

Discuss your use or reliance on the X-probe, if applicable.

9.

Describe in-situ pressure test plans and results, if applicable and available, including tube selection criteria.

10.

Describe tube pull plans and preliminary results, if applicable and available; include tube selection criteria.

11.

Discuss the assessment of tube integrity for the previous operating cycle.

12.

Discuss the assessment of tube integrity for next operating cycle.

13.

Provide the schedule for SG-related activities during the remainder of the current outage.

14.

Discuss what steps have been taken, or will be taken, in response to the lessons learned from the Indian Point Unit 2 tube failure. In addition, please be prepared to discuss the following:

a) Discuss the actions that are taken in response to identifying a new degradation mechanism, and b) Discuss the actions taken to ensure that data noise levels are acceptable, and c) Address data quality issues and the need for criteria to address data quality.

Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs Section Thomas S. Cosgrove, Manager (2 Copies)

Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 L. W. Pearce, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Bureau of Radiation Protection ATTN: Larry Ryan P O Box 2063 Harrisburg, PA 17120 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. E. Donnellon, Director Projects and Scheduling (BV-IPAB)

Post Office Box 4 Shippingport, PA 15077 Mr. J. A. Hultz, Manager Projects & Support Services FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077