Information Provided by Virginia Electric and Power Company During the NRC Site Audits in Relation to the License Renewal Applications for the Surry and North Anna Power Stations, Units 1 and 2
ML020180099
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 01/17/2002
From: Kugler A
Division of Regulatory Improvement Programs
To:
Division of Regulatory Improvement Programs
Kugler A, NRR/DRIP/RLEP, 415-2828
References
TAC MB1992, TAC MB1993, TAC MB1994, TAC MB1995
Download: ML020180099 (3)


Text

January 17, 2002 NOTE TO:

File FROM:

Andrew J. Kugler, Sr. Environmental Project Manager /s/AJKugler Environmental Section License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation.

SUBJECT:

INFORMATION PROVIDED BY VIRGINIA ELECTRIC AND POWER COMPANY DURING THE NRC SITE AUDITS IN RELATION TO THE LICENSE RENEWAL APPLICATIONS FOR THE SURRY AND NORTH ANNA POWER STATIONS, UNITS 1 AND 2 (TAC NOS. MB1992, MB1993, MB1994 AND MB1995)

The Virginia Electric and Power Company (VEPCo, or the licensee) provided the attached documents to the NRC staff in response to staff requests made during site audits at the Surry and North Anna Power Stations, Units 1 and 2. The documents are:

1.

Cultural Resources Assessment, Surry Power Station, March 2001 2.

Chippokes Plantation State Park Master Plan Executive Summary, December 1999 3.

Cultural Resources Assessment, North Anna Power Station, March 2001 4.

Cultural Resources Assessment Addendum, North Anna Power Station, October 2001 5.

Vitello-Lipid and Vitello-Protein Deposition in Environmentally Stressed and Non-Stressed Populations of Morone Saxatilis (Striped Bass), Thesis by David Van Grimes, August 1990 6.

An Ecological Investigation of the Lower North Anna and Upper Pamunkey River System, James R. Reed, Jr., and George M. Simmons, Jr., January 18, 1972 Because the staff may rely on some of this information in its environmental review of VEPCos application for renewal of the Surry and North Anna licenses, this information is being docketed and made publicly available. Please note that, for the protection of the potential historical resources identified, the figures were not included in the Cultural Resources Assessments and Addendum for the Surry and North Anna Power Stations provided to the NRC by VEPCo.

Docket Nos. 50-280, 50-281, 50-338 and 50-339 Attachments: As stated

January 17, 2002 NOTE TO:

File FROM:

Andrew J. Kugler, Sr. Environmental Project Manager /s/AJKugler Environmental Section License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation.

SUBJECT:

INFORMATION PROVIDED BY VIRGINIA ELECTRIC AND POWER COMPANY DURING THE NRC SITE AUDITS IN RELATION TO THE LICENSE RENEWAL APPLICATIONS FOR THE SURRY AND NORTH ANNA POWER STATIONS, UNITS 1 AND 2 (TAC NOS. MB1992, MB1993, MB1994 AND MB1995)

The Virginia Electric and Power Company (VEPCo, or the licensee) provided the attached documents to the NRC staff in response to staff requests made during site audits at the Surry and North Anna Power Stations, Units 1 and 2. The documents are:

1.

Cultural Resources Assessment, Surry Power Station, March 2001 2.

Chippokes Plantation State Park Master Plan Executive Summary, December 1999 3.

Cultural Resources Assessment, North Anna Power Station, March 2001 4.

Cultural Resources Assessment Addendum, North Anna Power Station, October 2001 5.

Vitello-Lipid and Vitello-Protein Deposition in Environmentally Stressed and Non-Stressed Populations of Morone Saxatilis (Striped Bass), Thesis by David Van Grimes, August 1990 6.

An Ecological Investigation of the Lower North Anna and Upper Pamunkey River System, James R. Reed, Jr., and George M. Simmons, Jr., January 18, 1972 Because the staff may rely on some of this information in its environmental review of VEPCos application for renewal of the Surry and North Anna licenses, this information is being docketed and made publicly available. Please note that, for the protection of the potential historical resources identified, the figures were not included in the Cultural Resources Assessments and Addendum for the Surry and North Anna Power Stations provided to the NRC by VEPCo.

Docket Nos. 50-280, 50-281, 50-338 and 50-339 Attachments: As stated DISTRIBUTION:

Environmental R/F AKugler EHickey (PNNL)

  • See previous concurrence - Note see next page: For Accessions nos.

DOCUMENT NAME: G:\\RGEB\\North Anna-Surry\\North Anna\\RAIs\\Docketing note 2.wpd OFFICE PM:RLEP NAME AKugler*

DATE 01/17/02 OFFICIAL FILE COPY

1.

Note to: File, Accession no.: ML020180099 2.

Package, Accession no.: ML020180119 3.

Att. 1-Cultural Resources Assessment, Surry Power Station, March 2001 - Accession no.:

ML020160090 4.

Att. 2-Chippokes Plantation State Park Master Plan Executive Summary, December 1999

- Accession no.: ML020160083 5.

Att.3-Cultural Resources Assessment, North Anna Power Station, March 2001 - Accession no.: ML020160087 6.

Att. 4-Cultural Resources Assessment Addendum, North Anna Power Station, October 2001 - Accession no.: ML020160094 7.

Att. 5-Vitello-Lipid and Vitello-Protein Deposition in Environmentally Stressed and Non-Stressed Populations of Morone Saxatilis (Striped Bass), Thesis By David Van Grimes, August 1990 - Accession no.: ML020150043 8.

Att. 6-An Ecological Investigation of the Lower North Anna and Upper Pamunkey River System, James R. Reed, Jr., and George M. Simmons, Jr., January 18, 1972 - Accession no.: ML020150071